George Romney Papers  1939-1973
full text File Size: 1341 K bytes

Container / Location Title
 
S. S. Kresge Administration Building, Second Boulevard West and Temple Avenue, Detroit, Michigan (  1929-1930) Job No. 1476 [subseries]
 
Design Development Drawings by Albert Kahn, Inc., Architects
 
Architectural Drawings  undated (ink-on-linen drawings, 30x53 inches))
Tube   62  
Basement Floor Plan
Tube   62  
First Floor Plan
Tube   62  
Second Floor Plan
Tube   62  
Third Floor Plan
Tube   62  
Fourth Floor Plan
 
Construction Drawings by Albert Kahn, Inc., Architects
 
Architectural Drawings  5/22/1929 except as noted (ink-on-linen drawings, 33-1/2x54-1/2 inches)
Tube   62  
Plot Plan (1), revised  6/17/1929
Tube   62  
Foundation Plan (2), revised  6/17/1929
Tube   62  
Basement Plan (3), revised  3/16/1930
Tube   62  
First Floor Plan (4), revised  3/11/1930
Tube   62  
Second Floor Plan (5), revised  3/11/1930
Tube   62  
Third Floor Plan (6), revised  12/18/1929
Tube   62  
Fourth Floor Plan (7), revised  11/4/1929
Tube   62  
Fifth Floor and Roof Plan (8), revised  6/17/1929
Tube   62  
Plan at Fifth and Sixth Floors and of Tower Roof (9), revised  6/17/1929
Tube   62  
East, South and North Elevations (10), revised  6/17/1929
Tube   62  
West Elevation and Longitudinal Section (11), revised  6/17/1929
Tube   62  
Plan of Pipe Space and Sections "A-A," "B-B" and "D-D" (12), revised  6/17/1929
Tube   62  
Details of Lower Portion (13), revised  6/17/1929
Tube   62  
Details of Upper Portion (14), revised  6/17/1929
Tube   62  
Details of Main Entrance (15), revised  6/17/1929
Tube   62  
Plan of First Floor Center Portion and Plans at Basement through Fourth Floors (16), revised  12/18/1929
Tube   62  
Details of Stairs # 3 & 4 (17), revised  9/10/1929
Tube   62  
Sections through Stairs and Elevators (18), revised  6/17/1929
Tube   62  
Wall Sections and Miscellaneous Details (19), revised  6/17/1929
Tube   62  
Interior Details (20), revised  6/17/1929
Tube   62  
Details of Metal Roofs on Tower and over Main Building (21), revised  6/17/1929
Tube   62  
Details of Second Floor Offices (22), revised  6/17/1929
Tube   62  
Details of Mr. Kresge's and Other Offices (23), revised  11/18/1929
Tube   62  
Details of First Floor and Elevator Lobbies (24), revised  6/17/1929
Tube   62  
Details of Fourth Floor (25), revised  11/18/1929
Tube   62  
Detail of Alternate for Tower Roof and Miscellaneous Details (26)  6/17/1929
 
Structural Drawings (ink-on-linen drawings, 34x55-1/2 inches)
Tube   63  
Footing Plan (1-S)  4/18/1929 revised  4/29/1929
Tube   63  
Column Schedule (2-S)  4/18/1929 revised  5/17/1929
Tube   63  
First and Second Floor Framing Plans (3-S)  undated
Tube   63  
Third and Fourth Floor Framing Plans (4-S)  undated
Tube   63  
Fifth and Sixth Floors and Roof Framing Plans (5-S)  5/5/1929
 
Mechanical Drawings  5/29/1929 (ink-on-linen drawings, 34-1/2x55-3/4 inches, except as noted)
Tube   63  
Foundation Plan (1-M), revised  6/22/1929
Tube   63  
Basement Floor Plan (2-M), revised  4/4/1930
Tube   63  
First Floor Plan (3-M), revised  4/4/1930
Tube   63  
Second Floor Plan (4-M), revised  4/4/1930
Tube   63  
Third Floor Plan (5-M), revised  4/4/1930
Tube   63  
Plan of Pipe Space above Third Floor (6-M), revised  4/4/1930
Tube   63  
Fourth Floor Plan (7-M), revised  11/19/1929
Tube   63  
Fifth and Sixth Floor Plans and Ventilating Details (8-M), revised  9/4/1929
Tube   63  
Heating Riser Diagrams (9-M)
Tube   63  
Heating Riser Diagram and Details (10-M)
Tube   63  
Plan of Machine Room and Isometric Diagrams of Water and Steam Piping (11-M), revised  3/5/1930
Tube   63  
Diagram of Ventilating Systems (18-M)  undated (31-1/4x32-1/4 inches)
 
Electrical Drawings  6/17/1929 except as noted (ink-on-linen drawings, 34x56 inches)
Tube   63  
Basement Plan (1-E), revised  2/10/1930
Tube   63  
First Floor Plan (2-E), revised  11/23/1929
Tube   63  
Second Floor Plan (3-E), revised  2/10/1930
Tube   63  
Third Floor Plan (4-E), revised  9/19/1929
Tube   63  
Fourth Floor Plan (5-E)
Tube   63  
Fifth Floor and Sixth Floor Machine Room Plans (6-E), revised  8/6/1929
Tube   63  
Riser Diagrams and Motor Schedule (7-E), revised  8/6/1929
 
Details of Transformer Bank (8-E)  6/15/1929