Proceedings of the Board of Regents (1963-1966)

JUNE MEETING, 1966 1547 the Bonds and, specifically and unqualifiedly, the Bonds then being delivered to the Government. SECTION 10. CONSTRUCTION FINANCING. The Borrower shall make every effort to obtain interim financing from private sources. Prior to entering into formal agreements for such financing, the Borrower shall furnish the Government with (1) a satisfactory preliminary opinion of bond counsel; (2) evidence of its ability to finance on reasonable terms the cost of the Project up to the time the Bonds are ready for delivery; and (3) evidence of the receipt of firm bids establishing that the Project can be constructed within the approved estimated cost thereof. In the event any loan under temporary financing should become due prior to the time when the Bonds are ready for delivery, the Borrower may apply to and, provided that the Borrower is in compliance with the Terms and Conditions of this Loan Agreement, receive from the Government an advance against the Bonds in an amount sufficient to liquidate such temporary loan. Should the Borrower be able to demonstrate to the Government's satisfaction that interim financing on reasonable terms is not available, the Government will consider requests for advances in anticipation of the issuance of the Bonds. Requisitions for construction advances shall be accompanied by such supporting data as the Government may require. The Government will honor such requisitions in amounts and at times deemed by it to be proper. Any funds made available to the Borrower by the Government pursuant to this Section shall be repaid in full from the first proceeds derived from the sale of the Bonds, and shall bear interest at the rate specified for the Bonds in the Loan Agreement from the date made available to the date of repayment. SECTION 11. PREREQUISITES TO LOAN DISBURSEMENTS. Prior to the Government disbursing any portion of the loan proceeds, the Borrower shall present satisfactory evidence that: (a) It is able to provide the furnishings and movable equipment required for the operation of the Project, as specified in Section 3 hereof; (b) It has deposited in the Construction Account such funds as are necessary with the loan proceeds to assure completion of the Project; and (c) It is able to provide the Project site or sites free from all encumbrances. SECTION 12. CONSTRUCTION ACCOUNT. The Borrower shall set up in a bank or banks which are members of the Federal Deposit Insurance Corporation, or with the fiscal agency of the Borrower fixed by law, a separate account or accounts (herein collectively called the "Construction Account") into which shall be deposited any temporary loans, Government advances, and proceeds from the sale of the Bonds (except accrued interest payments), and the additional funds, if any, required by the provisions of the Loan Agreement to be furnished by the Borrower in order to assure the payment of all Project Costs. Moneys in the Construction Account shall be expended only for such purposes as

/ 1600
Pages

Actions

file_download Download Options Download this page PDF - Pages 1547-1549 Image - Page 1547 Plain Text - Page 1547

About this Item

Title
Proceedings of the Board of Regents (1963-1966)
Author
University of Michigan. Board of Regents.
Canvas
Page 1547
Publication
Ann Arbor :: The University,
1915-
Subject terms
University of Michigan. -- Board of Regents -- Periodicals.

Technical Details

Link to this Item
https://name.umdl.umich.edu/acw7513.1963.001
Link to this scan
https://quod.lib.umich.edu/u/umregproc/acw7513.1963.001/1591

Rights and Permissions

These materials have been dedicated to the public domain using the Creative Commons Public Domain Dedication at https://creativecommons.org/publicdomain/zero/1.0/legalcode. To the extent possible under the law, the Regents of the University of Michigan have waived all copyright and related or neighboring rights to them. If you have questions about the collection, please contact Digital Content and Collections at [email protected].

Manifest
https://quod.lib.umich.edu/cgi/t/text/api/manifest/umregproc:acw7513.1963.001

Cite this Item

Full citation
"Proceedings of the Board of Regents (1963-1966)." In the digital collection University of Michigan, Proceedings of the Board of Regents. https://name.umdl.umich.edu/acw7513.1963.001. University of Michigan Library Digital Collections. Accessed June 22, 2025.
Do you have questions about this content? Need to report a problem? Please contact us.