Reprint: Just-in-Time Scholarly Monographs
Skip other details (including permanent urls, DOI, citation information)This work is protected by copyright and may be linked to without seeking permission. Permission must be received for subsequent distribution in print or electronically. Please contact mpub-help@umich.edu for more information. :
For more information, read Michigan Publishing's access and usage policy.
Attachment 6
CRL | Yale Library | ||
One-time cost per volume | |||
Acquisition activities | $9.06 | $12.00 | Allowance |
Cataloging and shelf preparation | $48.43 | $35.00 | Allowance |
Annual cost per volume | |||
Circulation (out and in) | $19.54 | $1.75 | OCS Study, Doc. 9; includes OPAC costs |
Preservation | IDC | $0.25 | Allowance |
Shelving space (CRL) | $0.22 | ||
Shelving space (ADA compliant) | $1.72 | Amortized construction cost/vols. per sq. foot | |
Shelving space (depository) | $0.14 | Amortized construction cost/vols. per sq. foot | |
Administration | IDC | $0.05 | Allowance |
Amortized proc. & admin space/yr. | IDC | $0.06 | Amortized cap. cost per net sq. foot*space per vol. |
Operating costs (ADA shelving) | IDC | $1.12 | HVAC, etc.*ratio/vols. per sq. foot |
Operating costs (depository shelving) | IDC | $0.01 | HVAC, etc.*ratio/vols. per sq. foot |
Operating costs (processing & admin.) | IDC | $0.04 | HVAC, etc.*ratio*space per vol. |
Cost elements for space | |||
Capital costs | |||
Construction cost/net sq.foot | $70 | $300 | Allowance |
Amortization period | 30 years | 35 years | |
Interest rate | 6% | 8% | |
Amortized cap. cost/net sq.foot | $20.69 | $25.74 | Amortization table |
Vols./sq.foot (CRL) | 100 | ||
Vols./sq.foot (ADA compliant) | 15 | OCS Study, Doc. 1 | |
Vols./sq.foot (depository) | 185 | OCS Study, Doc. 1 | |
No. of volumes | 2,000,000 | ||
Processing & admin. space | IDC | 5,000 nsf | OCS design, in progress |
Processing & admin. space/vol. | IDC | 0.0025 | Total space/number of volumes |
Operating costs | |||
HVAC, maintenance, etc./gsf | IDC | $12 | Allowance |
Ratio gsf/nsf | 1.098 | 1.4 | Allowance |
Sources:
CRL cost information provided by Donald Simpson, CRL President, in August 1997 correspondence. CRL accounts for many cost factors that are itemized by Yale by applying a 35% indirect cost (IDC) rate to its core activities. Yale Library cost information based on estimates, allowances, and formulas provided above.