Albert Kahn Associates records: 1825-2014 (bulk 1900-1945)
full text File Size: 4073 K bytes | how to request materials

 
Request materials for use in the Bentley Library
Container / Location Title
 
Job No. 803-892 [subseries]
 
First and Old Detroit National Bank, Job No. 803, Detroit, Michigan 1919-1922
 
Construction Drawings by Albert Kahn, Architect
 
Architectural Drawings 12/20/1919, revised 9/22/1920 (Ink-on-linen drawings with red ink, pencil and blue pencil revisions, 30-3/4x47 to 31-3/4x52-3/4 inches)
Oversize Tube   16  
Plot Plan (1)
Oversize Tube   16  
Sub-Basement and Mezzanine Floor Plans (2)

(revision date illegible)

Oversize Tube   16  
Basement, Basement Mezzanine and First Floor Mezzanine Floor Plans (3) revised 2/15/1922
Oversize Tube   16  
First and Second Floor Plans (4) revised 2/14/1922
Oversize Tube   16  
Third, Fourth and Truss Space Floor Plans (5) revised 2/14/1922
Oversize Tube   16  
Sixth and Seventh Floor Plans (6) revised 5/29/1920
Oversize Tube   16  
Fifth and Eighth Floor Plans (7) revised 2/15/1922
Oversize Tube   16  
Ninth and Typical Floor Plans (8)
Oversize Tube   16  
Twenty-Second, Twenty-Third and Twenty-Fourth Floor Plans (9)
Oversize Tube   16  
Roof and Pipe Space Floor Plans (10) undated
Oversize Tube   16  
Woodward Avenue Elevation (11)
Oversize Tube   16  
Cadillac Square Elevation (12)
Oversize Tube   16  
East Elevation (13)
Oversize Tube   16  
West Half of South Elevation and West Elevation of Court and Section on Line "F-F" (14)
Oversize Tube   16  
East Half of South Elevation, Section "G-G" and Cross-Section "B-B" (15)
Oversize Tube   16  
Transverse Section on Line "D-D" (16)
Oversize Tube   16  
Sections "A-A," "C-C" and "E-E" (17)
Oversize Tube   16  
Elevation of West Bay, Cadillac Square, and Details of Lower Stories (18)
Oversize Tube   16  
Detail of Upper Portion of Cadillac Square and Woodward Ave. Elevations (19)
Oversize Tube   16  
First Floor Exterior Details (20)
Oversize Tube   16  
Details of Rear Elevation (21)
Oversize Tube   16  
Details of Passenger Elevators, Pent House and Stairs #3 (22)
Oversize Tube   16  
Sections thru' Elevator Lobby and Freight Elevator (23) revised January 1921
Oversize Tube   16  
Sections thru' Elevators and Details of Passenger Elevator Doors, etc. (24) revised 1/4/1921
Oversize Tube   17  
Details of Elevators (25)

(undated due to linen damage)

Oversize Tube   17  
Sections and Details of Stairs (26)
Oversize Tube   17  
Sub-Basement Mezzanine, Basement Mezzanine and First Floor Plans (27)
Oversize Tube   17  
First Floor Mezzanine and Third and Fourth Floor Plans (28)
Oversize Tube   17  
Miscellaneous Floor Plan Details (29)
Oversize Tube   17  
Detail of Stack and Typical Wall Sections (30)
Oversize Tube   17  
Details of Typical Toilet Rooms and Corridor Office Partitions (31)
Oversize Tube   17  
Details of Typical Doors, Toilets and Barber Shop (32), undated revised 9/22/1920
Oversize Tube   17  
Details of Girders, Metal Louvres, Skylights, Columns and Walls, etc. (33)
Oversize Tube   17  
Details of Window Frames in Main Banking Room, Shop Fronts and Savings Bank (34)
Oversize Tube   17  
Plan and Interior Elevations of Directors' Room and Appurtenances on Sixth Floor (35)
Oversize Tube   17  
Basement Plan, Elevations and Details (36)
Oversize Tube   17  
Interior Designs for Entrance Lobby (37) 9/20/1919, revised 9/22/1920
Oversize Tube   17  
Interior Designs for Main Banking Room (38) 9/20/1920, revised 9/22/1920
Oversize Tube   17  
Interior Designs for Savings Bank (39)

(date illegible due to linen damage)

Oversize Tube   17  
Typical Floor Plan Showing Revised Widths of Elevator Doors (41) 5/24/1920, revised 9/22/1920 (31-1/2x36-1/2 inches)
Oversize Tube   17  
First Floor Plan (47)

(undated due to linen damage)

(39-1/4x53-3/4 inches)
Oversize Tube   17  
[Floor Plan], untitled due to linen damage (48) undated (39-1/4x53 inches)
Oversize Tube   17  
Details of Vaults in Sub-Basement Mezzanine, in Basement and at Eighth Floor (50) 11/22/1920, revised 12/21/1920 (32-3/4x37-3/4 inches)
Oversize Tube   17  
Details of Vault Furniture and Safe-Deposit Vault Floor Framing (52) 11/22/1920, revised 12/21/1920 (32-3/4x38 inches)
Oversize Tube   17  
Details of Furniture in Bank Vault (52A), undated revised 12/21/1920 (33x38 inches)
Oversize Tube   17  
Typical Floor Plan (65)

(undated due to linen damage)

(36-1/2x49 inches)
Oversize Tube   17  
Part Plan of Public Elevator Lobby at Twenty-First through Twenty-Fouth Floors (65A) undated (18x10-3/4 inches)
Oversize Tube   17  
Details of Ceiling of Second Floor (Low Part) (82) 3/10/1921, revised 9/7/1921 (27x44-1/2 inches)
 
Structural Drawings 12/20/1919

(some not numbered or dated due to linen damage)

(Ink-on-linen drawings with pencil notations, 30x50-1/2 to 31-1/2x52-1/2 inches)
Oversize Tube   18  
Column Schedule (1-S)
Oversize Tube   18  
Column Schedule (2-S)
Oversize Tube   18  
Column Schedule (cont)
Oversize Tube   18  
Foundation Plan and Details of Caissons
Oversize Tube   18  
[Details of] Foundation Girders and Grillage for Columns 86, 87, 88 and 90
Oversize Tube   18  
Sub-Basement Mezzanine and Basement Floor Framing Plans
Oversize Tube   18  
Basement Mezzanine and First Floor Framing Plans (7-S)
Oversize Tube   18  
First Floor Mezzanine and Second Floor Framing Plans (8-S)
Oversize Tube   18  
Third and Fourth Floor Framing Plans (9-S)
Oversize Tube   18  
Fifth Floor Framing Plan revised 10/15/1920
Oversize Tube   18  
Sixth Floor and Truss Space Framing Plans
Oversize Tube   18  
Seventh and Eighth Floor Framing Plans (12-S)
Oversize Tube   18  
Ninth Floor Framing Plan revised 8/24/1920
Oversize Tube   18  
Typical Floor Framing Plan
Oversize Tube   18  
Twenty-First, Twenty-Second and Twenty-Third Floor Framing Plans (15-S)
Oversize Tube   18  
Twenty-Fourth Floor and Pipe Space Floor Framing Plans (16-S) revised 9/10/1920
Oversize Tube   18  
Pent House Floor and Main Roof Framing Plan (17-S) revised 9/1/1920
Oversize Tube   19  
Fifth Floor Truss and Girder Details (18-S)
Oversize Tube   19  
Wind Bracing Systems A-A and M-M (19-S)
Oversize Tube   19  
Wind Bracing Systems D-D, J-J and K-K (22-S)
Oversize Tube   19  
Wind System F-F, Woodward Avenue Elevation (24-S)
Oversize Tube   19  
Wind System G-H, Rear Elevation (25-S)
Oversize Tube   19  
Longitudinal Wind Bracing System M-M.
Oversize Tube   19  
Wind System N-N, Cadillac Square Elevation (27-S)
Oversize Tube   19  
Wind Bracing Connections, Special Vault and D-Type (28-S) 3/15/1920
Oversize Tube   19  
Wind Bracing Systems, B-E and F-Type (29-S) 3/15/1920
Oversize Tube   19  
Wind Bracing Systems, C-Type (30-S) 3/15/1920
Oversize Tube   19  
Wind Bracing Systems, A, B, C and X-Type (31-S) 3/15/1920
Oversize Tube   19  
Wind Bracing Connections, 20, 26 and 30-Inch Spandrel Connections (32-S) 3/15/1920
Oversize Tube   19  
Wind Bracing Connections, 18 and 24-Inch Spandrel Connections (33-S) 3/15/1920
Oversize Tube   19  
Wind Bracing Connections, 15-Inch Spandrel Connections (34-S) 3/15/1920
Oversize Tube   19  
Wind Bracing Connections, 12 and 18-Inch Spandrel Connections
Oversize Tube   19  
Untitled drawing (36-S) undated
Oversize Tube   19  
Elevation and Detail of Additional Girder at Caisson for Column #8 (38-S) 9/29/1920 (28-1/2x26 inches)
Oversize Tube   19  
Piling Plan (1000-S) 4/12/1920 (26-3/4x34-1/4 inches)
Oversize Tube   19  
Cornice Channels, Pipe Space (1016-S) 2/2/1921 (17-1/4x30-1/2 inches)
Oversize Tube   19  
Main Cornice Details (1026-S) 6/24/1921, revised 8/5/1921 (16-1/2x39 inches)
 
Mechanical Drawings by Albert Kahn, Architects and Engineers 1/5/1920 (Ink-on-linen drawings with pencil notations, 31-1/4x50-1/4 to 31-1/2x52 inches)
Oversize Tube   20  
Section Details and Symbols (1-M) revised 12/3/1920
Oversize Tube   20  
Sub-Basement Mezzanine and Sub-Basement Floor Plans (2-M) revised 10/17/1921
Oversize Tube   20  
Basement Mezzanine and Basement Floor Plans (3-M), undated revised 11/11/1921
Oversize Tube   20  
First Floor Mezzanine and First Floor Plans (4-M) revised 11/29/1921
Oversize Tube   20  
Second Floor Plan and Details of Typical Toilet Room (5-M) revised 5/6/1921
Oversize Tube   20  
Third and Fourth Floor Plans (6-M) revised 9/13/1921
Oversize Tube   20  
Fifth Floor and Truss Space Plans (7-M) revised 9/13/1921
Oversize Tube   20  
Sixth and Seventh Floor Plans (8-M) revised 5/18/1921
Oversize Tube   20  
Eighth and Ninth Floor Plans (9-M) revised 3/21/1922
Oversize Tube   20  
Typical Floor Plan for Electrical Work Only, Fifth to Twenty-Fourth Floors, and Typical Floor Plan, Tenth to Nineteenth Floors (10-M) revised 5/18/1921
Oversize Tube   20  
Twentieth through Twenty-Third Floors Plan and Twenty-Fourth Floor Plan (11-M) revised 5/18/1921
Oversize Tube   20  
Pipe Space Plan (12-M) revised 10/6/1921
Oversize Tube   20  
Riser Diagrams (13-M), revised5/6/1921
Oversize Tube   20  
[Riser Diagram], untitled (14-M) revised 5/6/1921
Oversize Tube   20  
[Riser Diagrams], untitled (15-M) revised 5/6/1921
Oversize Tube   20  
Sub-Basement Mezzanine and Basement [Electrical] Plans (16-M) undated
Oversize Tube   20  
Riser Diagram-Lighting Feeders and Diagram of Telephone Risers (17-M) undated
Oversize Tube   20  
Riser Diagram-Power Feeders (18-M) undated (31-1/2x44 inches)
Oversize Tube   20  
Layouts of Fan Room in Basement and of Exhaust and Recirculating Duct in Truss Space and Details (19-M) 12/3/1920, revised 10/18/1921
Oversize Tube   20  
Typical [Pipe] Installation Plan and Front and Rear Sectional Elevations (20-M) 3/17/1921, revised 5/6/1921
 
Mechanical Drawings (cont) (Black and red ink-on-linen drawings, 39x53 to 45x54 inches)
Oversize Tube   21  
Sub-Basement Mezzanine [Electrical] Plan (21M) 5/9/1921, revised 8/23/1921
Oversize Tube   21  
Basement [Electrical] Plan (22-M) 3/2/1921, revised 8/2/1921
Oversize Tube   21  
First Floor [Electrical] Plan (23-M) 5/19/1921, revised 11/29/1921
Oversize Tube   21  
First Floor Mezzanine [Electrical] Plan (24-M) 4/27/1921, revised 8/2/1921 (30-1/4x50-3/4 inches)
Oversize Tube   21  
Second Floor [Electrical] Plan (25-M) 4/18/1920, revised 8/2/1921
Oversize Tube   21  
Third Floor [Electrical] Plan (26-M) revised 8/2/1921
Oversize Tube   21  
Undated

(undated due to linen damage)

Oversize Tube   21  
Fourth Floor [Electrical] Plan (27-M) 3/31/1921, revised 8/2/1921
Oversize Tube   21  
Fifth Floor [Electrical] Plan (28-M) revised 8/2/1921

(date illegible)

Oversize Tube   21  
Sixth Floor [Electrical] Plan (29-M) 4/13/1921
Oversize Tube   21  
Seventh Floor [Electrical] Plan (31-M) 4/12/1921, revised 8/2/1921
Oversize Tube   21  
Eighth Floor [Electrical] Plan (32-M), undated revised 8/2/1921
Oversize Tube   21  
Typical Floor [Electrical] Plan (33-M) revised 9/6/1921

(undated due to linen damage)

Oversize Tube   21  
Riser Diagram (34-M) 4/7/1921, revised 6/8/1921
Oversize Tube   21  
Truss Space [Electrical] Plan (35-M) 5/19/1921, revised 10/6/1921
Oversize Tube   21  
Conduit Schedule and [Electrical] Plans and Sections (36-M) 10/24/1921 (30-3/4x47 inches)
Oversize Tube   21  
Wiring Diagram-Electric Sub-Station (37-M) 11/3/1921 (29-3/4x46-1/2 inches)
Oversize Tube   21  
[Electrical] Sections (38-M) 11/17/1921, revised 9/20/1922 (31-1/4x46-1/2 inches)
Oversize Tube   21  
Pipe Space Plan (39-M)

(undated due to linen damage)

Oversize Tube   21  
Power Risers (40-M) undated (36x38-3/4 inches)
Oversize Tube   21  
Main Distribution of A.C. and D.C. Current (42-M) 8/24/1921 (30-3/4x42-1/4 inches)
Oversize Tube   21  
Main Control Switchboard (44-M)

(undated due to linen damage)

(32x41-1/2 inches)
 
Ford Motor Company Building, Job No. 807, 54th Street & Broadway, New York, New York 1917-1919
 
Construction Drawings by Albert Kahn, Architect, Ernest Wilby, Associate
 
Architectural Drawings 8/30/1917, revised 12/5/1917 (ink-on-linen drawings with pencil notations, 23-1/2x34 to 27-3/4x37-3/4 inches)
Drawer   20 Folder   4
Plot Plan (1) revised 10/19/1917
Drawer   20 Folder   4
Foundation and Basement Floor Plans (2)
Drawer   20 Folder   4
Plans of First and Second Floors (3)
Drawer   20 Folder   4
Plans of Third, Fourth, Fifth and Sixth Floors (4)
Drawer   20 Folder   4
Roof Plan and Details of Skylight (5)
Drawer   20 Folder   4
Broadway and 54th Street Elevations (6)
Drawer   20 Folder   4
East and North Elevations (7)
Drawer   20 Folder   4
Cross-Section and Details of Lobbies, Vestibules and Stairs No. 2 (8)
Drawer   20 Folder   4
Details of Stairs No. 1 and Passenger Elevator Shaft (9)
Drawer   20 Folder   4
Details of Stairs No. 3 and Freight Elevator (10)
Drawer   20 Folder   4
Detail of West 54th Street Elevation (11) revised 1/17/1918
Drawer   20 Folder   4
Exterior Details of Office Entrance and Marquise (12)
Drawer   20 Folder   4
Details of Main Entrance to Show Room and of Hollow Metal Windows for Court Walls (13)
Drawer   20 Folder   4
First Floor and Ceiling Plans of Show Room and Interior Elevations (14) 10/25/1917
Drawer   20 Folder   4
Interior Elevations (15) 10/25/1917
Drawer   20 Folder   4
Interior Elevations, Second Floor (16) 10/25/1917
Drawer   20 Folder   4
Details of Vestibule and Stairs (20) 10/25/1917
Drawer   20 Folder   4
Plans and Details of Fourth, Fifth and Sixth Floors (21) 10/25/1917
Drawer   20 Folder   4
Basement Plan (22) 11/21/1917
Drawer   20 Folder   4
First Floor Plan (23) 12/27/1917
Drawer   20 Folder   4
Second Floor Plan (24) 12/28/1917
Drawer   20 Folder   4
Details of Granite Pier Bases and Window and Door Sills (25) 12/29/1917
Drawer   20 Folder   4
Sections thro' Roof Spandrels Showing Revised Location of Beams and Roof Slab (28) 5/28/1918
Drawer   20 Folder   4
Basement Plan and Sections of Toilet Room Addition (30) 11/12/18 (15x18 inches)
 
Structural Drawings 8/30/1917, revised 11/7/1917 (ink-on-linen drawings with pencil notations, 27-1/2x34-1/2 inches)
Drawer   20 Folder   5
Column Schedule and Details (1-S)
Drawer   20 Folder   5
First Floor Framing Plan (2-S)
Drawer   20 Folder   5
Second Floor Framing Plan (3-S)
Drawer   20 Folder   5
Third Floor Framing Plan (4-S) revised 1/19/1918
Drawer   20 Folder   5
Sixth Floor Framing Plan (5-S)
Drawer   20 Folder   5
Roof Framing Plan (6-S) revised 11/21/1917
Drawer   20 Folder   5
Bending Diagrams (7-S) 10/11/1917
Drawer   20 Folder   5
Addition to Sheet 2-S (8-S) 10/11/1917 (7-3/4x8-1/2 inches)
 
Mechanical Drawings (ink and pencil drawings on linen)
Drawer   20 Folder   5
Basement Heating Plan, Sixth Floor Plan, Riser Diagram and Typical Connection Diagram (1-M) 8/31/1917, revised 11/8/1917 (28-1/2x35 inches)
Drawer   20 Folder   5
Plans of Fourth, Fifth and Sixth Floors (2-M) 1/14/1917, revised 2/2/1917 (18x21-1/2 inches)
Drawer   20 Folder   5
Heating Plan for Secretary's Room (3-M) 1/4/1919 (17-1/2x30-1/2 inches)
 
United States Signal Corps Mobilization Camps (Aviation Training Camp), Job No. 809, Joy Field, Mt. Clemens, Michigan 1917
Box   10  
Specifications for a Group of Buildings for Aviation Training Camp (Job 809-R) 12/12/1917
 
Construction Drawings by Albert Kahn, Architect, Ernest Wilby, Associate
 
Architectural Drawings, except as noted 5/8/1917 (photostatic prints with pencil notations, 7-1/4x14 to 9-1/2x14 inches)
Box   10  
Flying Field Plot Plan (1-A) 5/19/1917
Box   10  
Mess Hall Plans (1)
Box   10  
Mess Hall Elevations and Sections (2)
Box   10  
Dope House Plan, Elevations and Sections (3)
Box   10  
Guard House Plans, Elevations and Sections (4)
Box   10  
Latrines Plan, Elevations and Sections (5)
Box   10  
Boiler House Plan, Elevations and Sections (6)
Box   10  
Officers' Club Plans, Elevations and Sections (7)
Box   10  
Commanding Officer's Quarters (Cantonment Building) Plans, Elevations and Sections (8)
Box   10  
Administration Building Plans, Elevations and Sections (9)
Box   10  
Machine Shop Plans, Elevations and Sections (10)
Box   10  
Aero Repair Shop Plan, Elevations and Sections (11)
Box   10  
Garage Plan and Elevation (12)
Box   10  
Garage Elevations, Sections and Details (13)
Box   10  
Roof Truss Plan and Elevation (14)
Box   10  
Hangar Plan and Details (15)
Box   10  
Hangar Plan, Elevations and Section (16)
Box   10  
Hangar Plan, Elevation and Details (17)
Box   10  
Hospital Plans, Elevations and Sections (18)
Box   10  
School Building Foundation Plan and Section (19)
Box   10  
School Building Plan and Elevations (20)
Box   10  
Aero Supply Building Plans, Elevations and Sections (21)
Box   10  
Post Exchange Plans, Elevations and Sections (22)
Box   10  
Commissioned and Non-Commissioned Officers' Cantonment Buildings Plans, Elevations and Sections (23)
Box   10  
Barracks Plan, Elevations and Sections (24)
Box   10  
Blacksmith Shop Plan, Elevations and Section (25)
 
The New Temple Beth El, Job No. 821, Detroit, Michigan 1920-1922
 
Construction Drawings by Albert Kahn, Architect undated (Ink-on-linen drawings, 26x33 inches)
 
Architectural Drawings
Drawer   4 Folder   1
Plot Plan (1) 4/18/1921, revised 5/17/1921
Drawer   4 Folder   1
Foundation Plan (2) 5/3/1921, revised 5/17/1921
Drawer   4 Folder   1
Basement Plan (3) revised 5/4/1922
Drawer   4 Folder   1
First Floor Plan (4) revised 2/14/1922
Drawer   4 Folder   1
Second Floor Plan (5) revised 2/14/1922
Drawer   4 Folder   1
Third Floor Plan (6) revised 2/14/1922
Drawer   4 Folder   1
Fourth Floor Plan (7) revised 2/14/1922
Drawer   4 Folder   1
Roof Plan (8) 11/11/1920, revised 5/17/1921
Drawer   4 Folder   1
Woodward Avenue and Gladstone Avenue Elevations (9) revised 5/17/1921
Drawer   4 Folder   1
Rear and North Elevations (10), revised 2/14/922
Drawer   4 Folder   1
Cross-Section, Main Auditorium, and Longitudinal Section (11) revised 5/17/1921
Drawer   4 Folder   1
Elevations of Basement Lobby and Sections C-C, D-D and E-E (12) revised 2/14/1922
Drawer   4 Folder   1
Exterior Details (13) revised 5/17/1921
Drawer   4 Folder   2
Plan of Columns, Door Elevations and Window Details (14) revised 5/17/1921
Drawer   4 Folder   2
Half-Plan of Ceiling under Balcony and Views Looking East and West (15) revised 2/14/1922
Drawer   4 Folder   2
South Elevation of Main Auditorium Line A-A and Elevations of Lobby #101 (16) revised 2/14/1922
Drawer   4 Folder   2
Corridor Elevations and Details of Men's Room #110 and Ladies Room #105 (18) revised 5/17/1921
Drawer   4 Folder   2
Interior Details of Assembly Room (19) revised 2/14/1922
Drawer   4 Folder   2
Details of Windows and Wardrobes in Class Rooms (20) 11/11/1920, revised 5/17/1921
Drawer   4 Folder   2
Details of Stair #3 (21) revised 5/17/1921
Drawer   4 Folder   2
Details of Main Stairs #2 (22) 11/11/1920, revised 5/17/1921
Drawer   4 Folder   2
Details of Passenger and Freight Elevators, Library Bookshelves and Dumbwaiter (23) revised 2/14/1922
Drawer   4 Folder   2
Details of Dining Room #1 and Women's and Men's Showers (24) revised 2/14/1922
Drawer   4 Folder   2
Revised Layout of Organ Space and Choir Gallery (30) 2/8/1922 (18x29 inches)
Drawer   4 Folder   2
West and South Elevations (38) 9/28/1922, revised 10/18/1922 (13x33 inches)
 
Structural Drawings
Drawer   4 Folder   3
Roof Framing Plan (1-S) revised 8/13/1921
Drawer   4 Folder   3
Fourth Floor Plan (2-S) revised 5/17/1921
Drawer   4 Folder   3
Third Floor Framing (3-S) revised 9/28/1921
Drawer   4 Folder   3
Second Floor Plan (4-S) revised 2/24/1922
Drawer   4 Folder   3
First Floor Framing (5-S) revised 8/20/1921
Drawer   4 Folder   3
Columns and Footings (6-S) revised 8/17/1921
Drawer   4 Folder   3
Truss Details (7-S) revised 8/13/1921
Drawer   4 Folder   3
Steel and Concrete Girders (8-S) revised 5/17/1921
Drawer   4 Folder   3
Main Dome Rib, Balcony Framing, Truss T2 and Details of Column Bases (9-S) revised 5/17/1921
 
Mechanical Drawings 12/22/1920
Drawer   4 Folder   3
Foundation Plan (1M) revised 8/17/1921
Drawer   4 Folder   3
Basement Plan (2M) revised 2/8/1922
Drawer   4 Folder   3
First Floor Plan (3M) revised 6/2/1921
Drawer   4 Folder   3
Second Floor Plan (4M) revised 6/2/1921
Drawer   4 Folder   3
Third Floor Plan (5M) revised 6/2/1921
Drawer   4 Folder   3
Fourth Floor Plan (6M) revised 3/7/1922
Drawer   4 Folder   3
Detail of Ventilating Equipment in Basement (7M) revised 8/17/1921
Drawer   4 Folder   3
Heating Riser Diagram and Details (8M) revised 6/2/1921
Drawer   4 Folder   3
Boiler Room (9M) revised 8/17/1921
 
Betsy Barbour Residence Hall, University of Michigan, Job No. 829, Ann Arbor, Michigan 1917
 
Construction Drawings by Albert Kahn, Architect, Ernest Wilby, Associate
 
Architectural Drawings 11/20/1917 (Ink-on-linen drawings with pencil and blue pencil revisions, 25x27to 25-3/4x28 inches)
Drawer   9 Folder   7
Plot Plan (1)
Drawer   9 Folder   7
Basement and First Floor Plans (2)
Drawer   9 Folder   7
Second, Third and Fourth Floor Plans (3)
Drawer   9 Folder   7
North and South Elevations (4)
Drawer   9 Folder   7
Maynard and State Street Elevations, Section "A-A" and Interior Details (5)
Drawer   9 Folder   7
Details of Maynard Street Entrance (6)
Drawer   9 Folder   7
Details of Windows and Fireplace in Sewing and Games Room #19 (7)
Drawer   9 Folder   7
Interior Details (8)
Drawer   9 Folder   7
Sections and Details of Stairs (9)
Drawer   9 Folder   7
Interior Details (10)
 
Structural Drawings undated (Ink-on-linen drawing with blue pencil revisions, 25-3/4x28 inches)
Drawer   9 Folder   7
First, Second, Third and Fourth Floor Plans (1-S)
 
Mechanical Drawings 12/20/1917 (Ink-on-linen drawings, 26x28 inches)
Drawer   9 Folder   7
Heating Riser Diagram and Foundation and Drainage Plan (1)
Drawer   9 Folder   7
Basement Plan (2)
Drawer   9 Folder   7
Second, Third and Fourth Floor Plans (3)
Drawer   9 Folder   7
Plumbing Riser Diagram and Details (4)
 
Ford Motor Company, Eagle Shipbuilding Plant, Job No. 847, River Rouge, Michigan 1918
 
Construction Drawings by Albert Kahn, Architect
 
Architectural Drawings 2/12/1918, revised 2/15/1918 (Ink-on-linen drawings)
Drawer   9 Folder   8
Plot Plan (IX) undated (14-1/2x32 inches)
Drawer   9 Folder   8
Plot Plan (1A) (30-1/2x41 inches)
Drawer   9 Folder   8
Building "A" Foundation Plan and Details (1) revised 3/1/1918 (30-3/4x 41-3/4 inches)
Drawer   9 Folder   8
Building "A" Floor Plan (2) revised 3/1/1918 (31-3/4x42 inches)
Drawer   9 Folder   8
Building "A" Roof Plan (3) revised 3/1/1918 (30-3/4x42 inches)
Drawer   9 Folder   8
Building "A" Elevations and Cross-Section (4) revised 2/26/1918 (32x42 inches)
Drawer   9 Folder   8
Elevation of Monitor and Typical Details (5) revised 2/26/1918 (31-1/2x42 inches)
Drawer   9 Folder   8
Building "B" Foundation Plan and Details (6)

(undated due to linen damage)

(33-3/4x49 inches)
Drawer   9 Folder   8
Building "B" Floor Plan and Details (7) revised 4/4/1918 (34-1/4x49 inches)
Drawer   9 Folder   8
Building "B" Roof Plan (8) (33-3/4x49 inches)
Drawer   9 Folder   8
Elevations and Sections thru' High Point and Monitor (9) revised 2/23/1918 (35x48-1/4 inches)
Drawer   9 Folder   8
Building "B" Sections (10) revised 2/23/1918 (34-3/4x48 inches)
 
Structural Drawings 2/11/1918, revised 2/15/1918 (Ink-on-linen drawings with pencil and blue pencil revisions)
Drawer   9 Folder   9
Details of Girders in Monitor Walls and under Main Roof (1-S) 2/12/1918 (31x42-1/2 inches)
Drawer   9 Folder   9
Building "B" Half-Plan Showing Framing and Details (2-S) (34x49 inches)
Drawer   9 Folder   9
Elevations, Sections and Sway Frame Details (3-S) (34x49 inches)
Drawer   9 Folder   9
Details of Roof Trusses, Monitor Framing and Bottom Chord Bracing (4-S) (34x49 inches)
Drawer   9 Folder   9
Building "B" Cross-Sections thru' High and Low Portions (5-S) (34-3/4x48-3/4 inches)
 
Mechanical Drawings (Ink-on-linen drawings with pencil and blue pencil notations)
Oversize Tube   2  
[Plan and Section of] Service Tracks (1-MR)

(undated due to linen damage)

(28-1/4x54-1/2 inches)
Oversize Tube   2  
Plot Plan and Details of Septic Tank, Sludge Beds and Toilet, etc. (1M) 3/5/1918 (31-3/4x42 inches)
Oversize Tube   2  
Drinking Water Layout (2M) 5/10/1918 (21-1/4x35 inches)
Oversize Tube   2  
Layout of Steam Plant and Detail of Unit Heater and Connections

(not numbered or dated due to linen damage)

(23x55 inches)
Oversize Tube   2  
Building "B" Layout of Heating System and Details (4M) 8/1/1918, revised 8/10/1918 (23x56 inches)
Oversize Tube   2  
Plan of Existing Underground Pipe Lines (5M) 8/16/1918 (24x43-1/2 inches)
Oversize Tube   2  
Building "A" Heating Plan (6M) undated (23x46-1/2 inches)
Oversize Tube   2  
Layout of Steam Piping (8M)

(undated due to linen damage)

(23-1/2x54-1/2 inches)
 
University Hospital, University of Michigan, Job No. 850, Ann Arbor, Michigan 1919-1921
 
Construction Drawings by Albert Kahn, Architect (Ink-on-linen drawings)
 
Architectural Drawings 10/4/1919 (35-1/2x60-1/2to37x64 inches)
Oversize Tube   3  
Plot Plan (1)
Oversize Tube   3  
Foundation Plan (2) revised 11/17/1919
Oversize Tube   3  
Sub-Basement Plan (3) revised 11/17/1919
Oversize Tube   3  
Basement Plan (4) revised 11/17/1919
Oversize Tube   3  
Ground Floor Plan (5)
Oversize Tube   3  
First Floor Plan (6) revised 11/17/1919
Oversize Tube   3  
Second Floor Plan (7) revised 11/17/1919
Oversize Tube   3  
Third Floor Plan (8)
Oversize Tube   3  
Fourth through Tenth Floors Plan (9)
Oversize Tube   3  
Roof Plan (10) revised 1/24/1921
Oversize Tube   4  
North and South Elevations of Ward Wings and Main Building (11) revised 11/17/1919
Oversize Tube   4  
East and West Elevations of Ward Wings and End Elevations of East and West Wings (12)
Oversize Tube   4  
East and West Elevations of Demonstration Wing and Sections D-D through GG (13)
Oversize Tube   4  
Elevations of Surgical Wing (14)
Oversize Tube   4  
Section on Line A-A Looking West and Elevations of Pent House (15) revised 11/17/1919
Oversize Tube   4  
Sections through Typical Ward and Demonstration Wings and Details of Fire Escapes (16) revised 11/17/1919
Oversize Tube   4  
Details of Ward Wings (17)
Oversize Tube   4  
North Elevation of Ward Wing and Main Building and Miscellaneous Details (18)
Oversize Tube   4  
Details of Surgical Building (19)
Oversize Tube   4  
Details of Amphitheater (20)
Oversize Tube   4  
Rear Elevation of Main Ward Building, East Elevation of Demonstration Wing and Miscellaneous Floor Plans (21) 10/30/1919 (17x28 inches)
Oversize Tube   4  
Plans, Elevations and Section of Diet Kitchen, Main Ward Building (22) 10/30/1919, revised 6/28/1920 (18x15 inches)
Oversize Tube   4  
Revised Plan of Wing between Administration Building and Main Building (27) 9/15/1920, revised 11/2/1920 (20x33 inches)
 
Structural Drawings 10/4/1919 (36x56 to 37x57 inches)
Oversize Tube   5  
Sub-Basement and Basement Framing Plans (1-S) revised 5/7/1920
Oversize Tube   5  
Ground Floor Framing (2-S) revised 5/10/1920
Oversize Tube   5  
First Floor Framing (3-S) revised 5/10/1920
Oversize Tube   5  
Second Floor Framing Plan (4-S) revised 5/11/1920
Oversize Tube   5  
Typical Floor Framing Plan, Third through Tenth Floors (5-S) revised 5/12/1920
Oversize Tube   5  
Roof Framing (6-S)
Oversize Tube   5  
Column Schedule (7-S) revised 4/16/1920
Oversize Tube   5  
Plan of Revised Framing, Sub-Basement Floor at Teaching Lab (8-S) 4/15/1920 (19-1/2x23-1/4 inches)
Oversize Tube   5  
Change in Framing Adjacent to Administration Building (11-S) 9/15/1920, revised 11/1/1920 (12-1/2x32 inches)
Oversize Tube   5  
Detail of Columns Supporting Area Walls (13-S) 12/2/1920 (12-1/2x32 inches)
 
Tables of Electrical Outlets undated (16-3/4x36 inches)
Drawer   3 Folder   8
Sub-Basement, Basement and Foundation Floor Plans (101M)
Drawer   3 Folder   8
Basement, Ground and First Floor Plans (102M)
Drawer   3 Folder   8
First Floor Plan (103M)
Drawer   3 Folder   8
Second and Third Floor Plans (104M)
Drawer   3 Folder   8
Third and Fourth Floor Plans (105M)
Drawer   3 Folder   8
Fourth and Fifth Floor Plans (106M)
 
Block Plans 12/30/1921, revised 4/20/1925 (23x33 inches)
Drawer   3 Folder   8
Sub-Basement Floor Plan (1)
Drawer   3 Folder   8
Basement Floor Plan (2)
Drawer   3 Folder   8
Ground Floor Plan (3)
Drawer   3 Folder   8
First Floor Plan (4)
Drawer   3 Folder   8
Second Floor Plan (5)
Drawer   3 Folder   8
Third Floor Plan (6)
Drawer   3 Folder   8
Fourth Floor Plan (7)
Drawer   3 Folder   8
Fifth Floor Plan (8)
Drawer   3 Folder   8
Sixth Floor Plan (9)
Drawer   3 Folder   8
Roof Plan (10)
 
James Couzens Mausoleum, Woodlawn Cemetery, Job No. 866 & 866-A, Detroit, Michigan 1919 and 1937
 
Mausoleum by Albert Kahn, Architect (Job No. 866)
 
Construction Drawings
 
Architectural Drawings 5/15/1919 (ink-on-linen drawings, 23-1/2x34-1/2 inches, except as noted)
Drawer   29 Folder   1
Foundation Plan (1)
Drawer   29 Folder   1
Floor Plan (2)
Drawer   29 Folder   1
Front and Rear Elevations (3)
Drawer   29 Folder   1
Side Elevation (4)
Drawer   29 Folder   1
Sections "A-A" and "B-B" (5)
Drawer   29 Folder   1
Revised Section "A-A" (5R) 6/27/1919 (23-1/2x22 inches)
Drawer   29 Folder   1
Section "C-C" (6) (2 drawings)
 
Stone Approach to Mausoleum by Albert Kahn, Inc., Architects (Job No. 866-A)
 
Construction Drawings
 
Architectural Drawings (pencil-on-vellum drawings)
Drawer   29 Folder   1
Plan, Elevation and Sections (1) 12/28/1936 (15-1/2x34 inches)
Drawer   29 Folder   1
Section (2) 1/30/1937, revised 2/8/1937 (16-1/2x43-1/2 inches)
 
Rosenberger, Oscar Mausoleum, Job No. 880 1919
Drawer   36 Folder   16
Construction Drawings, Architectural (5 drawings)
 
Ford Motor Company, Service Building, Job No. 892, Buenos Aires, Argentina 1919-1920
Drawer   37 Folder   1
Construction Drawings, Architectural, Structural, and Mechanical (26 drawings)