George Romney Papers  1939-1973
full text File Size: 1228 K bytes | Add this to my bookbag

   Container / Location    Title
 
Transcripts [subseries]:
Box   31  
Paul Oreffice Testimony, NRC, Chicago,  February 2, 1977
Box   31  
Oral Argument, NRC, Chicago,  November 17, 1977
 
Prehearing Conferences, NRC,
Box   31  
Washington, D.C.,  January 9, 1978 [Milton Freeman for intervenors]
Box   31  
Washington, D.C.,  March 1, 1978 [Freeman for intervenors]
Box   31  
Bethesda, Md.,  March 2, 1978
Box   31  
Bethesda, Md.,  April 13, 1978
Box   31  
Washington, D.C.,  May 17, 1978
Box   31  
Bethesda, Md.,  May 31, 1978
Box   31  
Bethesda, Md.,  July 11, 1978
Box   31  
Bethesda, Md.,  September 7, 1978
Box   32  
Midland, Mi.,  December 14, 1978
Box   32  
Deposition, Ronald Lee Erickson, NRC, Detroit, Mi.,  January 20, 1981
Box   32  
Prehearing Conference, NRC, Midland, Mi.,  January 28, 1981
Box   32  
Prehearing Conference, NRC, Midland, Mi.,  January 29, 1981
Box   32  
Deposition, Harold D. Thornburg (Director, Division of Reactor Construction Inspection, Office of Inspection and Enforcement NRC) Bethesda, Md.,  February 20, 1981
Box   32  
Prehearing Conference, NRC, Midland, Mi.,  April 27, 1981
 
Evidentiary Hearings, NRC, ASLB, Midland, Mi.
Box   32  
Witness: Gilbert S. Keeley,  July 8, 1981
Box   32  
Witness: Eugene J. Gallagher (Civil Engineer in the Division of Resident and Regional Reactor Inspection, Reactor Engineering Branch, Office of Inspection and Enforcement, NRC)  July 15, 1981 (5 folders)
Box   32  
Witnesses: James W. Cook (Vice President, Consumers Power Company); Eugene Gallagher; and Darl S. Hood (Senior Project Manager, Division of Licensing, Office of Nuclear Reactor Regulation, NRC)  July 16, 1981
Box   32  
Witnesses: Darl S. Hood; and Donald M. Turnbull (Senior Supervising Engineer, Site Quality Assurance Superintendent, Midland Project Quality Assurance Department, Consumers Power Company),  July 17, 1981
Box   32  
Witness: Stephen H. Howell (Executive Vice President, Consumers Power Company),  August 4, 1981
Box   32  
Witness: Ralph B. Peck (Consulting Engineer, employed by Bechtel with regard to geotechnical aspects of Midland Project site),  August 6, 1981
Box   33  
Witnesses: Ralph B. Peck; Joseph Kane (Principal Geotechnical Engineer, Geotechnical Engineering Section, Hydrologic and Geotechnical Engineering Branch, Division of Engineering, Office of Nuclear Reactor Regulation, NRC); and Hari Narain Singh (Civil Engineer, U.S. Army Corps of Engineers, Detroit, Michigan),  August 7, 1981
Box   33  
Witnesses: Joseph Kane; Hari N. Singh; and Darl Hood,  August 8, 1981
Box   33  
Witness: John William Gilray (Principal Quality Assurance Engineer, Quality Assurance Branch, Office of Nuclear Reactor Regulation, NRC),  August 10, 1981
Box   33  
Witnesses: Alfred J. Hendron, Jr. (Consultant to Bechtel on soil stability, Professor, University of Illinois, Department of Civil Engineering); Hari N. Singh; and Joseph Kane,  August 11, 1981
Box   33  
Meeting, Subcommittee on Midland Plant Units 1 and 2, Advisory Committee on Reactor Safeguards, NRC. Washington, D.C.,  February 2, 1982
Box   33  
Meeting, Subcommittee on Midland Plant Units 1 and 2, ACRS, NRC, Washington, D.C.,  April 29, 1982 (3 folders)
Box   33  
Oral Argument, ASLB Appeal Board, Bethesda, Md.,  May 13, 1982
Box   33  
NRC Staff's Testimony. Witnesses: James G. Keppler (Regional Administrator of NRC's Region III office); Darl Hood; John Gilray; Ronald J. Cook (Senior Resident Inspector for the NRC at the Midland Plant); Ross B. Landsman (Inspector for the NRC, Region III at the Midland Plant); Ronald N. Gardner (Inspector for the NRC, Region III at the Midland Plant); and Wayne D. Shafer (Chief, Midland Section, Office of Special Cases for the NRC, Region III),  October 29, 1982
 
Evidentiary Hearings, ASLB, NRC, Midland, MI
Box   33  
Witnesses: Joseph Kane; and Donald Lewis (Acting Assistant Project Engineer and Engineering Group Supervisor for Licensing and Safety, Midland Nuclear Project, Bechtel Associates Professional Corporation),  November 16, 1982
Box   33  
Witnesses: Donald A. Sommers (Engineering Supervisor, Bechtel Associates Professional Corporation); Donald Evans; and John P. Bradley (Certified Consulting Meteorologist, Murray and Trettel, Inc., Northfield, Illinois),  March 8, 1983.
Box   33  
Witnesses: Donald Evans; Donald Sommers; John Bradley; James Carson (Meteorologist, Division of Environmental Impact Studies, Argonne National Laboratory); and Dr. Steve Y.H. Tsai (Hydrologist, Division of Environmental Impact Studies, Argonne National Laboratory)  March 9, 1983
Box   34  
Witnesses: James Carson; James Y.H. Tsai; David A. Anderson, Assistant Project Engineer, Midland Project, Bechtel Corporation; David T. Perry, Section Head, Mechanical Nuclear Group, Design Production Department, Consumers Power Company; and Gerald B. Slade, Assistant Site Manager, Midland Plant, Consumers Power Company,  March 10, 1983
Box   34  
Witnesses: John R. Ridgely, Aleck W. Serkiz, Ronald Wayne Hernan,  March 11, 1983 (6 folders)
Box   34  
Supplemental Testimony of James G. Keppler with Respect to Quality Assurance, ASLB, NRC,  March 25, 1983
Box   34  
Witnesses: John J. Harrison, Ronald Gardner, Ron Cook, Ross Landsman and Darl Hood,  September 21, 1983