Chrysler Corporation (Dodge) One-Half-Ton Truck Building and Addition, Mound Road, Detroit (Warren), Michigan (1937-1938 1945-1946) Job No. 1766-P [subseries]:
 
Factory Building (Building No. 101) by Albert Kahn, Inc., Architects & Engineers (Job. No. 1766)
 
Construction Drawings
 
Architectural Drawings except as noted (ink-on-linen and pencil-and-ink-on-vellum drawings, 27-1/2x52-1/2 inches, except as noted)
Tube   64  
Plot Plan (1)
Tube   64  
Foundation Plan (2)
Tube   64  
Pit Details (3-P)
Tube   64  
First Floor Plan (4)
Tube   64  
Second Floor Plan (5)
Tube   64  
Roof Plan of Second Floor Portion and Door Details (6)
Tube   64  
North and West Elevations (7)
Tube   64  
South and East Elevations (8)
Tube   64  
Longitudinal and Cross-Sections (9)
Tube   64  
Details of Employment Department, Hospital and Factory Offices, and "P" Detail Numbers(10)
Tube   64  
Longitudinal Sections "A-A" (11)
Tube   64  
Sections "B-B" and "C-C" (12)
Tube   64  
Sections "D-D" and "E-E" and "F" Detail Numbers (13)
Tube   64  
Section "F-F" and Door and Ladder Details (14)
Tube   64  
Sections "G-G," "H-H," "J-J" & "K-K" through Motor Receiving Room (15)
Tube   64  
Sections "L-L" and "T-T" (16)
Tube   64  
Sections "M-M" through "Q-Q" & "S-S" and "N" Detail Numbers (17)
Tube   64  
Sections through Ovens and "C" Detail Numbers (18)
Tube   64  
Construction Details and "A" Detail Numbers (19)
Tube   64  
Construction Details and "B" Detail Numbers (20)
Tube   64  
Construction Details and "E" Detail Numbers (21)
Tube   64  
Construction Details and "D" Detail Numbers (22)
Tube   64  
Details of Elevated Toilet Rooms No. 1, 2, 3 & 4 (23)
Tube   64  
Details of Switchboard and Transformer Rooms No. 1 & 2 (24)
Tube   64  
Details of Freight and Elevator Stairs and "J" Detail Numbers (25)
Tube   64  
Details of Offices, Second Floor (26)
Tube   64  
Details of Office Stairs (27)
Tube   64  
Details of Offices and Stairs No. 5 and "K" Detail Numbers (28)
Tube   64  
Details of Doors and "L" Detail Numbers (29)
Tube   65  
Foundation and Roof Plans (30)
Tube   65  
First Floor Plan and Elevations (31)
Tube   65  
Sections "A-A" and "B-B" of Export Building (32)
Tube   65  
Details of Loading Dock Sections and Corner (33)
Tube   65  
Details of Overhead Toilet and Door (34)
Tube   65  
Construction Details (35)
Tube   65  
Details of Tunnel and Incline (36)
Tube   65  
Details of Layout of Storage Tanks (37)
Tube   65  
Details of Main Entrance and "R" Detail Numbers (38)
Tube   65  
Details of Fan and Heater Platforms (39) (18x33 inches)
Tube   65  
Details of Scale Pit, Trenches and Pit for Final Assembly Conveyor No. 9 (40)
Tube   65  
Details of Conveyor Pits (41)
Tube   65  
First Floor Plan of Revision and Extension of Present and Future Partitions (42) (16-1/2x30 inches)
Tube   65  
Details of Steel Sash Partitions in Receiving Room No. 2, Tool Crib and Office, Second Floor (43) (25-1/2x37-1/2 inches)
Tube   65  
Revised Details of Hospital Waiting Rooms, Stairs, New Dark Room and Cashier's Room (45) (23-1/2x33 inches)
Tube   65  
Details of Proposed Skylights for Second-Floor Toilet Rooms (47) (21-3/4x30-1/2 inches)
Tube   65  
Detail of Opening in Partition between Telephone Equipment and Switchboard Room (48) (20-1/2x28 inches)
Tube   65  
Details Showing Removal of Stairs No. 6 and New Floor Slab (49) (13-1/2x13 inches)
Tube   65  
Structural Drawings except as noted (ink-on-linen and pencil-on-vellum drawings, 26x51 to 27x52 inches)
Tube   65  
Roof Framing Plan, West Portion (1-S)
Tube   65  
Roof Framing Plan, East Portion (2-S)
Tube   65  
Floor Framing Plans and Truss Details (3-S)
Tube   65  
Longitudinal Section and Truss Details (4-S)
Tube   65  
Part Cross-Section and Truss Details (5-S)
Tube   65  
Truss Details (6-S)
Tube   65  
Columns and Footings Schedules and Details (7-S)
Tube   65  
Second Floor Framing Plan and Material Schedule (8-S)
Tube   65  
Framing Elevations (9-S)
Tube   65  
General Roof Plan and Crane Details (12-S)
Tube   65  
Column and Truss Details and Footing Schedule for Export Building (13-S)
Tube   65  
Mechanical Drawings except as noted (ink-on-linen and pencil-on-vellum drawings, 28x53 inches, except as noted)
Tube   65  
Plot Plan Showing Underground Sprinkler System and Plumbing Outside of Buildings (1-M)
Tube   65  
Foundation Plan and Details (2-M)
Tube   65  
First Floor Plan (3-M)
Tube   65  
Plans of Second Floor and Toilet Rooms and Plan of Employment Dept., Hospital and Factory Offices (4-M)
Tube   65  
Foundation and First Floor Plans of Export Building and Details (5-M)
Tube   65  
Plans of First Floor and Offices, Showing Automatic Building Sprinklers (6-M) (27-3/4x46-1/2 inches)
Tube   65  
Plan of Second Floor and Sections "X-X" and "Y-Y," Showing Sprinklers (7-M) (24-1/2x48 inches)
Tube   66  
First Floor Plan (8-M)
Tube   66  
Plans of Second Floor and Employment Department, Hospital and Factory Offices (9-M)
Tube   66  
Plan of Second Floor Offices (10-M)
Tube   66  
Details of Export and Drive-Away Buildings (11-M)
Tube   66  
Details of Tunnel and Header Room Piping (12-M)
Tube   66  
Details of Main Sewer and Water Services (101-M) (27x50 inches)
 
Electrical Drawings except as noted (ink-on-linen and pencil-on-vellum drawings, 26-1/4x51-3/4 to 28x53 inches, except as noted)
Tube   66  
Plot Plan and Diagram of Time Clock and Program Wiring (1-E)
Tube   66  
First Floor Plan (2-E), revised 1/281938
Tube   66  
Factory Lighting Plan and First and Second Floor Lighting Feeder Diagrams (3-E)
Tube   66  
Plan at Second Floor Offices (4-E)
Tube   66  
Plan of Employment Department, Hospital and Factory Offices, Details of Elevator and Section Showing Method of Installing High Bay and Second Floor Factory Lighting Fixtures (5-E)
Tube   66  
Part Longitudinal Section "A-A" and Sections of Monitor in High Bay and of Low Bay between Trusses (6-E)
Tube   66  
Power Feeder Diagram and Bus Layout, First Floor Plan (7-E)
Tube   66  
Power Wiring Diagram, Second Floor Plan (8-E)
Tube   66  
Manhole Details (9-E)
Tube   66  
Details of East Transformer Vault (10-E)
Tube   66  
Details of West Transformer Vault (11-E)
Tube   66  
Details of Switching Station (12-E)
Tube   66  
Floor Plan of Export Building and Cross-Section (13-E)
Tube   66  
Details of Drive-Away Building and Gate House (14-E) (17-1/4x21-3/4 inches)
 
Addition to Factory Building No. 101 by Albert Kahn Associated Architects & Engineers, Inc. (Job No. 1766-P)
 
Construction Drawings
 
Architectural Drawings except as noted (ink-on-linen and pencil-on-vellum drawings, 27-1/2x52-1/2 inches, except as noted)
Tube   67  
Plot Plan (1)
Tube   67  
Plan of Temporary Parking Lot (1-A) (19x26 inches)
Tube   67  
Foundation Plan (2)
Tube   67  
First Floor Plan (3)
Tube   67  
Roof Plan and Details (4)
Tube   67  
North and East Elevations (5)
Tube   67  
West Elevation and Longitudinal Section "A-A" (6)
Tube   67  
Sections (7)
Tube   67  
Longitudinal Section "E-E" (8)
Tube   67  
Typical Elevation of High and Low Bays on North and East Walls and Sections (9)
Tube   67  
Sections "N-N" and "P-P" (10)
Tube   67  
Construction Details (11)
Tube   67  
Construction Details (12)
Tube   67  
Details of Doors, West Elevation (13)
Tube   67  
Details of Doors, East Elevation (14)
Tube   67  
Details of New Truck Well and Railroad Doors, East End of Present Building (15)
Tube   67  
Plans and Details of Men's Toilets, Switch Room and Transformer Platform (16)
Tube   67  
Details of Toilet Rooms Nos. 1, 3, 5, 8, 9 & 10 (17)
Tube   67  
Details of Men's and Women's Coat Rooms and Vault in Office (18-R)
Tube   67  
Details of Catwalk Bridges between Present and New Buildings (19)
Tube   67  
Elevations of Partition at East Trucking Well and Employees' Entrance (20)
Tube   67  
Details of Bridge over Railroad Tracks (21)
Tube   67  
Miscellaneous Details (22)
Tube   67  
Plan, Sections and Details of Conveyor Bridge (23)
Tube   67  
Miscellaneous Sections and Details (24)
Tube   68  
Plan of Parking Layout and Details of Guard House and Fence at West End (25)
Tube   68  
Second Floor Plan of Office (26)
Tube   68  
Details of Pits (27)
Tube   68  
Details of Alterations to Present Conveyor Housing, East End of Present Building (28)
Tube   68  
Details of Tunnel from New Assembly Building to Military Vehicle Servicing Plant (29)
Tube   68  
Details of Trestle (30)
Tube   68  
Details of Revised Main Entrance, Present Building (31)
Tube   68  
Details of Revised North Elevation between Columns # 2 & 5 (32)
Tube   68  
Details of Truck Wells on South Side of Boxing Plant (33)
Tube   68  
Plan of New Office Layout and Toilet Partitions, Second Floor (34) (27-1/4x32-1/2 inches)
Tube   68  
Details of Scale Pits and Car Puller Pit (35)
Tube   68  
Details of Small Parts Dip and Fire Dump Tanks (36)
Tube   68  
Roof Plan and Details of Canopy over Loading Docks (37)
Tube   68  
Details of Vestibule Closure at Columns "A-A-1" to "2-1" (39) (27-1/4x32-1/4 inches)
Tube   68  
Details of Vestibule Closures (40) (27-1/4x37-1/2 inches)
Tube   68  
Details of Ramp, North Side of Boxing Plant (41) (14-1/4x33-1/2 inches)
Tube   68  
Details of Overhead Door and Vestibule at East End of Building (42) (24x30 inches)
Tube   68  
Details of New Concrete Railroad Bumper (43) (16-1/2x28-1/4 inches)
Tube   68  
Details of Acoustical Ceiling in Foremen's Assembly Room (44) (28x25-1/2 inches)
Tube   68  
Details of Alterations and Additions to Present Conveyor Housing at East End of Assembly Building (45) (28-1/4x32-1/4 inches)
Tube   68  
Details of New Steel Sash in North Wall of Paint Mixing Room (46) (14-1/2x34 inches)
Tube   68  
Details of New Conveyor Opening and New Concrete Slab (47) (28x25-1/2 inches)
Tube   68  
Details of Alterations to Conveyor Housing at East End of Assembly Building (48) (27-1/2x45 inches)
Tube   68  
Detail of Roof Ventilator Houses (201) (14-1/4x19-1/2 inches)
Tube   68  
Details of Location of Louvre Houses and Hatches (202) (16-1/2x19 inches)
 
Structural Drawings except as noted (ink-on-linen and pencil-and-ink-on vellum drawings, 26-1/2x51-3/4 to 28x53 inches, except as noted)
Tube   65  
Column and Footing Schedule (1-S)
Tube   65  
Roof Framing Plan, Wall Framing Elevation, and Truss and Material Schedules (2-S)
Tube   65  
Longitudinal Sections and Truss Details (3-S)
Tube   65  
Truss Details (4-S)
Tube   65  
Floor Framing Plans for Toilet Rooms, Transformer Platforms and Connections to Present Building (5-S)
Tube   65  
Wall Framing Elevations and Details of Alterations to Present Trusses (6-S)
Tube   65  
Details of Structural Steel Work in Present Building (7-S)
Tube   65  
Details of Alterations to Truss T-19 (8-S) (14x24-1/2 inches)
Tube   65  
Details of Alterations to Present Conveyor Housing, East End of Building (9-S) (27x49-1/4 inches)
Tube   65  
Miscellaneous Details (X-S) (28x37-3/4 inches)
Tube   65  
Details of Field Work on Swayframe (SK 101-S) (11x16-1/4 inches)
 
Mechanical Drawings except as noted (ink-on-linen and pencil-and-ink-on-vellum drawings, 26-1/2x51-3/4 to 28x53 inches, except as noted)
Tube   69  
Plot Plan (1-MR)
Tube   69  
Foundation Plan, Plumbing (2-M)
Tube   69  
First Floor Plan, Plumbing (3-M)
Tube   69  
Details of Toilet Rooms (4-M)
Tube   69  
First Floor Plan, Heating (5-M)
Tube   69  
Heating Riser Diagram and Details (6-M)
Tube   69  
Second Floor Plan, Venting (7-M)
Tube   69  
Details of Equipment Layout in Fan Rooms # 2 & 3 (8-M)
Tube   69  
Details of Equipment Layout in Fan Room # 1 (9-M)
Tube   69  
Plans and Sections of Tunnel Schemes # 1 & 2 and Pipe Trestle Scheme # 3 (10-M)
Tube   69  
Details of Tunnel Piping (10-M-R)
Tube   69  
Details of Second Floor Venting (11-M)
Tube   69  
Plot Plan and First Floor Plan, Fire Protection (100-M)
Tube   69  
Proposed Plan of Lumber Storage Drainage (200-M)
Tube   69  
Details of Radiator Connections for Second Floor Offices (201-M) (21-1/4x33 inches)
 
Electrical Drawings (ink-and-pencil-on-vellum drawings, 28x54 inches)
Tube   69  
Underground and Switching Station Plans, Sections and Symbols (1-E)
Tube   69  
Substation Details (2-E)
Tube   69  
First Floor Power Plan -- West Half (3-E)
Tube   69  
First Floor Power Plan -- East Half (4-E)
Tube   69  
First Floor Lighting Plan -- West Half (5-E)
Tube   69  
First Floor Lighting Plan -- East Half (6-E)
Tube   69  
Section "A-A," Lighting Panel Schedule and Details (7-E)
Tube   69  
Plot Plan and Details of Fence Lighting and Toilets (8-E)
Tube   69  
First Floor Plan, Showing Signal Systems, and Fan Room Plans (9-E)
Tube   69  
Second Floor Plan, Showing Office Lighting, and First Floor Entrance Plan (10-E)
Tube   69  
Details of Heating Tunnels, Ramp Enclosure at Column P-64 and Relocated Conveyor Housing (11-E)