Albert Kahn Associates records: 1825-2014 (bulk 1900-1945)
full text File Size: 4086 K bytes | how to request materials

 
Request materials for use in the Bentley Library
Container / Location Title
 
Job No. 1888-2223 [subseries]
 
Ford Motor Company, Airplane Parts Manufacturing Building (Willow Run Bomber Factory), Job No. 1888-R, Ypsilanti, Michigan 1941-1943
 
Construction Drawings by Albert Kahn Associated Architects & Engineers, Inc.
 
Architectural Drawings 6/30/1941 (ink-on-linen drawings with pencil notations and ink and pencil drawings on vellum, 31x64-1/2 to 33-1/2x66-3/4 inches)
Oversize Tube   35  
Plot Plan (1) revised 5/23/1942
Oversize Tube   35  
Site Plan Showing Parking for 26,095 Cars (2) undated (32x53-3/4 inches)
Oversize Tube   35  
Foundation Plan and Details (2) revised 11/3/1941
Oversize Tube   35  
Foundation Plan and Details (2-A) revised 7/30/1941
Oversize Tube   35  
First Floor Plan (3) revised 3/10/1942
Oversize Tube   35  
First Floor Plan-Temporary Construction Lighting (3-A)
Oversize Tube   35  
First Floor Plan (3-B) 4/1/1943, revised 11/12/1943
Oversize Tube   35  
Mezzanine Floor Plan (4) revised 3/10/1942
Oversize Tube   35  
Mezzanine Floor Plan-Temporary Construction Lighting (4-A)
Oversize Tube   35  
Mezzanine Floor Plan (4-B) 9/28/1943
Oversize Tube   35  
Second Floor Plan (5) revised 11/3/1941
Oversize Tube   35  
Second Floor Plan (5-B) 11/27/1943
Oversize Tube   35  
Roof Plan (6) revised 5/4/1942
Oversize Tube   35  
Roof Plan (6-A) revised 7/2/1942
Oversize Tube   35  
Sections (7) revised 7/30/1941
Oversize Tube   35  
Sections (8) revised 7/30/1941
Oversize Tube   35  
Sections (9) revised 11/3/1941
Oversize Tube   35  
Sections (10) revised 11/3/1941
Oversize Tube   35  
East and West Elevations (11) revised 11/3/1941
Oversize Tube   35  
Elevations (12) revised 12/29/1941
Oversize Tube   35  
Elevations (13) revised 8/19/1941
Oversize Tube   35  
Elevation Details (14) revised 8/19/1941
Oversize Tube   35  
Elevation Details (15)

(date illegible due to vellum damage)

Oversize Tube   36  
Sections (16) revised 9/10/1941
Oversize Tube   36  
"A" Sections (17) revised 9/10/1941
Oversize Tube   36  
Sections (18) revised 8/19/1941
Oversize Tube   36  
Sections and Details (19) revised 3/10/1942
Oversize Tube   36  
Construction Details "A" (20) revised 9/10/1941
Oversize Tube   36  
Construction Details (21) revised 9/10/1941
Oversize Tube   36  
Construction Details (22) revised 9/10/1941
Oversize Tube   36  
Details of Bridges and Ladders (23) revised 7/30/1941
Oversize Tube   36  
Details of Stairs and Toilets (24) revised 9/10/1941
Oversize Tube   36  
Details of Toilets (25) revised 3/10/1942
Oversize Tube   36  
Details of Toilets and Locker Rooms (26) revised 3/10/1942
Oversize Tube   36  
Details of Second Floor Locker Rooms, Partitions and Lunch Room Tables (27) revised 11/3/1941
Oversize Tube   36  
Door Details (28) revised 8/19/1941
Oversize Tube   36  
Details of Stairs # 11, 12, 53 & 54 and Toilet Rooms (29) revised 3/10/1942
Oversize Tube   36  
Details of Crane Platforms and Partition Line "B" (30) revised 9/10/1941
Oversize Tube   36  
Crane Clearance Diagrams and Platform Details (31) 2/4/1942
Oversize Tube   36  
Plans and Sections of Stair # 5 and Freight Elevator (32) revised 3/23/1942
Oversize Tube   36  
Plans and Sections of Stairs # 1-4 and Passenger Elevator (33) revised 12/10/1941
Oversize Tube   36  
Miscellaneous Details of Engineering Building (34) 10/10/1941
Oversize Tube   36  
Details of Underground Transformer Sub-Stations (35) revised 3/30/1942
Oversize Tube   37  
Details of Expansion Joints (36) revised 9/10/1941
Oversize Tube   37  
Details of Expansion Joints (37) revised 9/10/1941
Oversize Tube   37  
Details of Expansion Joints (38) revised 8/26/1941
Oversize Tube   37  
Plans and Sections of Fan Rooms at Roof (39) revised 5/26/1942
Oversize Tube   37  
Details of Fan Rooms on Col. Lines 15-17 & 28-30 (40) revised 11/3/1941
Oversize Tube   37  
Blackout Details and Details of Hangar Door and Engineering Department (41) 7/30/1941
Oversize Tube   37  
Tunnel Details (42) revised 9/9/1941
Oversize Tube   37  
Details of Fan Rooms # 68 & 69 and First Floor Pump Rooms (43) 8/19/1941, revised 2/24/1942
Oversize Tube   37  
Plans and Sections of Hospital Unit (44) 8/25/1941, revised 11/11/1942
Oversize Tube   37  
Details of First Aid Units (45) 9/3/1941, revised 3/23/1942
Oversize Tube   37  
Details of Exterior Bridges and Watch Towers (46) 9/2/1941, revised 9/30/1941
Oversize Tube   37  
Bridge Details (47) 9/2/1941, revised 9/30/1941
Oversize Tube   37  
Plans and Sections of Metallurgical, Physical and Chemistry Labs (48) 10/4/1941, revised 2/26/1942
Oversize Tube   37  
Details of Metallurgical, Physical and Chemistry Labs (49) 10/4/1941, revised 3/5/1942
Oversize Tube   37  
Laboratory Equipment Details-Metallurgical, Physical and Chemistry Labs (50) 10/4/1941, revised 2/13/1942
Oversize Tube   37  
Laboratory Equipment Details-Metallurgical, Physical and Chemistry Labs (50-A) 10/4/1941, revised 1/9/1942 (33x46 inches)
Oversize Tube   37  
Revisions to X-Ray Laboratory-Engineering Building Portion (50-B) 12/24/1941, revised 5/11/1942
Oversize Tube   37  
Details of Women's Locker Rooms, Toilet Rooms and Lunch Rooms (51) revised 10/6/1941
Oversize Tube   37  
Plans and Details of Main Kitchen and Cafeteria, Second Floor Engineering Building (52) 10/10/1941, revised 2/24/1942
Oversize Tube   37  
First and Second Floor Plans at Pay-Station and Private Dining Rooms (53) 10/10/1941, revised 2/24/1942
Oversize Tube   37  
Details of Toilet and Locker Rooms and Pay-Station, Engineering Building (54) 10/10/1941, revised 2/24/1942
Oversize Tube   37  
Details of Pay-Station, Engineering Building (55) 10/10/1941, revised 2/24/1942
Oversize Tube   37  
Details of Main Kitchen, Private Dining Rooms, Cafeteria and Toilets (56) 10/10/1941, revised 12/29/1941
 
Architectural Drawings (cont) (ink and pencil drawings on vellum and tracing paper, 20x30-3/4 to 31-1/2x46-3/4 inches)
Drawer   19 Folder   2
Details for Metal Duct Openings (100) 9/18/1941, revised 10/20/1941
Drawer   19 Folder   2
Details of Openings, Framing, etc., for Ducts from Fan Pits # 1-7 & 9 (104) 10/8/1941, revised 10/20/1941
Drawer   19 Folder   2
Details of Duct Openings at Transfer Bay (105) 9/25/1941
Drawer   19 Folder   2
Details of Duct Openings at Bridge (106) 9/25/1941, revised 11/15/1941
Drawer   19 Folder   2
Details of Revised Transformer Hatches, Sub-Stations #1-A to 8 (107) 9/25/1941 (17-3/4x33 inches)
Drawer   19 Folder   2
Details of Revised Transformer Hatches, Sub-Stations #9 & 10 (108) 9/26/1941 (16x24-1/2 inches)
Drawer   19 Folder   2
Details of Openings for Ducts from Toilets and Fan Pit #8 (109) 10/20/1941, revised 1/22/1942
Drawer   19 Folder   2
Details of Men's Lunch Rooms, First Floor, Mezzanine and Second Floor (112) revised 11/3/1941
Drawer   19 Folder   2
Details of Second Floor Sub-Stations (114) revised 12/29/1941 (19-3/4x23-1/2 inches)
Drawer   19 Folder   2
Details of Openings for Ducts (115) 11/26/1941, revised 1/22/1942
Drawer   19 Folder   2
Details of Openings for Ducts (116) 12/11/1941, revised 8/20/1942
Drawer   19 Folder   2
Details of Transformer Sub-Station Em-1 (117) 11/25/1941
Drawer   19 Folder   2
Details of Fan Platforms, Walkways and Openings for Ducts (118) 12/11/1941, revised 1/28/1942
Drawer   19 Folder   2
Details of Gratings and Catch Boxes at Manholes to Tunnels #1-3 (119) 12/11/1941
Drawer   19 Folder   2
Details of Revised Crane Operator's Platforms-Manufacturing and Receiving Areas (120) 12/19/1941, revised 2/4/1942
Drawer   19 Folder   2
Details of Relocation of Craneway Platforms and Ladders (121) 12/19/1941
Drawer   19 Folder   2
Details of Manhole for Transformer Oil Drain Tank (121) 4/7/1942, revised 6/12/1942 (16-1/2x23-1/4 inches)
Drawer   19 Folder   2
Details of Supports for Roof Obstruction Lights (122) 12/12/1941
Drawer   19 Folder   2
Details of Jib Cranes, Second Floor Col. Line Q (123) 12/18/1941
Drawer   19 Folder   3
Plan of Mezzanine Floor Wood Partitions (124) 12/8/1941, revised 4/18/1942 (18x47 inches)
Drawer   19 Folder   3
Details of Wood Partitions (125) 12/18/1941, revised 4/18/1942 (18x43-1/2 inches)
Drawer   19 Folder   3
Details of Mezzanine Floor Locker Rooms (130) 3/10/1942
Drawer   19 Folder   3
Details of Mezzanine Floor Locker Rooms (131) 3/10/1942, revised 4/9/1942
Drawer   19 Folder   3
Details of First and Second Floor Locker Rooms (132-133) 3/10/1942 (2 drawings)
Drawer   19 Folder   3
Detail of Expansion Joint in Ceiling (134) 1/21/1942 (18-1/2x18-1/2 inches)
Drawer   19 Folder   3
Details of Mezzanine Floor Locker Rooms (135) 3/10/1942
Drawer   19 Folder   3
Plan of Revised Sub-Station #4 (136) 2/5/1942 (18-1/2x30 inches)
Drawer   19 Folder   3
Details of Truck Scale Pit and Scale House (137) 7/14/1942, revised 9/15/1942
Drawer   19 Folder   3
Details of Revised Crane Operator's Platforms, Manufacturing Area (138) revised 2/4/1942
Drawer   19 Folder   3
Plan and Sections of Metal Partitions, Second Floor, Engineering Building (139) 2/4/1942
Drawer   19 Folder   3
Details of Radio and Instrument Rooms (140) 3/9/1942, revised 11/23/1942
Drawer   19 Folder   3
Details of Women's Toilet Rooms # F-19 to F-23 and Men's Toilet Room # M-33 (141) 3/10/1942
Drawer   19 Folder   3
Plan of Women's Toilet Room # F-21 and Men's Toilet Room # M-31 (142) 3/10/1942
Drawer   19 Folder   3
Details of Women's Toilet Room # F-22 and Men's Toilet Room # M-32 (143) 3/10/1942
Drawer   19 Folder   3
Details of Women's Toilet Rooms # F-25 to F-27 (144) 3/10/1942
Drawer   19 Folder   3
Details of First and Mezzanine Floor Toilet Rooms (145) 3/10/1942
Drawer   19 Folder   3
Details of First Floor Toilet Rooms # F-29 to F-32 (146) 3/10/1942
Drawer   19 Folder   3
Details of Toilet Rooms (147) 3/10/1942
Drawer   19 Folder   4
Details of Revisions Involved in Change from Locker Room to Record Room (148) 3/3/1942, revised 3/12/1942
Drawer   19 Folder   4
Details of Unit Heater Service Walks, Receiving Bay (150) 3/4/1942, revised 3/11/1942
Drawer   19 Folder   4
Details of Unit Heater Service Walks, Shipping Bay (151) 3/4/1942, revised 3/11/1942
Drawer   19 Folder   4
Details of First Aid Units # 5 & 6 (152) 3/14/1942, revised 5/8/1942
Drawer   19 Folder   4
Details of New Door at Cafeteria Dining Room, Second Floor, Engineering Building (153)

(date illegible due to vellum damage)

(13x21-1/2 inches)
Drawer   19 Folder   4
Details of Revisions to Hospital (154) revised 4/18/1942
Drawer   19 Folder   4
Details of Partition on Tool Design, Locker Room # M-4 (155) 3/16/1942, revised 11/11/1942
Drawer   19 Folder   4
Details of Openings for Ducts (156) 3/26/1942
Drawer   19 Folder   4
Details of Fan Platforms and Duct Openings (157) 3/26/1942
Drawer   19 Folder   4
Details of Duct Openings from Radio and Instrument Rooms (158) 4/6/1942, revised 11/23/1942
Drawer   19 Folder   4
Plans and Sections of Pits # 1 & 2 (159) 3/26/1942 (15-1/2x26 inches)
Drawer   19 Folder   4
Details of Concrete Valve Pits (160) 4/2/1942, revised 4/6/1942
Drawer   19 Folder   4
Details of Valve Pits # C-2 & C-3 (161) 4/10/1942
Drawer   19 Folder   4
Details of New Fan Platform at Col. Line 40 between U & UV, First Floor (162) 5/5/1942
Drawer   19 Folder   4
Details of Machine Gun Range (164) 5/21/1942, revised 6/25/1942
Drawer   19 Folder   4
Details of Fan Rooms on Col. Line "C" (165) 4/18/1942
Drawer   19 Folder   4
Details of Valve Pits for Fire-Protection System (167) 5/7/1942
Drawer   19 Folder   4
Part Plot Plan Showing Fences and Gates (168) 5/23/1942, revised 8/10/1942
Drawer   19 Folder   4
Plans and Section of Spiral Stairway, Engineering Building (169) 5/26/1942
Drawer   19 Folder   4
Plans and Elevation of Stairs to Mezzanine over F.A. Unit #5 (171) 5/29/1942
Drawer   19 Folder   5
Details of Additional Doors # 8 and Change in Doors at B-3 (172) 6/6/1942
Drawer   19 Folder   5
Plot Plan Showing Fences and Gates (173) 6/18/1942
Drawer   19 Folder   5
Details of Additional Walkways and Platforms over Craneways # 2-5 (174) 10/20/1942, revised 1/8/1943
Drawer   19 Folder   5
Details of Turntable Pit and Machine Room for Compass Calibration of the B-24 (176-178) 8/10/1942, revised 8/20/1942 (3 drawings)
Drawer   19 Folder   5
Details of Revision of Duct and Register Openings in Sub-Stations (179-180) 8/13/1942, revised 10/5/1942 (2 drawings)
Drawer   19 Folder   5
Laboratory Plans, Sections and Details (181) 10/5/1942, revised 11/11/1942
Drawer   19 Folder   5
Details of Platforms for Blackout Sirens (182) 10/6/1942
Drawer   19 Folder   5
Details of Tunnel, Fan Room T-1 (183) revised 11/18/1942
Drawer   19 Folder   5
Details of Addition to Fan Room #35 (184) revised 11/18/1942
Drawer   19 Folder   5
Details of New Fan Room #54-A (185) revised 11/18/1942
Drawer   19 Folder   5
Details of Temporary Wood Shed over Turntable (186) 11/24/1942 (19-1/2x31-1/2 inches)
Drawer   19 Folder   5
Details of Radio Compass Calibrating Transmitter Housing Post (187) 11/30/1942 (20-1/2x17-1/2 inches)
Drawer   19 Folder   5
Details of Revision of X-Ray Room (189) 3/22/1943 (17-1/4x30-1/2 inches)
Drawer   19 Folder   5
Details of Revised Doors, South Elevation (190) 6/30/1943
Drawer   19 Folder   5
Details of Salvage Yard, Distribution Center (193) 8/28/1943
 
Architectural Drawings (cont) (ink-on-linen drawings and pencil-on-vellum drawings, 31x55 to 32-1/2x66-1/4 inches)
Oversize Tube   38  
Foundation Plan, Engineering Building (101) 9/18/1941, revised 10/6/1941
Oversize Tube   38  
Foundation Plan, Engineering Building (102) 9/18/1941, revised 9/29/1941
Oversize Tube   38  
Foundation Plan, Engineering Building (103) 9/18/1941, revised 9/29/1941
Oversize Tube   38  
Details of Craneway Service Walks (126) 1/29/1942, revised 5/20/1943
Oversize Tube   38  
Details of Craneway Service Walks (127) 1/29/1942, revised 4/30/1942
Oversize Tube   38  
Details of Craneway Service Walks (128) 1/29/1942, revised 3/11/1942
Oversize Tube   38  
Details of Craneway Service Walks (129)

(date illegible due to vellum damage)

Oversize Tube   38  
Details of Payroll Offices (149) 3/4/1942, revised 4/4/1942
Oversize Tube   38  
Details of Battery Room (163) revised 4/11/1942
 
Structural Drawings 4/29/1941 (ink drawings on vellum and linen, 32-1/2x50 inches)
Drawer   19 Folder   6
Column Schedule and Footing Plan (1-S1) revised 9/9/1941
Drawer   19 Folder   6
Column Schedule and Footing Plan (1-S2) 6/28/1941, revised 8/18/1941
Drawer   19 Folder   6
Details of Bottom Chord Bracing, Crane Girders and Roof Framing (2-S1) revised 10/10/1941
Drawer   19 Folder   6
Roof Framing Plan, Second Floor Plan and Details of Bottom Chord Bracing (2-S2) 6/28/1941, revised 10/10/1941
Drawer   19 Folder   6
Framing Plans and Schedule, South of Expansion Line "K" from Columns 19 to 81 (3-S1) 6/28/1941, revised 11/17/1941
Drawer   19 Folder   6
Framing Plan and Beam Schedule, North of Expansion Line "K" from Columns 19 to 81 (3-S2) 6/28/1941, revised 6/30/1941
Drawer   19 Folder   6
Framing Plans, South of Expansion Line "K" & East of Column Line 81 (3-S3) 6/28/1941, revised 9/25/1941
Drawer   19 Folder   6
Framing Plans, North of Expansion Line "K" & East of Column Line 81 (3-S4) 6/28/1941, revised 6/30/1941
Drawer   19 Folder   6
Details of Wall Framing, Bracing and Crane Runways (4-S1) revised 11/17/1941
Drawer   19 Folder   6
Details of Wall Framing and Bracing (4-S2) 6/28/1941, revised 9/25/1941
Drawer   19 Folder   6
Details of Trusses and Sway Frames (5-S) revised 6/30/1941
Drawer   19 Folder   6
Sections and Details (6-S) revised 6/30/1941
Drawer   19 Folder   6
Cross-Section and Truss Details and Schedule (7-S) revised 6/30/1941
Drawer   19 Folder   6
Details of Framing for 150-Foot Doors (8-S) 6/28/1941, revised 10/27/1941
Drawer   19 Folder   6
Details of Exterior Bridges and Watch Towers (9-S) 9/2/1941, revised 9/30/1941
Drawer   19 Folder   6
Details of Added and Revised Trusses and Trolley Beam Conn. (SK-101-S) 6/28/1941, revised 6/30/1941
Drawer   19 Folder   6
Details of Vaults and Machine Foundations (SK-102-S) 6/4/1941, revised 10/4/1941
Drawer   19 Folder   6
Details of Men's Toilet Rooms and Mezzanine Storage Space (103-S) 2/18/1942, revised 3/14/1942 (30-1/4x39-1/4 inches)
 
Mechanical Drawings (ink and pencil drawings on vellum and sepia prints, 31x64-1/2 to 32x66 inches)
Oversize Tube   39  
Revisions of Trunk Sewers of Sheet No. 1 (1-MX) 10/25/1941 (22x20 inches)
Oversize Tube   39  
Plot Plan (1-M) revised 4/20/1942
Oversize Tube   39  
Foundation Plan (2-M) 12/8/1941
Oversize Tube   39  
Aviation Field Drainage Plan (2-Ma) undated (34x47-1/2 inches)
Oversize Tube   39  
Plan of Drainage Work, South of Building (2-Mb) 1/19/1942 (24x69 inches)
Oversize Tube   39  
Details of First Aid Rooms, Scale and Spray Pits (2-Mc) 12/30/1941
Oversize Tube   39  
Foundation Plan, Showing Sprinkler and Plumbing Work Outside of Building Walls (2-Md) 12/23/1941, revised 6/26/1942
Oversize Tube   39  
First Floor Plan and Details (3-M) undated
Oversize Tube   39  
Mezzanine Floor Plan and Details (4-M) undated
Oversize Tube   39  
Second Floor Plan and Details (5-M) undated
Oversize Tube   39  
Plan of First Floor Engineering Section, Between Column Lines B & M (6-M) revised 1/9/1942
Oversize Tube   39  
Plan of First Floor Engineering Section, Between Column Lines M & X (7-M) revised 12/22/1941
Oversize Tube   39  
Plan of First Floor Engineering Section, Between Column Lines X & ZQ (8-M) revised 10/13/1942
Oversize Tube   39  
Plan of Second Floor Engineering Section, Between Column Lines B & N (9-M) revised 6/5/1942
Oversize Tube   39  
Plan of Second Floor Engineering Section, Between Column Lines N & ZA (10-M) revised 6/5/1942
Oversize Tube   39  
Plan of Second Floor Engineering Section, between Column Lines ZA & ZQ and Locker Room Details (11-M) revised 1/7/1942
Oversize Tube   39  
Toilet Room Details (12-M) undated
Oversize Tube   39  
Toilet and Locker Room Details (13-M) undated
Oversize Tube   39  
Toilet and Locker Room Details (13-Ma) undated
Oversize Tube   39  
Locker Room and First Aid Unit Details (13-Mb) 3/17/1942
Oversize Tube   39  
First Floor Plan (14-M) 12/8/1941, revised 5/22/1942
Oversize Tube   39  
Mezzanine Floor Plan (15-M) 12/8/1941, revised 5/22/1942
Oversize Tube   39  
Second Floor Plan (16-M) 12/8/1941, revised 4/24/1942
Oversize Tube   39  
Heating and Ventilating Details (17-M) 12/8/1941, revised 5/22/1942
Oversize Tube   39  
Details and Plan of Trench under Engineering Section (18-M) 12/8/1941
Oversize Tube   39  
Elevation and Section of Typical Support for Heating Coil (20-XM) 11/4/1941 (18-3/4x31-1/2 inches)
Oversize Tube   40  
First Floor Plan (20-M) 8/14/1941, revised 5/4/1942
Oversize Tube   40  
Mezzanine Floor Plan (21-M) 8/14/1941, revised 5/4/1942
Oversize Tube   40  
Second Floor and Truss Space Plan (22-M) 8/14/1941, revised 5/4/1942
Oversize Tube   40  
Sections and Details (23-M) 8/14/1941, revised 2/4/1942
Oversize Tube   40  
Plan and Details of Fan Units 1-26 (24-M) 8/14/1941, revised 2/4/1942
Oversize Tube   40  
Plan of Fan Units 27-39 (25-M) 8/14/1941, revised 2/4/1942
Oversize Tube   40  
Plan of Fan Units 40-65 (26-M) 8/14/1941, revised 2/4/1942
Oversize Tube   40  
Plan of Fan Rooms 66-69 (27-M) 8/14/1941, revised 1/7/1942
Oversize Tube   40  
Plan of Fan Units 70-80 (28-M) 8/14/1941
Oversize Tube   40  
Details of Ventilation for Engineering Lab (29-M) 9/14/1941, revised 1/10/1942
Oversize Tube   40  
Plan of Toilet Rooms M-1 to M-5 and S-1 to S-5, (30-M) 10/9/1941, revised 3/3/1942
Oversize Tube   40  
Plan of Fan Units 70-80 (31-M) 11/3/1941, revised 8/8/1942
Oversize Tube   40  
Plan of Tunnel System and Details of Fan Units 140 & 141 (32-M) 11/25/1941, revised 12/2/1941
Oversize Tube   40  
Plan of Fan Units 105, 105-A, 106, 112 & 115 (33-M) 11/25/1941, revised 4/8/1942
Oversize Tube   40  
Plan of Fan Units 107-114 (34-M) 11/25/1941, revised 3/12/1942
Oversize Tube   40  
Plan of Fan Units 116-121 (35-M) 11/25/1941, revised 3/19/1942
Oversize Tube   40  
Plan of Toilet Exhaust Units 122-129 (36-M) 11/25/1941, revised 3/3/1942
Oversize Tube   40  
Plan of Fan Units 130-134 (37-M) 11/25/1941, revised 3/19/1942
Oversize Tube   40  
Plan of Smoke Exhaust Fan Units and Details (38-M) 12/17/1941
Oversize Tube   40  
Plan of Toilet Exhaust Systems (41-M) 3/12/1942, revised 4/8/1942
Oversize Tube   40  
Plan of Toilet Rooms and First Aid Room (42-M) 3/12/1942, revised 4/8/1942
Oversize Tube   40  
Plot Plan Showing Settling Basins and Oil Separators (43-M) 4/22/1942, revised 5/22/1942 (28-1/4x40-1/2 inches)
Oversize Tube   40  
Plans and Sections of Settling Basin and Oil Separator No. 1 (44-M) 4/22/1942, revised 5/22/1942 (28-3/4x39-1/4 inches)
Oversize Tube   40  
Plans and Sections of Settling Basin and Oil Separator No. 2 (45-M) 4/22/1942, revised 5/22/1942 (25x38-1/2 inches)
Oversize Tube   40  
Construction Details of Settling Basins and Oil Separators (46-M) 4/22/1942, revised 5/22/1942 (25x38-1/2 inches)
Oversize Tube   40  
Details of Roof Hatch for Pump Houses-Oil Separator Nos. 1 & 2 (46-XM) 6/25/1942 (15-1/2x29-1/2 inches)
Oversize Tube   40  
Details of Air-Conditioning-Radio and Instrument Rooms (47-M) revised 8/12/1942 (31-1/4x41 inches)
Oversize Tube   40  
Plan of Transformer Room Ventilation, First Floor Battery Room and Additions and Revisions to Hospital Area (48-M) 3/19/1942, revised 5/11/1942
 
Mechanical Drawings (pencil drawings on tracing paper and vellum, 22-1/2x34-1/2 to 27x48-3/4 inches)
Drawer   19 Folder   7
Plan and Sections of Welding and Tool Room Offices (49-M), undated revised 4/15/1942
Drawer   19 Folder   7
Plan and Section of Office for Maintenance Department (50-M), undated revised 5/22/1942
Drawer   19 Folder   7
Plans, Section and Piping Diagram of Gauge Inspection Room (51-M), undated revised 5/22/1942
Drawer   19 Folder   7
Plan, Elevation and Section of Chief Clerk's Office (52-M) 3/24/1942, revised 5/22/1942
Drawer   19 Folder   7
Plan and Section of Five Offices and Conference Room (53-M), undated revised 4/15/1942
Drawer   19 Folder   7
Plan and Sections of Shipping Record Office (54-M), undated revised 4/15/1942
Drawer   19 Folder   7
Plans, Elevation, Section and Detail of Property Receiving Office Ventilation (55-M), undated revised 4/24/1942
Drawer   19 Folder   7
Plan and Sections of Manufacturing Superintendent Clerk and Blue-Print Release Offices (56-M), undated revised 4/15/1942
Drawer   19 Folder   7
Plan and Sections of Engine Dress-Up and Shipping Offices (57-M), undated revised 4/15/1942
Drawer   19 Folder   7
Plan and Sections of Outer Wing Department Office (58-M), undated revised 4/15/1942
Drawer   19 Folder   7
Plan and Section of Industrial Relations Office (59-M), undated revised 4/15/1942
 
Mechanical Drawings (cont) (pencil and blue ink drawings on vellum and sepia prints, 30x64 to 32-1/4x66-1/2 inches)
Oversize Tube   41  
Plans and Section of Miscellaneous Small Parts Spray Room and New Dressing and Shower Rooms Ventilation (60-M) 5/13/1942, revised 6/4/1942
Oversize Tube   41  
Plans and Sections of Revised Sub-Station Ventilation (63-M) 7/20/1942, revised 8/6/1942
Oversize Tube   41  
Plans and Sections of Tunnel Ventilation (64-M) 7/30/1942, revised 9/1/1942
Oversize Tube   41  
Plans and Sections of Scale House and Scale Pit (65-M) 7/30/1942 (25-1/4x38-1/2 inches)
Oversize Tube   41  
Plan of Paint Lab Ventilation (66-M) 10/8/1942, revised 12/7/1942 (22-1/4x26-1/2 inches)
Oversize Tube   41  
Plans, Elevation and Section of Tunnel Ventilation (67-M) 10/21/1942, revised 11/6/1942
Oversize Tube   41  
First Floor Plan and Details (68-M) 10/19/1943
Oversize Tube   41  
Plan and Section of Filter Layout for Propeller Area (69-M) 2/20/1943, revised 5/20/1943 (23x42 inches)
Oversize Tube   41  
Details of Exhaust Ventilating System from Present Air Washer (70-M), undated revised 5/24/1943 (32-1/4x36 inches)
Oversize Tube   41  
Plan of Underground Fire Protection Mains (100-M) 9/24/1941
Oversize Tube   41  
Plan of Fire Protection Sprinkler System (100-Ma) 2/21/1942, revised 8/4/1942
Oversize Tube   41  
Plans of Overhead Automatic Sprinkler System 9/24/1941

(number illegible due to paper damage)

Oversize Tube   41  
Plan and Sections of Underground Fire Protection Mains (102-M) 10/9/1941 (21-1/2x31-1/4 inches)
Oversize Tube   41  
Plan and Details of Equipment Layout of Main Kitchen (300-M) 9/16/1941, revised 9/29/1941 (19-1/2x41-1/4 inches)
Oversize Tube   41  
Plan of Equipment Layout of Cafeteria Dining Room (301-M) 9/4/1941, revised 9/16/1941 (19-1/2x52 inches)
Oversize Tube   41  
Plan and Details of Equipment Layout of Kitchens for Private Dining Rooms (302-M) 9/5/1941 (19-1/2x41-1/4 inches)
Oversize Tube   41  
Plan and Details of Layout of Services for Main Kitchen (303-M) 9/16/1941, revised 9/30/1941 (19-1/2x41-1/2 inches)
Oversize Tube   41  
Plan of Services for Cafeteria Dining Room (304-M) 9/16/1941, revised 9/18/1941 (19-1/2x52 inches)
Oversize Tube   41  
Plan of Services for Private Dining Room Kitchens (305-M) 9/16/1941, revised 9/18/1941 (19-1/2x41-1/2 inches)
 
Electrical Drawings (ink and pencil drawings on vellum, 32x61-1/2 to 34x68 inches)
Oversize Tube   42  
Plans of Lighting and Power Layout in Service Tunnel (30-E) 8/4/1941, revised 2/12/1942
Oversize Tube   42  
Plan of Cubicle Locations in First Floor Manufacturing Area (31-E) 8/25/1941, revised 6/22/1942
Oversize Tube   42  
Cubicle Details (32-E-1) 9/4/1941
Oversize Tube   42  
Cubicle Details (32-E) 8/18/1941, revised 10/3/1941
Oversize Tube   42  
Key Plan and Schematic Wiring Diagrams of 220 V. and 440 V. Power, 440 V. Welding and 230 V. D.C. (33-E) 8/25/1941, revised 12/12/1941
Oversize Tube   42  
Schematic One-Line Diagram (under Slab) of General Lighting in Manufacturing Area (34-E-1) 10/2/1941, revised 11/18/1941
Oversize Tube   42  
Key Plan and Schematic Conduit Diagram for Emergency Lighting and 180 ~ and 240 ~ HiCycle Panels (34-E) 8/25/1941, revised 3/24/1942
Oversize Tube   42  
Schematic Diagram of Conduit Layout for Low Tension System and 110 V. and 180 ~ HiCycle Receptacles (35-E) 8/25/1941, revised 3/30/1942
Oversize Tube   42  
Plan of Conduit Layout in Floor Slab for 440 V. Power, 440 V. Welding, 240 V. Power, 250 V. D.C. and Lighting (36-E) 8/25/1941, revised 11/26/1941
Oversize Tube   42  
Plan of Conduit Layout in Floor Slab for 440 V. Power, 440 V. Welding, 240 V. Power, 250 V. D.C. and General and Emergency Lighting (37-E) 8/25/1941, revised 11/22/1941
Oversize Tube   42  
Plan of Conduit Layout in Floor Slab for 440 V. Power, 440 V. Welding, 240 V. Power, 250 V. D.C. and Lighting (38-E) 8/25/1941, revised 11/18/1941
Oversize Tube   42  
Plan of Conduit Layout in Floor Slab for 110 V. and 180 ~ and 240 ~ HiCycle Receptacles and Low Tension (39-E) 9/3/1941, revised 1/19/1942
Oversize Tube   42  
Plan of Conduit Layout in Floor Slab for 110 V. and 180 ~ and 240 ~ HiCycle Receptacles and Low Tension (40-E) 8/25/1941, revised 1/19/1942
Oversize Tube   42  
Plan of Conduit Layout in Floor Slab for 110 V. and 180 ~ and 240 ~ HiCycle Receptacles and Low Tension (41-E) 9/3/1941, revised 1/19/1942
Oversize Tube   42  
Plan of Conduit Layout in Floor Slab for 440 V. Power, 220 V. Power, 250 V. D.C. and 120 V. General and Emergency Lighting (42-E) 9/25/1941, revised 1/22/1942
Oversize Tube   42  
Plan of Conduit Layout in Floor Slab for 440 V. Power and 120 V. General and Emergency Lighting (43-E) 9/30/1941, revised 1/22/1942
Oversize Tube   42  
Plan of Conduit Layout in Floor Slab for 440 V. Power and 120 V. General and Emergency Lighting (44-E) 10/4/1941, revised 1/22/1942
Oversize Tube   42  
Plan of Conduit Layout in Floor Slab for 440 V. Power and 120 V. General and Emergency Lighting (45-E) 11/12/1941, revised 9/19/1942
Oversize Tube   42  
Plan of Conduit Layout in Floor Slab for 440 V. Power and 120 V. General and Emergency Lighting (46-E) 12/2/1941, revised 1/22/1942
Oversize Tube   42  
Plan of Conduit Layout in Floor Slab for 440 V. Power and 120 V. General and Emergency Lighting (47-E) 12/5/1941, revised 2/12/1942
Oversize Tube   42  
Details of Emergency Switchboard (48-E) 3/10/1942
Oversize Tube   42  
Plan and Sections of Conduit and Equipment Layout of Transformer Vault EM-1 (48-E-1) 3/19/1942
Oversize Tube   42  
Plan and Sections of Conduit and Equipment Layout of Transformer Vault EM-2 (48-E-2) 3/10/1942, revised 3/20/1942
Oversize Tube   42  
Plan and Sections of Conduit and Equipment Layout of Transformer Vault EM-3 (48-E-3) 3/10/1942, revised 4/17/1942
Oversize Tube   42  
Plan and Sections of Conduit and Equipment Layout of Transformer Vault EM-4 (48-E-4) 3/20/1942
Oversize Tube   42  
Plan of Conduit Layout in Floor Slab for 110 V. and 180 ~ HiCycle Receptacles and Low Tension (49-E) 9/25/1941, revised 1/19/1942
Oversize Tube   43  
Plan of Conduit Layout in Floor Slab for 110 V. and 180 ~ HiCycle Receptacles and Low Tension (50-E) 9/30/1941, revised 1/19/1942
Oversize Tube   43  
Plan of Conduit Layout in Floor Slab for 110 V. and 180 ~ HiCycle Receptacles and Low Tension (51-E) 10/4/1941, revised 1/19/1942
Oversize Tube   43  
Plan of Conduit Layout in Floor Slab for 110 V. and 180 ~ HiCycle Receptacles and Low Tension (52-E) 11/11/1941, revised 1/19/1942
Oversize Tube   43  
Plan of Conduit Layout in Floor Slab for 110 V. and 180 ~ HiCycle Receptacles and Low Tension (53-E) 12/2/1941, revised 1/19/1942
Oversize Tube   43  
Plan of Conduit Layout in Floor Slab for 110 V. and 180 ~ HiCycle Receptacles and Low Tension (54-E) 12/5/1941, revised 3/30/1942
Oversize Tube   43  
Plan of Conduit for Monorail System (55-E) 12/17/1941, revised 11/16/1942
Oversize Tube   43  
Plan and Sections of Conduit and Equipment Layout of Transformer Vault "Y" (55-E-1) 3/21/1942
Oversize Tube   43  
Plan and Sections of Conduit and Transformer Equipment Layout for Monorail Crane (55-E-2) 11/16/1942
Oversize Tube   43  
Plan of Panel Locations on First Floor (56-E) revised 2/26/1942
Oversize Tube   43  
Plan of Panel Locations on First Floor (56-E-1) 12/5/1941, revised 4/14/1942
Oversize Tube   43  
Key Plan and Schematic Wiring Diagram of Three-Phase 480 V. Power and120/208 V. General Lighting (57-E) 10/6/1941, revised 4/9/1942
Oversize Tube   43  
Key Plan and Schematic Wiring Diagram of Three-Phase 180 ~ HiCycle (58-E) 10/9/1941, revised 3/30/1942
Oversize Tube   43  
Plan of Panel Locations on Mezzanine Floor (59-E) 1/15/1942, revised 4/27/1942
Oversize Tube   43  
Plan of Panel Locations on Mezzanine Floor (59-E-1) 1/15/1942, revised 7/8/1942
Oversize Tube   43  
Plan of Panel Locations on Second Floor (60-E) 1/15/1942, revised 4/27/1942
Oversize Tube   43  
Plan of Panel Locations on Second Floor (60-E-1) 1/15/1942, revised 7/6/1942
Oversize Tube   43  
Cubicle Details of First Floor Assembly Area (61-E) 11/27/1941, revised 4/29/1942
Oversize Tube   43  
Cubicle Details of First Floor Assembly Area (61-E-1) 1/12/1942, revised 4/29/1942
Oversize Tube   43  
Plans of Building Utility Power in Manufacturing Area (62-E) 2/9/1942, revised 4/27/1942
Oversize Tube   43  
Plan of Building Utility Power and Roof Ventilation Fans (63-E) 3/6/1942, revised 4/23/1942
Oversize Tube   43  
Plans and Sections of Conduit Layout for Fan Rooms (64-E) 12/1/1942
Oversize Tube   43  
Plans of Conduit Layout for Dark Room and Paint Mix Laboratory (65-E) 12/4/1942
Oversize Tube   44  
Details of Conduit Layout in Sub-Station "K" (70-E) 12/15/1941, revised 3/11/1942
Oversize Tube   44  
Details of Control Conduit and Grounding Plan for Sub-Station "K" (71-E) 12/15/1941, revised 4/30/1942
Oversize Tube   44  
Details of Power Conduit Layout in Sub-Station "M" (72-E), revised 3/11/942 11/5/1941
Oversize Tube   44  
Details of Control Conduits and Grounding Plan for Sub-Station "M" (73-E) 1/2/1942
Oversize Tube   44  
Details of Conduit Layout in Sub-Station "N" (74-E) 2/26/1942
Oversize Tube   44  
Details of Capacitor Rack in Sub-Stations "A-D" (75-E) 2/9/1942, revised 2/21/1942
Oversize Tube   44  
Details of Capacitor Rack in Sub-Stations "F-J" (75-E-1) 2/9/1942, revised 2/21/1942
Oversize Tube   44  
Details of Capacitor Rack in Sub-Station "K" (75-E-2) undated
Oversize Tube   44  
Details of Capacitor Rack in Sub-Station "M" (75-E-3) 2/21/1942
Oversize Tube   44  
Details of Conduit Layout for Capacitors (75-E-4) 3/31/1942
Oversize Tube   44  
Details of Transformer and Switchgear Assemblies (78-E) 9/15/1941
Oversize Tube   44  
Details of Control Panels for Sub-Stations (79-E) 8/29/1941, revised 2/23/1942
Oversize Tube   44  
Details of Arrangement of Electrical Equipment Bases in Sub-Stations (80-E) 2/13/1942
Oversize Tube   44  
Details of 120/13.8 Kv. Outdoor Sub-Stations No. 1-East and No. 2-West (81-E) 10/29/1941, revised 8/14/1942
Oversize Tube   44  
Key Plan for Underground Duct System (82-E) 12/1/1941, revised 5/22/1942
Oversize Tube   44  
Plans of Lighting Layout in Sub-Stations "A-J" (83-E) 1/12/1942
Oversize Tube   44  
Cable Routing Schedule (84-E) 3/31/1942, revised 3/5/1943 (ink-on-linen drawing)
Oversize Tube   44  
Control Cable Routing Schedule (84-E-1) 5/22/1942, revised 3/5/1943 (ink-on-linen drawing)
Oversize Tube   44  
Details of Underground Duct Line to Huron River Pumping Station (85-E) 1/6/1942, revised 8/30/1943
Oversize Tube   44  
Plans and Sections of Conduit Layout of Oil Separator Nos. 1 & 2 (86-E) 5/4/1942, revised 5/29/1942
Oversize Tube   44  
Diagram of Control Cable (87-E) undated
Oversize Tube   44  
Panel and Pull-Box Schedules (88-E) 10/28/1941, revised 3/25/1942
Oversize Tube   44  
Map of Dual-Power Service from The Detroit Edison Company and Interconnections with Other Sources to Ford Bomber Plant (89-E) undated (16-1/2x24 inches)
Oversize Tube   45  
Details of Electrical Conduit and Connections for Compass Calibrating Turntable and Machine Room (120-E) 12/21/1942 (pencil-on-linen drawing)
Oversize Tube   45  
Plans of Lighting and Receptacles between Rows B-C, Columns 19-37 (150E) 9/24/1941, revised 2/5/1942
Oversize Tube   45  
Plans of Lighting and Receptacles between Rows B-C, Columns 37-59 (151-E) 9/24/1941, revised 2/5/1942
Oversize Tube   45  
Plans of Lighting and Receptacles between Rows B-C, Columns 59-81 (152-E) 12/28/1941
Oversize Tube   45  
Plans of Lighting and Receptacles between Rows B-C, Columns 81-103 (153-E) 5/11/1942
Oversize Tube   45  
Plans of Lighting and Receptacles between Rows B-C, Columns 103-125 (154-E) 12/31/1941
Oversize Tube   45  
Plans of Lighting and Receptacles between Rows B-C, Columns 125-141 (155-E) 12/16/1941, revised 12/31/1941
Oversize Tube   45  
Plans of Lighting and Receptacles between Rows J-K, Columns 19-37 (156-E) 10/10/1941, revised 5/26/1943
Oversize Tube   45  
Plans of Lighting and Receptacles between Rows J-K, Columns 37-59 (157-E) 10/10/1941, revised 5/4/1942
Oversize Tube   45  
Plans of Lighting and Receptacles between Rows J-K, Columns 59-81 (158-E) 10/10/1941, revised 1/2/1942
Oversize Tube   45  
Plans of Lighting and Receptacles between Rows J-K, Columns 81-103 (159-E) 10/10/1941, revised 1/2/1942
Oversize Tube   45  
Plans of Lighting and Receptacles between Rows J-K, Columns 103-125 (160-E) 12/15/1941, revised 1/3/1942
Oversize Tube   45  
Plans of Lighting and Receptacles between Rows J-K, Columns 125-141 (161-E) 12/15/1941, revised 1/3/1942
Oversize Tube   45  
Plans of Lighting and Receptacles between Rows P-Q, Columns 19-37 (162-E) undated
Oversize Tube   45  
Plans of Lighting and Receptacles between Rows P-Q, Columns 37-59 (153-E) undated
Oversize Tube   45  
Plans of Lighting and Receptacles between Rows P-Q, Columns 59-81 (164-E) 11/7/1942
Oversize Tube   45  
Plans of Lighting and Receptacles between Rows P-Q, Columns 81-103 (165-E) 1/3/1942
Oversize Tube   45  
Plans of Lighting and Receptacles between Rows P-Q, Columns 103-125 (166-E) 1/15/1942
Oversize Tube   45  
Plans of Lighting and Receptacles between Rows P-Q, Columns 125-141 (167-E) 1/15/1942
Oversize Tube   45  
Plans of Lighting and Receptacles between Rows TU-UV, Columns 19-37 (168-E) 2/5/1942
Oversize Tube   45  
Plans of Lighting and Receptacles between Rows TU-UV, Columns 37-59 (169-E) 2/3/1942
Oversize Tube   46  
Plans of Lighting and Receptacles between Rows TU-UV, Columns 59-81 (170-E) 2/27/1942
Oversize Tube   46  
Plans of Lighting and Receptacles between Rows TU-UV, Columns 81-103 (171-E) 1/19/1942, revised 2/29/1942
Oversize Tube   46  
Plans of Lighting and Receptacles between Rows TU-UV, Columns 103-125 (172-E) 1/19/1942, revised 2/3/1942
Oversize Tube   46  
Plans of Lighting and Receptacles between Rows TU-UV, Columns 125-149-1/2 (173-E) 1/19/1942, revised 8/4/1942
Oversize Tube   46  
Plans of Lighting and Receptacles between Rows 15 & 17, Columns B-J and between Rows 17 & 19, Columns B-C, J-K, P-Q and TU-UV (174-E) 1/20/1942
Oversize Tube   46  
Plans of Lighting and Receptacles between Rows 15 & 17, Columns J-X (175E) 5/4/1942
Oversize Tube   46  
Plans of Lighting and Receptacles between Rows 15 & 17, Columns X-ZR (176-E) 1/20/1942
Oversize Tube   46  
Lighting Plans of Interior Bridges (177-E) 9/25/1941, revised 2/4/1942
Oversize Tube   46  
Plans of Lighting and Receptacles between Rows 28 & 30, Columns UV-ZR (178-E) undated
Oversize Tube   46  
Plans of First and Second Floor, Engineering Building (179-E) undated (ink-on-linen drawing)
Oversize Tube   46  
Plan of Revisions to Hospital (179-E-1) undated (ink-on-linen drawing)
Oversize Tube   46  
Plans of Hospital and Laboratory, First Floor, Engineering Building (180-E) 1/9/1942 (ink-on-linen drawing)
Oversize Tube   46  
Plans of Main Kitchen and Cafeteria, Second Floor, Engineering Building (181-E) undated (ink-on-linen drawing)
Oversize Tube   47  
Plans and Sections of Exterior Bridges and Watch Towers (182-E) 1/12/1942 (ink-on-linen drawing)
Oversize Tube   47  
Plans of Lighting between Rows A & B and Rows 2 & 30, Inclusive (183-E) undated
Oversize Tube   47  
Plans of Lighting between Rows A & B and Rows 72 & 95, Inclusive (184-E) undated
Oversize Tube   47  
Plans of Lighting between Rows C-J and K-P and Rows 17 & 59, Inclusive (185-E) 12/12/1941, revised 1/20/1942 (ink-on-linen drawing)
Oversize Tube   47  
Plans of Lighting between Rows C-J and K-P and Rows 59 & 103, Inclusive (186-E) 12/12/1941 (ink-on-linen drawing)
Oversize Tube   47  
Plan of Lighting between Rows X & ZR and Rows 3 & 15, Inclusive (187-E) undated
Oversize Tube   47  
Plan of Lighting between Rows UV & ZR and Rows 17 & 28, Inclusive (188-E) 1/20/1942
Oversize Tube   47  
Plan of Lighting between Rows B & X and Rows 3 & 15, Inclusive (189-E) undated
Oversize Tube   47  
Plans of Lighting between Rows Q & TU and Rows 17 & 103, Inclusive (190-E) 12/16/1941, revised 1/20/1942
Oversize Tube   47  
Plan of Lighting between Rows Q & TU and Rows 103 & 139, Inclusive (191-E) 12/16/1941
Oversize Tube   47  
Plans of Lighting between Rows C-J and K-P and Rows 103 & 141, Inclusive (192-E) 12/15/1941 (ink-on-linen drawing)
Oversize Tube   47  
Plans of Electrical Floor Outlets in Offices, Rows UV-TU and Lights Above (193-E) 3/24/1942 (pencil-on-linen drawing)
Oversize Tube   47  
Plan and Section of Salvage Yard Distribution Center Electrical Layout (195-E) 9/1/1943 (ink-on-linen drawing, 29-1/2x37-1/2 inches)
 
Electrical Conduit Number Schedules 7/18/1942 (ink and pencil schedules on vellum, 31-1/4x65 to 32-3/4x65-3/4 inches)
Oversize Tube   48  
Plot Plan Showing Protective Lighting (240-E) 12/13/1941 (ink-on-linen drawing)
Oversize Tube   48  
Underground Duct-Factory Building, #1-300 (250-E) 5/22/1942, revised 3/5/1943
Oversize Tube   48  
Underground Duct-Factory Building, #304-600 (251-E) 5/22/1942, revised 3/5/1943
Oversize Tube   48  
Underground Duct-Factory Building, #601-900 (252-E) 5/22/1942, revised 3/5/1943
Oversize Tube   48  
Underground Duct-Factory Building, #901-1200 (253-E) 5/22/1942, revised 3/5/1943
Oversize Tube   48  
Underground Duct-Factory Building, #1201-1500 (254-E) 5/22/1942, revised 3/5/1943
Oversize Tube   48  
Underground Duct-Factory Building, #1501-1739-A (255-E) 5/22/1942, revised 3/5/1943
Oversize Tube   48  
Underground Feeder Service, #1739-1838 440 V. Power, 440 V. Welding and 220 V. Power (256-E)
Oversize Tube   48  
Underground Feeder Service, #1839-1959 180 ~ HiCycle and 220 V. and 440 V. Power (257-E)
Oversize Tube   48  
#1960-2200 (258-E) 5/22/1942
Oversize Tube   48  
#2201-2500 (259-E) 5/22/1942, revised 3/5/1943
Oversize Tube   48  
Underground Feeder Service, #2501-2800 440 V. Power (260-E)
Oversize Tube   48  
Underground Feeder Service, #2801-3022 440 V. Power, 250 V. D.C. and 180 ~ HiCycle Receptacles (261-E)
Oversize Tube   48  
Underground Feeder Service, #3023-3112 180 ~ HiCycle Receptacles and 110 V. Receptacles (262-E)
Oversize Tube   48  
Underground Feeder Service, #3113-3299 120 V. Receptacles, Sub-Station Lighting, and Low Tension (263-E)
Oversize Tube   48  
Underground Feeder Service, #3300-3350 440 V. Power (264-E)
Oversize Tube   48  
Underground Feeder Service, #3351-3401 440 V. Power (265-E)
Oversize Tube   48  
Underground Feeder Service, #3402-3452 440 V. Power (266-E)
Oversize Tube   48  
Underground Feeder Service, #3453-3503 440 V. Power (267-E)
Oversize Tube   48  
Underground Feeder Service, #3504-3554 440 V. Power (268-E)
Oversize Tube   48  
Underground Feeder Service, #3555-3606 440 V. Power (269-E)
Oversize Tube   48  
Underground Feeder Service, #3607-3657 440 V. Power (270-E)
Oversize Tube   48  
Underground Feeder Service, #3658-3708-E, 440 V. Power (271-E)
Oversize Tube   48  
Underground Feeder Service, #3709-3759 440 V. Power (272-E) revised 11/16/1942
Oversize Tube   49  
Underground Feeder Service, #3760-3877-B, Low Tension (273-E)
Oversize Tube   49  
Underground Feeder Service, #3878-3979 Low Tension (274-E)
Oversize Tube   49  
Underground Feeder Service, #3980-4121-A (275-E)
Oversize Tube   49  
Underground Feeder Service, #4122-4314-B, General Lighting and 180 ~ HiCycle Power (276-E)
Oversize Tube   49  
#4315-4400 (277-E) 5/22/1942, revised 3/5/1943
Oversize Tube   49  
Power Conduits-Sub-Stations A-D & M, #4401-4700 (278-E) 12/4/1941, revised 3/5/1943
Oversize Tube   49  
Power Conduits-Sub-Stations E-K, #4701-5000 (279-E) 12/4/1941, revised 3/5/1943
Oversize Tube   49  
Underground Feeder Service, #5000-5115-A, 180 ~ HiCycle and General Lighting (280-E)
Oversize Tube   49  
Underground Feeder Service, #5116-5200 440 V. Power and General Lighting (281-E)
Oversize Tube   49  
Control Conduits-Sub-Stations E-K, #5201-5500 (282-E) 1/17/1942, revised 3/5/1943
Oversize Tube   49  
Underground Feeder Service, #6000-6099 180 ~ HiCycle (285-E)
Oversize Tube   49  
Underground Feeder Service, #6100-6199 110 V. Receptacles (286-E)
Oversize Tube   49  
Underground Duct-Factory Building, #6501-6800 (288-E) 5/22/1942, revised 3/5/1943
Oversize Tube   49  
Underground Duct-Factory Building, #6801-7000 (289-E) 5/22/1942, revised 3/27/1943
Oversize Tube   49  
Feeder Service, #7001-7160 440 V. Power, 220 V. Monorail and Low Tension (290-E)
Oversize Tube   49  
Feeder Service, #7161-7300 (291-E)
Oversize Tube   49  
#7301-7500 (292-E) 5/22/1942, revised 3/5/1943
Oversize Tube   49  
Sub-Station Power, #7501-7800 (293-E) 4/8/1942, revised 3/5/1943
Oversize Tube   49  
Sub-Station Power, #7801-8100 (294-E) 4/8/1942, revised 3/5/1943
Oversize Tube   49  
Sub-Station Control, #8401-8700 (296-E) 4/8/1942, revised 3/5/1943
Oversize Tube   49  
#9301-9600 (299-E) 5/22/1942, revised 3/5/1943
Oversize Tube   49  
#9601-9900 (300-E) 5/22/1942, revised 3/5/1943
Oversize Tube   49  
#9901-10,000 (301-E) 5/22/1942, revised 3/5/1943
 
Ford Motor Company, Airfield for Airplane Parts Manufacturing Building (Willow Run Bomber Factory), Job No. 1888-R, Ypsilanti, Michigan 1941-1944
 
Construction Drawings by Albert Kahn Associated Architects & Engineers, Inc.
 
Architectural Drawings for Airfield (pencil and ink drawings on vellum and ink drawings on linen)
Oversize Tube   50  
Plan of Flying Field (F-1) revised 12/4/1941 (36-1/2x48 inches)
Oversize Tube   50  
Plan of Flying Field (F-1-R) 8/28/1941 (36x46-3/4 inches)
Oversize Tube   50  
Details of Runway and Taxiway (2-F) 7/18/1941 (23-1/2x36 inches)
Oversize Tube   50  
Details of Runway and Taxiway (2-F-R) undated (31-1/2x65-1/4 inches)
Oversize Tube   50  
Details of Runway and Taxiway (3-F) undated (31-1/2x65-1/4 inches)
Oversize Tube   50  
Details of Flying Field Construction Shed (4-F) 7/23/1941, revised 8/7/1941 (14x27-1/4 inches)
Oversize Tube   50  
Location Plan for Airplane Anchor Tie-Downs (5-F) 10/2/1941, revised 11/27/1941 (16-1/2x54-3/4 inches)
Oversize Tube   50  
Details of Airport Floodlight Transformer Vault (6-F) revised 12/4/1941 (31-1/4x58 inches)
Oversize Tube   50  
Location Plan of Numerals and Wind Tee Circles for Runway Marking (7-F-R) revised 4/10/1942 (35x49-3/4 inches)
Oversize Tube   50  
Plan of Numerals and Wind Tee Circles for Runway Markings (8-F-R) undated (39-1/2x46-3/4 inches)
 
Mechanical Drawings for Airfield (pencil-on-vellum drawings)
Oversize Tube   50  
Field Drainage Plan (200-M)

(date illegible)

(sepia print, 34x47-1/4 inches)
Oversize Tube   50  
Details of Manholes #2 and 3 (201-M) 9/2/1941 (23-1/4x32-1/2 inches)
Oversize Tube   50  
Details of Manholes "X" (202-M) 10/1/1941 (23-1/4x33-1/4 inches)
 
Electrical Drawings for Airfield (pencil-on-vellum drawings, 32-1/4x64-3/4 to 33-1/2x67-3/4 inches)
Oversize Tube   51  
Diagram of Flying Field One-Line Wiring (92-E) 10/24/1941, revised 9/8/1943
Oversize Tube   51  
Plans and Sections of Equipment in Floodlight Transformer Vaults (93-E) 5/6/1942, revised 9/8/1943 (32x76 inches)
Oversize Tube   51  
Details of Hangar and Factory Building Obstruction Lighting (94-E) 10/24/1941, revised 5/5/1944 (ink-on-linen drawing)
Oversize Tube   51  
Details of Flying Field Lighting (95-E) 10/24/1941, revised 4/10/1942
Oversize Tube   51  
Details of Flying Field Control Desk (96-E) 3/8/1943 (ink-on-linen drawing)
Oversize Tube   51  
Diagram of Three-Line Connection of 2300 V. Vertical Lift Switchgear in Airport Sub-Station (97-E) 5/28/1942 (ink-on-linen drawing)
Oversize Tube   51  
Plans and Sections of Airport Sub-Station (98-E) 5/23/1942 (32-1/2x45-1/2 inches)
Oversize Tube   51  
Equipment Location and Underground Details (99-E) 11/14/1941, revised 9/8/1943
Oversize Tube   51  
Details of Inserts and Conduit in Floodlight Transformer Vaults (100-E) 10/24/1941, revised 9/8/1943
Oversize Tube   51  
Details of Relay and Circuit Breaker Cabinet for Floodlight Transformer Vaults (101-E) 12/1/1941, revised 5/13/1942
Oversize Tube   51  
Cable Schedule for Underground Duct System around Flying Field (102-E) 2/2/1942, revised 4/20/1942
Oversize Tube   51  
Cable Schedule for Underground Duct System around Flying Field (103-E) 2/2/1942, revised 4/20/1942
Oversize Tube   51  
Conduit Schedule for Airport Hangar Sub-Station 6/1942

(not numbered due to vellum damage)

(32-1/4x72 inches)
 
Electrical Drawings (cont) (pencil and ink drawings on vellum, 32-3/4x45-3/4 to 33x47-3/4 inches)
Drawer   19 Folder   8
Flying Field Equipment Schedule (104-E) 1/26/1942, revised 2/13/1942 (ink-on-linen drawing)
Drawer   19 Folder   8
Circuit Chart for Relay Cubicle in Hangar Sub-Station (105-E) 5/13/1942, revised 9/28/1942
Drawer   19 Folder   8
Circuit Chart for Relay Cubicle in Hangar Sub-Station (106-E) 9/28/1942
Drawer   19 Folder   8
Details of Cubicles for Constant Current Transformers in Hangar Sub-Station (107-E) 3/4/1942
Drawer   19 Folder   8
Details of Large Power and Control Conduit Installation in Airport Hangar Sub-Station (108-E) 3/29/1942
Drawer   19 Folder   8
Plan and Details of Control Conduit for Airport Hangar Sub-Station (109E) 3/29/1942, revised 5/6/1942
Drawer   19 Folder   8
Insert and Grounding Plan for First Floor of Hangar Sub-Station (110-E) 3/28/1942, revised 5/6/1942
Drawer   19 Folder   8
Insert Details for Airport Sub-Station-Hangar Building (112-E) 3/28/1942, revised 5/6/1942
Drawer   19 Folder   8
Diagrams of Connections to Relay and Distribution Cabinet Terminals in Flying Field Vaults 1-12 (113-E) 5/13/1942
Drawer   19 Folder   8
Wind Tee Details and Plan of Obstruction Light Layout around Houses in N.W. Corner of Flying Field (114-E) 5/20/1942
Drawer   19 Folder   8
Plan and Sections of Constant Current Transformer Cubicles in Airport Sub-Station (115-E) 5/6/1942, revised 7/7/1942
Drawer   19 Folder   8
Diagrams of Control Wire Connections between Control Panels and 2300 V. Switchgear in Airport Sub-Station (116-E) 6/8/1942
Drawer   19 Folder   8
Schematic Control Diagrams for 2300 V. Switchgear in Airport Sub-Station (117-E) 6/8/1942, revised 10/30/1942
Drawer   19 Folder   8
Wiring Diagrams of Miscellaneous Equipment in Airport Sub-Station (118-E) 6/8/1942, revised 3/8/1943
 
Diagrams of Terminal Connections in Auxiliary Relay Cubicle at Airport Sub-Station (119-E) 9/28/1942
 
Ohio Stamping Plant, Chrysler Corporation, Automotive Body Division, Job No. 2117, Twinsburg, Ohio 1956
Oversize Tube   112  
Construction Drawings, Architectural (5 drawings)
 
Shaarey Zedek Temple, Congregation Shaarey Zedek, Job No. 2138, Southfield, Michigan 1960
Oversize Tube   110  
Construction Drawings, Architectural and Structural (60 drawings)
 
Shaarey Zedek Temple, Congregation Shaarey Zedek, Job No. 2138, Southfield, Michigan 1960-1962
Oversize Tube   111  
Construction Drawings, Mechanical and Electrical (49 drawings)
 
Shaarey Zedek Temple, Congregation Shaarey Zedek, Job No. 2138-A, Southfield, Michigan 1960-1964
Oversize Tube   114  
Construction Drawings, Architectural, Structural, Mechanical, and Electrical (23 drawings)
 
General Electric, Appliance and Television Group, Appliance Park East, Job No. 2223-A, Columbia, Maryland 1969-1972
Drawer   45 Folder   5
Construction Drawings, Electrical (26 drawings)