U-M Stadium, aerial view / HS12258

Viewer

Actions

file_download Download image 202 x 134 (JPEG) 404 x 269 (JPEG) 809 x 538 (JPEG) 1618 x 1076 (JPEG)

About this Item

Record Details

Title
U-M Stadium, aerial view
Collection Title
Athletic Department (University of Michigan) records
Collection Creator
University of Michigan. Athletic Dept.
Box / Drawer
12
Folder / Container / Volume
SID Football Photos Facilities M Stadium
Notes
Bernard Green (UM Eng. 1891) of the Osborn Engineering Company of Cleveland, lead architect. Also known as "The Big House," excavation for the stadium began in September 1926 and construction was completed by October 1927. The stadium has undergone numerous improvements and renovations, which include an expansion project by the architectural firm Venturi, Scott-Brown and Associates in 1997; and another renovation and expansion project by the firm HNTB Architecture in 2010.
Kenneth C. Black and Daniel L. Dworsky, architects. Crisler Arena construction completed in 1967 with multiple renovations starting in 1998. Originally called the University Events Building and was renamed Crisler Arena in 1970. In 2012, with the addition of the The William Davidson Player Development Center, the name was changed to Crisler Center.
Item Number
HS12258
Finding Aid
umich-bhl-943
Scan Source
1.3 x 0.9 inches 35mm color slide
Repository
Bentley Historical Library
Date Added/Updated
2016-03-12 01:35:24

Technical Details

Image Size
1618 x 1076
File Size
166 KB
Record
HS12258
Link to this Item
https://quod.lib.umich.edu/b/bhl/x-hs12258/hs12258

Rights and Permissions

This image may be protected by copyright law.

Manifest
https://quod.lib.umich.edu/cgi/i/image/api/manifest/bhl:HS12258:HS12258

Cite this Item

View the Help Guide for more information.

Full citation
"U-M Stadium, aerial view; HS12258". https://quod.lib.umich.edu/b/bhl/x-hs12258/hs12258. University of Michigan Library Digital Collections. Accessed September 28, 2022.