Albert Kahn Associates records: 1825-2014 (bulk 1900-1945)
full text File Size: 4086 K bytes | how to request materials

 
Request materials for use in the Bentley Library
Container / Location Title
 
Job No. 900-999 [subseries]
 
Cadillac Motor Car Company, Sales and Service Building and Addition, Job No. 900, 900-A & 900-E, York Street and Cass Avenue, Detroit, Michigan 1919-1926
 
Cadillac Sales & Service Building (Job No. 900)
 
Construction Drawings
 
Architectural Drawings, except as noted 5/22/1919 (blue prints, 28x35 inches)
Drawer   29 Folder   12
First Floor Plan (3) revised 7/29/1919
Drawer   29 Folder   12
Second Floor Plan (4)

(undated due to paper damage)

Drawer   29 Folder   12
Third Floor Plan (5) revised 7/29/1919
Drawer   29 Folder   12
Typical Floor Plan (6) revised 7/29/1919
Drawer   29 Folder   12
Sixth Floor Plan and Details of First Story Windows, York Street Elevation (7) revised 7/29/1919
Drawer   29 Folder   12
Roof and Pent House Roof Plans and Details of Monitor and Flagpole (8) revised 7/29/1919
Drawer   29 Folder   12
Cass Avenue (East) Elevation (9)
Drawer   29 Folder   12
York Street (South) Elevation (10)
Drawer   29 Folder   12
North Elevation and Details of Used Car Room (11) revised 7/29/1919
Drawer   29 Folder   12
West Elevation and Details of Steel Sash Partitions (12) revised 7/29/1919
Drawer   29 Folder   12
Transverse Section, Section thru' Examination Room and Interior Elevations (13) revised 7/29/1919
Drawer   29 Folder   12
Details of Upper Portion of York Street and North Elevations and Details of Shield on Roof Balustrade (15)
Drawer   29 Folder   12
Exterior Details (16)
Drawer   29 Folder   12
Plan of Pent House and Details of Stairs No. 2 (17) revised 7/29/1919
Drawer   29 Folder   12
Detail of Stairs No. 2 (18) revised 7/29/1919
Drawer   29 Folder   12
Details of Stairs No. 1 (19) revised 7/29/1919
Drawer   29 Folder   12
Transverse Section thru' Examination Room and Details of Doors and Skylight (20)
Drawer   29 Folder   12
Details of Passenger Elevator and Dumb Waiter (21) undated
Drawer   29 Folder   12
Interior Details for Sales Room (22)
Drawer   29 Folder   12
Details of Main Lobby and Stairs and of Show Windows (23) 5/27/1919
 
Structural Drawings 5/22/1919 (blue prints, 28x35 inches)
Drawer   29 Folder   13
Column and Footing Schedule and Details (1-S) revised 7/3/1919
Drawer   29 Folder   13
Details of Basement Walls and First Floor Plan (2-S) revised 7/21/1919
Drawer   29 Folder   13
Second Floor Plan and Beam Schedule (3-S) revised 7/31/1919
Drawer   29 Folder   13
Third, Fourth, Fifth and Sixth Floors Plan and Beam Schedule (4-S) revised 7/31/1919
 
Mechanical Drawings, 6/9/1919 revised 8/14/1919 except as noted 6/9/1919, revised 8/14/1919 (blue prints, 28x35 inches)
Drawer   29 Folder   13
Drainage Plan (1-M) 8/15/1919
Drawer   29 Folder   13
First Floor Plan (2-M)
Drawer   29 Folder   13
Second Floor Plan (3-M)
Drawer   29 Folder   13
Typical Third, Fourth and Fifth Floor Plan (4-M)
Drawer   29 Folder   13
Sixth Floor Plan (5-M)
Drawer   29 Folder   13
Boiler Room Plan and Riser Diagram (6-M)
 
Cadillac Sales and Service Building Addition (Job No. 900-A)
 
Construction Drawings by Albert Kahn, Inc., Architects
 
Architectural Drawings, except as noted 12/1/1925 (ink-on-vellum drawings, 29x38 inches, except as noted)
Drawer   30 Folder   1
Plot Plan (1) revised 12/16/1925
Drawer   30 Folder   1
Foundation Plan (2) revised 12/21/1925
Drawer   30 Folder   1
First Floor Plan (3) revised 2/17/1926
Drawer   30 Folder   1
Second Floor Plan (4), due to paper damage undated
Drawer   30 Folder   1
Roof Plan (5) revised 2/17/1926
Drawer   30 Folder   1
Sections "A-A" through "E-E" and Elevation Looking towards Ramp (6) revised 2/17/1926
Drawer   30 Folder   1
York Street, North and West Elevations (7) revised 12/16/1925
Drawer   30 Folder   1
Details of South and West Walls and Ramp (8) revised 2/17/1926
Drawer   30 Folder   1
Details of Stairs and Doors (9) revised 12/22/1925
Drawer   30 Folder   1
Details of Ramp (10) (pencil-on-vellum drawing, 26x36 inches)
Drawer   30 Folder   1
Alternate Details Using Asbestos Protected Metal Covering for New Roof Ramp (11) 6/2/1924 (pencil-on-vellum drawing, 21-1/4x31-1/4 inches)
 
Structural Drawings 12/2/1925, revised 12/16/1925 (ink-on-linen drawings, 31-1/2x41-1/2 inches)
Drawer   30 Folder   1
Second Floor Framing Plan and Beam Schedule (1-S)
Drawer   30 Folder   1
Roof Plan and Future Second Floor Mezzanine Framing Plan and Details (2-S)
Drawer   30 Folder   1
Column Schedule and Details (3-S)
 
Mechanical Drawings 12/23/1925 (ink-on-linen drawings, 31-1/2x41-1/2 inches)
Drawer   30 Folder   1
Foundation Plan (1-M)
Drawer   30 Folder   1
First Floor Plan (2-M)
Drawer   30 Folder   1
Second Floor Plan (3-M)
Drawer   30 Folder   1
Plan of Present Boiler Room and Details (4-M)
 
New Service Offices and Waiting Room (Job No. 900-E)
 
Construction Drawings by Albert Kahn, Inc., Architects
 
Architectural Drawing 6/30/1926 (pencil-on-vellum drawing, 26x26 inches)
Drawer   30 Folder   1
First Floor Plan and Interior Elevations (1)
 
Mechanical Drawing 7/15/1926 (ink-on-linen drawing, 28x28 inches)
Drawer   30 Folder   1
Foundation and First Floor Plans and Details (1-M)
 
General Motors (Durant) Building, Job No. 902, Detroit, Michigan 1919-1920
Box   2  
Specification for Office and Laboratory Building, Durant Building Corporation by Albert Kahn, Incorporated 8/2/1919
 
Construction Drawings by Albert Kahn, Architect
 
Architectural Drawings 8/2/1919 (Ink-on-linen drawings with pencil notations, 28-3/4x34 to 29x44 inches)
Drawer   12 Folder   6
Plot Plan Showing Present Buildings (A-1) undated
Drawer   12 Folder   6
Plot Plan (1)
Drawer   12 Folder   6
Excavation Plan (A-2) 6/6/1919
Drawer   12 Folder   6
Details of Swimming Pools (2) revised 9/2/1919
Drawer   12 Folder   6
Grading Plan (A-3) revised 5/28/1921
Drawer   12 Folder   6
Details of Laboratory Foundations and Tunnel (3)

(undated due to linen damage)

Drawer   12 Folder   6
Plan of Foundation and Sub-Basement (4) revised 1/3/1922
Drawer   12 Folder   6
Basement Plan (5-R) revised 1/3/1922
Drawer   12 Folder   6
First Floor Plan (6) revised 1/3/1922
Drawer   12 Folder   6
Plan of Mezzanine Floor and First Floor of Laboratory (7) revised 1/3/1922
Drawer   12 Folder   6
Second Floor Plan (8) revised 5/16/1921
Drawer   12 Folder   6
Third Floor Plan (9) revised 5/16/1921
Drawer   12 Folder   6
Fourth Floor Plan (10) revised 9/27/1920
Drawer   12 Folder   6
Fifth Floor Plan (11) revised 9/27/1920
Drawer   12 Folder   6
Typical Floor Plan (12) revised 11/1/1920
Drawer   12 Folder   6
Fourteenth Floor Plan (13) revised 6/23/1920
Drawer   12 Folder   6
Fifteenth Floor Plan (14) revised 6/23/1920
Drawer   12 Folder   6
Plan of Pipe Space and Sixteenth Floor (15) revised 7/20/1920
Drawer   12 Folder   6
Roof Plan (16) revised 6/10/1920
Drawer   12 Folder   7
North Elevation, Grand Boulevard

(not numbered or dated due to print damage)

(sepia print)
Drawer   12 Folder   7
South Elevation, Milwaukee Avenue (18) revised 9/2/1919
Drawer   12 Folder   7
West Elevation, Second Avenue (19) revised 9/2/1919
Drawer   12 Folder   7
Section "A-A" (20) revised 9/2/1919
Drawer   12 Folder   7
Section "B-B" (21) revised 1/3/1922
Drawer   12 Folder   7
Section "C-C" thru' Courts #1, 2 & 4, Looking towards Laboratory (22) revised 7/9/1920
Drawer   12 Folder   7
Section "D-D" thru' Courts # 1, 2 & 4, Looking North (23-R) revised 1/3/1922
Drawer   12 Folder   7
Sections "E-E" and "J-J" (24) revised 1/3/1922
Drawer   12 Folder   7
Elevations of Courts # 2 & 4 and Sections "G-G" and "H-H" (25) revised 5/5/1920
Drawer   12 Folder   7
Section "F-F" thru' Courts # 3 & 7, Looking East (26) revised 5/18/1920
Drawer   12 Folder   7
Section "I-I" thru' Courts # 1 & 8, Looking West (27) revised 1/3/1922
Drawer   12 Folder   7
Details of Driveway (28)

(undated due to linen damage)

Drawer   12 Folder   7
Details of Main Entrance, West Grand Boulevard (29) revised 9/2/1919 (sepia print)
Drawer   12 Folder   7
Details of Main Entrance (30) revised 9/2/1919
Drawer   12 Folder   7
Details of First Story Windows (31) revised 2/24/1920
Drawer   12 Folder   7
Details of Entrances to Shops on Grand Boulevard and Second and Cass Avenues (32) revised 6/10/1920
Drawer   12 Folder   8
Details of Typical Window Frames and Typical Walls and Spandrels (33) revised 1/3/1922
Drawer   12 Folder   8
Basement Plan, East Half, Future Arrangement (34)

(undated due to linen damage)

Drawer   12 Folder   8
Wall Sections (34-R) revised 1/3/1922
Drawer   12 Folder   8
Details of Fourteenth and Fifteenth Stories (35) revised 1/3/1922
Drawer   12 Folder   8
Details of Laboratory Entrance Portico, Milwaukee Street Elevation (36) revised 1/3/1922
Drawer   12 Folder   8
Details of Laboratory, Milwaukee Street Elevation (37) revised 7/9/1920
Drawer   12 Folder   8
Details of Laboratory Entrance Steps, Milwaukee Street Elevation (38) revised 7/9/1920
Drawer   12 Folder   8
Detail of Typical Bay for Laboratory (39)

(undated due to linen damage)

Drawer   12 Folder   8
Details of Connection between Laboratory and Office Building (40) revised 1/3/1922
Drawer   12 Folder   8
Foundation Plan of Stairs, Elevators, etc. of Laboratory Building, Footing Plan of Exterior Columns and Area Walls, and Sections thru' Columns at Basement Floor (41) revised 5/10/1920
Drawer   12 Folder   8
Basement and First Floor Plans of Laboratory Building (42) revised 1/3/1922
Drawer   12 Folder   8
Mezzanine and Second Floor Plans of Laboratory Building (43) revised 1/3/1922
Drawer   12 Folder   8
Plans of Third Floor, Pent Houses at Fifth Floor and North Wall at Fourth Floor of Laboratory Building (44) revised 1/3/1922
Drawer   12 Folder   8
Detail Sections of Elevators L-1 to L-4 and Stairs # 9 (45) revised 1/3/1922
Drawer   12 Folder   8
Cross-Section thru' Laboratory at Fourth Floor, Typical Elevation of Half-Bay and Sections "T-T" and "U-U" thru' Fresh Air Intake and Shaft (46) revised 1/3/1922
Drawer   12 Folder   8
Plans of Stairs # 1 at Basement through Fourth Floors and at East Entrance (47) revised 6/10/1920
Drawer   12 Folder   8
Plans of Stairs # 1 at Eleventh through Fifteenth Floors (48-R) 1/2/1920, revised 9/3/1920
Drawer   12 Folder   9
Details of Elevators "A" to "M" & "Z" and Stairs # 7 & 8 (49) revised 6/10/1920
Drawer   12 Folder   9
Basement Plan of Elevators and Lobby and Details of Freight Elevators (50) revised 7/1920
Drawer   12 Folder   9
Detail Plans of Stairs # 8 & 12 and Elevators "A" to "M" & "W" to "Z" (51) revised 9/1/1920
Drawer   12 Folder   9
Details of Elevators "A" to "M" and Stairs # 2 (52) revised 9/1/1920
Drawer   12 Folder   9
Details of Elevators and Stairs (53) revised 1/3/1922
Drawer   12 Folder   9
Detail Plans of Stairs # 2, 5 & 15 and Elevators "A" to "M" & "Z" (54) revised 6/23/1920
Drawer   12 Folder   9
Plan of Pent House, Plan at Pipe Space and Details of Stairs (55) revised 1/3/1922
Drawer   12 Folder   9
Sections thru' Stairs # 1 & 6, 7 & 8 and 2 & 5 (56) revised 6/10/1920
Drawer   12 Folder   9
Typical Floor Plan Showing Men's Toilet and Stairs # 1 and Elevations and Details of Toilets (57) revised 1/3/1922
Drawer   12 Folder   9
Elevations of Corridors (58) revised 9/1/1920
Drawer   12 Folder   9
Detail Sections of Hollow Metal Doors, Frames and Trim and Section thru' Stair # 15 (59) revised 1/3/1922
Drawer   12 Folder   9
Details of Main Entrance Lobby #104 (60) revised 3/24/1920
Drawer   12 Folder   9
Reflected Ceiling Plans and Elevations of Elevator Lobby and Stairway # 3 (61) revised 9/2/1919
Drawer   12 Folder   9
Elevations and Ceiling Plan of East and West Corridors (62) revised 9/1/1920
Drawer   12 Folder   9
Details of Entrance Lobby # 105 to Laboratory (63) revised 1/3/1922
Drawer   12 Folder   9
Detail Sections thru' Stairs # 10 and Lobby # 210 (64)

(undated due to linen damage)

Drawer   12 Folder   9
Plan of Sub-Basement and Machine Room (65) 9/9/1919, revised 1/3/1922
Drawer   12 Folder   10
Details of Laboratory Flues (66) 11/12/1919, revised 5/10/1920
Drawer   12 Folder   10
Sections "C-C" and "D-D" thru' Stair # 1 and Elevations and Details for Toilets (67) 1/2/1920, revised 1/3/1922
Drawer   12 Folder   10
Revised Marble and Plaster Work in Stairs # 3 & 4 and Lobbies # 104 & 105 (68) 1/2/1920, revised 2/17/1920
Drawer   12 Folder   10
Detail Sections thru' Stairs # 10 and Lobby # 210, Showing Revised Finish of Plaster and Marble Wainscot (70) 1/3/1920, revised 1/3/1922
Drawer   12 Folder   10
Details of Air Shaft and Revised Details Showing New Location of Two-Part Sliding Doors to Office Building from Driveway (71) 1/6/1920
Drawer   12 Folder   10
Details of West End of Driveway (72) revised 12/11/1920
Drawer   12 Folder   10
Details of Driveway at East End of Building (73) 1/20/1920, revised 12/11/1920
Drawer   12 Folder   10
Details of Doors in Basement (74) 5/11/1920, revised 7/26/1920
Drawer   12 Folder   10
Details of Mailing Room, Monorail and Men Janitors' Locker Room # 5-C (75) 5/11/1920, revised 1/3/1922
Drawer   12 Folder   10
Details of Women's Toilet Room # 21, Toilets # M-8, M-9 & M-13, and Utility Space (76) revised 1/3/1922
Drawer   12 Folder   10
Plan of Mezzanine Floor Utilities Space and Miscellaneous Details (77) revised 1/3/1922
Drawer   12 Folder   10
Basement Plan for Telephone Conduit Layout (78) undated
Drawer   12 Folder   10
Revisions to Stairs # 8 between Sub-Basement and First Floor and Details of Stairs # 5 (270 & 274) 3/30/1920, revised 7/23/1920
 
Structural Drawings (Ink-on-linen drawings with pencil notations, 37-1/2x47 to 36-1/4x48 inches)
Drawer   12 Folder   11
Column Schedule (1-S) revised 9/2/1919
Drawer   12 Folder   11
Column Schedule (2-S) revised 9/2/1919
Drawer   12 Folder   11
Details of Columns (3-S) 8/11/1919
Drawer   12 Folder   11
Half Framing Plan of First Floor (4-S) 9/22/1919
Drawer   12 Folder   11
Half Framing Plan of Mezzanine Floor revised 9/22/1919

(not numbered due to linen damage)

Drawer   12 Folder   11
Half Framing Plan of Second Floor (6-S) revised 9/9/1919
Drawer   12 Folder   11
Third Floor Framing Plan (7-S) revised 9/2/1919
Drawer   12 Folder   11
Typical Floor Half Framing Plan of Fourth to Eleventh Floors (8-S) 6/28/1919, revised 9/10/1919
Drawer   12 Folder   11
Plan of Framing Adjoining Laboratory at First Floor of Laboratory (9-S) 6/28/1919, revised 9/13/1919
Drawer   12 Folder   11
Half Framing Plan of Twelfth and Thirteenth Floors (10-S) 7/1/1919, revised 8/2/1919
Drawer   12 Folder   11
Half Framing Plan of Fourteenth Floor (11-S) 8/1/1919
Drawer   12 Folder   11
Half Framing Plan of Fifteenth Floor (12-S) revised 9/2/1919
Drawer   12 Folder   11
Half Framing Plan of Pipe Gallery

(not numbered or dated due to linen damage)

Drawer   12 Folder   11
Half Framing Plan of Roof (14-S) revised 9/15/1919
Drawer   12 Folder   11
Wind Bracing Details (15-S) revised 9/6/1919
Drawer   13 Folder   1
Girder Details (16-S) revised 8/6/1919
Drawer   13 Folder   1
Details of Girders and Trusses (17-S) revised 9/23/1919
Drawer   13 Folder   1
Penthouse Roof Plan and Truss Details (18-S) revised 9/16/1919
Drawer   13 Folder   1
Framing Plan of Ground, First, Second and Forty-Third Floors of Laboratory (19-S) revised 9/24/1919
Drawer   13 Folder   1
Framing Plan of Fourth Floor and Penthouses (20-S) 8/2/1919, revised 10/16/1919
Drawer   13 Folder   1
Beam Schedule for Laboratory Building 10/17/1919

(not numbered due to linen damage)

Drawer   13 Folder   1
Details of Trusses for Laboratoy (22-S) 8/1/1919, revised 8/15/1919
Drawer   13 Folder   1
Footing Schedule 8/8/1919, revised 10/8/1919

(not numbered due to linen damage)

Drawer   13 Folder   1
Details of Retaining Walls of Main Building (24-S) undated
Drawer   13 Folder   1
Details of Retaining Walls around Sub-Basement (25-S) revised 10/15/1919
Drawer   13 Folder   1
Details of Men's and Women's Swimming Pools (26-S) undated
Drawer   13 Folder   1
Details of Trusses (27-S)

(undated due to linen damage)

Drawer   13 Folder   1
Column Schedule (28-S)

(undated due to linen damage)

Drawer   13 Folder   1
Details of Roof and Pipe Gallery Framing

(not numbered or dated due to linen damage)

 
Structural "Sketches" (Ink-on-linen drawings with pencil notations)
Drawer   13 Folder   2
Section thru' Vacuum Room of Laboratory Building (112-S) 9/9/1919, revised 9/15/1919 (12-1/2x22-3/4 inches)
Drawer   13 Folder   2
Plan and Revised Layout of Retaining Wall between Columns # 263 & 176A (113-S) 9/12/1919 (10-1/4x34 inches)
Drawer   13 Folder   2
Elevation of Retaining Walls at Driveways (114-S) 9/17/1919, revised 9/18/1919 (17x22 inches)
Drawer   13 Folder   2
Elevation Showing Location of Bolts for Beam Seats for Beams Connecting Laboratory with Durant Building (115-S) 9/29/1919, revised 10/13/1919 (15-1/4x37 inches)
Drawer   13 Folder   2
Elevation Showing Location of Bolts for Beam Seats for Beams Connecting Laboratory with Durant Building (117-S) 10/10/1919 (15-1/2x38-3/4 inches)
Drawer   13 Folder   2
Plan and Section of Proposed Walkway around Testing Machine Opening at Ground Floor Level-Laboratory Building (119-S) 1/10/1920 (14x22 inches)
Drawer   13 Folder   2
Elevation Showing Location of Bolts for Beam Seats for Beams Connecting Laboratory with Durant Building at Second Floor of Laboratory (120-S) 10/13/1919 (14-3/4x38-1/4 inches)
Drawer   13 Folder   2
Elevation Showing Location of Bolts for Beam Seats for Beams Connecting Laboratory with Durant Building at Third Floor of Laboratory (121-S) 10/15/1919 (15x38-1/2 inches)
Drawer   13 Folder   2
Details of Concrete Columns Supporting Steel Girders, Showing Base Plates and Anchor Bolts for Same-Laboratory Building (122-S) 10/21/1919 (13x26-1/4 inches)
Drawer   13 Folder   2
Details of Pipe Sleeves in Laboratory (124-S) 11/4/1919, revised 11/26/1919 (24-1/2x33-1/2 inches)
Drawer   13 Folder   2
Details of Instrument Tower-Laboratory Building (125-S) 11/12/1919 (26x32 inches)
Drawer   13 Folder   2
Plan and Section of Openings in Floors for Steam Risers (128-S) 12/3/1919 (15-1/2x20 inches)
 
Structural Drawings (cont) (Black and red ink drawings on linen with pencil notations, 24-1/4x30 to 28x43-1/2 inches)
Drawer   13 Folder   3
Changes in Framing at Vents B and F (132-S) 1/19/1920, revised 4/22/1920 (Pencil-on-vellum drawing)
Drawer   13 Folder   3
Plans and Sections of Beams and Girders-Field Work, First and Second Floors (133-S) 1/19/1920, revised 2/20/1920
Drawer   13 Folder   3
Details of Brackets on Columns Supporting Girders and Trusses in Laboratory (136-S) 1/28/1920
Drawer   13 Folder   3
Details of Brackets Supporting Beams, Ground to Fourth Floors (139-S) 2/2/1920, revised 3/12/1920
Drawer   13 Folder   3
Details of Framing for Locker Rooms in Courts # 2 & 4 (140-S) 4/1/1920, revised 4/21/1920
Drawer   13 Folder   3
Details of Concrete Spandrels in Courts # 1 & 5 at Second Floor (141-S) 2/19/1920, revised 3/25/1920
Drawer   13 Folder   3
Details of Bracing for Girder G-36 (143-S) 3/22/1920
Drawer   13 Folder   3
Revised Details of Columns 77, 78 & 96-A at Fourteenth Floor, Elevator "A" (144-S) 4/21/1920
Drawer   13 Folder   3
Plan and Sections of Pit for Elevator "A" and Details of Pipe Chase in Sub-Basement (151-S) 4/20/1920
Drawer   13 Folder   3
Part Plans and Sections of Laboratory Floors over Openings for Tower and Machine Room (154-S) 4/15/1920
Drawer   13 Folder   3
Plans of Stairways # 17-20 (157-S) 4/26/1920, revised 10/6/1920
Drawer   13 Folder   3
Details of New Brackets on Columns 332 & X91-A (160-S) 4/29/1920, revised 5/7/1920
Drawer   13 Folder   3
Plans and Sections of Framing and Footings in Basement Truckway (161-S & 162-S) 5/11/1920, revised 5/22/1920
Drawer   13 Folder   3
Details of Floor over Vacuum Room Opening in Laboratory (165-S) 5/17/1920
Drawer   13 Folder   3
Record of Test Borings (188-S) 9/23/1920
 
Mechanical Drawings 8/12/1919 (Ink-on-linen drawings with pencil notations, 36x44-1/4 to 36-1/4x48 inches)
Drawer   13 Folder   4
Plot Plan revised 2/4/1920

(not numbered due to linen damage)

Drawer   13 Folder   4
Sub-Basement Plan, East Half (2-M) revised 12/6/1920
Drawer   13 Folder   4
Sub-Basement Plan, West Half (3-M) revised 12/27/1922
Drawer   13 Folder   4
Basement Plan, East Half (4-M) revised 5/23/1921
Drawer   13 Folder   4
Basement Plan, West Half (5-M) revised 8/17/1922
Drawer   13 Folder   4
First Floor Plan, East Half (6-M) revised 10/26/1921
Drawer   13 Folder   4
First Floor Plan, West Half (7-M) revised 8/17/1922
Drawer   13 Folder   4
Mezzanine Floor Plan, East Half (8-M) revised 5/23/1921
Drawer   13 Folder   4
Mezzanine Floor Plan, West Half (9-M) revised 2/24/1922
Drawer   13 Folder   4
Second Floor Plan, East Half (10-M) revised 6/16/1920
Drawer   13 Folder   4
Second Floor Plan, West Half (11-M) revised 8/6/1920
Drawer   13 Folder   4
Typical Floor Plan of Floors # 3 to 12, East Half (12-M) revised 6/16/1920
Drawer   13 Folder   4
Typical Floor Plan of Floors # 3 to 13, West Half (13-M) revised 6/18/1920
Drawer   13 Folder   5
Fourteenth Floor Plan, East Half (14-M) revised 5/2/1922
Drawer   13 Folder   5
Fourteenth Floor Plan, West Half (15-M) revised 9/8/1920
Drawer   13 Folder   5
Fifteenth Floor Plan, East Half (16-M) revised 5/2/1922
Drawer   13 Folder   5
Fifteenth Floor Plan, West Half (17-M) revised 6/11/1920
Drawer   13 Folder   5
Pipe Space Plan, East Half (18-M) revised 9/8/1920
Drawer   13 Folder   5
Pipe Space Plan, West Half (19-M) revised 8/5/1920
Drawer   13 Folder   5
Pent House Plan and Vent Riser Details (20-M) revised 8/5/1920
Drawer   13 Folder   5
Drainage Plan, Laboratory (21-M) revised 4/20/1920
Drawer   13 Folder   5
Basement Plan, Laboratory (22-M) revised 8/24/1921
Drawer   13 Folder   5
Ground Floor Plan, Laboratory (23-M) revised 10/21/1921
Drawer   13 Folder   5
First Floor Plan, Laboratory (24-M) revised 10/21/1921
Drawer   13 Folder   5
Second Floor Plan, Laboratory (25-M) revised 8/24/1921
Drawer   13 Folder   5
Third Floor Plan, Laboratory (26-M) revised 8/24/1921
Drawer   13 Folder   6
Fourth Floor Plan, Laboratory (27-M)

(undated due to linen damage)

Drawer   13 Folder   6
Machine Room Plan (28-M) revised 7/20/1920
Drawer   13 Folder   6
Swimming Pool Details (29-M) revised 1/28/1920
Drawer   13 Folder   6
Piping Diagrams (30-M)

(undated due to linen damage)

Drawer   13 Folder   6
Piping Details (31-M) revised 5/18/1920
Drawer   13 Folder   6
Tunnel Piping Details (32-M) 9/13/1919, revised 7/6/1920
Drawer   13 Folder   6
Heating Riser Diagram (33-M) revised 6/11/1920
Drawer   13 Folder   6
Heating Riser Diagram (34-M) revised 6/11/1920
Drawer   13 Folder   6
Heating Riser Diagram (35-M) revised 1/31/1920
Drawer   13 Folder   6
Heating Riser Diagram (36-M) revised 10/19/1920
Drawer   13 Folder   6
Heating Riser Diagram (37-M) revised 1/31/1920
Drawer   13 Folder   6
Details of Pipe Shafts (38-M) revised 1/22/1920
 
Electrical Drawings (Ink-on-linen drawings with pencil notations, 36x48 to 36x51 inches)
Drawer   13 Folder   7
Sub-Basement Plan (39-M) 10/10/1919, revised 6/17/1920
Drawer   13 Folder   7
Basement Wiring Plan, East Half (40-M) 1/8/1920, revised 6/17/1920
Drawer   13 Folder   7
Basement Wiring Plan, West Half (41-M) 8/12/1919, revised 11/1/1920
Drawer   13 Folder   7
First Floor Plan (42-M) 10/10/1919, revised 11/26/1920
Drawer   13 Folder   7
Mezzanine Floor Plan (43-M) 10/10/1920, revised 6/1/1920
Drawer   13 Folder   7
Second Floor Plan (44-M) 10/10/1920, revised 5/29/1920
Drawer   13 Folder   7
Typical Floor Plan, East Half, Third to Twelfth Floors (45-M) 6/21/1920, revised 6/25/1920
Drawer   13 Folder   7
Plan of Center Connection between Main Building and Laboratory (46-M) 10/10/1919, revised 6/20/1920
Drawer   13 Folder   7
Fourteenth Floor Lighting Plan, East Half (47-M) revised 1/9/1922
Drawer   13 Folder   7
Fifteenth Floor Lighting Plan, East Half (48-M) 7/17/1920, revised 1/9/1922
Drawer   13 Folder   7
Fifteenth Floor Lighting Plan, West Half (49-M) 7/17/1920, revised 1/9/1922
Drawer   13 Folder   7
Fifteenth Floor and Pipe Space Plan, East Half-Kitchen Wiring (50-M) 1/8/1920, revised 1/9/1922
Drawer   13 Folder   7
Sixteenth Floor and Pipe Space Wiring Plan, West Half-Wiring (51-M) 1/8/1920, revised 1/9/1922

(letter from F. Gossman attached, 1/29/1965)

Drawer   13 Folder   7
Pent House Plan (52-M) 10/10/1919, revised 3/26/1920
Drawer   13 Folder   8
Basement Plan, Laboratory (53-M) 9/21/1919, revised 1/9/1922
Drawer   13 Folder   8
Ground Floor Plan, Laboratory (54-M) 10/10/1919, revised 1/9/1922
Drawer   13 Folder   8
First Floor Plan, Laboratory (55-M) 10/10/1919, revised 1/9/1922
Drawer   13 Folder   8
Second Floor Plan, Laboratory (56-M) 10/10/1919, revised 1/9/1922
Drawer   13 Folder   8
Third Floor Plan, Laboratory (57-M) 10/10/1919, revised 10/17/1920
Drawer   13 Folder   8
Fourth Floor Plan, Laboratory (58-M) 8/12/1919, revised 1/9/1922
Drawer   13 Folder   8
Light and Power Riser Diagram (59-M) 10/10/1919, revised 1/9/1922
Drawer   13 Folder   8
Plan of Electrical Conduit Lines and Sections of Duct Lines (60-MR) revised 5/21/1920
Drawer   13 Folder   8
Site Plan of Additions to Sewers by Albert Kahn, Architect, Ernest Wilby, Associate (61-M) revised 12/16/1919 (17-1/2x30 inches)
Drawer   13 Folder   8
First Floor Plan, Laboratory by Albert Kahn, Architect, Ernest Wilby, Associate (62-M) 10/22/1919 (17-1/2x31-1/2 inches)
Drawer   13 Folder   8
Layout of Electrical Lab, East End of First Floor (63-M) revised 11/20/1919 (27-1/2x60 inches)
Drawer   13 Folder   8
Plan of Register Openings (64-M) undated (17-1/2x31-1/2 inches)
Drawer   13 Folder   8
Layout of Electric Sub-Station in Laboratory Basement (64-M) ?/17/1920, revised 7/7/1921 (Pencil-on-paper drawing, 27x38-1/4 inches)
Drawer   13 Folder   8
Details of Power House Tunnel revised 1/20/1920

(not numbered due to linen damage)

(30-1/4x54 inches)
Drawer   13 Folder   8
Plan Showing Location of Light Outlets in Typical Bays by Albert Kahn, Architect, Ernest Wilby, Associate (66-M) 12/16/1919 (17x30-3/4 inches)
Drawer   13 Folder   8
Riser Diagrams for Low Tension Conduit, Clock and Telephone Systems, Main Building and Laboratory (67-M) 2/3/1920, revised 1/9/1922
 
Mechanical and Electrical Drawings (Ink-on-linen drawings, 36x48 to 36x51 inches)
Drawer   13 Folder   9
Plan of Revised Machine Room Piping (68-M) revised 5/23/1921
Drawer   13 Folder   9
Layout of Sprinkler, Basement (69-M) undated
Drawer   13 Folder   9
Thirteenth Floor Radiator Plan (70-M) 6/11/1920, revised 1/9/1922
Drawer   13 Folder   9
Thirteenth Floor Lighting Plan revised 1/9/1922

(not numbered due to linen damage)

Drawer   13 Folder   9
Detail of Special Manhole Cover (75-M) 6/23/1920 (17-1/2x30-3/4 inches)
Drawer   13 Folder   9
Details of Refrigerator Piping (76-M) 1/9/1922
Drawer   13 Folder   9
Elevations and Details of Laboratory Power Cabinets (77-M) revised 10/17/1920
Drawer   13 Folder   9
Fire Alarm Riser Diagram (80-M) 8/24/1920 (25-1/2x26 inches)
Drawer   13 Folder   9
Thirteenth and Fourteenth Floor Plans (83) 10/18/1920, revised 1/9/1922 (21-1/4x39-3/4 inches)
Drawer   13 Folder   9
Details of Supply and Return Connections to Vento Heaters for Fan Units (85-M) 11/18/1920 (17-1/2x31 inches)
Drawer   13 Folder   9
First Floor Electrical Plan by Albert Kahn Architect and Engineers (88-M) 12/9/1921, revised 1/9/1922
Drawer   13 Folder   9
Electrical Plan of Mezzanine over Sales Rooms # 106-B & 106-C by Albert Kahn Architects and Engineers (89-M) 1/12/1922, revised 1/9/1922
Drawer   13 Folder   9
Mezzanine Floor Electrical Plan by Albert Kahn Architects and Engineers (90-M) 1921, revised 1/9/1922
Drawer   13 Folder   9
First Floor Electrical Plan, West End

(not numbered or dated due to paper damage)

(Pencil-on-paper drawing, 19-3/4x28-1/2 inches)
Drawer   13 Folder   9
Details of Transformer Room No. 1

(not numbered or dated due to linen damage)

(29-1/2x41 inches)
Drawer   13 Folder   9
Details of Transformer Room No. 1 5/26/1920

(not numbered due to linen damage)

(29-1/2x42 inches)
Drawer   13 Folder   9
Details of Transformer Room No. 2

(not numbered or dated due to linen damage)

(29-1/2x40-1/4 inches)
Drawer   13 Folder   9
Details of Transformer Room No. 2 (48-M) 5/20/1920 (30x41 inches)
 
Fisher Body Company, Job No. 940, Cleveland, Ohio 1920
Oversize Tube   75  
Construction Drawings, Architectural (26 drawings)
 
Fisher Body Company, Job No. 940, Cleveland, Ohio 1920
Oversize Tube   76  
Construction Drawings, Stuctural (21 drawings)
 
Fisher Body Company, Job No. 940, Cleveland, Ohio 1920
Oversize Tube   77  
Construction Drawings, Mechanical and Electrical (28 drawings)
 
Fisher Body Company, Power House, Job No. 940-A, Cleveland, Ohio 1920
Drawer   34 Folder   17
Construction Drawings, Architectural, Stuctural, and Mechanical (31 drawings)
 
Ford Motor Company, Service Building, Addition of Second Story Offices Over One Story Showroom, Job No 982, 982-D, Sao Paulo, Brazil 1920, 1934
Drawer   37 Folder   2
Construction Drawings, Architectural, Structural, and Mechanical (25 drawings)
 
Ford Motor Company, Iron Mountain Plant, Job No. 988, 988-A, B, C, D, E, G, J, K, L, M, N, P and Y, Iron Mountain and Pequaming, Michigan 1923-1927
 
General Plot Plan by Albert Kahn, Inc., Architects (Job No. 988)
Drawer   24 Folder   11
Architectural Drawing undated (ink-on-linen drawing, 30x41 inches)
 
Wood Distillation Plant by Albert Kahn, Architect (Job No. 988-A)
 
Construction Drawings
 
Architectural Drawings 5/2/1923 (ink-on-linen drawings with pencil notations, 31x40 inches, except as noted)
Drawer   24 Folder   11
General Plot Plan (0) undated (31x41 inches)
Drawer   24 Folder   11
Plot Plan (1) revised 12/22/1923
Drawer   24 Folder   11
Door and Lintel Schedules and Sections "A-A" to "J-J" (2)
Drawer   24 Folder   11
Foundation Details for Lime Lee Stills and Tanks (3)
Drawer   24 Folder   11
Column Details (4)
Drawer   24 Folder   11
Footing Plan for Primary Stills between Columns 1-10 (5)
Drawer   24 Folder   11
Foundation Plan for Refinery, Plan of Footings under Tanks, and Sections "A-A" to "H-H" (6) revised 12/14/1923
Drawer   24 Folder   11
Footing Plan, Columns 13-20, Acetate Drying and Ethyl Acetate Buildings (7) revised 12/24/1923
Drawer   24 Folder   11
First Floor Plan, Columns 1-10, Primary Still Building (8) revised 6/21/1923
Drawer   24 Folder   11
Second Floor Plan, Columns 1-10, Primary Still Building (9) revised 6/21/1923
Drawer   24 Folder   11
First, Second and Third Floor Plans, Refinery (10) revised 12/14/1923
Drawer   24 Folder   11
Fourth and Fifth Floor Plans, Refinery, and Details (11)
Drawer   24 Folder   11
First Floor Plan, Columns 13-20, Acetate Drying and Ethyl Acetate Buildings (12) revised 1/31/1924
Drawer   24 Folder   11
Second Floor Plan, Columns 13-20, Acetate Drying and Ethyl Acetate Buildings (13) revised 6/19/1924
Drawer   24 Folder   11
Third Floor Plan, Columns 13-20, Acetate Drying and Ethyl Acetate Buildings, and Detail of Stairway #4 (14) revised 6/19/1924
Drawer   24 Folder   11
Roof Plan (15) revised 6/19/1924
Drawer   24 Folder   11
North Elevation, Columns H-1 to H-10 (16) revised 9/15/1923
Drawer   24 Folder   11
North Elevation, Columns H-10 to H-13 and South Elevation, Columns A-10 to A-13 (17)
Drawer   24 Folder   11
North Elevation, Columns H-13 to H-20 (18) revised 6/19/1924
Drawer   24 Folder   11
West Elevation (19) revised 12/24/1923
Drawer   24 Folder   12
South Elevation, Columns A-13 to A-20 (20) revised 6/19/1924
Drawer   24 Folder   12
South Elevation, Columns A-1 to A-10 (21) revised 9/15/1923
Drawer   24 Folder   12
East Elevation (22) revised 9/15/1923
Drawer   24 Folder   12
Section on Line "A-A" (23) revised 9/15/1923
Drawer   24 Folder   12
Section on Line "B-B" (24) revised 9/15/1923
Drawer   24 Folder   12
Section "C-C" (25) revised 8/27/1923
Drawer   24 Folder   12
Section on Line "D-D" (26) revised 6/19/1924
Drawer   24 Folder   12
Section on Line "E-E" (27) revised 9/15/1923
Drawer   24 Folder   12
Section "F-F" and Details of Sludge Duct and Trench (28) revised 1/31/1924
Drawer   24 Folder   12
Section on Line "G-G" (29)
Drawer   24 Folder   12
Plan of Lower Floor of Dryers and Mezzanine in Ethyl Acetate Building and Section on Line "G-G" (30) revised 1/31/1924
Drawer   24 Folder   12
Section "G-G" (31) revised 6/19/1924
Drawer   24 Folder   12
Section "H-H" (32)
Drawer   24 Folder   12
Detail of Stairway No. 3 (33)
Drawer   24 Folder   12
Detail of Flashing in Hy-Rib Wall (34) revised 9/15/1923
Drawer   24 Folder   12
Interior Details of Refinery (35) revised 1/31/1924
Drawer   24 Folder   12
Details of Industrial Rails, Curbs and Bumpers (36)
Drawer   24 Folder   12
Details of Doors, Metal Curtain Wall, Gas Duct, Tracks, etc. (37)
Drawer   24 Folder   12
Detail of Fire Escape No. 1 (38)
Drawer   24 Folder   12
Detail of Fire Escape No. 2 (39)
 
Structural Drawings of Wood Distillation Plant, except as noted 4/23/1923 (ink-on-linen drawings with pencil notations, 31x40 inches)
Drawer   24 Folder   13
Roof Plan and Details (1-S)
Drawer   24 Folder   13
Bottom Chord Plan (2-S) revised 5/10/1923
Drawer   24 Folder   13
Sections Showing Trusses, Primary Still Department (3-S)
Drawer   24 Folder   13
Sections Showing Trusses and Sway Frames, Refining and Acetate Drying Departments (4-S)
Drawer   24 Folder   13
Second Floor Plan, Primary Still Department (5-S) revised 5/16/1923
Drawer   24 Folder   13
Second and Third Floor Plans, Refinery (6-S) revised 7/14/1923
Drawer   24 Folder   13
Fourth and Fifth Floor Plans, Refinery (7-S) revised 6/12/1923
Drawer   24 Folder   13
Second Floor Plan, Acetate Drying Department (8-S) revised 11/21/1923
Drawer   24 Folder   13
Third Floor Plan, Acetate Drying Department (9-S) revised 9/7/1923
Drawer   24 Folder   13
Second Floor and Mezzanine Plans, Ethyl Acetate Department (10-S) revised 9/25/1923
Drawer   24 Folder   13
Third Floor Plan, Ethyl Acetate Department (11-S) revised 5/17/1923
Drawer   24 Folder   13
North and South Elevations (12-S)
Drawer   24 Folder   13
End Elevations (13-S) revised 9/12/1923
Drawer   24 Folder   13
Sections Showing Refinery Walls (14-S) revised 8/16/1923
Drawer   24 Folder   13
Column Schedule (15-S)
Drawer   24 Folder   13
Details of Fire Escapes (16-S) 6/7/1923
Drawer   24 Folder   13
Miscellaneous Details (17-S) revised 10/10/1923
Drawer   24 Folder   13
Sections Showing Concrete Work for Continuous Acetate Dryers (18-S) 5/3/1923, revised 9/17/1923
Drawer   24 Folder   13
Details of Miscellaneous Platforms and Supports (20-S) 4/2/1924
 
Mechanical and Electrical Drawings of Wood Distillation Plant by Albert Kahn Architect 10/1/1923 (ink-on-linen drawings with pencil notations, 31x40 inches)
Drawer   25 Folder   1
Plot Plan (1-M)
Drawer   25 Folder   1
Foundation Plan, Primary Stills (2-M)
Drawer   25 Folder   1
First Floor Plan, Primary Stills (3-M)
Drawer   25 Folder   1
Second Floor Plan, Primary Stills (4-M)
Drawer   25 Folder   1
Foundation, First Floor and Second Floor Plans, Refinery (5-M)
Drawer   25 Folder   1
Third, Fourth and Fifth Floor Plans, Refinery (6-M)
Drawer   25 Folder   1
Foundation Plan, Acetate Drying and Ethyl Acetate (7-M) revised 2/7/1924
Drawer   25 Folder   1
First Floor Plan, Acetate Drying and Ethyl Acetate (8-M) revised 2/7/1924
Drawer   25 Folder   1
Plan of Lower Floor of Driers and Mezzanine, Acetate Drying and Ethyl Acetate (9-M)
Drawer   25 Folder   1
Second Floor Plan, Acetate Drying and Ethyl Acetate (10-M) revised 2/7/1924
Drawer   25 Folder   1
Third Floor Plan, Acetate Drying and Ethyl Acetate (11-M) revised 2/7/1924
Drawer   25 Folder   1
Heating Riser Diagram and Miscellaneous Details (12-M) revised 2/7/1924
 
Carbonization Building (Job No. 988-B) by Albert Kahn, Architect
 
Construction Drawings
 
Architectural Drawings, except as noted 10/6/1923 (ink-on-linen drawings with pencil notations, 31x47-1/2 inches)
Drawer   25 Folder   2
Plot Plan (101)
Drawer   25 Folder   2
Foundation Plan, Briquetting Department (102)
Drawer   25 Folder   2
Foundation Plan, First Floor Plan and Second Floor Plan Retort Department (103) revised 7/30/1923
Drawer   25 Folder   2
Foundation Plan, Wood Drying Department (104)
Drawer   25 Folder   2
First Floor Plan, Briquetting Department (105)
Drawer   25 Folder   2
Second Floor Plan, Briquetting Department (106) revised 4/14/1925
Drawer   25 Folder   2
Second Floor Gallery Plan, Operating Floor Plan and Fourth Floor Plan, Retort Department (107) revised 7/30/1923
Drawer   25 Folder   2
First Floor Plan, Wood Drying Department (108)
Drawer   25 Folder   2
Second Floor Plan, Wood Drying Department (109R) 4/4/1924
Drawer   25 Folder   2
Floor Plans at Elevations: 140'-6", 146' and 130', Wood Drying Department (109A) 4/4/1924
Drawer   25 Folder   2
Roof Plan (110)
Drawer   25 Folder   2
North Elevation, Column F-1 to F-9 (111) revised 4/14/1925
Drawer   25 Folder   2
North Elevation, Columns F-9 to F-11, and South Elevation, Columns A-9 to A-11 (112) revised 7/30/1923
Drawer   25 Folder   2
North Elevation, Columns F-11 to F-19 (113)
Drawer   25 Folder   2
West Elevation (114)
Drawer   25 Folder   3
South Elevation, Columns A-11 to A-19 (115)
Drawer   25 Folder   3
South Elevation, Columns A-1 to A-9 (116)
Drawer   25 Folder   3
East Elevation and West and South Elevations of Scrubber Tank (117)
Drawer   25 Folder   3
Longitudinal Section thru' Briquetting Department "A-A" (118) revised 4/13/1925
Drawer   25 Folder   3
Section thru "C-C," Briquetting Department, and Sections "L-L" and "M-M" (119) revised 4/11/1925
Drawer   25 Folder   3
Sections "B-B" and "D-D" (120) revised 4/14/1925
Drawer   25 Folder   3
Sections on Lines "E-E' and "F-F" (121) revised 7/30/1923
Drawer   25 Folder   3
Section "G-G" (122) 4/4/1924
Drawer   25 Folder   3
Section "H-H" (123)
Drawer   25 Folder   3
Sections "I-I" and "J-J" (124)
Drawer   25 Folder   3
Details of Metal Curtains between Columns, of Rail Connections to Concrete, and of Curbs (125)
Drawer   25 Folder   3
Details of Stairways and Tin-Clad Doors (126)
Drawer   25 Folder   3
Sections "N-N" and "O-O" (127) 4/4/1924
Drawer   25 Folder   3
Details of Platforms in Retort and Briquetting Departments (128) 4/4/1924, revised 4/14/1925
 
Structural Drawings of Carbonization Building, except as noted 5/3/1923 (ink-on-linen drawings with pencil notations, 31x39-3/4 inches, except as noted)
Drawer   25 Folder   4
Roof Plan--Top Chord and Details of Typical Connections--Purlin Bracing (101-S)
Drawer   25 Folder   4
Bottom Chord Plan and Typical Details of Strut Connections (102-S)
Drawer   25 Folder   4
Sections Showing Roof Trusses "A," "B" & "C" and Sway Frames (103-S)
Drawer   25 Folder   4
Sections Showing Roof Trusses "D," "E" and "D-D" (104-S) revised 6/22/1923
Drawer   25 Folder   4
Floor Plans, Retort Department (105-S) revised 2/13/1924
Drawer   25 Folder   4
Sections Showing Retort House Walls (106-S) revised 9/6/1923
Drawer   25 Folder   4
Plan and Sections of Wood Dryer Supports (107-S) revised 3/7/1924
Drawer   25 Folder   4
Details of Wood Dryer Supports (108-S)
Drawer   25 Folder   4
North and South Elevations (109-S) revised 1/29/1924
Drawer   25 Folder   4
East and West Elevations (110-S)
Drawer   25 Folder   4
Details of Platforms and Walkways (111-S) 8/15/1923, revised 4/30/1924
Drawer   25 Folder   4
Details of Bins and Walkways (112-S) 8/15/1923, revised 3/6/1924 (31x41 inches)
Drawer   25 Folder   4
Column Schedule (113-S) revised 9/21/1923
Drawer   25 Folder   5
Details of Platforms and Walkways (114-S) 8/15/1923, revised 3/11/1924
Drawer   25 Folder   5
Plan and Details of Foundations, Charcoal Cooling and Briquetting Department (115-S) 9/4/1923, revised 2/22/1924
Drawer   25 Folder   5
Details of Retort Bay Foundations (116-S) 7/24/1923, revised 1/31/1924
Drawer   25 Folder   5
Footing Schedule and Details, Wood Drying Department (117-S) 9/5/1923, revised 1/31/1924
Drawer   25 Folder   5
Details of Intermediate Floors and Walkways in Charcoal Cooling and Briquetting Department (119-S) 9/4/1923, revised 4/28/1924
Drawer   25 Folder   5
Details of Intermediate Floors in Charcoal Bin and Sections in Charcoal Cooling and Briquetting Department (120-S) 9/4/1923, revised 1/15/1924
Drawer   25 Folder   5
Details of Charcoal Bin (121-S) 8/25/1923, revised 1/15/1924
Drawer   25 Folder   5
Details of Supports for Gas Scrubber (123-S) 1/31/1924, revised 2/22/1924
Drawer   25 Folder   5
Details of Floors and Framing, Briquetting Plant (124-S) 1/29/1924, revised 2/13/1924
Drawer   25 Folder   5
Details of Floors and Framing, Charcoal Pulverizing and Screening Plant (125-S) 2/23/1924
Drawer   25 Folder   5
Details of Foundations for Wood Dryers (126-S) revised 2/22/1924
Drawer   25 Folder   5
Miscellaneous Foundation Details (127-S) 2/8/1924, revised 2/26/1924
Drawer   25 Folder   5
Details of Miscellaneous Steel Work, Retort Bay (128-S) 3/12/1924, revised 4/15/1924
 
Mechanical Drawings of Carbonization Building undated (ink-on-linen drawings with pencil notations, 31x47 inches)
Drawer   25 Folder   6
Foundation Plan, Charcoal Briquetting Department (1-M)
Drawer   25 Folder   6
First Floor Plan, Briquetting Department (2-M)
Drawer   25 Folder   6
Second Floor Plan, Briquetting Department (3-M)
Drawer   25 Folder   6
Floor Plans, Retorts Department (4-M)
Drawer   25 Folder   6
Floor Plans, Retorts Department (5-M)
Drawer   25 Folder   6
Foundation Plan, Wood Drying Department (6-M)
Drawer   25 Folder   6
First Floor Plan, Wood Drying Department (7-M)
Drawer   25 Folder   6
Second Floor Plan, Wood Drying Department (8-M)
 
Power House No. 1 (Job No. 988-C) by Albert Kahn, Architect
 
Construction Drawings
 
Architectural Drawings 8/13/1923 (ink-on-linen drawings with pencil notations, 34x46-1/2 inches, except as noted)
Drawer   25 Folder   7
Plot Plan (201) revised 9/14/1923
Drawer   25 Folder   7
Plans of Foundation, Basement and Ground Floor (202) 3/31/1925
Drawer   25 Folder   7
Plans of Water Treatment Floor, Boiler Floor and Turbine Room (203) 4/6/1925
Drawer   25 Folder   7
Plans of Bunker Floor and Platforms over Boilers (204) revised 4/6/1924
Drawer   25 Folder   7
Plans of Conveyor Room and Heater Floor, Elevation of Chimneys and Electric Sign, and Details of Steel Sash Partitions (205) revised 9/10/1924
Drawer   25 Folder   7
East and North Elevations (206) revised 2/14/1924
Drawer   25 Folder   7
West and South Elevations and Details of Stairs No. 2 & 3 (207) revised 2/14/1924
Drawer   25 Folder   7
Transverse Section on Line "A-A" (208) revised 4/8/1925
Drawer   25 Folder   7
Section thru' Boiler Room on Line "C-C" and Details of Open Steel Stairs (209) revised 4/3/1925
Drawer   25 Folder   7
Section thru' Boiler Room on Line "B-B" and Details of Elevator (210) revised 4/6/1925
Drawer   25 Folder   7
Section thru' Turbine Room, Looking toward Boiler House on Line "D-D" (211) revised 10/1/1923
Drawer   25 Folder   7
Details of Stairs No. 1 and No. 4 (212) revised 2/26/1924
Drawer   25 Folder   7
Details of Monitor Skylights and West Wall (213) revised 9/7/1923
Drawer   25 Folder   7
Details of North, South and East Elevations (214) revised 12/12/1923
Drawer   25 Folder   7
Details of Main Entrance to Boiler House and Doors (215) revised 9/14/1923
Drawer   25 Folder   7
Details of Additions and Alterations to Stairways, Power House No. 1 (218) undated (pencil-on-vellum drawing, 28x34-3/4 inches)
Drawer   25 Folder   7
Details of Platforms in Front of Boilers (219) 4/1/1925, revised 4/20/1925
 
Structural Drawings, except as noted 8/22/1923 (ink-on-linen drawings, with pencil notations, 31x39-1/2 inches)
Drawer   25 Folder   8
Plan of Roof and Bottom Chord (201-S) revised 12/21/1923
Drawer   25 Folder   8
Floor Plans of Turbine and Boiler (202-S) revised 4/8/1924
Drawer   25 Folder   8
Cross Section "A-A" (203-S) revised 4/29/1924
Drawer   25 Folder   8
Longitudinal Section "B-B" (204-S) revised 4/29/1924
Drawer   25 Folder   8
Plan and Sections of Saw Dust Bunker (205-S) revised 9/14/1923
Drawer   25 Folder   8
East and West Elevations (206-S) revised 9/19/1923
Drawer   25 Folder   8
North and South Elevations (207-S) revised 11/1/1923
Drawer   25 Folder   8
Details of Walkway and Stairway System (108-S) revised 12/6/1923
Drawer   25 Folder   8
Column Schedule (209-S) revised 9/18/1923
Drawer   25 Folder   8
Revised Foundation Plan (210-S) 8/20/1923, revised 10/26/1923
Drawer   25 Folder   8
Revised Footing Schedule and Miscellaneous Details (211-S) 9/6/1923, revised 9/18/1923
Drawer   25 Folder   8
Details of Revised Chimney Foundations (212-S) 8/31/1923, revised 9/5/1923
Drawer   25 Folder   8
Details of Boiler Framing (213-S)
Drawer   25 Folder   8
Details of Miscellaneous Platforms (214-S) revised 10/26/1923
Drawer   25 Folder   9
Plan of Revised Arrangement of Pipe Tunnels (215-S) 9/5/1923
Drawer   25 Folder   9
Ground Floor Plan and Sections (218-S) 9/10/1923, revised 10/26/1923
Drawer   25 Folder   9
Details of Dust Catcher No. 1 (219-S) 9/26/1923, revised 2/22/1924
Drawer   25 Folder   9
Details of Dust Catcher No. 2 (220-S) 9/26/1923, revised 2/22/1924
Drawer   25 Folder   9
Miscellaneous Details (221-S) 10/26/1923, revised 1/4/1924
Drawer   25 Folder   9
Miscellaneous Details (222-S) 12/14/1923, revised 5/8/1924
Drawer   25 Folder   9
Details of Main Gas Ducts under Boilers (223-S) 1/24/1924, revised 2/11/1924
Drawer   25 Folder   9
Erection Plan, Boiler No. 3 (225-S) 4/1/1924
Drawer   25 Folder   9
Details of Ash Hopper, Boiler No. 3 (226-S) 3/31/1924, revised 4/21/1924
Drawer   25 Folder   9
Details of Framing for Boiler No. 3 (227-S) 4/1/1924
Drawer   25 Folder   9
Details of Crushed and Pulverized Coal Bins (228R-S) 7/30/1924, revised 8/28/1924
Drawer   25 Folder   9
Details of 500 K-W Turbo-Generator Foundation (229-S) 7/11/1924, revised 10/23/1925
 
Addition to Present Saw Mill (Job 988-D) by Albert Kahn, Architect
 
Construction Drawings
 
Architectural Drawings 5/2/1923 (ink-on-linen drawings with pencil notations, 31x39-3/4 inches)
Drawer   25 Folder   10
Plot Plan (301) revised 7/12/1923
Drawer   25 Folder   10
Footing and First Floor Plans (302) revised 8/24/1923
Drawer   25 Folder   10
Saw Mill and File Room Floor Plans (303) revised 9/29/1923
Drawer   25 Folder   10
North, South and West Elevations and Cross-Section on Line "A-A" (304) revised 9/29/1923
Drawer   25 Folder   10
Longitudinal Section on Line "B-B" and Details of Exterior and Stairs (305) revised 9/17/1923
 
Structural Drawings, except as noted 5/3/1923 (ink-on-linen drawings with pencil notations, 31x39-3/4 inches)
Drawer   25 Folder   10
Bottom Chord Plan, Roof Plan and Filing Room Floor Plan (301-S) revised 6/5/1923
Drawer   25 Folder   10
Cross-Section, Column Schedule and Details of Truss B and Sway Frames (302-S) revised 6/5/1923
Drawer   25 Folder   10
Elevations and Typical Building Sections (303-S) revised 6/5/1923
Drawer   25 Folder   10
Second Floor Plan and Beam Schedule (304-S) revised 7/11/1923
Drawer   25 Folder   10
Second Floor Details (305-S) revised 7/11/1923
Drawer   25 Folder   10
Foundation Plan and Column and Footing Schedule (306-S) 6/13/1923, revised 12/12/1923
 
Conveyor Bridges (Job No. 988-E) by Albert Kahn, Architect
 
Construction Drawings
 
Architectural Drawings, except as noted 10/6/1923 (ink-on-linen drawings with pencil notations, 32-1/2x41-3/4 inches, except as noted)
Drawer   25 Folder   11
Plan and Sections of Bridge between Power House and Saw Mill (401)
Drawer   25 Folder   11
Plan, South Elevation and Sections of Bridge between Power House and Saw Mill

(not numbered)

(pencil-on-vellum drawing, 29x39 inches)
Drawer   25 Folder   11
Plan, East Elevation and Sections of Bridge between Saw Mill and Carbonization Building (403) 11/1/1923
Drawer   25 Folder   11
Plans at Conveyor Walkways and at Auxiliary Conveyor Platforms of Monitor on Present Saw Mill (404) 11/23/1923, revised 1/17/1924
Drawer   25 Folder   11
North, South and West Elevations and Sections of Monitor on Present Saw Mill (405) revised 1/17/1924
Drawer   25 Folder   11
Sections of Monitor on Present Saw Mill (406) 11/23/1923, revised 1/17/1924
Drawer   25 Folder   11
Plan, Elevation and Sections of Bridge between Wood Storage and Carbonization Buildings (407) undated
 
Structural Drawings (ink-on-linen drawings with pencil notations, 31x40 inches)
Drawer   25 Folder   11
Site Plan Showing General Arrangement of Conveyor Bridges (400-S) 9/24/1923, revised 11/6/1923
Drawer   25 Folder   11
Plan, Elevations and Sections of Bridge between Power House and Saw Mill (401-S) 9/21/1923, revised 3/13/1924
Drawer   25 Folder   11
Plans of Top and Bottom Chord Bracing, Elevations and Sections of Bridge between Carbonization Building and Saw Mill (402-S) 10/30/1923, revised 11/7/1923
Drawer   25 Folder   11
Details Showing Conveyor Layout and Supports in New Saw Mill (403-S) 12/13/1923
Drawer   25 Folder   11
Details Showing Conveyor Arrangement and Monitor over Present Saw Mill (404-S) 12/23/1923, revised 3/13/1924
Drawer   25 Folder   11
Monitor Elevations and Details Showing Arrangement of Columns under Monitor of Present Saw Mill (405-S) 12/13/1923, revised 12/14/1924
Drawer   25 Folder   11
Details Showing Alterations to Trusses in Present Saw Mill (406-S) 12/13/1923
Drawer   25 Folder   11
Bridge Support and Miscellaneous Details (407-S) 12/13/1923, revised 1/24/1924
Drawer   25 Folder   11
Details of Bridge between Carbonization Building and Wood Storage Bins (408-S) 11/7/1923, revised 3/13/1924
 
Shipping Building (Job No. 988-G) by Albert Kahn, Architect
 
Construction Drawings
 
Architectural Drawings 1/2/1924 (ink-on-linen drawings, 31x39-1/2 inches)
Drawer   25 Folder   12
Plot, Foundation, Floor and Roof Plans (601)
Drawer   25 Folder   12
Elevations and Sections (602)
Drawer   25 Folder   12
Miscellaneous Details (603)
 
Structural Drawings, except as noted 2/6/1924 (ink-on-linen drawings with pencil notations, 31x40-3/4 inches)
Drawer   25 Folder   12
Roof Framing Plan, Elevations, Cross-Section and Typical Section for Columns (601-S)
Drawer   25 Folder   12
Foundation Plan and Sections (602-S)
Drawer   25 Folder   12
Details of Pipe Bridge from Distillation Building to Shipping Building (603-S) 4/14/1924
 
Mechanical Drawing 4/1/1924 (ink-on-linen drawing, 30-1/2x39-1/2 inches)
Drawer   25 Folder   12
Plot, Foundation and Floor Plans (1-M)
 
Charcoal and Briquette Storage Plant (Job No. 988-J) by Albert Kahn, Inc., Architects
 
Construction Drawings
 
Architectural Drawings 1/6/1925 (ink-on-linen drawings with pencil notations, 29-3/4x40 inches)
Drawer   25 Folder   13
Foundation and Footing Plan and Details (1402)
Drawer   25 Folder   13
First Floor Plan and Details (1403)
Drawer   25 Folder   13
Plans of Bin Bottoms and Penthouse and Details (1404)
Drawer   25 Folder   13
Elevations (1405)
Drawer   25 Folder   13
Cross-Section "A-A" (1406)
Drawer   25 Folder   13
Sections "B-B" and "C-C" and Typical Wall Sections (1407)
 
Structural Drawings 12/16/1924 (ink-on-linen drawings with pencil notations, 30x39 inches)
Drawer   25 Folder   13
Details of Concrete Deck and Foundation (1401-S) revised 1/2/1925
Drawer   25 Folder   13
Details of Concrete for Conveyor Tunnel and Hoist Pit (1402-S) revised 1/8/1925
Drawer   25 Folder   13
Detail of Hopper and Bucket Guides (1403-S)
Drawer   25 Folder   13
Details Showing General Arrangement of Tunnel and Storage Conveyors in Carbonization Building (1404-S) 12/17/1924
 
Tar Distillation Plant--Addition to Distillation Building (Job No. 988-K) by Albert Kahn, Architect
 
Construction Drawings
 
Architectural Drawings 12/20/1923 (ink-on-linen drawings, 31x39-3/4 inches)
Drawer   26 Folder   1
Plot and Roof Plans (501)
Drawer   26 Folder   1
Foundation and First Floor Plans (502)
Drawer   26 Folder   1
Second and Third Floor Plans (503)
Drawer   26 Folder   1
North and South Elevations (504)
Drawer   26 Folder   1
West Elevation (505)
Drawer   26 Folder   1
Section "A-A" and Stairway Details (506)
Drawer   26 Folder   1
Section "B-B" (507)
Drawer   26 Folder   1
Miscellaneous Details (508)
 
Structural Drawings (ink-on-linen drawings, 31x40 inches)
Drawer   26 Folder   1
Foundation Plan, Footing Schedule and Details (501-S) 10/18/1923, revised 12/19/1923
Drawer   26 Folder   1
Roof Plan, Elevations, Cross-Section and Column Schedule (502-S) 11/22/1923
Drawer   26 Folder   1
Second and Third Floor Plans and Details (503-S) 10/30/1923, revised 12/19/1923
 
Mechanical Drawings 2/11/1924 (ink-on-linen drawings with pencil notations, 31x40 inches)
Drawer   26 Folder   1
Foundation and First Floor Plans (1-M)
Drawer   26 Folder   1
Second and Third Floor Plans (2-M)
 
Gas Duct System for Wood Distillation Plant (Job No. 988-L) by Albert Kahn, Architect, and Albert Kahn, Inc., Architects
 
Construction Drawings
 
Architectural Drawing 12/22/1923 (ink-on-linen drawing, 31x39-1/2 inches)
Drawer   26 Folder   2
Plot Plan (701)
 
Structural Drawings, except as noted 12/22/1923 (ink-on-linen drawings with pencil notations, 31x39-3/4 inches, except as noted)
Drawer   26 Folder   2
Sections Showing Flue Gas Duct through Distillation Building (700-S) revised 4/2/1924
Drawer   26 Folder   2
Plan, Elevation and Details Showing General Arrangement of Exterior Gas Mains (701-S) revised 2/25/1924
Drawer   26 Folder   2
Details of Gas Duct Supports (702-S) revised 2/25/1924
Drawer   26 Folder   2
Plan and Sections Showing Arrangement of Gas Ducts in Carbonization Building (703-S) revised 4/2/1924
Drawer   26 Folder   2
Sections and Gas Duct Details for Carbonization Building (704-S) revised 4/2/1924
Drawer   26 Folder   2
Details of Duct Connections (705-S) 2/11/1924, revised 4/3/1924
Drawer   26 Folder   2
Details of Footings for Outside Gas Duct Supports (706-S) 2/9/1924, revised 2/11/1924
Drawer   26 Folder   2
Details of Supports for Gas Duct in Distillation Building (708-S) 3/14/1924
Drawer   26 Folder   2
Details of Duct Supports in Charcoal and Briquetting Plant and in Carbonization Building (709-S) 3/24/1924, revised 7/16/1924
Drawer   26 Folder   2
Details of Duct Supports in Wood Drying Department in Carbonization Building (710-S) 4/2/1924
Drawer   26 Folder   2
Details of Alterations in Briquette Dryers, Ducts and Fans in Carbonization Building (711-S) 6/29/1925 (25x37 inches)
Drawer   26 Folder   2
Details of Vapor Ducts and Stacks for Acetate Drums in Distillation Building (712-S) 7/16/1925, revised 11/13/1925
Drawer   26 Folder   2
Details of Stacks in Carbonization Building (713-S) 10/30/1926, revised 4/2/1927 (25x37 inches)
Drawer   26 Folder   2
Details of Stack Foundations in Carbonization Building (714-S) 6/21/1926, revised 4/2/1927 (25x37 inches)
Drawer   26 Folder   2
Details of Breachings for Stack No. 4 in Carbonization Building (715-S) 12/8/1926, revised 4/2/1927 (25x37 inches)
 
Club House (Job No. 988-M) by Albert Kahn, Architect
 
Construction Drawings
 
Architectural Drawings 11/30/1923 (pencil-on-vellum drawings, except as noted, 21-1/2x25-1/2 inches)
Drawer   26 Folder   3
Foundation Plan (801)
Drawer   26 Folder   3
First Floor Plan (802) revised 2/5/1924
Drawer   26 Folder   3
Front, Rear and Side Elevations (803)
Drawer   26 Folder   3
Sections "A-A," "B-B" and "C-C" (804)
Drawer   26 Folder   3
Plans and Elevations (805) undated (pencil drawing on tracing paper)
 
Saw Mill for Green Parts (Job No. 988-N) by Albert Kahn, Architect and Albert Kahn, Inc., Architect
 
Construction Drawings
 
Architectural Drawings 5/15/1924 (ink-on-linen drawings with pencil notations, 31x39-3/4 inches)
Drawer   26 Folder   4
Plot Plan (901) revised 6/6/1924
Drawer   26 Folder   4
First Floor Plan and Stairway and Other Details (902)
Drawer   26 Folder   4
Second Floor and Roof Plans (903) revised 7/22/1924
Drawer   26 Folder   4
East, West and South Elevations and Toilet Room Details (904) revised 6/6/1924
Drawer   26 Folder   4
Typical Cross-Section, Looking North (905) revised 6/6/1924
Drawer   26 Folder   4
Details Showing Typical Intersection between Saw Mill and Transfer Building (906) revised 6/6/1924
Drawer   26 Folder   4
Toilet Room Details (907) revised 7/17/1924
 
Structural Drawings 5/20/1924 (ink-on-linen drawings with pencil notations, 31x39-3/4 inches)
Drawer   26 Folder   4
Top and Bottom Chord Plan and Details of Toilet Room Steelwork (901-S) revised 7/18/1924
Drawer   26 Folder   4
Typical Cross-Section and Sway Frame Details (902-S) revised 6/6/1924
Drawer   26 Folder   4
Second Floor Plan (903-S) revised 7/7/1924
Drawer   26 Folder   4
Steelwork Elevations (904-S) revised 7/7/1924
Drawer   26 Folder   4
Foundation Plan (905-S) revised 5/7/1924
 
Pequaming Plant Power House and Storage Bin (Job No. 988-P) by Albert Kahn, Inc., Architects
 
Construction Drawings
 
Architectural Drawings, except as noted 10/6/1924 (ink-on-linen drawings with pencil notations, 29-3/4x39-1/2 inches)
Drawer   26 Folder   5
Plot Plan (1001) revised 4/7/1925
Drawer   26 Folder   5
Foundation Plan and Details of Ash Trench (1002) revised 2/4/1925
Drawer   26 Folder   5
First Floor Plan, Storage Bin Floor Plan and Details of Pilasters (1003) revised 4/10/1925
Drawer   26 Folder   5
Second Floor Plan, Plan of Conveyor and Platform, and Sections (1004) revised 2/4/1925
Drawer   26 Folder   5
Roof Plan and East and West Elevations of Power House and Storage Bin (1005) revised 12/16/1924
Drawer   26 Folder   5
North and South Elevations (1006) revised 12/16/1924
Drawer   26 Folder   5
Cross-Sections "A-A" and "B-B" (1007) revised 1/19/1925
Drawer   26 Folder   5
Longitudinal Sections "C-C" and "D-D" (1008) 10/5/1924, revised 4/7/1925
Drawer   26 Folder   5
Sections through North and South Walls and Details (1009) revised 10/27/1924
Drawer   26 Folder   5
Details of Conveyor Bridge (1010) revised 10/27/1924
Drawer   26 Folder   5
Details (1011) revised 10/27/1924
Drawer   26 Folder   5
Details of Conveyor Housing Alterations (1012) 3/20/1925
 
Structural Drawings (ink-on-linen drawings with pencil notations, 29-1/2x39-1/2 inches)
Drawer   26 Folder   5
Details of Boiler and Stack Foundations (1001-S) 8/30/1924, revised 4/7/1925
Drawer   26 Folder   5
Details of Boiler House and Sawdust Bin Foundations (1002-S) 9/26/1924, revised 10/10/1924
Drawer   26 Folder   5
Floor Plans and Roof Plan for Power House and Storage Bin (1003-S) 9/15/1924, revised 4/7/1925
Drawer   26 Folder   5
Cross-Section and Details (1004-S) 10/7/1924
Drawer   26 Folder   5
Elevations and Sections (1005-S) 10/7/1924, revised 4/7/1925
Drawer   26 Folder   5
Details of Platforms and Conveyor Supports (1006-S) 10/8/1924
 
Mechanical Drawings (ink-on-linen drawings with pencil notations, 30x39-1/2 inches)
Drawer   26 Folder   5
Setting Plan for 2-300 H.P. Vertical Wickes Boilers (1-M) 9/24/1924
Drawer   26 Folder   5
Plan of Engine Room with Miscellaneous Sections (2-M) 10/31/1924
 
Hospital (Job No. 988-Y) by Albert Kahn, Inc., Architect
 
Construction Drawings
 
Architectural Drawings 1/21/1925 (ink-on-linen drawings with pencil notations, 26x39 inches)
Drawer   26 Folder   6
Plot Plan (1)
Drawer   26 Folder   6
Basement and Foundation Plan (2)
Drawer   26 Folder   6
First Floor Plan (3)
Drawer   26 Folder   6
Second Floor Plan (4)
Drawer   26 Folder   6
East and West Elevations (5)
Drawer   26 Folder   6
North and South Elevations and Sections "A-A," "B-B" and "C-C" (6)
Drawer   26 Folder   6
Exterior Details (7)
Drawer   26 Folder   6
Details of Operating Rooms and Miscellaneous Details (8) undated
Drawer   26 Folder   6
First Floor, Second Floor and Basement Plans (9)
Drawer   26 Folder   6
Details of Elevator and Stairs (10)
Drawer   26 Folder   6
Interior Elevations and Details (11)
Drawer   26 Folder   6
Miscellaneous Details (12)
 
Structural Drawings undated (pencil-on-vellum drawings, 26x38-1/2 inches)
Drawer   26 Folder   6
First Floor Framing Plan, Column Schedule and Details (1-S)
Drawer   26 Folder   6
Second Floor Framing Plan and Details (2-S)
Drawer   26 Folder   6
Roof Framing Plan (3-S)
 
Mechanical Drawings 1/9/1925 (ink-on-linen drawings with pencil notations, 26x38-1/2 inches)
Drawer   26 Folder   6
Basement Plan and Details (1-M)
Drawer   26 Folder   6
First Floor Plan and Electrical Riser Diagram (2-M)
Drawer   26 Folder   6
Second Floor Plan and Details (3-M)
 
Police Headquarters Building and First Precinct Police Station, Job No. 990-R, Beaubien and Clinton Streets, Detroit, Michigan 1921-1923
 
Construction Drawings by Albert Kahn, Architect
 
Architectural Drawings, 8/4/1921 General Revision, 9/15/1921 8/4/1921, 9/15/1921 (ink-on-linen drawings, 35x36 inches)
Drawer   29 Folder   5
Plot Plan (1) revised 11/18/1921
Drawer   29 Folder   5
Foundation Plan (2)
Drawer   29 Folder   5
Basement Plan (3) revised 8/8/1922
Drawer   29 Folder   5
First Floor Plan (4) revised 9/1/1922
Drawer   29 Folder   5
Second Floor Plan (5) revised 9/12/1922
Drawer   29 Folder   5
Third Floor Plan (6) revised 1/5/1922
Drawer   29 Folder   5
Fourth Floor Plan (7) revised 1/9/1922
Drawer   29 Folder   5
Fifth Floor Plan and Column Details (8) revised 11/13/1922
Drawer   29 Folder   5
Sixth and Seventh Floor Plans (9) revised 5/6/1922
Drawer   29 Folder   5
Eighth and Ninth Floor Plans (10) revised 11/18/1921
Drawer   29 Folder   5
Pipe Space Floor Plan and Roof Plan (11)
Drawer   29 Folder   5
Details of Elevators (12) revised 10/26/1921
Drawer   29 Folder   5
West Elevation (13) revised 10/26/1921
Drawer   29 Folder   5
North Elevation (14) revised 10/26/1921
Drawer   29 Folder   5
South Elevation (15) revised 10/26/1921
Drawer   29 Folder   5
East Elevation (16) revised 10/26/1921
Drawer   29 Folder   6
Court Elevations and Details of Mezzanine and Metal Grilles (17) revised 10/26/1921
Drawer   29 Folder   6
Elevation of Northwest Corner and Details of Lower Stories of Main Building (18) revised 11/18/1921
Drawer   29 Folder   6
Exterior Details of Upper Stories of Main Building (19) revised 1/19/1922
Drawer   29 Folder   6
Details of Front Entrance and Entrance to First Precinct Police Station (North Elevation) (20) revised 11/18/1921
Drawer   29 Folder   6
Details of North Wall of Armory Building (21) revised 10/26/1921
Drawer   29 Folder   6
Exterior Details of Armory Building (22) revised 10/26/1921
Drawer   29 Folder   6
Cross-Section at Center Line of Building and South Elevation of Court (23) revised 10/26/1921
Drawer   29 Folder   6
Details of Running Track and Monitor in Armory (24) revised 10/26/1921
Drawer   29 Folder   6
Details of Roof over Wagon Court (25) revised 10/26/1921
Drawer   29 Folder   6
Details of Stairs (26) revised 11/18/1921
Drawer   29 Folder   6
Details of Stairs (27) revised 11/18/1921
Drawer   29 Folder   6
Details of Pistol Range, Steel Doors, Cell Fronts and Eighth & Ninth Floor Windows (28) revised 11/18/1921
Drawer   29 Folder   6
Miscellaneous Details (29) revised 10/26/1921
Drawer   29 Folder   6
Details of Partitions, Corridors, Dumb Waiter and Cabinets (30) revised 11/18/1921
Drawer   29 Folder   6
Details of First Floor Lobby (31) revised 10/26/1921
Drawer   29 Folder   6
Details of Police Commissioner's Room and Other Offices (32) revised 9/1/1922
Drawer   29 Folder   6
Details of Toilet Rooms (33) revised 1/9/1922
 
Structural Drawings 8/4/1921 except as noted, General Revision 9/15/1921 (ink-on-linen drawings, 36x36 inches, except as noted)
Drawer   29 Folder   7
Column Schedule (1-S) revised 11/9/1921
Drawer   29 Folder   7
Armory Column Schedule and Footing Details (2-S)
Drawer   29 Folder   7
First Floor Framing Plan and Beam Schedule (3-S)
Drawer   29 Folder   7
Second Floor Framing Plan and Beam Schedule (4-S)
Drawer   29 Folder   7
Third Floor Framing Plan and Beam Schedule (5-S) revised 10/31/1921
Drawer   29 Folder   7
Fourth Floor Framing Plan and Beam Schedule (6-S) revised 11/4/1921
Drawer   29 Folder   7
Fifth Floor Framing Plan and Beam Schedule (7-S) revised 11/7/1921
Drawer   29 Folder   7
Sixth Floor Framing Plan and Beam Schedule (8-S) revised 11/9/1921
Drawer   29 Folder   7
Seventh Floor Framing Plan and Beam Schedule (9-S) revised 11/10/1921
Drawer   29 Folder   7
Eighth Floor Framing Plan and Beam Schedule (10-S) revised 11/18/1921
Drawer   29 Folder   7
Ninth Floor Framing Plan and Beam Schedule (11-S)
Drawer   29 Folder   8
Roof and Attic Framing Plans, Details of Trusses and Beam Schedule (12-S) revised 2/10/1922
Drawer   29 Folder   8
Garage Floor Framing Plan, Key Plan for Basement Walls and Beam Schedule (13-S)
Drawer   29 Folder   8
Armory Floor Framing Plan and Beam Schedule (14-S) revised 12/8/1921
Drawer   29 Folder   8
Running Track Balcony Floor Plan and Details (15-S)
Drawer   29 Folder   8
Armory and Wagon Court Roof Plans and Truss Details (16-S)
Drawer   29 Folder   8
Armory Roof Framing Details (17-S)
Drawer   29 Folder   8
Plan of Eighth Floor Framing around Cells (18-S) 12/5/1921 (34x44 inches)
Drawer   29 Folder   8
Plan of Ninth Floor Framing at Cells (19-S) 1/7/1922 (33-1/2x44 inches)
Drawer   29 Folder   8
Details of Towers (20-S) 2/13/1922 (27-1/2x35-1/2 inches)
Drawer   29 Folder   8
Alternate Design for Wireless Towers "A" and "C" (21-S) 2/13/1922 (27-1/2x36-1/2 inches)
 
Mechanical Drawings, except as noted 8/6/1921 (ink-on-linen drawings, 36x36 inches, except as noted)
Drawer   29 Folder   9
Foundation Plan (1-M) revised 11/28/1921
Drawer   29 Folder   9
Basement Plan for Plumbing (2-M) revised 11/28/1921
Drawer   29 Folder   9
Basement Plan for Heating, Ventilating and Electrical Work (3-M) revised 8/8/1922
Drawer   29 Folder   9
First Floor Plan (4-M) revised 11/28/1921
Drawer   29 Folder   9
Second Floor Plan (5-M) revised 11/28/1921
Drawer   29 Folder   9
Third Floor Plan (6-M) revised 1/7/1922
Drawer   29 Folder   9
Fourth and Fifth Floor Plans (7-M) revised 1/7/1922
Drawer   29 Folder   9
Sixth and Seventh Floor Plans (8-M) revised 8/10/1922
Drawer   29 Folder   9
Plan of Pipe Space above Seventh Floor and Details of Pipe Shafts (9-M) revised 11/28/1921
Drawer   29 Folder   9
Eighth and Ninth Floor Plans (10) revised 11/28/1921
Drawer   29 Folder   9
Pipe Space Floor Plan and Details of Pipe Shafts (11) revised 11/28/1921
Drawer   29 Folder   9
Heating Riser Diagrams for Main Building and Armory (12-M) revised 8/12/1922
Drawer   29 Folder   9
Section thru' Gymnasium and Court and Heating Riser Diagram (13-M) revised 8/10/1922
Drawer   29 Folder   10
Ventilation Details (14-M) revised 11/28/1921
Drawer   29 Folder   10
Service Details (15-M) revised 11/28/1921
Drawer   29 Folder   10
Machine Room Details (16-M) revised 11/28/1921
Drawer   29 Folder   10
Details of Transformer Room and Switch Vault (17-M & 17-MR) revised 9/23/1921
Drawer   29 Folder   10
Electrical Riser Diagram and Details (18-M) revised 11/28/1921
Drawer   29 Folder   10
Plan of Rotary and Transformer Rooms (19-M) revised 5/22/1922
Drawer   29 Folder   10
Wiring Diagram of Rotary Converters (20-M) revised 7/27/1922 (29-1/2x45 inches)
Drawer   29 Folder   10
Plan and Front Elevation of Switchboard (21-M) 5/11/1922 (26-1/2x35 inches)
Drawer   29 Folder   10
Sixth and Seventh Floor Plans, Showing Piping and Connections for Kitchen Equipment (21-M) 1/15/1923, revised 3/14/1923 (15x23-1/2 inches)
Drawer   29 Folder   10
Electrical Plan of Transformer and Rotary Rooms and Switch Vault (22-M) 5/20/1922 (24-1/2x37 inches)
Drawer   29 Folder   10
Details of Fan Motor for Police Station Garage (100-M) 7/24/1922 (12-1/2x18 inches)
Drawer   29 Folder   10
Revised Fifth Floor Plan, Prosecuting Attorney's Division (106-M) 11/16/1922, revised 3/14/1923 (17-1/2x23-1/4 inches)
 
Dr. Christopher Gregg Parnall Residence, Job No. 994 & 994-A, Oxford Street, Ann Arbor, Michigan 1921-1923
 
Construction Drawings by Albert Kahn, Architect
 
Architectural Drawings for Job No. 994, undated, except as noted (pencil-on-vellum drawings, 19x24-3/4 inches)
Drawer   29 Folder   11
Plot Plan (1)
Drawer   29 Folder   11
Basement Plan (2)
Drawer   29 Folder   11
First Floor Plan (3)
Drawer   29 Folder   11
Second Floor Plan (4)
Drawer   29 Folder   11
Attic Plan (5)
Drawer   29 Folder   11
East Elevation (6)
Drawer   29 Folder   11
North Elevation (7)
Drawer   29 Folder   11
South Elevation (8)
Drawer   29 Folder   11
West Elevation (9)
Drawer   29 Folder   11
Interior Details (10)
Drawer   29 Folder   11
Details of Stairs, Interior Walls and Living Room Fireplace (11)
Drawer   29 Folder   11
Revised Details (12) revised 10/22/1921
 
Mechanical Drawing for Job No. 994 6/8/1921 (ink-on-linen drawing, 19x25 inches)
Drawer   29 Folder   11
Basement Plan (1-M)
 
Architectural Drawings for Job No. 994-A 2/17/1923 (pencil-on-vellum drawings, 15x22 inches)
Drawer   29 Folder   11
Basement Plan (2)
Drawer   29 Folder   11
First Floor Plan (3)
Drawer   29 Folder   11
Second Floor Plan (4) revised 2/23/1923
Drawer   29 Folder   11
Attic and Roof Plan (5)
Drawer   29 Folder   11
East Elevation (6)
Drawer   29 Folder   11
Side Elevation (7)
Drawer   29 Folder   11
Side Elevation (8)
Drawer   29 Folder   11
Rear Elevation (9)
 
Trussed Concrete Steel Company (Truscon Steel), Worker Housing, Job No. 999, Hamtramck, Michigan ca. 1920
 
Construction Drawings
 
Architectural Drawings undated (ink-on-linen drawings, 30-1/4x46 inches)
Drawer   30 Folder   2
Floor Plans, Elevation and Sections (2 drawings)