Office of the Registrar (University of Michigan), records  1840-2003 (bulk 1867-1993)
full text File Size: 140 K bytes | how to request materials

Container / Location Title
 
Project Files [series]

The Project Files (20.5 linear feet, 51 tubes, 13 oversize folders) have been arranged into the following sub-series: Ann Arbor Projects, Herman Miller Projects, Pfizer Campus Projects, and Other Michigan Projects. Each subseries has been divided into Textual Files and Drawings and Plans. Drawings and Plans includes items in both folders and tubes. Folders are largely comprised of pencil drawings and sketches, while tubes are largely composed of project plans.

 
Ann Arbor Projects [subseries]

The Ann Arbor Projects (9.5 linear feet, 15 tubes, 6 oversize folders) subseries contains correspondence, minutes, permits, presentations, and working files related to various projects Pollack worked on in Ann Arbor. These projects include the Allen Creek Greenway Task Force; the Ann Arbor Corridor Study; the Farmer's Market commission; the Parks, Recreation, and Open Space Plan; the Commission on Art in Public Places; Downtown Design Guidelines; the Downtown Development Authority, Fuller Road; Furstenberg Park; Gandy Dancer; Huron-Division-Fifth St; Liberty Plaza; Mary Beth Doyle Park; the State Street Urban Design Project; and the University of Michigan. The subseries also contains sketches, plans, and drawings related to Pollack's projects in Ann Arbor.

 
Textual Records
 
Allen Creek Greenway Task Force (ACGTF)
Box   5  
Maps and Drawings
Box   5  
History and Site Booklet
Box   5  
Findings and Recommendations, Final
Box   5  
Findings and Recommendations, Draft
Box   5  
Meetings  2005
Box   5  
Workshop 1B, Site Specific Data
Box   5  
Meetings  July-September 2006
Box   5  
General Information
Box   5  
Workshop 1A  April 22, 2006
Box   5  
Floodway
Box   5  
Tonight's Meeting  May 17, 2006
Box   5  
Materials for Meeting  August 2, 2006
Box   5  
"Help Shape Allen Creek Greenway," Workbook
Box   5  
Greenway Plan
Box   5  
Correspondence
Box   5  
Powerpoint Presentations
Box   6  
Public Participation materials
Box   6  
Task Force Handouts
Box   6  
Principles
Box   6  
Interactive Public Design Project
Box   6  
Public Process
Box   6  
Supplemental Appendix (4 folders)
Box   6  
Washtenaw Avenue  2005-2009
Box   6  
Preliminary Planning
Box   6  
News clippings
Box   6  
City of Ann Arbor Parcel Options
Box   6  
Miscellaneous
Box   6  
Resolution Creating a New Greenway Taskforce
Box   6  
Communication (3 folders)
 
Ann Arbor Corridor Study
Box   6  
Original Artwork
Box   6  
Composite of Design Guidelines  1983
Box   6  
Final Draft Report  1983 (2 folders)
Box   6  
Draft Report  1983 (2 folders)
Box   6  
Preliminary Drafts  1983
Box   6  
Proposal for Services  1981
 
Ann Arbor Farmer's Market Commission
Box   7  
Binder: Minutes and agenda  2005
Box   7  
Market Commission Background
Box   7  
Farmer's Market Working Files  2005
Box   7  
Farmer's Market Master Plan (draft)  2004
Box   7  
Friends of the Market  2005
Box   7  
Agendas and Correspondence  2005-2006
Box   7  
Correspondence  2005
Box   7  
Meeting Agenda  June 15, 2006
Box   7  
Market Commission Working Files (3 folders)
Box   7  
Information on Other Michigan Farmer's Markets
Box   7  
Site Planning
Box   7  
Complaints  2009
Box   7  
Seniority  2008
Box   7  
Market Commission
Box   7  
Public Market
Box   7  
Stark Complaint
Box   8  
Former Market Commission
Box   8  
Market Commission, J. Black
Box   8  
Market Commission, Current
Box   8  
Advisory Commission
Box   8  
Boundary and Topographic Survey  2003
Box   8  
Background Information
Box   8  
Farmers Market Working Files
Box   8  
Presentation
Box   8  
Public Meeting
 
Ann Arbor Parks, Recreation and Open Space Plan
Box   8  
Award Submission  1982
Box   8  
Final Draft and Appendix  1981
Box   8  
Park Maintenance Plan  1976
Box   8  
Proposed Parks and Open Space Plan  1978
Box   8  
Summary Plan  1981
Box   8  
Bandemer Park Plans  1993
 
Commission on Art in Public Places (CAPP)
Box   8  
Ann Arbor Public Art Commission  2004-2008
Box   8  
Annual Report  2003
Box   8  
Arts Alliance
Box   8  
CAPP meeting minutes  2004
Box   8  
CAPP Planning  2005
Box   8  
Community interviews  2003
Box   8  
Community resource book
Box   9  
Correspondence (3 folders)
Box   9  
Grant proposal
Box   9  
Jury process
Box   9  
Master plan  2004
Box   9  
Master plan RFP documents  2003
Box   9  
MDOT Slide Presentation  1994
Box   9  
Off the Wall Gallery
Box   9  
Park Advisory Commission meeting  2004
Box   9  
Plan preparation
 
Downtown Ann Arbor Design Guidelines
Box   9  
Ann Arbor Downtown Plan  2008
Box   9  
Comments from City Website  2009
Box   9  
Guidelines Drafts  2008-2010 (3 folders)
Box   9  
Memos  2006-2007
Box   9  
Miscellaneous
Box   9  
Planning commission meetings  2008
Box   9  
Recommended Policy Framework for Downtown Ann Arbor  2005
Box   9  
Working Files (3 folders)
Box   9  
Workshops
 
Downtown Development Authority (DDA)
 
Agendas
Box   9  
 1986
Box   9  
 1987 (2 folders)
Box   9  
 1988 (3 folders)
Box   9  
 1989
Box   10  
 2002
Box   10  
 2003 (2 folders)
Box   10  
 2004
Box   10  
Meeting Agendas and Minutes
Box   10  
Misc. Correspondence
Box   10  
Huron/Fifth/Division (2 folders)
Box   10  
Pedestrian Improvements Master Plan materials (6 folders)
Box   10  
Pedestrian Improvements 4th Avenue
Box   10  
News Clippings
Box   10  
Preliminary Concepts
Box   10  
Contract
Box   10  
Preliminary Draft Materials
Box   10  
Walt's Letter
Box   10  
Light Fixtures (2 folders)
Box   10  
Memos and Attachments
Box   10  
Questionnaire
Box   10  
Projects Evaluation
Box   11  
Correspondence
Box   11  
Details
Box   11  
Master Plan, Construction Standards
Box   11  
Liberty Street (3 folders)
Box   11  
Master Plan, Base Maps
Box   11  
Graphics
Box   11  
Maps
Box   11  
Liberty Street Evaluation
Box   11  
Liberty Street Estimate
Box   11  
Library Lot
Box   11  
S. Fourth Street Estimate
Box   11  
Construction Engineering  2001
Box   11  
Pollack Designs Billing Summaries  1983-1985
Box   11  
Ann Arbor Transit Authority (AATA) Downtown Transfer Center Plans
Box   11  
Ann Arbor Walking Tours
Box   11  
Attachments  2003
Box   11  
"R" Items  2003,  2005
Box   11  
"The Ann Arbor Central Area -- A Program for the Future,"  1987
Box   11  
Downtown Ann Arbor Revitalization Plan Maps  2005
 
Fuller Road Projects
Box   11  
Fuller Road/Fuller Park Site Information
 
Fuller Road/Maiden Lane Intersection
Box   11  
Correspondence (3 folders)
Box   11  
Plans  2006
Box   11  
Roundabouts research
 
Fuller Road Re-Alignment Wetland Mitigation
Box   11  
Correspondence (2 folders)
Box   11  
Monitoring Report and Drawings
Box   11  
Lee Skabelund's Notes
Box   12  
Revised Specifications
Box   12  
Wetland Mitigation (2 folders)
Box   12  
Wetland Slides  2000
Box   12  
Reports  1998-2002
Box   12  
Photographs and Slides  2001
Box   12  
Contract Documents for Fuller Road Wetland Mitigation and Tree Planting Project, File No. 94048  1994
Box   12  
Specifications  1992-1999 (scattered)
 
Glen/Fuller
Box   12  
Award Submission
Box   12  
Fuller/Glen Transit Project
Box   12  
Glenn/Fuller/Geddes Study  1981
Box   12  
Glen/Fuller Project Draft Negative Declaration  1980
Box   12  
Glen Fuller Project Environmental Assessment  1981 (2 folders)
Box   12  
Photographs (3 folders)
Box   12  
Plans and Drawings
Box   12  
Project planning
Box   12  
Drawings
 
Furstenberg Park
Box   12  
Award Submission
Box   12  
Furstenberg Park Development Request for Proposals  1990
Box   12  
Reconnaissance  1991
 
Gandy Dancer
Box   12  
Project Files  1976-1978
Box   12  
Photographs
Box   12  
Specifications for Site Development  1976
Box   13  
Huron, Division, Fifth streets (Ann Arbor)
Box   13  
ASLA Award Submission  2005
Box   13  
Presentations  2005
Box   13  
Project Proposal  2003
Box   13  
Public Hearing 2998
Box   13  
Urban Design Workbook  2004
 
Liberty Plaza
Box   13  
Submittals
 
Chronological File
Box   13  
 March 2003
Box   13  
 May-June, 2003
Box   13  
 January-February, 2003
Box   13  
 August-December, 2002
Box   13  
 December 2001-July 2002
Box   13  
Contract Documents for the Liberty Plaza Improvements  2003
Box   13  
Specifications for Bidding  March 13, 2003
Box   13  
Specifications for Review  2003
Box   13  
Community Meetings  2002
Box   13  
Construction Meeting notes  2003
 
Mary Beth Doyle Park (Brown Park) Detention Basin
 
Chronological File
Box   13  
 March-April, 2003
Box   13  
 May-August, 2003
Box   13  
Correspondence and presentations (5 folders)
Box   13  
DEQ Permit  2005
Box   14  
Mallet's Creek RFP
Box   14  
Meeting minutes  2006
Box   14  
Project Manual
Box   14  
Proposal  2003 (2 folders)
 
State Street Urban Design Project
Box   14  
Request for Qualifications
Box   14  
Construction Notes  2002-2003 (2 folders)
Box   14  
Correspondence  2000-2003 (3 folders)
Box   14  
Design Intent  2000-2001
Box   14  
General  2001
Box   14  
Plans and Drawings
Box   14  
State Street Area Project Pedestrian Improvement Plans  November 2001
Box   14  
South State Street Two-Way Traffic Study  2000
Box   14  
South University Streetscape Improvements Proposal
 
University of Michigan
Box   14  
North Quad Site Improvements Technical Specifications  2009
Box   14  
North Quad Working Files  2009
Box   14  
Rackham Green Land Improvements Technical Specifications  2009
 
Drawings and Plans
Tube   42  
Allen Creek Greenway Taskforce -- Aerial Photographs and Overlays
 
Ann Arbor Corridor Study
Tube   2  
Aerial photographs and overlays
Tube   2  
Base Maps
Tube   2  
Sketches
 
Broadway Street Shopping Area
Drawer   1 Folder   1
Urban Design Plan  January 10, 1981
Drawer   1 Folder   1
Richard Raab Parking Lot Schemes  April 7, 1981
Drawer   1 Folder   1
Broadway Place Shopping Area Conceptual Sketches  undated
Drawer   1 Folder   1
Broadway Wall Project Slope Cross Sections  September 8, 1983
Drawer   1 Folder   1
Kroger Parking Lot Options  March 24, 1982
Drawer   1 Folder   1
Site Plan for Expansion of Broadway Kroger  July 15, 1977
Drawer   1 Folder   1
Broadway Wall -- Grading and Slope Stabilization  September 8, 1983
Drawer   1 Folder   1
Retaining Wall Extension  May 23, 1984
Drawer   1 Folder   1
Raab Shopping Center Site Plan Options  August 17, 1983
Tube   45  
Urban Design Plan  January 10, 1981
Tube   45  
Landscape Plan  undated
Drawer   1 Folder   1
Cobblestone Farm  1985
Drawer   1 Folder   2
Downtown Development Authority
Drawer   1 Folder   2
Maynard Street
 
Pedestrian Improvements Project
Drawer   1 Folder   2
Detroit St/Farmers Market -- Misc. Plans and Drawings
Drawer   1 Folder   2
Fourth Street -- Miscellaneous Plans and Drawings
Drawer   1 Folder   2
Liberty Street
Drawer   1 Folder   2
Liberty Street and Fourth Avenue
Drawer   1 Folder   2
South University Pedestrian Way -- Plans and drawings
Tube   5  
Detroit St/Farmer's Market -- Miscellaneous Plans and Drawings
Tube   6  
Fourth Avenue -- Miscellaneous Plans and Drawings
Tube   7  
Kerrytown Lighting  April 1997
Tube   7  
Phase I:  Fall 1983,  June 9, 1983
Tube   7  
Phase I:  Fall 1985,  July 17, 1985
Tube   8  
Phase II:  Fall 1985
Tube   8  
Phase II  January 19, 1990
Tube   9  
South University Pedestrian Way -- Miscellaneous Plans and drawings
Tube   9  
West Liberty Street
Tube   9  
Miscellaneous plans
Tube   10  
State Street Area Project Phase II Pedestrian Improvements -- Plans Issued for Bidding  March 13, 2003
Tube   10  
Urban Design Concept
Tube   3  
Fourth and Catherine Parking Lot -- Plans
Tube   4  
Liberty Plaza Improvements -- Issued for Bidding  March 13, 2003
Tube   4  
Miscellaneous Overlays
Tube   4  
North Corridor Campus Pathway
 
State Street
Drawer   1 Folder   3
Maynard and State Street Studies
Drawer   1 Folder   3
State Street Pedestrian Alley
 
Tally Hall
Drawer   1 Folder   4
Site Plan  1985
Drawer   1 Folder   4
Miscellaneous Plans
 
First Congregational Church
Drawer   1 Folder   4
Miscellaneous Sketches and Courtyard Plans
 
Fuller-Glen
 
Early Concept Studies
Drawer   1 Folder   4
Fuller/Glen Transit Project Preliminary Site Plans  May 19, 1981
Drawer   1 Folder   4
Preliminary Bridge Railing Details  May 19, 1981
Drawer   1 Folder   4
General Analysis Sketches  October 26, 1979
Drawer   1 Folder   4
Conceptual Grading Plan  May 1, 1981
Drawer   1 Folder   4
Early Site Studies
Drawer   1 Folder   4
Fuller Road Wetland Mitigation
 
Fuller Road Projects
 
Plans
Tube   11  
Fuller-Glen Project  November 30, 1981
Tube   11  
State Street to Glen Plan and Profile  November 3, 1982
Tube   11  
Fuller Rd/Oak Way Realignment  May 19, 1993
 
Maps and Diagrams
Tube   12  
Fuller Penetrator Bike Route Study  October 21, 1975
Tube   12  
Glen-Fuller Transit Project  October 9, 1979
Tube   12  
Fuller-Glen Final Alignment (Proposed)  November 11, 1980
Tube   12  
Fuller-Glen Shrub Bed Count  September 22, 1983
Tube   12  
Fuller Pool Entrance Revisions
Tube   12  
Fuller Rd Survey  September 10, 1991
Tube   13  
Fuller-Glenn Planting and Grading Studies
Tube   13  
Fuller-Glenn Public Hearing -- Overall Approach
Drawer   1 Folder   5
Furstenberg Park -- Miscellaneous Plans and Drawings  1991
Tube   14  
Furstenberg Park -- Miscellaneous Plans and Drawings  1991
 
Gandy Dancer
Drawer   1 Folder   5
Schematic Site Plan  March 1976
Drawer   1 Folder   5
Sketches
Tube   14  
Plans  June 24, 1976
Tube   14  
Planting Plan  May 1976
Tube   14  
Schematic Site Plan  March 1976
Tube   14  
Sketches
Drawer   1 Folder   6
Huron-Division-Fifth St
Drawer   1 Folder   6
Sketches and Drawings
Tube   15  
Site Surveys
Tube   15  
Sketches
Tube   15  
Sketches and drawings
Drawer   1 Folder   6
Huron River Corridor Study
Drawer   1 Folder   6
Master Plan Studies  1987
Drawer   1 Folder   6
Miscellaneous sketches
Tube   15  
One-Way to Two-Way Signage Conversion Plans  July 30, 2003
Tube   15  
University of Michigan North Campus Hubbard-Hayward Street Proposed Realignment and Parking Lots Improvement Plan  July 16, 1993
 
Herman Miller Projects [subseries]

The Herman Miller Projects (2 linear feet, 1 tube, 1 oversize folder) subseries documents various projects Pollack completed for Herman Miller, Inc. and their Zeeland and Holland, Michigan campuses. Materials include correspondence, permit applications, working files, sketches, and plans.

 
Textual Files
Box   15  
104th Avenue, Street Improvement (2 folders)
Box   15  
Building B East
Box   15  
Building C-1
Box   15  
Building F Entry
 
Burns
Box   15  
Post Ecological Prescription Burn Report and Landscape Management/Maintenance Observations
Box   15  
Prescribed Burn  2004
Box   15  
SQA Burn
Box   15  
Correspondence
Box   15  
Design Yard
Box   15  
General Contacts  2003
 
Greenhouse
Box   15  
General
Box   15  
LEED Greenhouse
Box   15  
Permanent Pavement
Box   15  
LEEDS Application
Box   15  
Main Site, B West
Box   15  
Main Site, Prescott B
Box   15  
MDC Planting
Box   15  
Phoenix Designs (2 folders)
Box   15  
Phoenix Designs Drawings  1996
Box   15  
Planters
 
Site/Landscape Management and Maintenance
Box   15  
Program  1996
Box   15  
Work session  1996
Box   15  
SQA (2 folders)
Box   15  
Technical Specifications for MDC Pond ~ Shoreline Plant Conversion  2004
Box   15  
Truck Parking
Box   15  
Van Wagoner Road
Box   15  
Zeeland Main Site
Box   15  
Zeeland Main Site plume
Box   15  
Zeeland Main Site Consumers Re-Alignment
Box   16  
Binders (many photographs included)
Box   16  
Powder Coat Technology facility
Box   16  
Miller SQA Facility
Box   16  
Phoenix Designs Project
Box   16  
Final site plan
 
Plans and Drawings
Drawer   2 Folder   7
Photographs
Drawer   2 Folder   7
Sketches
Tube   16  
Zeeland Mainsite drawings
Tube   16  
Powder Coat Technology  1991
Tube   16  
Dallas Schematic Site/Planting Plan
Tube   16  
SQA Greenhouse  February 6, 2001
Tube   16  
Phase 1 Construction  1995
Tube   16  
New Phase 1 Plant and Offices  January 17, 1995
Tube   16  
Miscellaneous
 
Pfizer Campus Projects [subseries]

The Pfizer Campus Projects (4.5 linear feet, 22 tubes, 5 oversize folders) subseries includes correspondence, minutes, permit applications, study results, plans, drawings, and sketches related to the Warner-Lambert, Parke-Davis, and Pfizer in Ann Arbor. There is a small amount of material related to the Kalamazoo campus as well. Major projects profiled include the Parke-Davis master plan, the 2800 Plymouth Road Facility, Pfizer's Planned Unit Development (PUD), and Stormwater Wetlands Management.

 
Textual Files
 
Parke-Davis/Warner Lambert
 
Master Plan
Box   17  
Relocation Master Plan  1984
Box   17  
Master Plan  1984
Box   17  
Master Plan  1985
Box   17  
Master Plan  1989-1990
Box   17  
Master Plan Update  1996
 
Master Plan with Heidi
Box   17  
Master Plan  1996-1997
Box   17  
Background Materials
Box   17  
Correspondence File  1996 (2 folders)
Box   17  
Master Plan III  2000
Box   17  
Building 20 Addition  1998
Box   17  
Documentation  1997
Box   17  
Graphics
Box   17  
Working Session  1998
Box   17  
Master Site Plan/Strategic 7 Year Plan  1997
Box   17  
Master Plan Report  1997 (2 folders)
 
2800 Plymouth Road Facility
Box   17  
Alternate
Box   17  
Building 26 Pre-Clinical Laboratory  1999
Box   17  
Building 26 Site Plan  2000
Box   17  
Cafeteria Conference Center Plan  1998
Box   17  
Childcare Center  1998
Box   17  
FAR Calculations  1999
Box   17  
Landscape Maintenance Proposal Form draft  1990
Box   17  
Materials Handling Center and Conference Cafeteria Center  1998
Box   17  
Materials Handling Center Plan  1998
Box   17  
Materials Handling Center Specs  1998
Box   17  
Power House Addition  1993
Box   17  
Power House Addition/South Parking Lot Site Plan  1993
Box   17  
Project Management and Communication  1999
Box   17  
Site Plan  1998
 
2800 Plymouth Road Facility
 
South 15 Acres
Box   17  
New Site Development  1993
 
Project Book
Box   17  
Construction Meetings  1993-1995
Box   17  
Submittals  1993-1994
Box   17  
Addendum  1993-1994
Box   17  
Pay Estimates  1993-1994
Box   17  
Miscellaneous  1993-1994
 
Technical Development Facility
Box   18  
General  1998
Box   18  
Submittal Originals  1996-1999
Box   18  
Site Plan  1998-2005 (2 folders)
Box   18  
Site Work -- Issued for Construction  1998
Box   18  
Preliminary Detention Study  November 1, 1990
Box   18  
Re-Zoning Application  September 14, 1992
Box   18  
Traffic Study  1990
 
Pfizer
 
Master Plan/Planned Unit Development (PUD)
Box   18  
Ann Arbor Planning Department Reports  1992-2001
Box   18  
Baxter Road Entrance and Guard Kiosk Plans  2005
Box   18  
Building 10 Executive Courtyard  2003
Box   18  
Building 28 Plans  2006
Box   18  
Building 35 Plans  2005
Box   18  
Buildings 85 and 75  2003
Box   18  
Campus Enhancements III  2005
 
Chronological File
Box   18  
 January-October, 2001
Box   18  
 September-October, 2001
Box   18  
 November-December, 2001
Box   18  
 January-February, 2002
Box   18  
 August-October, 2002
Box   18  
 November-December, 2002
Box   18  
 January 2003
Box   18  
cGMP Warehouse Plans  2006
Box   18  
Community Context and Redevelopment Opportunities  2007
Box   18  
Concept Master Plan sketches  2001
Box   18  
Engineering  2000
Box   18  
Global Facilities Management Information Document  2002
Box   18  
Guard Kiosk and Site Improvements  2004
Box   18  
Informational  2000-2002
Box   18  
Land and Water Management -- Wetland Inventory  2000
Box   18  
Lawn Conversion -- Phase IV  2005
Box   18  
Lighting  2000
Box   18  
Master Plan Edits  2003
Box   18  
Master Planning  2001-2003 (3 folders)
Box   19  
Master Plan Meetings  2001-2003
Box   19  
Master Plan Overlays  2002
Box   19  
Master Plan Proposals  2000-2002
 
Natural Features
Box   19  
55 Acre Site Natural Features Inventory  2001
Box   19  
Landmark Tree Survey  2001
Box   19  
Natural Features  2002
Box   19  
Natural Features Data  2002
Box   19  
Natural Features Inventory  2002
Box   19  
Veridian Botanical Inventory and Landmark Tree Survey  2002
Box   19  
Parking  2008
Box   19  
Patrick Judd File  2001-2002
Box   19  
Plans and Graphics  2002
Box   19  
Prairie Conversion -- Phase II  2003
Box   19  
Project Review Coordination  1999
Box   19  
Sanitary Sewer Analysis  2001
Box   19  
Scanned Photos  undated
Box   19  
Site Design Standards  2002
Box   19  
Site Options Study  2001
Box   19  
Site Photographs
Box   19  
Site Planning and Design Team Meeting  2004
Box   19  
Site Plans for Parking Structure and Wetlands Use Permit  2000
Box   19  
Strategic Facilities Plan  2004
Box   19  
Strategic Site Plan and Master Plan Review  2003
Box   19  
Strategic Site Plans  2000-2005 (5 folders)
 
Zoning
Box   19  
Rezoning and Area Plan  2002
Box   19  
Zoning  2001-2002
Box   19  
Zoning Petition  2001
Box   19  
Coordination Meeting  2003
Box   19  
Coordination Meeting Minutes  1998-2002 (3 folders)
Box   20  
Coordination Meeting Minutes  1998-2002 (2 folders)
 
Miller's Creek
Box   20  
Breakfast and Open House  2003
Box   20  
Correspondence  2001-2003 (2 folders)
Box   20  
Crossing Options  2004
Box   20  
Grant Application  2005-2006
Box   20  
Watershed Improvement Plan  2003
Box   20  
Site Acquisition  2001
 
Stormwater Wetlands Management
Box   20  
Building 14 Courtyard  2000
Box   20  
Detention Basin 3  2001-2002
 
Land and Water Management Master Plan
Box   20  
DEQ Permit Correspondence  2000
Box   20  
Site Improvement  2000
Box   20  
Specifications  2000
Box   20  
Photographs
 
Stormwater Management Master Plan
Box   20  
Bid Period  2000
Box   20  
Calculations  2000
 
Chronological File
Box   20  
 September-December, 1999
Box   20  
 January-May, 2000
Box   20  
 June-July, 2000
Box   20  
 March 2001
Box   20  
Storm Water Management Study  2001
Box   20  
Stormwater Research Introduction  2002
Box   20  
Stormwater Update  1984-1999
Box   21  
Wetland Annual Monitoring Report  2003
Box   21  
Wetland Investigation and Delineation  2001
Box   21  
Wetland Monitoring -- Basin 3  2001-2002
Box   21  
Wetland Use Permit  2000
 
Drawings and Plans
 
Parke-Davis/Warner-Lambert
Drawer   2 Folder   8
Building 10 Courtyard-Preliminary Planting Plan  August 14, 1992
 
Child Care Center
Drawer   2 Folder   8
Miscellaneous sketches  1998
Drawer   2 Folder   8
Playground Concept Sketch  March 31, 1999
 
The Courtyard
Drawer   2 Folder   8
Existing Conditions  January 26, 1987
Drawer   2 Folder   8
Sketch Options  January 1987
Drawer   2 Folder   8
Courtyard Planting Plan  March 4, 1987
Drawer   2 Folder   8
Miscellaneous sketches
 
Entry Gate and Signage
Drawer   2 Folder   9
Miscellaneous Plans and Drawings  1992
Drawer   2 Folder   9
Signage sketches  undated
Drawer   2 Folder   9
Master Plans Studies  1992-1993
 
North Entrance Court
Drawer   2 Folder   9
Miscellaneous sketches
Drawer   2 Folder   10
Parking Deck-Miscellaneous sketches and plans
Drawer   2 Folder   10
Switch Box Buffer-Concept Sketches  June 21, 1999
Drawer   2 Folder   10
Toxicology Building-Planting Plans  May 8, 1985
Drawer   2 Folder   10
Miscellaneous Plans
Tube   17  
Administration Support Facility Plans  September 8, 2000
 
Building 26
Tube   17  
Building 23 & 26 Phase II Construction Drawings  June 9, 2000
Tube   17  
Building 26 Phase II Construction Drawings  August 1, 2000
Tube   18  
Building 26, Pre-Clinical Laboratory, and Parking Site Improvement Plans  December 4, 2002
Tube   18  
Miscellaneous Sketches
Tube   18  
Building 35 Addition  September 2, 2004
Tube   18  
Building PC-1 Preliminary Planting Plan Options  undated
Tube   19  
Child Care Center-Plans Issued for Bidding  June 1, 1999
 
Clinical Research Building 16
Tube   19  
General Trades  September 4, 1990
Tube   20  
Site and Foundation Package  April 19, 1990
Tube   20  
Cooling Towers -- Issued for Construction  June 2, 1997
 
Entry Gate and Signage
Tube   21  
Miscellaneous Plans and Drawings  1992
Tube   21  
Signage sketches  undated
 
Fitness Trail
Tube   21  
Seed Mix Layout Modifications  May 1989
Tube   21  
Preliminary Parcour Layout  August 1988
Tube   21  
Fitness Trail Layout Record  November 2, 1988
Tube   21  
Future Development Plan Options  undated
 
Granite Sculpture Site Improvements
Tube   21  
Issued for Owner's Review  April 16, 2002
Tube   21  
Issued for Construction  August 12, 2002
Tube   22  
Huron Parkway Connector Tunnel -- Construction Issue, Site Work  December 14, 2000
 
Land and Water Management
Tube   22  
Plans Issued for Construction  May 17, 2000
Tube   22  
Re-Application for Inland Lakes and Stream Permit  May 12, 2000
Tube   23  
Master Plans Studies  1992-1993
Tube   23  
Materials Handling Center and Cafeteria Conference Center Site Improvement Plans  March 22, 1999
 
New Site Development: South 15 Acres
Tube   23  
Plans Issued for Construction  September 8, 1993
 
North Entrance Court
Tube   23  
Conclusion of Design Development Plans  March 9, 2001
Tube   24  
Miscellaneous Plans  2001
Tube   24  
Program/Character Discussion Diagrams  October 2000
Tube   24  
North Parking Addition  July 11, 1997
Tube   24  
North Parking Lot Area and Southwest Trucking Dock  July 11, 1989
 
Parking Deck
Tube   25  
Phase II Minor Modification  February 1990
Tube   25  
Issued for Construction  November 29, 1990
Tube   25  
Parking Lots B, C, and D Relocation and Minor Building Additions  July 19, 1999
Tube   26  
Power House Addition, South Parking Lot, and Entry Drive
Tube   26  
Appendix A  June 2, 1993
Tube   26  
Wetland Permit Application  May 27, 1993
Tube   26  
Administrative Amendment  April 4, 1994
Tube   26  
As-Built Record  March 7, 1995
Tube   26  
Preliminary Sketch Landscape Plan  April 29, 1993
Tube   27  
Southern Parking Area Earthwork and Reforestation  February 26, 1990
Tube   27  
Southwest Entry Schematic Designs  June 9, 2004
Tube   27  
Storm Sewer Tie-In Plans  1991
Tube   27  
Storm Water Management Master Plan  2000
 
Switch Box Buffer
Tube   27  
Plans Issued for Bidding  August 1, 1999
Tube   28  
Technical Development Facility
Tube   28  
Plans Issued for Construction  August 3, 1999
Tube   28  
Administrative Amendment  October 18, 2005
Tube   28  
Site Capacity Diagram
Tube   28  
Temporary Modular Addition to Building 50  December 17, 1998
Tube   29  
Temporary Modular Office Addition
Tube   29  
Plans Issued for Bidding  April 13, 1998
Tube   29  
Plan Submitted for Administrative Amendment  April 1, 1998
Tube   29  
Temporary Parking Relocation -- Issued for Construction  May 9, 2000
 
Toxicology Building
Tube   29  
Proposed Planting Plans  April 1985
Tube   29  
Planting Plans  May 8, 1985
Tube   29  
Tree Area Removal and Relocation Proposals  April 1990
 
The Pond and Building Edge
Tube   30  
Preliminary Sketch Options  January 1987
Tube   30  
Final Preliminary Plan  February 10, 1987
Tube   30  
Planting Plan  March 4, 1987
 
University of Michigan
Tube   30  
Preliminary Grading Plan  November 1990
Tube   30  
Tree Relocation  November 1990
Tube   30  
Regrading and Soil Stabilization Plan  July 1992
Tube   30  
Miscellaneous Plans and Drawings
 
Pfizer
Drawer   2 Folder   11
1600 Site Plan Schematics,  April 2006
Drawer   2 Folder   11
Building 10Executive Courtyard Sketches  2003
Drawer   2 Folder   11
Building 28 Loading Dock Renovation and South End Distribution -- Sketches  2006
Drawer   2 Folder   11
Campus Green and Entrance Plaza  July 2000
Drawer   2 Folder   11
Development Office Building Site Influences  November 26, 2003
Drawer   2 Folder   11
ERIN Walks and Planting Schematic  February 18, 1993
 
Kalamazoo Campus
Drawer   2 Folder   11
Final Schematic Options  September 2008
Drawer   2 Folder   11
Lot 1 Options  August 2008
Drawer   2 Folder   11
Rough Grading Options  December 2005
Drawer   2 Folder   12
Sketches
Drawer   2 Folder   12
Studies  2000
 
Miller's Crossing
Drawer   2 Folder   12
Sketches  April 23, 2003
Drawer   2 Folder   12
Evaluation Criteria  April 18, 2003
Drawer   2 Folder   12
Site Options Study Sketches  2001
Drawer   2 Folder   12
Miscellaneous Plans and Drawings
Tube   31  
Area Plan  undated
Tube   31  
Baxter Road Entrance and Guard Kiosk -- Issued for 100% Final Review  September 9, 2005
Tube   32  
Building 10/20 Courtyard-Plans Issued for Bidding,  March 30, 2001
Tube   32  
Building 20 -- Stair Tower Addition, Submitted for Administrative Amendment  February 5, 2004
Tube   32  
Building 28 Loading Dock Renovation and South End Distribution -- Submitted for PUD Site Plan Administrative Amendment  March 10, 2006
 
Building 35
Tube   33  
Storm Water Infrastructure  September 16, 2004
Tube   33  
Sitework Bid Package  October 10, 2005
 
Building 85 -- Fire Pump House and Emergency Services
Tube   34  
Plans Submitted for PUD Site Plan  April 9, 2003
Tube   34  
Building 85 and Building 75 -- Submitted for PUD Site Plan Construction Approval  September 25, 2003
Tube   35  
Building 910 Site Demolition and Meadow Restoration -- Issued for Bidding  March 17, 2008
Tube   35  
Campus Base Maps  2000
 
Guard Kiosk
Tube   35  
Plans, 5  March 2002
Tube   35  
Plans Issued for Construction  October 5, 2004
Tube   36  
Huron Parkway Reconstruction Planting Plan  September 3, 2004
Tube   36  
Huron Parkway Site Improvements -- Issued for Design Development Owner Review  December 14, 2006
 
Master Plan
Tube   36  
Preliminary Framework Diagrams  November 2002
Tube   36  
Sketches
Tube   37  
Submitted for PUD  November 26, 2001
Tube   37  
Traffic Study -- Proposed Changes  January 15, 2002
Tube   37  
Miscellaneous Plans and Sketches
 
Planting Enhancements
Tube   37  
Issued for Construction  September 11, 2000
Tube   37  
Phase II  April 11, 2001
 
Prairie Conversion
Tube   37  
Issued for Bidding  October 28, 2002
Tube   37  
Sketches  October 7, 2002
Tube   38  
Southwest Campus Site Restoration -- Check Set  July 9, 2006
Tube   38  
Miscellaneous Plans and Drawings
 
Other Michigan Projects [subseries]

The Other Michigan Projects (4.5 linear feet, 13 tubes, 1 folder) subseries contains correspondence, working files, press clippings, minutes, permit applications, sketches, drawings, and plans relating to various Pollack projects in Michigan. These projects include Charlevoix, the Huron River Bikeway Study, the Huron-Whittaker Corridor Study, Independence Lake Park, and the Pere Marquette Rail Trail.

 
Textual Files
 
Charlevoix -- East Park and Marina Improvements
Box   21  
Agreement for parks project  2001
Box   21  
Bid period Addendum 2
 
Chronological File
 
Marina
Box   21  
 May-July, 2002
Box   21  
 August-October, 2002
 
Park
Box   21  
 June 2001-June 2002
Box   21  
 July-September, 2002
Box   21  
Clippings (2 folders)
Box   21  
Conference facility  2003
 
Correspondence
Box   21  
Miscellaneous (4 folders)
Box   21  
Park and Landslide facilities  2003
Box   22  
Cost estimates
Box   22  
Existing Conditions  2002
Box   22  
Meeting minutes  2006
Box   22  
Park plan and notes  2002-2003
Box   22  
Photographs -- Existing conditions  2001 (color)
Box   22  
Plan merger  2002-2003
Box   22  
Project meeting notes
Box   22  
Public meetings
Box   22  
Sketches  2004
Box   22  
Waterways Commission information
 
Huron River Bikeway Study (and related)
Box   22  
Huron River Greenway Trail
Box   22  
Huron River Greenway Planning Report  2000
Box   22  
Huron River Plan  2002
 
Permit
Box   22  
Application  2000-2006
Box   22  
Appeal  2006
Box   22  
Michigan Natural Rivers Report  1977
Box   22  
Huron Valley Corridor Study  1978
Box   22  
Waterworks Master Plan  1986
Box   22  
Proposal for Services -- Huron River Bikeway Study  1983
Box   22  
Proposal for Segment 'D' Nonmotorized Trail  2003
Box   22  
Segment 'D' Nonmotorized Trail Proposal file
Box   22  
Huron River Bipath -- Participatory Design  1976
Box   22  
Huron River Bikeway Study  1984
Box   22  
Segment 'D' Summary Report  2004
Box   22  
Segment 'D' Correspondence (2 folders)
Box   22  
Prelim Bike Study Report  1997
Box   22  
Public Meetings
Box   22  
Correspondence and Meetings (3 folders)
 
Huron -- Whittaker Corridor
Box   23  
Fund Applications  1999 (4 folders)
Box   23  
Huron-Whittaker Corridor Study Proposal  1998
Box   23  
Huron-Whittaker Corridor Study  1999
Box   23  
I-94 Huron Street Interchange Specifications  2000 (2 folders)
Box   23  
I-94 Huron Street Interchange Landscape Enhancement Plans  2000
Box   23  
TEA-21: North Campus Corridor Non-Motorized Pathway
 
Ypsilanti
Box   23  
Project Proposals  1999
Box   23  
Public Meetings  1999-2000 (2 folders)
Box   23  
Rolled drawings
 
Independence Lake Park
Box   24  
Awards  1986
Box   24  
Background
Box   24  
Water Spray Play Facility Drawings  2001
Box   24  
Drawings  1981-1982
 
Phase II
Box   24  
Notes
Box   24  
Plan Proposals
Box   24  
Master Plan
Box   24  
Pre-Applications  1978-1986
Box   24  
Graphics
Box   24  
Contract
Box   24  
Promotional Materials
Box   24  
Site location
Box   24  
Addendum #1
Box   24  
Correspondence
Box   24  
Master Plan
Box   24  
Notes
Box   24  
Site development plan  1978
Box   24  
Master plan update  2008
Box   24  
DEQ Permit  2001
Box   24  
Miscellaneous  2000
Box   24  
Water Spray Play Facility Construction  2001-2003 (2 folders)
Box   24  
Water Spray Play Facility specifications  2001-2002
Box   24  
Winter Parking Lot and Trails  2002
Box   24  
Winter Parking Lot and Trails Permits
Box   24  
Workshop Notes, 22  May 2000
Box   24  
Tree planting specifications  1988
Box   24  
Request for Proposal  2003
Box   24  
Park development proposal  2000
 
Pere Marquette Rail-Trail of Mid-Michigan (Midland County, Mich.)
Box   25  
Arbutus Bog signs  1998
Box   25  
ASLA Awards submission (includes slides) (binder)
Box   25  
A Vision for a Linear Park in Midland County  1992
Box   25  
Bike studies  2000
Box   25  
Bridge Diagrams
Box   25  
Bridge Stuff
Box   25  
City of Caseville  1996-1997
Box   25  
Clippings  1994-1996
Box   25  
Connecting Michigan 2000  2000
 
Grant applications
Box   25  
DNR/MDOT for Phase III  1993
Box   25  
ISTEA/MDOT applications  1993
Box   25  
ISTEA  1992
Box   25  
ISTEA applications  1992-1993
Box   25  
ISTEA general materials -- Phase II
Box   25  
Midland County Linear Park Proposal for Services  1991
Box   25  
Midland County Parks and Recreation Policies and Procedures  1992
Box   25  
Pere Marquette Rail-Trail: From Start to Finish  2000
Box   25  
Photographs and Negatives
 
Plans
Box   25  
Arbutus Bog
Box   25  
City of Coleman  1994
Box   25  
Dublin Avenue to Veterans Memorial Park
Box   25  
Project development  1994-1999
 
Surveys
Box   25  
Phase II
Box   25  
Phase III
Box   25  
Phase IV
Box   25  
Drawings and Plans
 
Drawings and plans
 
Alpena Bi-Path
Tube   39  
Potential Alignment  May 14, 1975
Tube   39  
Plans  June 11, 1975
Tube   39  
Plans  May 20, 1975
Tube   39  
Miscellaneous Plans
 
Plans
Tube   39  
Preliminary Engineering Report  December 3, 2003
Tube   40  
Proposed Phase 1 -- Marine Work  November 14, 2005
Tube   41  
Proposed Phase 2 -- Floating Pier System  November 9, 2005
Tube   41  
Miscellaneous sketches
Drawer   2 Folder   13
Miscellaneous sketches
Drawer   2 Folder   13
Cherry Hill (Superior Township) -- Sketches and Overlays
 
Independence Lake Park
Drawer   2 Folder   13
Miscellaneous Drawings and Sketches
Tube   1  
Concept Sketches  January 13, 1978
 
Plans
Tube   43  
Water Spray Play Feature -- Issued for Construction  March 15, 2001
Tube   43  
Boardwalks and Culvert Replacement -- Inland Lakes and Streams Permit  November 10, 2000
Tube   43  
Site Construction  March 7, 1988
Tube   44  
Parking Lot and Trails -- Issued for Construction  October 13, 2000
Tube   44  
Plans  February 21, 1979
Tube   3  
Presentation Drawings and Notes
Drawer   2 Folder   13
Pere Marquette Rail Trail
Drawer   2 Folder   13
City Midland -- Miscellaneous Sketches and Drawings  1992
Drawer   2 Folder   13
Currie Parkway Crossing Options  June 1992
Drawer   2 Folder   13
Seating Area Locations  June 1992
Tube   46  
City Midland -- Miscellaneous Sketches and Drawings  1992
Tube   46  
City of Coleman -- Miscellaneous Sketches and Drawings
Tube   47  
Sanford Lake Park -- Miscellaneous Plans and Sketches
Tube   47  
Overview
Tube   47  
Miscellaneous Plans and Sketches
Tube   48  
Plans
Tube   48  
Arbutus Bog Boardwalk  April 3, 1995
Tube   48  
City of Coleman  July 13, 1994
Tube   48  
City of Coleman Trailhead  September 9, 1997
Tube   49  
City of Midland Section  July 31, 1992
Tube   49  
City of Midland Section -- Supplementary Path Information  August 14, 1992
Tube   49  
Dublin Ave (Midland, MI) to Cedar St (Sanford, MI)  September 10, 1993
Tube   50  
Dublin Ave (Midland, MI) to North Bradley (Geneva Township, MI)  July 8, 1994
Tube   50  
Dublin Ave (Midland, MI) to North Bradley (Geneva Township, MI) -- Sanford Village Restroom Building  June 28, 1996
Tube   51  
Dublin Ave (Midland, MI) to Veterans Memorial Park (Jerome Township, MI)  December 15, 1998
Tube   51  
North Bradley (Geneva Township, MI) to Coleman City Limits (Coleman, MI)  September 26, 1994
Tube   51  
Rail Trail Amenities  June 15, 1998