George Romney Papers  1939-1973
full text File Size: 1294 K bytes | Add this to my bookbag

Container / Location Title
 
First and Old Detroit National Bank, Detroit, Michigan,  1919-1922, Job No. 803 [subseries]
 
Construction Drawings by Albert Kahn, Architect
 
Architectural Drawings,  12/20/1919 revised  9/22/1920 (Ink-on-linen drawings with red ink, pencil and blue pencil revisions, 30-3/4x47 to 31-3/4x52-3/4 inches)
Tube   16  
Plot Plan (1)
Tube   16  
Sub-Basement and Mezzanine Floor Plans (2)     (revision date illegible) 
Tube   16  
Basement, Basement Mezzanine and First Floor Mezzanine Floor Plans (3), revised  2/15/1922
Tube   16  
First and Second Floor Plans (4), revised  2/14/1922
Tube   16  
Third, Fourth and Truss Space Floor Plans (5), revised  2/14/1922
Tube   16  
Sixth and Seventh Floor Plans (6), revised  5/29/1920
Tube   16  
Fifth and Eighth Floor Plans (7), revised  2/15/1922
Tube   16  
Ninth and Typical Floor Plans (8)
Tube   16  
Twenty-Second, Twenty-Third and Twenty-Fourth Floor Plans (9)
Tube   16  
Roof and Pipe Space Floor Plans (10),  undated
Tube   16  
Woodward Avenue Elevation (11)
Tube   16  
Cadillac Square Elevation (12)
Tube   16  
East Elevation (13)
Tube   16  
West Half of South Elevation and West Elevation of Court and Section on Line "F-F" (14)
Tube   16  
East Half of South Elevation, Section "G-G" and Cross-Section "B-B" (15)
Tube   16  
Transverse Section on Line "D-D" (16)
Tube   16  
Sections "A-A," "C-C" and "E-E" (17)
Tube   16  
Elevation of West Bay, Cadillac Square, and Details of Lower Stories (18)
Tube   16  
Detail of Upper Portion of Cadillac Square and Woodward Ave. Elevations (19)
Tube   16  
First Floor Exterior Details (20)
Tube   16  
Details of Rear Elevation (21)
Tube   16  
Details of Passenger Elevators, Pent House and Stairs #3 (22)
Tube   16  
Sections thru' Elevator Lobby and Freight Elevator (23), revised  January 1921
Tube   16  
Sections thru' Elevators and Details of Passenger Elevator Doors, etc. (24), revised  1/4/1921
Tube   17  
Details of Elevators (25)     (undated due to linen damage) 
Tube   17  
Sections and Details of Stairs (26)
Tube   17  
Sub-Basement Mezzanine, Basement Mezzanine and First Floor Plans (27)
Tube   17  
First Floor Mezzanine and Third and Fourth Floor Plans (28)
Tube   17  
Miscellaneous Floor Plan Details (29)
Tube   17  
Detail of Stack and Typical Wall Sections (30)
Tube   17  
Details of Typical Toilet Rooms and Corridor Office Partitions (31)
Tube   17  
Details of Typical Doors, Toilets and Barber Shop (32), undated,  revised 9/22/1920
Tube   17  
Details of Girders, Metal Louvres, Skylights, Columns and Walls, etc. (33)
Tube   17  
Details of Window Frames in Main Banking Room, Shop Fronts and Savings Bank (34)
Tube   17  
Plan and Interior Elevations of Directors' Room and Appurtenances on Sixth Floor (35)
Tube   17  
Basement Plan, Elevations and Details (36)
Tube   17  
Interior Designs for Entrance Lobby (37),  9/20/1919 revised  9/22/1920
Tube   17  
Interior Designs for Main Banking Room (38),  9/20/1920 revised  9/22/1920
Tube   17  
Interior Designs for Savings Bank (39)     (date illegible due to linen damage) 
Tube   17  
Typical Floor Plan Showing Revised Widths of Elevator Doors (41),  5/24/1920 revised  9/22/1920 (31-1/2x36-1/2 inches)
Tube   17  
First Floor Plan (47)     (undated due to linen damage)  (39-1/4x53-3/4 inches)
Tube   17  
[Floor Plan], untitled due to linen damage (48),  undated (39-1/4x53 inches)
Tube   17  
Details of Vaults in Sub-Basement Mezzanine, in Basement and at Eighth Floor (50),  11/22/1920 revised  12/21/1920 (32-3/4x37-3/4 inches)
Tube   17  
Details of Vault Furniture and Safe-Deposit Vault Floor Framing (52),  11/22/1920 revised  12/21/1920 (32-3/4x38 inches)
Tube   17  
Details of Furniture in Bank Vault (52A), undated, revised  12/21/1920 (33x38 inches)
Tube   17  
Typical Floor Plan (65)     (undated due to linen damage)  (36-1/2x49 inches)
Tube   17  
Part Plan of Public Elevator Lobby at Twenty-First through Twenty-Fouth Floors (65A),  undated (18x10-3/4 inches)
Tube   17  
Details of Ceiling of Second Floor (Low Part) (82),  3/10/1921 revised  9/7/1921 (27x44-1/2 inches)
 
Structural Drawings,  12/20/1919     (some not numbered or dated due to linen damage)  (Ink-on-linen drawings with pencil notations, 30x50-1/2 to 31-1/2x52-1/2 inches)
Tube   18  
Column Schedule (1-S)
Tube   18  
Column Schedule (2-S)
Tube   18  
Column Schedule (cont.)
Tube   18  
Foundation Plan and Details of Caissons
Tube   18  
[Details of] Foundation Girders and Grillage for Columns 86, 87, 88 and 90
Tube   18  
Sub-Basement Mezzanine and Basement Floor Framing Plans
Tube   18  
Basement Mezzanine and First Floor Framing Plans (7-S)
Tube   18  
First Floor Mezzanine and Second Floor Framing Plans (8-S)
Tube   18  
Third and Fourth Floor Framing Plans (9-S)
Tube   18  
Fifth Floor Framing Plan, revised  10/15/1920
Tube   18  
Sixth Floor and Truss Space Framing Plans
Tube   18  
Seventh and Eighth Floor Framing Plans (12-S)
Tube   18  
Ninth Floor Framing Plan, revised  8/24/1920
Tube   18  
Typical Floor Framing Plan
Tube   18  
Twenty-First, Twenty-Second and Twenty-Third Floor Framing Plans (15-S)
Tube   18  
Twenty-Fourth Floor and Pipe Space Floor Framing Plans (16-S), revised  9/10/1920
Tube   18  
Pent House Floor and Main Roof Framing Plan (17-S), revised  9/1/1920
Tube   18  
Fifth Floor Truss and Girder Details (18-S)
Tube   19  
Wind Bracing Systems A-A and M-M (19-S)
Tube   19  
Wind Bracing Systems D-D, J-J and K-K (22-S)
Tube   19  
Wind System F-F, Woodward Avenue Elevation (24-S)
Tube   19  
Wind System G-H, Rear Elevation (25-S)
Tube   19  
Longitudinal Wind Bracing System M-M.
Tube   19  
Wind System N-N, Cadillac Square Elevation (27-S)
Tube   19  
Wind Bracing Connections, Special Vault and D-Type (28-S),  3/15/1920
Tube   19  
Wind Bracing Systems, B-E and F-Type (29-S),  3/15/1920
Tube   19  
Wind Bracing Systems, C-Type (30-S),  3/15/1920
Tube   19  
Wind Bracing Systems, A, B, C and X-Type (31-S),  3/15/1920
Tube   19  
Wind Bracing Connections, 20, 26 and 30-Inch Spandrel Connections (32-S),  3/15/1920
Tube   19  
Wind Bracing Connections, 18 and 24-Inch Spandrel Connections (33-S),  3/15/1920
Tube   19  
Wind Bracing Connections, 15-Inch Spandrel Connections (34-S),  3/15/1920
Tube   19  
Wind Bracing Connections, 12 and 18-Inch Spandrel Connections
Tube   19  
Untitled drawing (36-S),  undated
Tube   19  
Elevation and Detail of Additional Girder at Caisson for Column #8 (38-S),  9/29/1920 (28-1/2x26 inches)
Tube   19  
Piling Plan (1000-S),  4/12/1920 (26-3/4x34-1/4 inches)
Tube   19  
Cornice Channels, Pipe Space (1016-S),  2/2/1921 (17-1/4x30-1/2 inches)
Tube   19  
Main Cornice Details (1026-S),  6/24/1921 revised  8/5/1921 (16-1/2x39 inches)
Tube   20  
Mechanical Drawings by Albert Kahn, Architects and Engineers,  1/5/1920 (Ink-on-linen drawings with pencil Tube notations, 31-1/4x50-1/4 to 31-1/2x52 inches)
Tube   20  
Section Details and Symbols (1-M), revised 12/3/1920
Tube   20  
Sub-Basement Mezzanine and Sub-Basement Floor Plans (2-M), revised  10/17/1921
Tube   20  
Basement Mezzanine and Basement Floor Plans (3-M), undated, revised  11/11/1921
Tube   20  
First Floor Mezzanine and First Floor Plans (4-M), revised  11/29/1921
Tube   20  
Second Floor Plan and Details of Typical Toilet Room (5-M), revised  5/6/1921
Tube   20  
Third and Fourth Floor Plans (6-M), revised  9/13/1921
Tube   20  
Fifth Floor and Truss Space Plans (7-M), revised  9/13/1921
Tube   20  
Sixth and Seventh Floor Plans (8-M), revised  5/18/1921
Tube   20  
Eighth and Ninth Floor Plans (9-M), revised  3/21/1922
Tube   20  
Typical Floor Plan for Electrical Work Only, Fifth to Twenty-Fourth Floors, and Typical Floor Plan, Tenth to Nineteenth Floors (10-M), revised  5/18/1921
Tube   20  
Twentieth through Twenty-Third Floors Plan and Twenty-Fourth Floor Plan (11-M), revised  5/18/1921
Tube   20  
Pipe Space Plan (12-M), revised 10/6/1921
Tube   20  
Riser Diagrams (13-M), revised5/6/1921
Tube   20  
[Riser Diagram], untitled (14-M), revised  5/6/1921
Tube   20  
[Riser Diagrams], untitled (15-M), revised  5/6/1921
Tube   20  
Sub-Basement Mezzanine and Basement [Electrical] Plans (16-M),  undated
Tube   20  
Riser Diagram-Lighting Feeders and Diagram of Telephone Risers (17-M),  undated
Tube   20  
Riser Diagram-Power Feeders (18-M),  undated (31-1/2x44 inches)
Tube   20  
Layouts of Fan Room in Basement and of Exhaust and Recirculating Duct in Truss Space and Details (19-M), 12/3/1920 revised  10/18/1921
Tube   20  
Typical [Pipe] Installation Plan and Front and Rear Sectional Elevations (20-M),  3/17/1921 revised  5/6/1921
Tube   21  
Sub-Basement Mezzanine [Electrical] Plan (21M),  5/9/1921 revised  8/23/1921
Tube   21  
Basement [Electrical] Plan (22-M),  3/2/1921 revised  8/2/1921
Tube   21  
First Floor [Electrical] Plan (23-M),  5/19/1921 revised  11/29/1921
Tube   21  
First Floor Mezzanine [Electrical] Plan (24-M),  4/27/1921 revised  8/2/1921 (30-1/4x50-3/4 inches)
Tube   21  
Second Floor [Electrical] Plan (25-M),  4/18/1920 revised  8/2/1921
Tube   21  
Third Floor [Electrical] Plan (26-M), revised  8/2/1921
Tube   21  
    (undated due to linen damage) 
Tube   21  
Fourth Floor [Electrical] Plan (27-M),  3/31/1921 revised  8/2/1921
Tube   21  
Fifth Floor [Electrical] Plan (28-M), revised  8/2/1921     (date illegible) 
Tube   21  
Sixth Floor [Electrical] Plan (29-M),  4/13/1921
Tube   21  
Seventh Floor [Electrical] Plan (31-M),  4/12/1921 revised  8/2/1921
Tube   21  
Eighth Floor [Electrical] Plan (32-M), undated, revised  8/2/1921
Tube   21  
Typical Floor [Electrical] Plan (33-M), revised  9/6/1921     (undated due to linen damage) 
Tube   21  
Riser Diagram (34-M),  4/7/1921 revised  6/8/1921
Tube   21  
Truss Space [Electrical] Plan (35-M),  5/19/1921 revised 10/6/1921
Tube   21  
Conduit Schedule and [Electrical] Plans and Sections (36-M),  10/24/1921 (30-3/4x47 inches)
Tube   21  
Wiring Diagram-Electric Sub-Station (37-M), 11/3/1921 (29-3/4x46-1/2 inches)
Tube   21  
[Electrical] Sections (38-M),  11/17/1921 revised  9/20/1922 (31-1/4x46-1/2 inches)
Tube   21  
Pipe Space Plan (39-M)     (undated due to linen damage) 
Tube   21  
Power Risers (40-M),  undated (36x38-3/4 inches)
Tube   21  
Main Distribution of A.C. and D.C. Current (42-M),  8/24/1921 (30-3/4x42-1/4 inches)
Tube   21  
Main Control Switchboard (44-M)     (undated due to linen damage)  (32x41-1/2 inches)