George Romney Papers  1939-1973
full text File Size: 1294 K bytes | Add this to my bookbag

Container / Location Title
 
Ford Motor Company Glass Manufacturing Plant, River Rouge, Michigan,  1922-1923, Job No.  1071 [subseries]:
 
Construction Drawings by Albert Kahn, Architect (Ink-on-linen drawings, 28x63 inches)
 
Architectural Drawings,  10/9/1922
Tube   6  
[Site Plan], untitled (1)
Tube   6  
Foundation Plan (2), revised  5/23/1923
Tube   6  
First Floor Plan (3), revised  6/27/1923
Tube   6  
Roof Plan (4),  11/23/1922
Tube   6  
Elevations (5), revised  11/23/1922
Tube   6  
Sections thru' Main Building (6), revised  5/2/1923
Tube   6  
Plans of Storage Bins, Cross-Section thru' Furnace Room and Details (7), revised  5/23/1923 (One drawing and one electrostatic print on mylar)
Tube   6  
Details of Conveyor Bin, Rolling Curtain, Railroad Tracks and Exterior (8), revised  5/23/1923
Tube   6  
Details of Storage Bins and Conveyor Pits (9), revised  11/23/1922
Tube   6  
Details of Balcony, Sand Tanks, Toilets, Stairs and Loading Platform (10), revised  8/1/1923
Tube   6  
Details of Roof and Wall Sections (11), revised  11/23/1922
Tube   6  
Plans and Elevations of Sub-Station No. 9 (19-A), undated, revised  11/23/1923 (28-1/4x32-1/4 inches)
Tube   6  
Sections and Stair Details of Sub-Station No.9 (19-B), undated, revised  2/12/1923 (28-1/2x33-1/4 inches)
Tube   6  
General Plan of Grinder Foundations (20),  2/5/1923 revised  11/19/1923 (22-1/2x40-3/4 inches)
 
Structural Drawings,  undated
Tube   7  
Roof Plan and Column and Footing Schedules (1-S), revised  11/11/1922
Tube   7  
Sections (2-S), revised  11/23/1922
Tube   7  
Sections (3-S), revised  11/11/1922
Tube   7  
Plans of Balcony, Charging Floor and Toilets (4-S), revised  11/27/1922
Tube   7  
Elevations (5-S), revised  11/11/1922
Tube   7  
Plans and Sections of Concrete Storage Bins (6-S), revised  11/11/1922
Tube   7  
Details of Connections to Concrete Bins (7-S), revised  11/11/1922
 
Mechanical Drawings
Tube   7  
Foundation Plan (1M),  12/22/1922 revised  3/27/1923
Tube   7  
First Floor Plan and Section "AA" (2M), 11/3/1922 revised  3/27/1923
Tube   7  
First Floor Plan and Sections "AA" & "BB" (3M), undated, revised  7/6/1923
Tube   7  
Heating Plan (4M),  12/29/1922 revised  5/2/1923