Cadillac Motor Car Company, Sales and Service Building and Addition, Job No. 900, 900-A & 900-E, York Street and Cass Avenue, Detroit, Michigan 1919-1926
Cadillac Sales & Service Building (Job No. 900)
Construction Drawings
Architectural Drawings, except as noted 5/22/1919
(blue prints, 28x35 inches)
Drawer 29
Folder 12
First Floor Plan (3) revised 7/29/1919
Drawer 29
Folder 12
Second Floor Plan (4)
(undated due to paper damage)
Drawer 29
Folder 12
Third Floor Plan (5) revised 7/29/1919
Drawer 29
Folder 12
Typical Floor Plan (6) revised 7/29/1919
Drawer 29
Folder 12
Sixth Floor Plan and Details of First Story Windows, York Street Elevation (7) revised 7/29/1919
Drawer 29
Folder 12
Roof and Pent House Roof Plans and Details of Monitor and Flagpole (8) revised 7/29/1919
Drawer 29
Folder 12
Cass Avenue (East) Elevation (9)
Drawer 29
Folder 12
York Street (South) Elevation (10)
Drawer 29
Folder 12
North Elevation and Details of Used Car Room (11) revised 7/29/1919
Drawer 29
Folder 12
West Elevation and Details of Steel Sash Partitions (12) revised 7/29/1919
Details of Main Entrance, West Grand Boulevard (29) revised 9/2/1919
(sepia print)
Drawer 12
Folder 7
Details of Main Entrance (30) revised 9/2/1919
Drawer 12
Folder 7
Details of First Story Windows (31) revised 2/24/1920
Drawer 12
Folder 7
Details of Entrances to Shops on Grand Boulevard and Second and Cass Avenues (32) revised 6/10/1920
Drawer 12
Folder 8
Details of Typical Window Frames and Typical Walls and Spandrels (33) revised 1/3/1922
Drawer 12
Folder 8
Basement Plan, East Half, Future Arrangement (34)
(undated due to linen damage)
Drawer 12
Folder 8
Wall Sections (34-R) revised 1/3/1922
Drawer 12
Folder 8
Details of Fourteenth and Fifteenth Stories (35) revised 1/3/1922
Drawer 12
Folder 8
Details of Laboratory Entrance Portico, Milwaukee Street Elevation (36) revised 1/3/1922
Drawer 12
Folder 8
Details of Laboratory, Milwaukee Street Elevation (37) revised 7/9/1920
Drawer 12
Folder 8
Details of Laboratory Entrance Steps, Milwaukee Street Elevation (38) revised 7/9/1920
Drawer 12
Folder 8
Detail of Typical Bay for Laboratory (39)
(undated due to linen damage)
Drawer 12
Folder 8
Details of Connection between Laboratory and Office Building (40) revised 1/3/1922
Drawer 12
Folder 8
Foundation Plan of Stairs, Elevators, etc. of Laboratory Building, Footing Plan of Exterior Columns and Area Walls, and Sections thru' Columns at Basement Floor (41) revised 5/10/1920
Drawer 12
Folder 8
Basement and First Floor Plans of Laboratory Building (42) revised 1/3/1922
Drawer 12
Folder 8
Mezzanine and Second Floor Plans of Laboratory Building (43) revised 1/3/1922
Drawer 12
Folder 8
Plans of Third Floor, Pent Houses at Fifth Floor and North Wall at Fourth Floor of Laboratory Building (44) revised 1/3/1922
Drawer 12
Folder 8
Detail Sections of Elevators L-1 to L-4 and Stairs # 9 (45) revised 1/3/1922
Drawer 12
Folder 8
Cross-Section thru' Laboratory at Fourth Floor, Typical Elevation of Half-Bay and Sections "T-T" and "U-U" thru' Fresh Air Intake and Shaft (46) revised 1/3/1922
Drawer 12
Folder 8
Plans of Stairs # 1 at Basement through Fourth Floors and at East Entrance (47) revised 6/10/1920
Drawer 12
Folder 8
Plans of Stairs # 1 at Eleventh through Fifteenth Floors (48-R) 1/2/1920, revised 9/3/1920
Drawer 12
Folder 9
Details of Elevators "A" to "M" & "Z" and Stairs # 7 & 8 (49) revised 6/10/1920
Drawer 12
Folder 9
Basement Plan of Elevators and Lobby and Details of Freight Elevators (50) revised 7/1920
Drawer 12
Folder 9
Detail Plans of Stairs # 8 & 12 and Elevators "A" to "M" & "W" to "Z" (51) revised 9/1/1920
Drawer 12
Folder 9
Details of Elevators "A" to "M" and Stairs # 2 (52) revised 9/1/1920
Drawer 12
Folder 9
Details of Elevators and Stairs (53) revised 1/3/1922
Drawer 12
Folder 9
Detail Plans of Stairs # 2, 5 & 15 and Elevators "A" to "M" & "Z" (54) revised 6/23/1920
Drawer 12
Folder 9
Plan of Pent House, Plan at Pipe Space and Details of Stairs (55) revised 1/3/1922
Plan of Sub-Basement and Machine Room (65) 9/9/1919, revised 1/3/1922
Drawer 12
Folder 10
Details of Laboratory Flues (66) 11/12/1919, revised 5/10/1920
Drawer 12
Folder 10
Sections "C-C" and "D-D" thru' Stair # 1 and Elevations and Details for Toilets (67) 1/2/1920, revised 1/3/1922
Drawer 12
Folder 10
Revised Marble and Plaster Work in Stairs # 3 & 4 and Lobbies # 104 & 105 (68) 1/2/1920, revised 2/17/1920
Drawer 12
Folder 10
Detail Sections thru' Stairs # 10 and Lobby # 210, Showing Revised Finish of Plaster and Marble Wainscot (70) 1/3/1920, revised 1/3/1922
Drawer 12
Folder 10
Details of Air Shaft and Revised Details Showing New Location of Two-Part Sliding Doors to Office Building from Driveway (71) 1/6/1920
Drawer 12
Folder 10
Details of West End of Driveway (72) revised 12/11/1920
Drawer 12
Folder 10
Details of Driveway at East End of Building (73) 1/20/1920, revised 12/11/1920
Drawer 12
Folder 10
Details of Doors in Basement (74) 5/11/1920, revised 7/26/1920
Drawer 12
Folder 10
Details of Mailing Room, Monorail and Men Janitors' Locker Room # 5-C (75) 5/11/1920, revised 1/3/1922
Drawer 12
Folder 10
Details of Women's Toilet Room # 21, Toilets # M-8, M-9 & M-13, and Utility Space (76) revised 1/3/1922
Drawer 12
Folder 10
Plan of Mezzanine Floor Utilities Space and Miscellaneous Details (77) revised 1/3/1922
Drawer 12
Folder 10
Basement Plan for Telephone Conduit Layout (78) undated
Drawer 12
Folder 10
Revisions to Stairs # 8 between Sub-Basement and First Floor and Details of Stairs # 5 (270 & 274) 3/30/1920, revised 7/23/1920
Structural Drawings
(Ink-on-linen drawings with pencil notations, 37-1/2x47 to 36-1/4x48 inches)
Drawer 12
Folder 11
Column Schedule (1-S) revised 9/2/1919
Drawer 12
Folder 11
Column Schedule (2-S) revised 9/2/1919
Drawer 12
Folder 11
Details of Columns (3-S) 8/11/1919
Drawer 12
Folder 11
Half Framing Plan of First Floor (4-S) 9/22/1919
Drawer 12
Folder 11
Half Framing Plan of Mezzanine Floor revised 9/22/1919
(not numbered due to linen damage)
Drawer 12
Folder 11
Half Framing Plan of Second Floor (6-S) revised 9/9/1919
Drawer 12
Folder 11
Third Floor Framing Plan (7-S) revised 9/2/1919
Drawer 12
Folder 11
Typical Floor Half Framing Plan of Fourth to Eleventh Floors (8-S) 6/28/1919, revised 9/10/1919
Drawer 12
Folder 11
Plan of Framing Adjoining Laboratory at First Floor of Laboratory (9-S) 6/28/1919, revised 9/13/1919
Drawer 12
Folder 11
Half Framing Plan of Twelfth and Thirteenth Floors (10-S) 7/1/1919, revised 8/2/1919
Drawer 12
Folder 11
Half Framing Plan of Fourteenth Floor (11-S) 8/1/1919
Drawer 12
Folder 11
Half Framing Plan of Fifteenth Floor (12-S) revised 9/2/1919
Drawer 12
Folder 11
Half Framing Plan of Pipe Gallery
(not numbered or dated due to linen damage)
Drawer 12
Folder 11
Half Framing Plan of Roof (14-S) revised 9/15/1919
Drawer 12
Folder 11
Wind Bracing Details (15-S) revised 9/6/1919
Drawer 13
Folder 1
Girder Details (16-S) revised 8/6/1919
Drawer 13
Folder 1
Details of Girders and Trusses (17-S) revised 9/23/1919
Drawer 13
Folder 1
Penthouse Roof Plan and Truss Details (18-S) revised 9/16/1919
Drawer 13
Folder 1
Framing Plan of Ground, First, Second and Forty-Third Floors of Laboratory (19-S) revised 9/24/1919
Drawer 13
Folder 1
Framing Plan of Fourth Floor and Penthouses (20-S) 8/2/1919, revised 10/16/1919
Drawer 13
Folder 1
Beam Schedule for Laboratory Building 10/17/1919
(not numbered due to linen damage)
Drawer 13
Folder 1
Details of Trusses for Laboratoy (22-S) 8/1/1919, revised 8/15/1919
Drawer 13
Folder 1
Footing Schedule 8/8/1919, revised 10/8/1919
(not numbered due to linen damage)
Drawer 13
Folder 1
Details of Retaining Walls of Main Building (24-S) undated
Drawer 13
Folder 1
Details of Retaining Walls around Sub-Basement (25-S) revised 10/15/1919
Drawer 13
Folder 1
Details of Men's and Women's Swimming Pools (26-S) undated
Drawer 13
Folder 1
Details of Trusses (27-S)
(undated due to linen damage)
Drawer 13
Folder 1
Column Schedule (28-S)
(undated due to linen damage)
Drawer 13
Folder 1
Details of Roof and Pipe Gallery Framing
(not numbered or dated due to linen damage)
Structural "Sketches"
(Ink-on-linen drawings with pencil notations)
Drawer 13
Folder 2
Section thru' Vacuum Room of Laboratory Building (112-S) 9/9/1919, revised 9/15/1919
(12-1/2x22-3/4 inches)
Drawer 13
Folder 2
Plan and Revised Layout of Retaining Wall between Columns # 263 & 176A (113-S) 9/12/1919
(10-1/4x34 inches)
Drawer 13
Folder 2
Elevation of Retaining Walls at Driveways (114-S) 9/17/1919, revised 9/18/1919
(17x22 inches)
Drawer 13
Folder 2
Elevation Showing Location of Bolts for Beam Seats for Beams Connecting Laboratory with Durant Building (115-S) 9/29/1919, revised 10/13/1919
(15-1/4x37 inches)
Drawer 13
Folder 2
Elevation Showing Location of Bolts for Beam Seats for Beams Connecting Laboratory with Durant Building (117-S) 10/10/1919
(15-1/2x38-3/4 inches)
Drawer 13
Folder 2
Plan and Section of Proposed Walkway around Testing Machine Opening at Ground Floor Level-Laboratory Building (119-S) 1/10/1920
(14x22 inches)
Drawer 13
Folder 2
Elevation Showing Location of Bolts for Beam Seats for Beams Connecting Laboratory with Durant Building at Second Floor of Laboratory (120-S) 10/13/1919
(14-3/4x38-1/4 inches)
Drawer 13
Folder 2
Elevation Showing Location of Bolts for Beam Seats for Beams Connecting Laboratory with Durant Building at Third Floor of Laboratory (121-S) 10/15/1919
(15x38-1/2 inches)
Drawer 13
Folder 2
Details of Concrete Columns Supporting Steel Girders, Showing Base Plates and Anchor Bolts for Same-Laboratory Building (122-S) 10/21/1919
(13x26-1/4 inches)
Drawer 13
Folder 2
Details of Pipe Sleeves in Laboratory (124-S) 11/4/1919, revised 11/26/1919
(24-1/2x33-1/2 inches)
Drawer 13
Folder 2
Details of Instrument Tower-Laboratory Building (125-S) 11/12/1919
(26x32 inches)
Drawer 13
Folder 2
Plan and Section of Openings in Floors for Steam Risers (128-S) 12/3/1919
(15-1/2x20 inches)
Structural Drawings (cont)
(Black and red ink drawings on linen with pencil notations, 24-1/4x30 to 28x43-1/2 inches)
Drawer 13
Folder 3
Changes in Framing at Vents B and F (132-S) 1/19/1920, revised 4/22/1920
(Pencil-on-vellum drawing)
Drawer 13
Folder 3
Plans and Sections of Beams and Girders-Field Work, First and Second Floors (133-S) 1/19/1920, revised 2/20/1920
Drawer 13
Folder 3
Details of Brackets on Columns Supporting Girders and Trusses in Laboratory (136-S) 1/28/1920
Drawer 13
Folder 3
Details of Brackets Supporting Beams, Ground to Fourth Floors (139-S) 2/2/1920, revised 3/12/1920
Drawer 13
Folder 3
Details of Framing for Locker Rooms in Courts # 2 & 4 (140-S) 4/1/1920, revised 4/21/1920
Drawer 13
Folder 3
Details of Concrete Spandrels in Courts # 1 & 5 at Second Floor (141-S) 2/19/1920, revised 3/25/1920
Drawer 13
Folder 3
Details of Bracing for Girder G-36 (143-S) 3/22/1920
Drawer 13
Folder 3
Revised Details of Columns 77, 78 & 96-A at Fourteenth Floor, Elevator "A" (144-S) 4/21/1920
Drawer 13
Folder 3
Plan and Sections of Pit for Elevator "A" and Details of Pipe Chase in Sub-Basement (151-S) 4/20/1920
Drawer 13
Folder 3
Part Plans and Sections of Laboratory Floors over Openings for Tower and Machine Room (154-S) 4/15/1920
Drawer 13
Folder 3
Plans of Stairways # 17-20 (157-S) 4/26/1920, revised 10/6/1920
Drawer 13
Folder 3
Details of New Brackets on Columns 332 & X91-A (160-S) 4/29/1920, revised 5/7/1920
Drawer 13
Folder 3
Plans and Sections of Framing and Footings in Basement Truckway (161-S & 162-S) 5/11/1920, revised 5/22/1920
Drawer 13
Folder 3
Details of Floor over Vacuum Room Opening in Laboratory (165-S) 5/17/1920
Drawer 13
Folder 3
Record of Test Borings (188-S) 9/23/1920
Mechanical Drawings 8/12/1919
(Ink-on-linen drawings with pencil notations, 36x44-1/4 to 36-1/4x48 inches)
Drawer 13
Folder 4
Plot Plan revised 2/4/1920
(not numbered due to linen damage)
Drawer 13
Folder 4
Sub-Basement Plan, East Half (2-M) revised 12/6/1920
Drawer 13
Folder 4
Sub-Basement Plan, West Half (3-M) revised 12/27/1922
Drawer 13
Folder 4
Basement Plan, East Half (4-M) revised 5/23/1921
Drawer 13
Folder 4
Basement Plan, West Half (5-M) revised 8/17/1922
Drawer 13
Folder 4
First Floor Plan, East Half (6-M) revised 10/26/1921
Drawer 13
Folder 4
First Floor Plan, West Half (7-M) revised 8/17/1922
Drawer 13
Folder 4
Mezzanine Floor Plan, East Half (8-M) revised 5/23/1921
Drawer 13
Folder 4
Mezzanine Floor Plan, West Half (9-M) revised 2/24/1922
Drawer 13
Folder 4
Second Floor Plan, East Half (10-M) revised 6/16/1920
Drawer 13
Folder 4
Second Floor Plan, West Half (11-M) revised 8/6/1920
Drawer 13
Folder 4
Typical Floor Plan of Floors # 3 to 12, East Half (12-M) revised 6/16/1920
Drawer 13
Folder 4
Typical Floor Plan of Floors # 3 to 13, West Half (13-M) revised 6/18/1920
Drawer 13
Folder 5
Fourteenth Floor Plan, East Half (14-M) revised 5/2/1922
Drawer 13
Folder 5
Fourteenth Floor Plan, West Half (15-M) revised 9/8/1920
Drawer 13
Folder 5
Fifteenth Floor Plan, East Half (16-M) revised 5/2/1922
Drawer 13
Folder 5
Fifteenth Floor Plan, West Half (17-M) revised 6/11/1920
Drawer 13
Folder 5
Pipe Space Plan, East Half (18-M) revised 9/8/1920
Drawer 13
Folder 5
Pipe Space Plan, West Half (19-M) revised 8/5/1920
Drawer 13
Folder 5
Pent House Plan and Vent Riser Details (20-M) revised 8/5/1920
Sections Showing Concrete Work for Continuous Acetate Dryers (18-S) 5/3/1923, revised 9/17/1923
Drawer 24
Folder 13
Details of Miscellaneous Platforms and Supports (20-S) 4/2/1924
Mechanical and Electrical Drawings of Wood Distillation Plant by Albert Kahn Architect 10/1/1923
(ink-on-linen drawings with pencil notations, 31x40 inches)
Drawer 25
Folder 1
Plot Plan (1-M)
Drawer 25
Folder 1
Foundation Plan, Primary Stills (2-M)
Drawer 25
Folder 1
First Floor Plan, Primary Stills (3-M)
Drawer 25
Folder 1
Second Floor Plan, Primary Stills (4-M)
Drawer 25
Folder 1
Foundation, First Floor and Second Floor Plans, Refinery (5-M)
Drawer 25
Folder 1
Third, Fourth and Fifth Floor Plans, Refinery (6-M)
Drawer 25
Folder 1
Foundation Plan, Acetate Drying and Ethyl Acetate (7-M) revised 2/7/1924
Drawer 25
Folder 1
First Floor Plan, Acetate Drying and Ethyl Acetate (8-M) revised 2/7/1924
Drawer 25
Folder 1
Plan of Lower Floor of Driers and Mezzanine, Acetate Drying and Ethyl Acetate (9-M)
Drawer 25
Folder 1
Second Floor Plan, Acetate Drying and Ethyl Acetate (10-M) revised 2/7/1924
Drawer 25
Folder 1
Third Floor Plan, Acetate Drying and Ethyl Acetate (11-M) revised 2/7/1924
Drawer 25
Folder 1
Heating Riser Diagram and Miscellaneous Details (12-M) revised 2/7/1924
Carbonization Building (Job No. 988-B) by Albert Kahn, Architect
Construction Drawings
Architectural Drawings, except as noted 10/6/1923
(ink-on-linen drawings with pencil notations, 31x47-1/2 inches)
Drawer 25
Folder 2
Plot Plan (101)
Drawer 25
Folder 2
Foundation Plan, Briquetting Department (102)
Drawer 25
Folder 2
Foundation Plan, First Floor Plan and Second Floor Plan Retort Department (103) revised 7/30/1923
Drawer 25
Folder 2
Foundation Plan, Wood Drying Department (104)
Drawer 25
Folder 2
First Floor Plan, Briquetting Department (105)
Drawer 25
Folder 2
Second Floor Plan, Briquetting Department (106) revised 4/14/1925
Drawer 25
Folder 2
Second Floor Gallery Plan, Operating Floor Plan and Fourth Floor Plan, Retort Department (107) revised 7/30/1923
Drawer 25
Folder 2
First Floor Plan, Wood Drying Department (108)
Drawer 25
Folder 2
Second Floor Plan, Wood Drying Department (109R) 4/4/1924
Drawer 25
Folder 2
Floor Plans at Elevations: 140'-6", 146' and 130', Wood Drying Department (109A) 4/4/1924
Drawer 25
Folder 2
Roof Plan (110)
Drawer 25
Folder 2
North Elevation, Column F-1 to F-9 (111) revised 4/14/1925
Drawer 25
Folder 2
North Elevation, Columns F-9 to F-11, and South Elevation, Columns A-9 to A-11 (112) revised 7/30/1923
Drawer 25
Folder 2
North Elevation, Columns F-11 to F-19 (113)
Drawer 25
Folder 2
West Elevation (114)
Drawer 25
Folder 3
South Elevation, Columns A-11 to A-19 (115)
Drawer 25
Folder 3
South Elevation, Columns A-1 to A-9 (116)
Drawer 25
Folder 3
East Elevation and West and South Elevations of Scrubber Tank (117)
Drawer 25
Folder 3
Longitudinal Section thru' Briquetting Department "A-A" (118) revised 4/13/1925
Drawer 25
Folder 3
Section thru "C-C," Briquetting Department, and Sections "L-L" and "M-M" (119) revised 4/11/1925
Drawer 25
Folder 3
Sections "B-B" and "D-D" (120) revised 4/14/1925
Drawer 25
Folder 3
Sections on Lines "E-E' and "F-F" (121) revised 7/30/1923
Drawer 25
Folder 3
Section "G-G" (122) 4/4/1924
Drawer 25
Folder 3
Section "H-H" (123)
Drawer 25
Folder 3
Sections "I-I" and "J-J" (124)
Drawer 25
Folder 3
Details of Metal Curtains between Columns, of Rail Connections to Concrete, and of Curbs (125)
Drawer 25
Folder 3
Details of Stairways and Tin-Clad Doors (126)
Drawer 25
Folder 3
Sections "N-N" and "O-O" (127) 4/4/1924
Drawer 25
Folder 3
Details of Platforms in Retort and Briquetting Departments (128) 4/4/1924, revised 4/14/1925
Structural Drawings of Carbonization Building, except as noted 5/3/1923
(ink-on-linen drawings with pencil notations, 31x39-3/4 inches, except as noted)
Drawer 25
Folder 4
Roof Plan--Top Chord and Details of Typical Connections--Purlin Bracing (101-S)
Drawer 25
Folder 4
Bottom Chord Plan and Typical Details of Strut Connections (102-S)
Details of Framing for Boiler No. 3 (227-S) 4/1/1924
Drawer 25
Folder 9
Details of Crushed and Pulverized Coal Bins (228R-S) 7/30/1924, revised 8/28/1924
Drawer 25
Folder 9
Details of 500 K-W Turbo-Generator Foundation (229-S) 7/11/1924, revised 10/23/1925
Addition to Present Saw Mill (Job 988-D) by Albert Kahn, Architect
Construction Drawings
Architectural Drawings 5/2/1923
(ink-on-linen drawings with pencil notations, 31x39-3/4 inches)
Drawer 25
Folder 10
Plot Plan (301) revised 7/12/1923
Drawer 25
Folder 10
Footing and First Floor Plans (302) revised 8/24/1923
Drawer 25
Folder 10
Saw Mill and File Room Floor Plans (303) revised 9/29/1923
Drawer 25
Folder 10
North, South and West Elevations and Cross-Section on Line "A-A" (304) revised 9/29/1923
Drawer 25
Folder 10
Longitudinal Section on Line "B-B" and Details of Exterior and Stairs (305) revised 9/17/1923
Structural Drawings, except as noted 5/3/1923
(ink-on-linen drawings with pencil notations, 31x39-3/4 inches)
Drawer 25
Folder 10
Bottom Chord Plan, Roof Plan and Filing Room Floor Plan (301-S) revised 6/5/1923
Drawer 25
Folder 10
Cross-Section, Column Schedule and Details of Truss B and Sway Frames (302-S) revised 6/5/1923
Drawer 25
Folder 10
Elevations and Typical Building Sections (303-S) revised 6/5/1923
Drawer 25
Folder 10
Second Floor Plan and Beam Schedule (304-S) revised 7/11/1923
Drawer 25
Folder 10
Second Floor Details (305-S) revised 7/11/1923
Drawer 25
Folder 10
Foundation Plan and Column and Footing Schedule (306-S) 6/13/1923, revised 12/12/1923
Conveyor Bridges (Job No. 988-E) by Albert Kahn, Architect
Construction Drawings
Architectural Drawings, except as noted 10/6/1923
(ink-on-linen drawings with pencil notations, 32-1/2x41-3/4 inches, except as noted)
Drawer 25
Folder 11
Plan and Sections of Bridge between Power House and Saw Mill (401)
Drawer 25
Folder 11
Plan, South Elevation and Sections of Bridge between Power House and Saw Mill
(not numbered)
(pencil-on-vellum drawing, 29x39 inches)
Drawer 25
Folder 11
Plan, East Elevation and Sections of Bridge between Saw Mill and Carbonization Building (403) 11/1/1923
Drawer 25
Folder 11
Plans at Conveyor Walkways and at Auxiliary Conveyor Platforms of Monitor on Present Saw Mill (404) 11/23/1923, revised 1/17/1924
Drawer 25
Folder 11
North, South and West Elevations and Sections of Monitor on Present Saw Mill (405) revised 1/17/1924
Drawer 25
Folder 11
Sections of Monitor on Present Saw Mill (406) 11/23/1923, revised 1/17/1924
Drawer 25
Folder 11
Plan, Elevation and Sections of Bridge between Wood Storage and Carbonization Buildings (407) undated
Structural Drawings
(ink-on-linen drawings with pencil notations, 31x40 inches)
Drawer 25
Folder 11
Site Plan Showing General Arrangement of Conveyor Bridges (400-S) 9/24/1923, revised 11/6/1923
Drawer 25
Folder 11
Plan, Elevations and Sections of Bridge between Power House and Saw Mill (401-S) 9/21/1923, revised 3/13/1924
Drawer 25
Folder 11
Plans of Top and Bottom Chord Bracing, Elevations and Sections of Bridge between Carbonization Building and Saw Mill (402-S) 10/30/1923, revised 11/7/1923
Drawer 25
Folder 11
Details Showing Conveyor Layout and Supports in New Saw Mill (403-S) 12/13/1923
Drawer 25
Folder 11
Details Showing Conveyor Arrangement and Monitor over Present Saw Mill (404-S) 12/23/1923, revised 3/13/1924
Drawer 25
Folder 11
Monitor Elevations and Details Showing Arrangement of Columns under Monitor of Present Saw Mill (405-S) 12/13/1923, revised 12/14/1924
Drawer 25
Folder 11
Details Showing Alterations to Trusses in Present Saw Mill (406-S) 12/13/1923
Drawer 25
Folder 11
Bridge Support and Miscellaneous Details (407-S) 12/13/1923, revised 1/24/1924
Drawer 25
Folder 11
Details of Bridge between Carbonization Building and Wood Storage Bins (408-S) 11/7/1923, revised 3/13/1924
Shipping Building (Job No. 988-G) by Albert Kahn, Architect