George Romney Papers  1939-1973
full text File Size: 1291 K bytes | Add this to my bookbag

Container / Location Title
 
Project Records [series]:

The heart of the Albert Kahn Papers is located in the Project Records series. A total of 7,417 original, architectural drawings by Kahn's firm are located in 32 flat-file storage drawers and 69 oversized tubes and are accessible to researchers for study. The meticulously detailed, ink-on-linen drawings are associated with 145 of Kahn's projects, and are organized for the most part in construction sets, with a few design development drawings available for some of the projects. The Bentley Library reference archivists will explain certain reproduction restrictions to researchers who wish to order duplications of drawings in hard copy or on CD. The drawings of a number of the 145 projects have been scanned.

The buildings represented in this collection of drawings range from Job #1, A. Dupont Residence (1896) to Job. No. 1888, Ford Motor Company Willow Run Bomber Plant (1941-1943). They include such industrial landmarks as Packard Motor Company Building No. 10, Ford Motor Company Highland Park Plant, Ford Motor Company River Rouge Eagle Shipbuilding Plant, Ford Motor Company River Rouge Glass Manufacturing Plant and the Amtorg Trading Company Stalingrad Tractor Plant. The drawings representing sections of these innovative factory buildings are especially illustrative of the pioneering structural design which revolutionized American industrial architecture. Elevations of the George G. Booth, Edsel and Eleanor Ford and James C. Couzens residences show the rich, historic, exterior detailing of Kahn's domestic architecture. His versatility with Italian Renaissance and Art Deco design styles in his institutional and commercial work is also beautifully illuminated in the construction drawings of, among others, the William L. Clements Library and at the University of Michigan and the Fisher Building in Detroit.

The original, ink-on-linen drawings in this series are arranged chronologically by building and often include the structural, mechanical and electrical drawings, as well as the architectural. Please note that the date, medium/support and dimensions of the documents within each of these sub-groups of drawings are described in their headings in the finding aid. Exceptions to these descriptive data are indicated next to each drawing in the list which follows the headings. A number of the larger projects include more than one building, as in the case of the Edsel and Eleanor Ford Residence (1926-1932), for which the drawings of the Gate Lodge, Heating Plant, Boat House, Dog Kennel and later Activities Building (1990-1991) are also available.

 
A. Dupont Residence, Detroit, Michigan,  1896, Job No. 1 [subseries]:
 
Construction Drawings,  undated (Black and red ink-on-linen drawings, 18-3/4x28 inches and 13-3/4x28 inches)
 
Architectural Drawings
Drawer   1 Folder   1
Foundation Plan (1)
Drawer   1 Folder   1
First Floor Plan (2)
Drawer   1 Folder   1
Second Floor Plan (3)
Drawer   1 Folder   1
Roof Plan (4)
Drawer   1 Folder   1
West Elevation (5)
Drawer   1 Folder   1
South Elevation (6)
Drawer   1 Folder   1
East Elevation (7)
Drawer   1 Folder   1
North Elevation (8)
Drawer   1 Folder   1
Elevations in Living Room and Cross Section thro' Main Part (9)
Drawer   1 Folder   1
Longitudinal Section (10)
 
Professor Edward DeMille Campbell Residence, Ann Arbor, Michigan,  1899, Job No. 12 [subseries]:
 
Construction Drawings by Nettleton and Kahn, Architects,  7/22/1899 (Ink-on-linen drawings, 18x26 inches)
 
Architectural Drawings
Drawer   8 Folder   1
Foundation Plan
Drawer   8 Folder   1
First Floor Plan
Drawer   8 Folder   1
Second Floor Plan
Drawer   8 Folder   1
Third Floor and Roof Plan
Drawer   8 Folder   1
West Elevation
Drawer   8 Folder   1
South Elevation
Drawer   8 Folder   1
North Elevation
Drawer   8 Folder   1
East Elevation
Drawer   8 Folder   1
Finish [Details] in Main Hall
Drawer   8 Folder   1
Inside Finish Details-Study, Living Room and Dining Room
Drawer   8 Folder   1
[Interior Elevations]-Pantry and China Closet Fittings
 
Sigma Phi House, University of Michigan, Ann Arbor,  undated, Job No. 66 [subseries]:
 
Construction Drawings,  undated (Black and orange ink-on-linen drawings, 22x34-3/4 to 22-1/2x35-1/2 inches except as noted)
 
Architectural Drawings
Drawer   8 Folder   3
Sub-Basement Plan (2)
Drawer   8 Folder   3
Basement Plan (3)
Drawer   8 Folder   3
First Floor Plan (4)
Drawer   8 Folder   3
Second Floor Plan (5)
Drawer   8 Folder   3
Third Floor Plan (6)
Drawer   8 Folder   3
Details of Inside Finish (7)
Drawer   8 Folder   3
Details of Inside Finish (8)
Drawer   8 Folder   3
West Elevation and Transverse Section through East Wing (9)
Drawer   8 Folder   3
East Elevation and Transverse Section (10)
Drawer   8 Folder   3
North Elevation (11)
Drawer   8 Folder   3
South Elevation (12)
Drawer   8 Folder   3
Detail of Front Elevation and Section thro' Front Wall (23-1/4x12 inches)
 
Temple Beth El, Detroit, Michigan,  1902, Jobs No. 89 and 136-A [subseries]:
 
Design Development Drawings (Set of Bonds) by George D. Mason and Albert Kahn, Architects,  undated (Ink-on-linen drawings)
Drawer   1 Folder   2
Elevation of Large Window on South Side of Temple Beth El (27x14 inches)
Drawer   1 Folder   2
Plan of Locker and Shower Rooms (12x14 inches)
Drawer   1 Folder   2
[Foundation Plan], untitled (13x16 inches)
Drawer   1 Folder   2
Heating Plan (Two drawings, 26x14 inches)
Drawer   1 Folder   2
Heating Plan for Temple Beth El Showing Mechanical Hot Air System of The Bryce Heating & Ventilating Co., Toledo Ohio (13x26 inches)
 
Design Development Drawings (Set of Bonds),  undated (Ink-on-linen drawings)
Drawer   1 Folder   2
Foundation and Basement Plan (1) (30x18 inches)
Drawer   1 Folder   2
First Floor Plan (2) (28x17 inches)
Drawer   1 Folder   2
Second Floor Plan (3) (26x17 inches)
Drawer   1 Folder   2
Roof Plan (4) (27x17 inches)
Drawer   1 Folder   2
Front and Rear Elevations (5) (16x28 inches)
Drawer   1 Folder   2
North Side Elevation (6) (17x26 inches)
Drawer   1 Folder   2
South Side Elevation (7) (16x27 inches)
Drawer   1 Folder   2
Detail of Front Entrance (8) (30x18 inches)
Drawer   1 Folder   2
Longitudinal Section on Line J-J Looking North (9) (17x30 inches)
Drawer   1 Folder   2
Sections thro' Lines E-E, G-G and H-H Looking East (10) (32x16 inches)
Drawer   1 Folder   2
Detail of Platform, Tabernacle Choir Gallery, etc., Detail of Skylight in Main Ceiling, and Section on Line A-A (11) (18x32 inches)
Drawer   1 Folder   2
Interior Details (12) (18x27 inches)
Drawer   1 Folder   2
Half-Elevation of Dome Trusses and Section of Side Walls of Dome, Detail Showing Support of Purlins at Top Joints, and Section thro' Corner of Dome (13) (27x18 inches)
Drawer   1 Folder   2
Plan of Dome (14) (27x18 inches)
 
Construction Drawings (Ink-on-linen drawings)
 
Architectural Drawings
Drawer   1 Folder   3
Detail of Rear Stairs, Rear Entrance Doors, Frames, Sash, Glass, Partitions and Cupboards (13) by Albert Kahn, Architect     (date not visible due to linen damage)  (29x48-3/4 inches)
Drawer   1 Folder   3
Plaster Details of Auditorium (20) by Mason & Kahn, Architects (20),  10/24/1902 (37x33-3/4 inches)
Drawer   1 Folder   3
Diagram Showing Plan and Profiles of Dome Ceiling (20),  undated (28x35-1/2 inches)
Drawer   1 Folder   3
[Plan] (23), untitled, by Albert Kahn, Architect,  undated (28x18 inches)
Drawer   1 Folder   3
Plaster Details of Auditorium (89) by Mason & Kahn, Architects,  10/17/1902 (40x29 inches)
Drawer   1 Folder   3
Plan of Auditorium and Sections on Lines A, B, C, D and E (Job No. 136-A)     (date not visible due to linen damage)  (23x47 inches)
Drawer   1 Folder   3
Alterations to Temple Beth El (2) by Albert Kahn, Architect (Job 136-A),  9/22/1902 (Pencil-on-vellum drawing, 23-1/2x30 inches)
 
Engineering Building, University of Michigan, Ann Arbor, Michigan,  1902-03 and  1908-1910, Job No. 145, 145A & 145B [subseries]:
 
Engineering Building (Job No. 145)
 
Design Development Drawings (Block Plans) by Mason & Kahn Architects,  undated (Ink-on-linen drawings, 27-1/2x39 to 27-1/2/x42 inches)
Drawer   3 Folder   10
Ground Floor Plan
Drawer   3 Folder   10
Second Floor Plan (Two drawings)
Drawer   3 Folder   10
Third Floor Plan
Drawer   3 Folder   10
Roof Plan
 
Construction Drawings by Mason & Kahn Architects,  undated (Ink and colored pencil drawings on linen, some with pencil notations, 27-3/4x440 to 29-3/4x43 inches)
 
Architectural Drawings
Drawer   3 Folder   10
Foundation Plan (1)
Drawer   3 Folder   10
Ground Floor Plan (2)
Drawer   3 Folder   10
Second Floor Plan (3), revised  4/1/1903
Drawer   3 Folder   10
Third Floor Plan (4), revised  4/1/1903
Drawer   3 Folder   10
Fourth Floor Plan (5), revisd  4/1/1903
Drawer   3 Folder   10
Roof Plan (6), revised  4/1/1903
Drawer   3 Folder   10
Elevations of South Wing and Center Pavilion (7)
Drawer   3 Folder   10
Elevations and Cross-Sections (8)
Drawer   3 Folder   10
Elevations and Cross-Section (9)
Drawer   3 Folder   10
Fourth Floor Plan by Albert Kahn, architect (10),  3/24/1903
Drawer   3 Folder   10
Details of Interior Finish (10)
Drawer   3 Folder   10
Detail of Main Stairs and Brick and Wood Details (11)
Drawer   3 Folder   10
Details of Steel Work (12)
Drawer   3 Folder   10
Roof Framing Plan (13)
Drawer   3 Folder   10
Detail of Stone and Brick Work in Archway (23)
Drawer   3 Folder   10
Details of Cupola, Interiors, Dormers and Boiler House Clere Story (28), discarded  2/26/1903
Drawer   3 Folder   10
Plan Showing Method of Determining Present Position of Wall (35) (14x22-1/2 inches)
Drawer   3 Folder   11
Elevations and Plan of Stacks, South Extension (37) (24-1/2x29-1/4 inches)
Drawer   3 Folder   11
Elevation and Plan of Stacks, South Extension, by Albert Kahn, Architect (37 Revised),  3/24/1903 revised  4/4/1903 (28-3/4x29 inches)
Drawer   3 Folder   11
Elevations and Plans of Stacks (38),  2/26/1903 completed  4/4/1903 (25x34-1/2 inches)
Drawer   3 Folder   11
Revised Brick and Wood Details (39),  9/16/1902
Drawer   3 Folder   11
Brick and Wood Details of Tower and Detail of Windows and Door at East Wing Stairs (44),  9/16/1902 revised  11/25/1902 (23x29 inches)
Drawer   3 Folder   11
Revised Plan of Center Pavilion, Ground Floor (46) (19x18-1/2 inches)
Drawer   3 Folder   11
Revised Plan of Center Pavilion, Fourth Floor (49) (19x18 inches)
Drawer   3 Folder   11
Ground Floor Plan (53),  11/17/1902 revised  12/30/1902
Drawer   3 Folder   11
Second Floor Plan (54),  11/17/1902 revised  12/30/1902
Drawer   3 Folder   11
Third Floor Plan (55),  11/17/1902 revised  12/30/1902
Drawer   3 Folder   11
Fourth Floor Plan (56),  11/17/1902 revised  12/30/1902
Drawer   3 Folder   11
Detail of Main Stairs (60),  11/18/1902 (27-1/4x23-1/4 inches)
Drawer   3 Folder   11
Revised Second Floor Plan of North Wing (91),  1/22/1903 (20x17-1/2 inches)
Drawer   3 Folder   11
Plans, Elevations and Sections of Boiler Room (96),  12/1902 (25x36 inches)
Drawer   3 Folder   11
Typical Interior Trim Details (99),  2/28/1903     ("Albert Kahn Architect in Charge" notation) 
Drawer   3 Folder   11
Plans, Elevations and Sections of Tower (102),  3/17/1903
Drawer   3 Folder   11
Details of Dormers (114),  4/14/1903 (28x53 inches)
Drawer   3 Folder   11
Detail of Entrance Doors and Lobby (119),  4/13/1903 (11x27-1/4 inches)
Drawer   3 Folder   11
Revised Plan of General Toilet, Locker Room, etc. (131),  9/1/1903 (19-1/4x29 inches)
Drawer   3 Folder   11
Interior Finish in Faculty and Secretary's Room and Studies (134),  9/17/1903 (25-1/2x26-1/4 inches)
Drawer   3 Folder   11
Ammended Plan of Library (139) (25x33-3/4 inches)
Drawer   3 Folder   11
Ammended Detail of Finish in Library (139) (25x33-3/4 inches)
Drawer   3 Folder   11
Archway in Centre Pavilion (10-1/2x38-1/2 inches)
 
Addition to Engineering Building (1908-1910) Job No. 145-A
 
Construction Drawings by Albert Kahn Architect, Ernest Wilby Associate
 
Architectural Drawings,  undated (Ink-on-linen drawings, 27x34 inches, except as noted)
Drawer   3 Folder   12
Foundation Plan (1),  9/9/1908 revised  8/11/1909
Drawer   3 Folder   12
Plot Plan (1-A)
Drawer   3 Folder   12
First Floor Plan (2), revised  4/20/1910
Drawer   3 Folder   12
Second Floor Plan (3), revised  9/20/1909
Drawer   3 Folder   12
Third Floor Plan (4), revised  4/20/1910
Drawer   3 Folder   12
Fourth Floor Plan (5), revised  4/20/1910
Drawer   3 Folder   12
Roof Plan and Details (6), revised  5/4/1909
Drawer   3 Folder   12
Longitudal Sections (7)
Drawer   3 Folder   12
Transverse Section and Details of Dormers and Doors (8)
Drawer   3 Folder   12
North and East Elevations (9), revised  5/4/1909
Drawer   3 Folder   12
South and West Elevations (10), revised  5/4/1909
Drawer   3 Folder   12
Section thro' Stairs and Details of Stairs(11)
Drawer   3 Folder   12
Interior Details (12)
Drawer   3 Folder   12
Details of Columns and Stairs in North Wing (13)
Drawer   3 Folder   12
Typical Detail of East Elevation (14)
Drawer   3 Folder   12
Typical Details of West and North Elevations (15)
Drawer   3 Folder   12
Typical Detail of Window Frames (16)
Drawer   3 Folder   12
Roof Framing Plan (17), revised  5/4/1909
Drawer   3 Folder   12
Riser Diagrams, West, North and East Walls (18)
Drawer   3 Folder   12
Riser Diagram, West and South Walls, and Detail of Typical Vent Air Register (19)
Drawer   3 Folder   12
Sections "D-D" and "E-E" thro' Fan Room (20)
Drawer   3 Folder   12
Revised Second Floor Plan (29),  4/21/1909 (11-1/4x15-1/4 inches)
 
Heating and Ventilating Plans by H. C. Anderson, Engineer,  undated (Ink-on-linen drawings with pencil notations, 24x34 inches)
Drawer   3 Folder   13
First Floor Plan (1),  6/29/1909
Drawer   3 Folder   13
Second Floor Plan (2)
Drawer   3 Folder   13
Third Floor Plan (3)
Drawer   3 Folder   13
Fourth Floor Plan (4)
Drawer   3 Folder   13
Riser Diagrams, North and East Walls (5)
Drawer   3 Folder   13
Riser Diagram, South and West Walls (6)
Drawer   3 Folder   13
Sections "R-R" and "B-B" (7)
 
Alterations to Library, Engineering Building (1910) Job No. 145-B
 
Architectural Construction Drawing by Albert Kahn, Architect, Ernest Wilby, Associate,  8/9/1910 (Ink-on-linen drawing, 17x21 inches)
Drawer   3 Folder   13
Alterations to Library, Second Floor (1)
 
Delta Upsilon House, University of Michigan, Ann Arbor (1902-1903) Job No. 173 [subseries]:
 
Construction Drawings by Albert Kahn, Architect,  10/18/1902 (Black and red ink, pencil and red pencil drawings on linen, 22x28-1/2 inches)
 
Architectural Drawings
Drawer   8 Folder   2
Basement Plan (1)
Drawer   8 Folder   2
Revised Basement Plan (1),  2/3/1903
Drawer   8 Folder   2
First Floor Plan (2)
Drawer   8 Folder   2
First Floor Plan (2),  4/9/1903 (18x30-1/4 inches)
Drawer   8 Folder   2
Second Floor Plan (3)
Drawer   8 Folder   2
Second Floor Plan (3),  4/9/1903 (18x28-1/2 inches)
Drawer   8 Folder   2
Third Floor Plan (4)
Drawer   8 Folder   2
Third Floor Plan (4),  4/9/1903 (18x28-1/2 inches)
Drawer   8 Folder   2
Front Elevation (5)
Drawer   8 Folder   2
West Elevation (6)
Drawer   8 Folder   2
East Elevation (7)
Drawer   8 Folder   2
Rear Elevation (8)
Drawer   8 Folder   2
Transverse Section and Detail of Interior Finish in General (9)
Drawer   8 Folder   2
Details of Interior Finish (10)
Drawer   8 Folder   2
Basement Plan (Revised 11),  11/26/1902 (15x25 inches)
Drawer   8 Folder   2
First and Second Floor Plans (Revised 12),  2/3/1903 (15x25 inches)
Drawer   8 Folder   2
Third Floor Plan (Revised 13),  11/26/1902 (15x25 inches)
Drawer   8 Folder   2
Rear and East Elevations (Revised 14),  2/3/1903 (15x25 inches)
Drawer   8 Folder   2
Exterior Details
Drawer   8 Folder   2
Exterior Details (18),  4/17/1903 (23x36 inches)
Drawer   8 Folder   2
Basement, First Floor, Second Floor and Attic Plans (19),  1/14/1903 (21-3/4x38 inches)
 
Packard Motor Company Factory Addition, Building Number 10, Detroit, Michigan,  1905-1909, Job No. 277 [subseries]:
 
Construction Drawings by Albert Kahn, Architect, Ernest Wilby, Associate,  10/25/1905 (Ink-on-linen drawings with pencil notations, 20-1/4x26 inches)
 
Architectural Drawings
Drawer   1 Folder   4
Foundation Plan (1), revised  12/16/1909
Drawer   1 Folder   4
First Floor Plan (2), revised  2/16/1909
Drawer   1 Folder   4
Second Floor Plan (3), revised  12/16/1909
Drawer   1 Folder   4
North and South Elevations (4)
Drawer   1 Folder   4
East and Court Elevations and Transverse and Typical Detail Sections (5)
Drawer   1 Folder   4
Revised Drawing of Fan Room and Air Flues (10),  11/22/1905 (15x23 inches)
Drawer   1 Folder   4
Revised Drawing of Floor Construction for Fan Room (12),  12/12/1905 (15-1/4x20 inches)
 
Packard Motor Company Factory Addition, Building Number 11, Detroit, Michigan,  1906, Job No. 289 [subseries]:
 
Construction Drawings by Albert Kahn, Architect, Ernest Wilby, Associate,  undated (Ink-on-linen drawings with pencil notations, 16-3/4x45-1/2 inches)
 
Architectural Drawings
Drawer   1 Folder   5
Foundation Plan of Section A (1),  4/10/1906
Drawer   1 Folder   5
Foundation and First Floor Plans of Section B (2)
Drawer   1 Folder   5
Plot Plan of Buildings 10, 11 and 12 Showing Columns and Conductors and Third Floor Plan of Section B, Building No. 11 (2) (17x47 inches)
Drawer   1 Folder   5
Foundation Plan of Section C (3)
Drawer   1 Folder   5
First Floor Plan of Section A (4)
Drawer   1 Folder   5
First Floor Plan of Section C (5)
Drawer   1 Folder   5
Secdong Floor Plan of Section A (6)
Drawer   1 Folder   5
Second Floor Plan of Section C (7)
Drawer   1 Folder   5
Second Floor Plan of Section B and East Elevation of Section A and B (8)
Drawer   1 Folder   5
Roof Plan, End Elevation of Section C, Section thro' Elevator Shaft Passage and Toilet Room, and Details (9)
Drawer   1 Folder   5
North and South Elevations of Section B, Transverse Section of Section B and Details (10)
Drawer   1 Folder   5
East and West Elevations of Section C (11) (17-3/4x45-1/2 inches)
Drawer   1 Folder   5
Block Plan (12)
Drawer   1 Folder   5
Block Plan (12) (17-1/2x33-1/4 inches)
Drawer   1 Folder   5
Typical Details of Coil and Connections, Fan Room, Riser Connections and Heating Ducts (13) (17-3/4x45 inches)
Drawer   1 Folder   5
Plan, Elevations and Sections of Bridge #2 between Old Buildings (20),  6/21/1906 &  6/29/1906 (Two drawings, 16x31-3/4)
Drawer   1 Folder   5
Plan, Elevations and Sections of Bridge #3 (21),  6/28/1906 (13-1/2x35 inches)
 
Packard Motor Car Company Forge Building, Detroit, Michigan,  1910, Job No. 201-A-N [subseries]:
 
Construction Drawings by Albert Kahn, Architect, Ernest Wilby, Associate,  1/15/1910 (Ink-on-linen drawings, 30x40 inches)
 
Architectural Drawings
Drawer   1 Folder   6
Foundation Plans, Sections A and B (1)
Drawer   1 Folder   6
First Floor Plans, Sections A and B (2)
Drawer   1 Folder   6
Roof Plans, Sections A and B (3)
Drawer   1 Folder   6
Second Floor Plan, East Elevation-Section B, South Elevation and Transverse Section (4)
Drawer   1 Folder   6
East Elevation-Section A and West Elevations-Section B (5)
Drawer   1 Folder   6
North Elevations and Transverse and Longitudinal Sections (6)
Drawer   1 Folder   6
Plot Plan, Detail of Interior Steel Columns in Stamping Room and Sections thru' Hammer Foundations (8),  1/26/1910
 
Albert Kahn Residence, Detroit, Michigan,  1906 and  1921-1928, Job No. 293 and 293-E, F & G [subseries]:
 
Albert Kahn Residence (Job No. 293)
 
Architectural Construction Drawings,  undated (Ink-on-linen drawings with pencil revisions, 17-1/2x25 to 23x31 inches)
Drawer   1 Folder   7
Basement Plan (1), Heating revised  9/11/1906
Drawer   1 Folder   7
First Floor Plan (2), Heating revised  9/11/1906
Drawer   1 Folder   7
Second Floor Plan (3)
Drawer   1 Folder   7
Attic and Roof Plan (4)
Drawer   1 Folder   7
Front Elevation (5)
Drawer   1 Folder   7
Rear Elevation (6)
Drawer   1 Folder   7
West Elevation (7)
Drawer   1 Folder   7
East Elevation (8)
Drawer   1 Folder   7
Transverse Section (9)
Drawer   1 Folder   7
Plan and Elevations of Terrace and Garden Enclosure (10)
Drawer   1 Folder   7
Plan and Elevations of Living Room Porch (41)
Drawer   1 Folder   7
Details of Vestibule and Main Hall (43)
Drawer   1 Folder   7
Details of Butler's Pantry and New Porch Addition (44)
Drawer   1 Folder   7
Dining Room, Den and Living Room Mantel Elevations (45)
Drawer   1 Folder   7
Details of Closets and Pantry Fittings (47), 10/9/1906
 
Gallery and Garage Addition to Residence for Mr. Albert Kahn by Albert Kahn, Inc., Architects (Job No. 293-F)
 
Architectural Construction Drawings,  6/8/1928 (Black and green ink and pencil drawings on vellum and tracing paper, 13x17 to 24-1/2x35-1/2 inches)
Drawer   1 Folder   8
First Floor Plan (2), revised  8/21/1928
Drawer   1 Folder   8
Second Floor and Roof Plan (3), revised  8/20/1928
Drawer   1 Folder   8
John R. Street Elevation (4), revised  9/14/1928
Drawer   1 Folder   8
East Elevation and Sections (5), revised  8/8/1928
Drawer   1 Folder   8
Sections "AA" and "BB" (6), revised  9/4/1928
Drawer   1 Folder   8
Garage Elevations and Details, revised  8/8/1928     (not numbered due to paper damage) 
Drawer   1 Folder   8
Detail of Paneling and Mantel and Section thru' Fireplace (9),  7/10/1928 revised  8/27/1928
Drawer   1 Folder   8
Ceiling Plan (10),  7/14/1928 revised  8/22/1928
Drawer   1 Folder   8
Revised Detail of Dining Room Bay (11),  8/15/1928 revised  8/16/1928
Drawer   1 Folder   8
Plan of Hearth in Gallery (12),  8/27/1928
Drawer   1 Folder   8
Detail of Paneling in Dining Room and Bay (13),  8/28/1928 revised  8/31/1928
Drawer   1 Folder   8
Elevations of Gallery Interiors Showing Revised Wood Cornice (14)     (undated due to paper damage) 
Drawer   1 Folder   8
Gallery Floor Pattern (50)     (undated due to paper damage) 
Drawer   1 Folder   8
Elevations of Gallery Interiors     (not numbered or dated due to paper damage) 
 
Mechanical Construction Drawings (Green and black ink drawing on vellum, 24-1/2x32-3/4 inches)
Drawer   1 Folder   8
Foundation Plan (1ME)     (undated due to paper damage) 
 
Alterations to Residence of Mr. Albert Kahn (Job No. 293-E)
 
Architectural Construction Drawing,  9/2/1921 (Pencil-on-vellum drawings)
Drawer   1 Folder   9
Details of Cupboards and Cabinets (48) (21-1/2x27 inches)
Drawer   1 Folder   9
Plan, Elevations and Sections of Second Floor Addition     (not numbered or dated due to paper damage)  (17-1/4x27 inches)
 
Alterations to Residence of Mr. Albert Kahn (Job No. 293-G)
 
Architectural Construction Drawing,  6/28/1928 (Pencil drawing on tracing paper, 19-3/4x28-1/4 inches)
Drawer   1 Folder   9
Detail of Wood Bookcase in Third Floor Bedroom (1)
 
George G. Booth Residence at Cranbrook, Birmingham, Michigan,  1907-1908 &  1913-1923, Jobs No. 333 & 333-A, B, D-K [subseries]:
 
George G. Booth Residence by Albert Kahn, Architect, Ernest Wilby, Associate (Job No. 333)
 
Survey Document by Mason L. Brown & Co., Civil Engineers, Detroit,  undated (Red, yellow and black ink drawing on linen, 31x37-1/2 inches)
Drawer   1 Folder   10
Contour Map of Proposed Residence Site for G. G. Booth, Esq., at Cranbrook
 
Architectural Construction Drawings,  undated (Ink-on-linen drawings, 23x46)
Drawer   1 Folder   10
Basement Plan (1),  4/1/1907 revised  6/28/1907
Drawer   1 Folder   10
Basement Piping Plan (1A), revised  7/23/1907
Drawer   1 Folder   10
First Floor Plan (2), revised  1/6/1908
Drawer   1 Folder   10
Second Floor Plan (3), revised  4/11/1908
Drawer   1 Folder   10
Third Floor and Roof Plan (4), revised  1/28/1908
Drawer   1 Folder   10
Sections on Lines A-B and C-D (5), revised  6/5/1907
Drawer   1 Folder   10
South Elevation (6), revised  1/6/1908
Drawer   1 Folder   10
North Elevation (7)
Drawer   1 Folder   10
East and West Elevations and Section thro' Rear Stairs (8), revised  6/5/1907
Drawer   1 Folder   10
Plan of Retaining Walls and Out-Buildings (9), revised  3/2/1908 (30x33-1/2 inches)
Drawer   1 Folder   10
Elevations and Sections of Garage and Out-Buildings (10), revised 10/8/1907 (26x33-1/2 inches)
Drawer   1 Folder   10
Details of Wardrobes, Linen Closet, Laundry Cupboard, Butler's and Kitchen Pantries, and Window and Door Trim, etc. (11) (22-3/4x27-1/2 inches)
Drawer   1 Folder   10
Plans of Revised Portion of Second and Third Floors and Roof (15), revised  6/7/1907 (22-1/2x33 inches)
Drawer   1 Folder   10
Front Elevation and Window Elevations Showing Stonework (19),  6/11/1907 revised  6/20/1907 (18-1/2x27-1/2 inches)
Drawer   1 Folder   10
Layout of Terrace (134) (26x26 inches)
Drawer   1 Folder   10
Plan and Details of Junk Garden and Terrace (135) (21-1/2x14 inches)
 
Cottage for Gardener for George Booth Residence by Albert Kahn, Architect, Ernest Wilby, Associate (Job No. 333-A)
 
Architectural Construction Drawings,  undated (Ink-on-linen drawings, 12x25-1/4 inches)
Drawer   1 Folder   11
Foundation and First Floor Plans (1),  3/28/1908
Drawer   1 Folder   11
Attic and Roof Plan and Section (2)
Drawer   1 Folder   11
South and East Elevations (3)
Drawer   1 Folder   11
North and West Elevations (4)
 
Water Tower for George Booth Residence by Albert Kahn, Architect, Ernest Wilby, Associate (Job No. 333-B)
 
Architectural Construction Drawing,  8/3/1908 (Ink-on-linen drawing, 33-1/2x22-1/2 inches)
Drawer   1 Folder   11
Plans and Details of Water Tower (1)
 
Addition to Water Tower for George Booth Residence by Albert Kahn, Architect, Ernest Wilby, Associate (Job No. 333-D)
 
Architectural Construction Drawing,  7/17/1913 (Ink-on-linen drawing, 24-1/4x23 inches)
Drawer   1 Folder   11
Plans and Elevations (1)
 
Addition to Residence for George Booth by Albert Kahn, Architect (Job No. 333-E)
 
Architectural Construction Drawings,  2/25/1918 (Ink-on-linen drawings with blue pencil revisions, 25-3/4x42-1/4 to 24-3/4x46 inches)
Drawer   1 Folder   11
Basement Plan (1), revised  7/11/1918
Drawer   1 Folder   11
First Floor Plan (2), revised  8/27/1918
Drawer   1 Folder   11
Roof Plan (3), revised  3/4/1918
Drawer   1 Folder   11
East Elevation (4), revised  6/20/1918
Drawer   1 Folder   11
West and South Elevations (5), revised  4/2/1918
Drawer   1 Folder   11
Sections (6), revised  4/2/1918
Drawer   1 Folder   11
Details of Library (7), revised  3/4/1918
Drawer   1 Folder   11
Details of Sun Room, Office and Work Room, and Hall and Work Room (8), revised  4/2/1918
Drawer   1 Folder   11
Detail of Tile Radiator Enclosure in Sun Room (27),  10/15/1918 (18-1/4x18-1/2 inches)
 
Mechanical Construction Drawings (Ink-on-linen drawings)
Drawer   1 Folder   11
Basement Plan (1M),  2/26/1918 revised  7/11/1918 (25-3/4x45-1/2 inches)
Drawer   1 Folder   11
Sun Room Plan and Sections -- Heating System (2M),  12/31/1918 (17x30 inches)
 
Addition to Residence for George Booth by Albert Kahn, Architect (Job No. 333-F)
 
Architectural Construction Drawings,  6/19/1918 (Ink-on-linen drawings with blue pencil revisions, 18-1/4x30-1/4 inches)
Drawer   1 Folder   12
Basement Plan (1), revised  7/11/1918
Drawer   1 Folder   12
First Floor Plan (2), revised  8/8/1918
Drawer   1 Folder   12
Second Floor Plan (3), revised  7/11/1918
Drawer   1 Folder   12
Third Floor Plan (4), revised  6/29/1918
Drawer   1 Folder   12
West and North Elevations (5), revised  8/8/1918
Drawer   1 Folder   12
South Elevation and Section thro' Porch on Line A-A (6), revised  8/8/1918
Drawer   1 Folder   12
East Elevation of Dormer for Alcove, Section thro' Porch on Line B-B and Detail of Overhang at Bay (7), revised  8/8/1918
Drawer   1 Folder   12
Details of Hall #37 and Main Stairs to Third Floor (8),  undated
Drawer   1 Folder   12
Interior Details of Chamber #30 (9), undated, revised  9/14/1918
Drawer   1 Folder   12
Interior Details of Dressing Rooms #32 & 35 (10), undated, revised  2/28/1919
Drawer   1 Folder   12
Interior Details of Chamber #33 (11), undated, revised  9/14/1918
Drawer   1 Folder   12
Details of Chamber #33 (12),  undated
Drawer   1 Folder   12
Details of Chamber #33 (12R),  9/13/1918 revised  9/26/1918
Drawer   1 Folder   12
Details of Baths #31 & 36 (13R), undated, revised  9/13/1918
Drawer   1 Folder   12
Interior Details of Porch (14),  undated
Drawer   1 Folder   12
Interior Details of Hall #37 (15),  undated
Drawer   1 Folder   12
South and East Elevations (16),  9/11/1918 revised  11/21/1918
Drawer   1 Folder   12
Details of Fountain Basin (17),  10/24/1918 revised  11/30/1918
 
Additions to Residence for George Booth by Albert Kahn, Architect, Ernest Wilby, Associate (Job No. 333-G)
 
Architectural Construction Drawing,  August 1918 (Ink-on-linen drawing, 26-1/4x45-3/4 inches)
Drawer   1 Folder   13
Basement Plan and Terrace Wall Details (1), revised  1/10/1919
 
Alterations and Additions to Service Wing of Residence for George Booth by Albert Kahn, Architect and Ernest Wilby, Associate (Job No. 333-H)
 
Architectural Construction Drawings, undated, revised  1/4/1922 (Ink-on-linen drawings, 28-1/2x35 inches)
Drawer   1 Folder   13
Basement Plan (1)     (not revised) 
Drawer   1 Folder   13
First Floor Plan (2)
Drawer   1 Folder   13
Second Floor Plan (3)
Drawer   1 Folder   13
Third Floor and Roof Plan and Section thro' Common Room Wing (4)
Drawer   1 Folder   13
South Elevation (5)
Drawer   1 Folder   13
West and South Elevations of Common Room Wing (6)
Drawer   1 Folder   13
East Elevation (7)
Drawer   1 Folder   13
North Elevation (8)     (not revised) 
Drawer   1 Folder   13
Interior Elevations and Sections (9)
Drawer   1 Folder   13
Interior Elevations (10)
Drawer   1 Folder   13
Common Room Details (125),  9/5/1919
 
Mechanical Construction Drawing,  4/28/1919 (Ink-on-linen drawing, 27-3/4x34-1/2 inches)
Drawer   1 Folder   13
Basement Plan (2M)
 
Alterations to Residence for George Booth by Albert Kahn, Architect (Job No. 333-J)
 
Architectural Construction Drawings (Pencil-on-vellum drawings)
Drawer   1 Folder   13
Detail of Bookcases (1), 11/7/1923 (21-3/4x18-1/2 inches)
Drawer   1 Folder   13
Detail of Balustrade for North Terrace (2),  11/15/1923 (26-3/4x21 inches)
 
Alterations to Bath Rooms for Residence of George Booth by Albert Kahn, Architect (Job No. 333-K)
 
Architectural Construction Drawing, 12/6/1923 (Pencil and red pencil drawing on vellum, 23-1/2x33-3/4 inches)
Drawer   1 Folder   13
Plans and Elevations of Guest Room Bath and Bath Rooms #37 & 41 (1), revised  1/9/1924
 
Additions to Residence for George Booth by Albert Kahn, Architect (Job No. 333-I)
 
Mechanical Construction Drawings,  12/12/1922 (Ink-on-linen drawings, 30x49 inches)
Drawer   1 Folder   14
Basement Plan (1M)
Drawer   1 Folder   14
First Floor Plan (2)
Drawer   1 Folder   14
Second Floor Plan (3)
Drawer   1 Folder   14
Third Floor Plan (4)
 
Ford Motor Company, Highland Park Plant, Michigan,  1908-1909, Job No. 375 [subseries]:
 
Construction Drawings by Albert Kahn, Architect, Ernest Wilby, Associate,  undated (Ink-on-linen drawings, 33x63 inches)
 
Architectural Drawings
Tube   1  
Plot Plan (Two drawings, 33x47 inches and 33x39 inches)
Tube   1  
Foundation Plan, North and South Halves (1), revised  9/8/1908 Heating revised  9/29/1909
Tube   1  
First Floor Plan, North and South Halves (2), revised  9/8/1908 Heating revised  9/29/1909
Tube   1  
Second Floor Plan, North and South Halves (3), revised  9/8/1908 Heating revised  9/29/1909 (One drawing and one electrostatic print)
Tube   1  
Third Floor Plan, North and South Halves (4), Heating revised  9/29/1909
Tube   1  
Fourth Floor Plan, North and South Halves (5), Heating revised  9/29/1909
Tube   1  
Roof Plan, North and South Halves (6)
Tube   1  
Front Elevation, North and South Halves (7) (One drawing and one electrostatic print)
Tube   1  
Transverse Section, Part Longitudinal Section, Section thru' Platform and Reservoir, Section A-A, and North and South Elevations (8), revised  9/14/1908 (One drawing and one electrostatic print)
Tube   1  
Rear Elevation, North and South Halves (9)
Tube   1  
Exterior Details of North and West Elevations (10) (One drawing and one electrostatic print)
Tube   1  
Details of Rear Wall and Doors, Plans of Stairs and Section thru' Stairs (11)
Tube   1  
Typical Detail for Windows with Plank Frames, Typical Double-Hung Windows in 8" HB Walls, Section thru' Elevator Shafts #1, #2 and #5 and Typical Interior Columns (12)
Tube   1  
First Floor Plan Showing Steel Frame, Front Elevation Showing Steel Frame of West Elevation and Typical Details of Steel Frame (13), revised  7/15/1908
Tube   1  
Elevation, Section and Details of Ford Motor Company Sign (27),  5/22/1909 (34x24 inches)
 
Ford Motor Company Power Building, Highland Park, Michigan,  1909, Job No. 375-A [subseries]:
 
Construction Drawings by Albert Kahn, Architect, Ernest Wilby, Associate (Ink-on-linen drawings, 23x29 inches)
 
Architectural Drawings
Drawer   2 Folder   1
Plans of Foundation and Drainage, First Floor and Roof, and Transverse Section (1),  4/15/1909 revised  8/25/1909
Drawer   2 Folder   1
North, South and West Elevations, Detail of Iron Stairs and Detail of Steel Girders, Brackets and Columns (2),  4/15/1909
Drawer   2 Folder   1
Plans and Elevations of North and South Doors, Sections A-A, B-B & C-C and Plan and Elevation of Corner Pier (3),  4/15/1909
Drawer   2 Folder   1
Revised Elevations and Section-This Sheet to Supersede Parts of Sheets No. 1 & No. 2 (12),  7/13/1909
Drawer   2 Folder   1
Revised Exterior Detail-This Sheet to Supersede Sheet No. 3 (13),  7/10/1909
Drawer   2 Folder   1
Plan, Elevations and Section A-A of Engine Foundations (14),  6/18/1909 revised  7/8/1909 (28 x 39 inches)
 
Ford Motor Company Administration Building, Highland Park, Michigan,  1909-1910, Job No. 375-D [subseries]:
 
Construction Drawings by Albert Kahn, Architect, Ernest Wilby, Associate (Ink-on-linen drawings, 28x44 inches)
 
Architectural Drawings
Drawer   2 Folder   2
Plot Plan (1),  2/12/1910 revised  6/24/1910
Drawer   2 Folder   2
Interior Finish, Basement Plan (1-A), 18x44 inches,  8/2/1910
Drawer   2 Folder   2
Plans and Sections of Tunnel between Power and Main Building and of Hose and Hydrant House (1-B),  7/26/1909 (17x21 inches)
Drawer   2 Folder   2
Foundation and Basement Plans (2),  2/12/1910 revised  7/12/1910
Drawer   2 Folder   2
First Floor Plan (2-A),  8/12/1910 (18x44 inches)
Drawer   2 Folder   2
First and Second Floor Plans (3)     (date not visible due to linen damage) 
Drawer   2 Folder   2
Second Floor Plan (3-A),  8/12/1910 (18x44 inches)
Drawer   2 Folder   2
Roof Plan, North and South Elevations and Sections (4),  2/12/1910
Drawer   2 Folder   2
Details of Room #105, Vestibule and North and South Stairs (5-A),  8/12/1910 (18x44 inches)
Drawer   2 Folder   2
Detail of End Bay-West Elevation, Detail of Main Entrance, and Typical Riser Diagram and Radiator Connections (6),  2/12/1910
Drawer   2 Folder   2
North Elevation of Lobby and Section thru' Stair Landing (6-A),  8/12/1910 (18x44 inches)
Drawer   2 Folder   2
Typical Details for Windows on North and South Elevations and Typical Details of North and South Elevation-Corner Bay (7),  2/12/1910
Drawer   2 Folder   2
Typical Detail of First and Second Story Partitions and Detail of Blind Windows, Door and Cast Iron Stairs (7-A),  8/12/1910 (18x44 inches)
Drawer   2 Folder   2
Detail of Entrance-East Elevation, and Elevation and Detail of Rear End Bay (8),  2/12/1910
Drawer   2 Folder   2
Typical Section thru' Column above Second Floor Line, Sections of Hot Air Ducts and Plan of Hot Air Duct at Corners (8-A),  8/12/1910 (18x44 inches)
Drawer   2 Folder   2
Plans of Main Staircase and Ceiling over Lobby (9-A),  8/12/1910 (18x44 inches)
Drawer   2 Folder   2
Pipe Connections at Gas House (27),  5/17/1910 (Red and black ink drawing on vellum, 16x28 inches)
Drawer   2 Folder   2
Plan, Elevation and Sections thru' Bridge at Factory and Office Buildings and Full-Size Detail of Fenestra Sash and Chanel [sic] [of] Iron Door Frame (31),  9/28/1910 (25x46 inches)
Drawer   2 Folder   2
Detail of Bridge Connecting Office and Factory Building (31), 11/2/1910 (25x37 inches)
Drawer   2 Folder   2
Plan and Sections of Desk in Room #223 (48),  undated (23x18 inches)
 
Horace Elgin Dodge Residence, Grosse Pointe, Michigan,  1910-1911, Job No. 423 [subseries]:
 
Construction Drawings by Albert Kahn, Architect, Ernest Wilby, Associate,  3/30/1910 (Ink-on-linen drawings, 27x39 inches)
 
Architectural Drawings
Drawer   2 Folder   3
Basement Plan (1), revised 12/5/1910
Drawer   2 Folder   3
Design for Retaining Wall in Front of Property (1-A), revised  6/18/1910 (16x19 inches)
Drawer   2 Folder   3
Basement Plan (1-B), revised  9/27/1910
Drawer   2 Folder   3
Excavation Plan (1-B)
Drawer   2 Folder   3
Plot Plan (1-C)
Drawer   2 Folder   3
First Floor Plan (2), revised 12/5/1910
Drawer   2 Folder   3
Second Floor Plan (3), revised 12/5/1910
Drawer   2 Folder   3
Third Floor and Roof Plan (4), revised 12/5/1910
Drawer   2 Folder   3
Section on Line A-A, Details for Vestibule, Door Frame with Side Lights, Typical Eaves and Box Windows and Section thro' Living Room Bay (5)
Drawer   2 Folder   3
Front Elevation (6)
Drawer   2 Folder   3
East Elevation and Details for Main Entrance Porch (7)
Drawer   2 Folder   3
West Elevation, Section on Line B-B, Details for Bath Room No 206, and Typical Door, Transom, Window Stool, Chair Rail and Door and Window Trim (8)
Drawer   2 Folder   3
South Elevation, Detail for Porch Ceiling and Removable Enclosure for South Porch (9)
Drawer   2 Folder   3
Main Hall Details (10), revised  9/21/1910 (Two drawings)
Drawer   2 Folder   3
Main Hall Details (10-A),  9/22/1910 revised  12/28/1910
Drawer   2 Folder   3
Dining Room and Living Room Details (11), revised  12/10/1910
Drawer   2 Folder   3
Details for Den, Main Stair, Reception Room, Sewing Room Cabinet, Nook in Chamber No. 209 and Mantel in Chamber No. 202 and Dining Room Ceiling Plan (12)
Drawer   2 Folder   3
Fittings for Butler's Pantry, Pantry, Closets, Cabinets, Wine Rack and Wardrobes (13)
Drawer   2 Folder   3
Revised Detail for South Porch (14) (16x21 inches)
Drawer   2 Folder   3
Details for Sinks in Butler's Pantry (40), 12/1/1910 (16x26 inches)
Drawer   2 Folder   3
Details for Main Entrance (105),  6/11/1910
Drawer   2 Folder   3
Boat House Plan and Roof Plan (129),  4/29/1911 (20x30 inches)
Drawer   2 Folder   3
Boat House South, North and West Elevations and Section (130),  4/29/1911 (20x28 inches)
 
The Detroit Free Press Office Building, Detroit, Michigan,  1911-1912, Job No. 487 [subseries]:
 
Design Development Architectural Drawings (Block Plans),  undated (Ink-on-linen drawings, 27-1/2x22-1/2 to 28x23-1/4 inches)
Drawer   10 Folder   10
Basement Plan (1)
Drawer   10 Folder   10
First Floor Plan (2)
Drawer   10 Folder   10
Second Floor Plan (3)
Drawer   10 Folder   10
Third and Fifth Floor Plans (4)
Drawer   10 Folder   10
Fourth Floor Plan (5)
Drawer   10 Folder   10
Sixth, Eighth and Ninth Floor Plans (6)
Drawer   10 Folder   10
Tenth Floor Plan (7)
Drawer   10 Folder   10
Seventh Floor Plan (8)
 
Construction Drawings by Albert Kahn, Architect, Ernest Wilby, Associate (Ink-on-linen drawings with pencil notations)
 
Architectural Drawings,  4/10/1911 (27-3/4x33-3/4 inches)
Drawer   10 Folder   10
Plot Plan (1) (27x31-1/2 inches)
Drawer   10 Folder   10
Foundation and Basement Plan and Section "AA" of Present Building (1-A),  undated
Drawer   10 Folder   10
Foundation and Basement Plans (2), revised  4/24/1912
Drawer   10 Folder   10
First and Second Floor Plans of Present Building (2-A),  undated
Drawer   10 Folder   10
First, Second and Mezzanine Floor Plans (3), revised  11/17/1911
Drawer   10 Folder   10
Third and Fourth Floor Plans (4)
Drawer   10 Folder   10
Ninth and Tenth Floor Plans (5), revised  2/8/1912
Drawer   10 Folder   10
Roof Plans and Sections (6)
Drawer   10 Folder   10
Front and Rear Elevations (7), revised  5/30/1911 (Two drawings, only one revised)
Drawer   10 Folder   10
East Side Elevation and Details of Typical Window Frames (8), revised  5/30/1911
Drawer   10 Folder   10
West Elevation and Detail of Iron Stairs to Mailing Room (9), revised  5/30/1911
Drawer   10 Folder   10
Longitudinal Section and Detail of Men's Toilet Rooms (10),  2/9/1912
Drawer   10 Folder   10
Transverse Section and Detail of Dumb Waiter (11)
Drawer   10 Folder   10
Detail of Front Elevation Showing Lower Portion of East Bay (12)
Drawer   10 Folder   10
Detail of Front Elevation Showing Lower Portion of East Bay-Alternate Design (12-A),  undated
Drawer   10 Folder   11
Typical Detail of Upper Story of North Part of East and West Elevations (13 & 13-A) (Two drawings, one undated)
Drawer   10 Folder   11
Detail of East Half of First Story Rear Elevation (14), revised  3/16/1912
Drawer   10 Folder   11
Typical Details of Stairs and Elevators from Third to Ninth Floor (15)
Drawer   10 Folder   11
Elevations and Details of Corridor Partitions (16)
Drawer   10 Folder   11
Typical Press Foundations and Typical Details of Fire Escape (17)
Drawer   10 Folder   11
Elevations of Main Entrance and Plan of Top of Marquise (18)
Drawer   10 Folder   11
Detail of Passenger Elevators (19),  undated (7x10 inches)
Drawer   10 Folder   11
Plan, Elevation and Section of Press Room (31),  9/5/1911 (21x26-3/4 inches)
Drawer   10 Folder   11
Interior Finish for First Floor (34),10/12/1911 revised  2/8/1912
Drawer   10 Folder   11
Details for General Office and Lobby (35),  10/12/1911
Drawer   10 Folder   11
Details for General Office and Lobby (35-A),  11/11/1911
Drawer   10 Folder   11
Details for General Office (36),  10/12/1911
Drawer   10 Folder   11
Details for General Office (36-A),  11/11/1911 revised  2/8/1912
Drawer   10 Folder   11
Ceiling Plan (37),  10/12/1911
Drawer   10 Folder   11
Detail of Main Entrance, Case in Lobby and Cashier's Cage (38),  10/12/1911
Drawer   10 Folder   11
Details of Main Stairs, Desks in General Office, Office Walls, Lobby Finish and Cast Iron Frames (39),  10/12/1911
Drawer   10 Folder   11
Plan of Tenth Floor (40), revised  8/10/1912 (28-1/2x35 inches)
Drawer   10 Folder   11
Plan of Editorial Room and Mezzanine, Tenth Floor (55),  4/3/1912 (16-1/4x22-3/4 inches)
Drawer   10 Folder   11
Lighting Plan for Mezzanine Floor in Editorial Room (67),  undated (14x27-3/4 inches)
Drawer   10 Folder   11
Details of Proof Room, Composing Room and Copy Room Partitions (70),  7/20/1912 revised  8/10/1912 (19-1/4x22 inches)
Drawer   10 Folder   11
Floor Plan of Rooms 701-702 (71),  7/25/1912 (8-3/4x11 inches)
Drawer   10 Folder   11
Ninth Floor Plan (73), revised  9/6/1912 (20-1/2x17-1/4 inches)
Drawer   10 Folder   11
Layout of Offices, Sixth Floor (76), revised  9/23/1912 (15-1/4x14-3/4 inches)
Drawer   10 Folder   11
Plan of Offices, Eighth Floor (80),  undated (18-1/4x18-3/4 inches)
Drawer   10 Folder   11
Plan at Sixth Floor (88),  10/23/1912 (12-3/4x9 inches)
Drawer   10 Folder   11
Plan of Offices-Southwest Corner of Sixth Floor (89),  10/31/1912 revised 11/5/1912 (11x12 inches)
Drawer   10 Folder   11
Plan of Offices on Ninth Floor, Northeast Corner (94),  12/13/1912 (12x13-1/4 inches)
Drawer   10 Folder   11
Layout of Offices, Southwest Corner on Eighth Floor (95),  undated (9-1/4x10-1/2 inches)
Drawer   10 Folder   11
Plan Showing Second Floor Office Lighting (97),  3/12/1913 revised  3/17/1913 (18-1/2x9-1/2 inches)
 
Structural Drawings (27-3/4x33-1/2 inches)
Drawer   10 Folder   12
First and Second Floor Framing Plans (1S),  4/7/1911 revised  2/18/1912
Drawer   10 Folder   12
Typical Floor Framing Plan and Tenth Floor Framing Plan (2S),  4/6/1911 revised  5/12/1911
Drawer   10 Folder   12
Roof Plan, Column Schedule and Details of Cast Iron Column Bases (3S),  4/7/1911 revised  2/8/1912
Drawer   10 Folder   12
Piling and Footing Plan (4S),  6/30/1911 revised  7/17/1911 (16-3/4x21-1/4 inches)
 
Mechanical and Electrical Drawings,  4/8/1911 (27-3/4x33-1/2 inches)
Drawer   10 Folder   12
Basement Plan and Drainage Plan (1E), revised  3/16/1912
Drawer   10 Folder   12
First and Second Floor Plans (2E), revised  10/28/1911
Drawer   10 Folder   12
Tenth Floor Plan and Typical Floor Plan (3E), revised  2/9/1912
Drawer   10 Folder   12
Detail of Ventilating Fan and Piping in Linotype Room and Elevation of Toilet Vents (4E),  4/12/1911
Drawer   10 Folder   12
Steam Riser Diagram (5E),  4/12/1911
Drawer   10 Folder   12
Plan of Machine Room (6E),  5/20/1911
Drawer   10 Folder   12
Revised Plan of Machine Room (7E),  3/6/1912 redrawn  6/11/1912 (24-1/4x33-3/4 inches)
 
King's Theatre (National Theatre), Detroit, Michigan,  1911,  1920 &  1924, Jobs No. 478 and 478-A, C & D [subseries]:
 
Theatre Building by Albert Kahn, Architect, Ernest Wilby, Associate (Job No. 478)
 
Architectural Construction Drawings,  2/14/1911 (Ink-on-linen drawings with pencil notations, 24x29-1/4 inches)
Drawer   8 Folder   4
Foundation and Parquet Floor Plans (1), revised  4/18/1911 (Two drawings, only one revised)
Drawer   8 Folder   4
Balcony and Mezzanine Floor Plan and Roof Plan (2), revised  4/18/1911
Drawer   8 Folder   4
North Elevation and Sections (3), revised  4/19/1911
Drawer   8 Folder   4
Half-Front Elevation, Half Cross-Section thro' Front and Details (4), revised  4/19/1911
Drawer   8 Folder   4
Ceiling Plan and Longitudinal Section (5), revised  4/19/1911
Drawer   8 Folder   4
First Floor and Balcony Plans and Cross-Section and Direct Elevation of Boxes (6), revised  4/21/1911
Drawer   8 Folder   4
Typical Side Elevation of Tower and Details of Vestibule and Lobby (7), revised  4/18/1911
Drawer   8 Folder   4
Plans of Stairs and Sections through Stairs (8), revised  4/22/1911
Drawer   8 Folder   4
Details of Dressing Rooms and Stairs to Boxes (9), revised  4/25/1911
Drawer   8 Folder   4
Detail for Marquise and Entrance Door Frame (10)
Drawer   8 Folder   4
Foundation and Parquet Floor Plans, Heating and Lighting (11), revised  4/8/1911 and  7/31/1911 (Two drawings)
Drawer   8 Folder   4
Half-Balcony and Mezzanine Plan and Roof Plan, Heating and Lighting (12), revised  6/20/1911
Drawer   8 Folder   4
Longitudinal Section and Sections thro' Front and Rear, Heating and Lighting (13)
Drawer   8 Folder   4
Terra-Cotta Detail of Half of Front Elevation (15),  3/20/1911 revised  4/20/1911 (29-3/4x39-3/4 inches)
Drawer   8 Folder   4
Sprinkler System Underground Plan (17),  3/23/1911 (19x11 inches)
Drawer   8 Folder   4
Sprinkler System Plans under Stage Floor and over Procenium Arch (18),  3/23/1911 (19x24-3/4 inches)
Drawer   8 Folder   4
Sprinkler System Plans for Gridiron Floor and Roof (19),  3/23/1911 (18x23 inches)
Drawer   8 Folder   4
Sprinkler System Plan for Dressing Rooms (20),  3/23/1911 (10-1/4x13-3/4 inches)
Drawer   8 Folder   4
Revised Plans Showing Dressing Rooms in Basement (36),  6/19/1911 (11x29-1/4 inches)
Drawer   8 Folder   4
Revised Basement Plan, Heating and Lighting (37),  6/20/1911 (11-3/4x19 inches)
Drawer   8 Folder   4
Elevations of Steel Frame for Electric Sign (40), revised  9/30/1911 (20x32-1/2 inches)
 
Structural Construction Drawings,  2/17/1911 (Ink-on-linen drawings with pencil notations, 24x29 inches)
Drawer   8 Folder   5
Half-Plans of Mezzanine and Balcony and Roof Plan (1S)
Drawer   8 Folder   5
Half-Front Elevation and Half-Cross-Section on "D-D" (2S)
Drawer   8 Folder   5
Gridiron and Stage Floor Plans and Details (3S),  4/10/1911 revised  4/11/1911
 
Alterations to King's (National) Theatre by Albert Kahn, Architect (Jobs No. 478-A, C & D)
 
Architectural and Mechanical Construction Drawings (Ink-on-linen drawings)
Drawer   8 Folder   5
Revised Plan, Elevation and Section, Mezzanine Floor Lobby, Job No. 478-A (1),  9/17/1920 (24x29-1/2 inches)
Drawer   8 Folder   5
Details of Alterations to Marquise, Job No. 478-C (1),  10/21/1920 revised  11/18/1920 (Pencil-on-vellum drawing, 19-1/4x28 inches)
Drawer   8 Folder   5
Basement and Roof Plans, Air-Conditioning System, Job No. 478-D (1M),  2/8/1924 (18x23-3/4 inches)
 
Professor George Washington Patterson Residence, Ann Arbor, Michigan,  1913, Job No. 544 [subseries]:
 
Construction Drawings
 
Architectural Drawings,  3/5/1913 revised  6/9/1913 (Ink-on-linen drawings, 19-1/2x27-1/4, inches, excpet as noted)
Drawer   3 Folder   9
Proposed Plot Plan,  undated (Pencil drawing on tracing paper, 19-3/4x26-1/4 inches)
Drawer   3 Folder   9
Plan of Basement (2),  undated     ("Void" notation) 
Drawer   3 Folder   9
Plan of Basement (2)
Drawer   3 Folder   9
Basement Plan (2)
Drawer   3 Folder   9
First Floor Plan (3)
Drawer   3 Folder   9
Second Floor Plan (4)
Drawer   3 Folder   9
Third Floor Plan (5)     (not revised) 
Drawer   3 Folder   9
Transverse Sections on Lines "A-A" and "B-B" (6)
Drawer   3 Folder   9
South Elevation (7)
Drawer   3 Folder   9
East Elevation and Section Showing Support for Brickwork in Large Gable at West End (8)
Drawer   3 Folder   9
West Elevation and Details for Interior Finish (9)
Drawer   3 Folder   9
North Elevation (10)
Drawer   3 Folder   9
Main Hall Details (11)     (not revised) 
Drawer   3 Folder   9
Living Room, Music Room and Study Details (12)     (not revised) 
Drawer   3 Folder   9
Dining Room Details and Elevations of Chamber Mantels (13)     (not revised) 
Drawer   3 Folder   9
Details of Butler's Pantry and Kitchen Cabinet, etc. (14)     (not revised) 
Drawer   3 Folder   9
Plan Showing Concrete Reinforcement and Structural Details (19),  7/16/1913
 
Mechanical Drawings,  2/22/1913 revised  6/9/1913 (Ink-on-linen drawing, 20x29 inches)
Drawer   3 Folder   9
Basement Plan (2M)
 
Detroit Athletic Club, Detroit, Michigan,  1913-1914 and  1918-1935, Jobs No. 593 and 593-A, H, I, N, O, P, Q & R [subseries]:
 
Detroit Athletic Club by Albert Kahn, Architect, Ernest Wilby, Associate (Job No. 593)
 
Architectural Construction Drawings,  11/29/1913 (Ink-on-linen drawings with pencil revisions, 29-1/4x34-1/2 inches)
Drawer   2 Folder   4
Plot Plan,  undated
Drawer   2 Folder   4
Excavation Plan (1A)
Drawer   2 Folder   4
Foundation Plan (2), undated, revised  1/7/1914
Drawer   2 Folder   4
Basement Plan and Details (3),  undated
Drawer   2 Folder   4
First Floor Plan and Details (4)
Drawer   2 Folder   4
First Floor Plan and Details (4), revised  1/30/1914
Drawer   2 Folder   4
First Floor Mezzanine and Ceiling Plans (5),  undated
Drawer   2 Folder   4
First Floor Mezzanine and Ceiling Plans (5), revised  1/30/1914
Drawer   2 Folder   4
Second Floor Plan and Details (6), revised  1/30/1914
Drawer   2 Folder   4
Second Floor Mezzanine [Plan] (7)
Drawer   2 Folder   4
Second Floor Mezzanine [Plan] (7), revised  2/11/1914
Drawer   2 Folder   4
Third Floor Plan and Details (8)
Drawer   2 Folder   4
Third Floor Plan and Details (8), revised  1/30/1914
Drawer   2 Folder   4
Fourth Floor Plan and Squash and Hand Ball Courts Elevations (9)
Drawer   2 Folder   4
Fourth Floor Plan and Squash and Hand Ball Courts Elevations (9), revised  1/30/1914
Drawer   2 Folder   4
Fourth Floor Plan, First Mezzanine (10)
Drawer   2 Folder   4
Fourth Floor Plan, Second Mezzanine (11)
Drawer   2 Folder   4
Fifth Floor Plan and Details (12)
Drawer   2 Folder   4
Fifth Floor Plan and Details (12), revised  1/30/1914
Drawer   2 Folder   4
Sixth Floor Plan and Details (13)
Drawer   2 Folder   4
Sixth Floor Plan and Details (13), revised  1/30/1914
Drawer   2 Folder   5
Bowling Alley Details and Plan of Pipe Space over Sixth Floor (14)
Drawer   2 Folder   5
Roof Plan (15)
Drawer   2 Folder   5
Longitudinal Section and Elevations of Light Court #1 (16),  undated
Drawer   2 Folder   5
Madison Avenue Elevation (18), revised  1/30/1914
Drawer   2 Folder   5
John R. Street Elevation (19), revised  1/30/1914
Drawer   2 Folder   5
Randolph Street Elevation (20), revised  1/30/1914
Drawer   2 Folder   5
Cross Street Elevation (21), revised  1/30/1914
Drawer   2 Folder   5
Detail of Front Elevation, First and Second Stories (22)
Drawer   2 Folder   5
Detail of Front Elevation at Third and Fourth Stories (23),  undated
Drawer   2 Folder   5
Detail of Front Elevation at Fifth and Sixth Stories (24)
Drawer   2 Folder   5
Detail of Ladies Entrance and Adjoining Wall (25)
Drawer   2 Folder   5
Detail of Rear Elevation below Fifth Story (26),  undated
Drawer   2 Folder   5
Details of Lobby, Lounging Room and Entrance to Grill Room, Billiard Room and Vestibules #116-B & 117 (27)
Drawer   2 Folder   5
Detail of Main Staircase (28)
Drawer   2 Folder   5
Details of Grill Room and Billiard Room (29)
Drawer   2 Folder   5
Interior Details of Vestibule #117, Lobby #134a, Lobby #212 and Stairs of Halls #113, 132a, 206 & 236a (30)
Drawer   2 Folder   5
Details for Main Dining Room and Ladies Dining Room (31)
Drawer   2 Folder   5
Details for Basement Corridor, Palm Room, Lobby #211 and Private Dining Rooms #208, 209 & 210 (32)
Drawer   2 Folder   5
Details for Third Floor Private Dining Rooms, Corridor #307, Library #135-A and Ladies Room #114 (33)
 
Structural Construction Drawings,  11/29/1913 (Ink-on-linen drawings with pencil revisions, 29-1/4x35 to 30-1/4x38 inches)
Drawer   2 Folder   6
Column Schedule (1-S)
Drawer   2 Folder   6
First Floor Framing Plan (2-S)
Drawer   2 Folder   6
First Floor Framing [Plan] (2-SR),  1/24/1914 revised  2/11/1914
Drawer   2 Folder   6
First and Second Floor Mezzanines Framing [Plans] (3-S)
Drawer   2 Folder   6
First and Second Floor Mezzanines Framing [Plans] (3-SR),  1/24/1914 revised  1/29/1914
Drawer   2 Folder   6
Second Floor Framing [Plan] (4-S)
Drawer   2 Folder   6
Second Floor Framing [Plan] (4-SR),  1/24/1914 revised  1/29/1914
Drawer   2 Folder   6
Third Floor Framing [Plan] (5-S)
Drawer   2 Folder   6
Third Floor Framing [Plan] (5-SR),  2/21/1914 revised  3/4/1914
Drawer   2 Folder   6
Fourth Floor Framing [Plan] (6-S)
Drawer   2 Folder   6
Fourth Floor Framing [Plan] (6-SR), undated, revised  3/4/1914
Drawer   2 Folder   6
Fourth Floor First and Second Mezzanines Framing [Plans] (7-S)
Drawer   2 Folder   6
Fourth Floor First and Second Mezzanines Framing [Plans] (7-SR),  undated
Drawer   2 Folder   6
Fifth Floor Framing Plan (8-S)
Drawer   2 Folder   6
Fifth Floor Framing [Plan] (8-SR),  undated
Drawer   2 Folder   6
Sixth Floor Framing Plan (9-S)
Drawer   2 Folder   6
Roof Framing and Half Attic Framing Plans (10-S)
Drawer   2 Folder   6
Attic Framing Plan (10-SR),  3/19/1914
Drawer   2 Folder   6
Revised Column Schedule (11-S),  1/17/1914 revised  3/5/1914
Drawer   2 Folder   6
Typical Connections on Flanges, Webs, Concrete Joists and Special Plate Girders (12-S),  1/24/1914
Drawer   2 Folder   6
Cornice Framing [Plan] and Details (25-S),  4/6/1914
 
Mechanical and Electrical Construction Drawings,  2/8/1913 (Ink-on-linen drawings with pencil revisions, 28-1/2x33-1/2 to 33x43-1/2 inches)
Drawer   2 Folder   7
Basement Plan (3M), revised  3/12/1914
Drawer   2 Folder   7
[First Floor Plan], untitled (4M),  12/18/1913 revised  4/10/1914
Drawer   2 Folder   7
First Floor Mezzanine Plan (5M), revised  3/30/1914
Drawer   2 Folder   7
Second Floor Plan (6M), revised  7/28/1914
Drawer   2 Folder   7
Plan of Second Floor Mezzanine (7M), revised  4/8/1914
Drawer   2 Folder   7
Third Floor Plan (8M),  4/17/1914
Drawer   2 Folder   7
Fourth Floor Plan (9M),  4/14/1914
Drawer   2 Folder   7
Fourth Floor Plan -- First Mezzanine (10M), revised  4/14/1914
Drawer   2 Folder   7
Fourth Floor Plan -- Second Mezzanine (11M)
Drawer   2 Folder   7
Fourth Floor Plan -- Second Mezzanine (11M), revised  4/16/1914
Drawer   2 Folder   7
Fifth Floor Plan (12M)
Drawer   2 Folder   7
Sixth Floor Plan (13M)
Drawer   2 Folder   7
Attic Plan (14M), revised  4/20/1914
Drawer   2 Folder   7
John R. Street Elevation (15M)
Drawer   2 Folder   7
Cross Street Elevation (16M)
Drawer   2 Folder   7
Randolph Street Elevation (17M)
Drawer   2 Folder   7
Madison Avenue Elevation (18M), revised  4/17/1914
Drawer   2 Folder   8
Machine Room Details (19M), revised  3/9/1914
Drawer   2 Folder   8
Diagram of Piping to Pumps, Heaters, etc., and Detail of Riser Connections (20M), revised  4/20/1914
Drawer   2 Folder   8
Roof Plan and Arrangement of Elevator Machinery in Pent House (21M)
Drawer   2 Folder   8
Electric Feeder Diagram (22M),  12/10/1913 revised  4/17/1914
Drawer   2 Folder   8
Details of Drain Box for Plunge (24M),  4/14/1914
Drawer   2 Folder   8
Details of Gutter Drain and Water Inlet (25M),  4/20/1914
Drawer   2 Folder   8
Refrigerating Layout (27M),  5/18/1914
Drawer   2 Folder   8
Plan of Kitchen -- Second Floor (33M),  6/17/1914 revised  7/1/1914
Drawer   2 Folder   8
Plan of Foundations in Machine Room (36M),  6/5/1914 revised  6/18/1914
Drawer   2 Folder   8
Diagram of Cooled Drinking Water Piping (39M),  7/20/1914
Drawer   2 Folder   8
Plan of Piping in Furred Space under Kitchen Floor and on First Floor Mezzanine Ceiling (38M),  7/11/1914
Drawer   2 Folder   8
Arrangement of Kitchen Apparatus (40M)     (Undated due to linen damage) 
Drawer   2 Folder   8
Plan and Elevation of Service Bar -- First Mezzanine (45M),  10/19/1914 (25-1/2x26-1/2 inches)
 
Seventh Floor Addition to Detroit Athletic Club by Albert Kahn, Architect, Ernest Wilby, Associate (Job No. 593-A)
 
Architectural Construction Drawings,  undated (Ink-on-linen drawings, 24x34 inches)
Drawer   2 Folder  
Plan of Seventh Floor on Roof of Present D.A.C Building (1),  2/19/1918
Drawer   2 Folder  
Plan of Roof over Seventh Floor (2)
Drawer   2 Folder  
Details of Skylights over Corridors and Typical Toilets (3)
Drawer   2 Folder  
Plan of Present Building (4)
Drawer   2 Folder  
Sections (5)
Drawer   2 Folder  
Full-Size Details of Galvanized Iron Work (6) (Pencil-on-vellum drawing, 22x32 inches)
Drawer   2 Folder  
Full-Size Details of D. H. Windows (7) (Pencil-on-vellum drawing, 23x38 inches)
Drawer   2 Folder  
Details of Entrance Doors to Corridors (8) (Pencil-on-vellum drawing, 23-1/2x37-1/2 inches)
Drawer   2 Folder  
Details of Doors in Corridor (9) (Pencil-on-vellum drawing, 25x38 inches)
 
Mechanical Construction Drawings by Albert Kahn, Architect,  2/19/1918 revised  3/13/1918 (Ink-on-linen drawings, 20x28-1/2 inches)
Drawer   2 Folder  
Floor Plan (1M)
Drawer   2 Folder  
Attic Plan (2M)
 
Alterations to Rooms #100, 113, 117, 150, 151 & 152 of Detroit Athletic Club by Albert Kahn, Architect. (Job No. 593-H)
 
Architectural Construction Drawings (Pencil and ink drawings on vellum)
Drawer   2 Folder   9
Details of Alterations (1),  2/29/1920 (16-1/4x41 inches)
Drawer   2 Folder   9
Plans of Mezzanine and First Floor (2),  2/27/1920 (16-1/4x41 inches)
Drawer   2 Folder   9
Revised Plan and Elevations of Reception Room, Showing Revision in Floor and Width of Soffit (3),  8/21/1920 revised  9/28/1920 (13x27 inches)
 
Squash Courts for Detroit Athletic Club by Albert Kahn, Inc., Architect (Job No. 593-I)
 
Architectural Construction Drawings, 12/4/1924 (Pencil and ink drawings on vellum, 22x24-1/2 inches)
Drawer   2 Folder   9
Plan (1), revised  2/24/1925
Drawer   2 Folder   9
Balcony and Roof Plans and Details (2), revised  2/24/1925
Drawer   2 Folder   9
Elevations (3), revised  1/8/1925
Drawer   2 Folder   9
Section (4), revised  1/8/1925
 
Structural Construction Drawings, 12/8/1924 (Pencil-on-vellum drawings, 23-1/2x26 inches)
Drawer   2 Folder   9
Details of Framing at Present Roof (2-S)
Drawer   2 Folder   9
Roof and Wall Framing Plan, Elevations and Sections (3-S), revised  1/8/1925
 
Mechanical Construction Drawing,  9/25/1924 (Ink-on-linen drawings, 23-1/4x27 inches)
Drawer   2 Folder   9
Plans and Details (1M)
 
Alteration to Ladies Reception Room of Detroit Athletic Club by Albert Kahn, Architect (Job No. 593-N)
 
Architectural Construction Drawings (Ink, pencil and colored pencil drawings on vellum, 13-1/2x27-1/2 to 15-1/2x29-1/4 inches)
Drawer   2 Folder   9
Details (1),  4/16/1930
Drawer   2 Folder   9
Plan and Elevations (2 & 3),  2/4/1930 (Two drawings)
 
Fourth Floor Lounge of Detroit Athletic Club by Albert Kahn, Inc., Architects & Engineers (Job No. 593-O)
 
Mechanical Construction Drawing,  12/18/1930 (Pencil and blue pencil drawing on velum, 24x30 inches)
Drawer   2 Folder   9
Ventilation Layout (1-M)
 
Air Conditioning for Detroit Athletic Club by Albert Kahn, Inc., Architects & Engineers (Job No. 593-P)
 
Mechanical Construction Drawings,  5/31/1935 (Pencil-on-vellum drawings)
Drawer   2 Folder   9
Plans of Basement and Platform for Coils and Filter on Third Floor (1M) (25x32 inches)
Drawer   2 Folder   9
Part Plans of Second Floor Mezzanine and Third Floor and Sections (2-M) (30-1/4x32 inches)
 
Alterations to Abbey Room, Lounge and Bowling Alley of Detroit Athletic Club by Albert Kahn, Inc., Architects (Job. No. 593-Q)
 
Architectural Construction Drawings,  6/14/1935 (Pencil and blue ink drawings on vellum, 20-3/4x34 inches)
Drawer   2 Folder   9
Basement Floor Plan (1)
Drawer   2 Folder   9
Passage and Hall Details (2)
Drawer   2 Folder   9
East and West Elevations of Abbey Room (3)
Drawer   2 Folder   9
North and South Elevations of Abbey Room (4)
Drawer   2 Folder   9
Lounge, Shower and Phone Booth Details (5)
 
Alterations to Cocktail Room, Grill Room and Billiard Room of Detroit Athletic Club by Albert Kahn, Inc., Architects & Engineers (Job. No. 593-R)
 
Architectural Construction Drawings,  12/18/1935 (Pencil-on-vellum drawings, 16x34 inches)
Drawer   2 Folder   9
Elevations and Ceiling Plan of Cocktail Room (1)
Drawer   2 Folder   9
Elevations and Sections of Grill Room, Billiard Room and Bar Front (2)
 
Newberry Residence Hall, University of Michigan, Ann Arbor,  1914 and  1920, Jobs No. 606 & 606-A [subseries]:
 
Design Development Drawings (Block Plans),  undated (Ink-on-linen drawings, 17-1/2x28 inches)
Drawer   8 Folder   6
First Floor Plan (1)
Drawer   8 Folder   6
Typical Floor Plan (2)
 
Construction Drawings by Albert Kahn, Architect, Ernest Wilby, Associate
 
Architectural Drawings,  4/17/1914 revised  6/18/1914 (Ink-on-linen drawings with pencil notations, 25-1/2x27-1/2 inches)
Drawer   8 Folder   6
Plot Plan and Details of Elevator, Mantels and Interior Doors (1)
Drawer   8 Folder   6
Foundation and Basement Plans (2), revised  7/17/1914
Drawer   8 Folder   6
First, Second and Third Floor Plans (3), revised  7/17/1914
Drawer   8 Folder   6
Attic Plan, East and West Elevations and Cross-Section (4), revised  7/17/1914
Drawer   8 Folder   6
North and South Elevations (5)
Drawer   8 Folder   6
One-Half-Inch Details of Exterior (6)     (Not revised) 
Drawer   8 Folder   6
Details of Stairs, Dumb Waiter and Cupboards in Kitchen, Serving Room and Kitchenette (7)
Drawer   8 Folder   6
Details of Porches, Windows and Toilets (8)
 
Mechanical Drawings, undated, revised  6/22/1914 (Ink-on-linen drawings with pencil notations, 25-1/26x27-1/2 inches)
Drawer   8 Folder   6
Basement and First Floor Plans (1M)
Drawer   8 Folder   6
Basement Plan (1MR),  9/30/1914
Drawer   8 Folder   6
Second and Third Floor Plans (2M)
Drawer   8 Folder   6
Fourth Floor Plan and Riser Diagram (3M)
Drawer   8 Folder   6
Revised Drainage Plan (4M),  8/18/1914
 
Supplementary Construction Drawing     (undated due to paper damage)  (Pencil-on-vellum drawing, 24x29 inches)
Drawer   8 Folder   6
Details of Elevator
 
Changes in Connection with Kitchen and Bakery (Job No. 606-A),  1/20/1920 (Pencil-on-vellum drawings, 13x26 inches)
Drawer   8 Folder   6
Basement Floor Plan (1)
Drawer   8 Folder   6
Details of Door Lintel, Tilting Flour Bin, Drawer and Shelf (2)
 
Detroit Trust Company, Detroit, Michigan,  1914-1915 and  1926, Job No. 637 & 637-F [subseries]:
 
Detroit Trust Company by Albert Kahn, Architect, Ernest Wilby, Associate (Job No. 637)
 
Design Development (Block Plans) Drawings,  undated (Ink-on-linen drawings, 16x30 inches)
Drawer   3 Folder   1
First Floor Plan
Drawer   3 Folder   1
Second Floor Plan
 
Architectural Construction Drawings,  12/15/1914 (Ink-on-linen drawings, 29x47 inches)
Drawer   3 Folder   1
Excavation and Plot Plan (1)
Drawer   3 Folder   1
Foundation Plan (2), revised  1/27/1915
Drawer   3 Folder   1
Basement Plan (3)
Drawer   3 Folder   1
First Floor Plan (4)
Drawer   3 Folder   1
Mezzanine Floor [Plan] (5)
Drawer   3 Folder   1
Second Floor Plan (6)
Drawer   3 Folder   1
Third Floor Plan (7)
Drawer   3 Folder   1
Roof Plan (8)
Drawer   3 Folder   1
Elevations (9)
Drawer   3 Folder   1
Cross-Section and Misc. Details (10)
Drawer   3 Folder   1
Longitudinal Section (11)
Drawer   3 Folder   1
Details of Fort Street Elevation (12)
Drawer   3 Folder   1
Revised Details, Fort Street Elevation (12-R),  2/8/1915
Drawer   3 Folder   1
Details of Shelby Street Elevation (13)
Drawer   3 Folder   1
Interiors (14)
Drawer   3 Folder   1
Interior Finish (15),  1/4/1915 revised  1/13/1915
Drawer   3 Folder   1
Interior Finish (16),  1/4/1915 revised  1/13/1915
Drawer   3 Folder   1
Details of Furniture in Cages on Second Floor (21),  2/5/1915 (23x39 inches)
 
Structural Construction Drawings,  11/20/1914 revised  1/15/1915 (Ink-on-linen drawings, 23x47 inches)
Drawer   3 Folder   2
Framing of First Floor (1S)
Drawer   3 Folder   2
Framing of Mezzanine (2S)
Drawer   3 Folder   2
Framing of Second Floor (3S)
Drawer   3 Folder   2
Framing of Third Floor (4S), revised  1/7/1915
Drawer   3 Folder   2
Framing of Roof (5S)
 
Mechanical Construction Drawings,  12/15/1914 (Ink-on-linen drawings, 29x47 inches)
Drawer   3 Folder   2
Basement Plan for Heating and Ventilation (1M), revised  2/19/1915
Drawer   3 Folder   2
Exhaust Piping (2M)
Drawer   3 Folder   2
Riser Diagram (3M)
Drawer   3 Folder   2
Future Fourth Floor Plan and Attic Plan Showing Future Piping (MM),  2/10/1915
 
Detroit Trust Company Addition by Albert Kahn, Inc., Architects (Job No. 637F)
 
Design Development (Block Plans) Drawings,  undated (Ink-on linen drawings, 27x30 inches)
Drawer   3 Folder   3
Basement Plan (1)
Drawer   3 Folder   3
Main Floor Plan (2)
Drawer   3 Folder   3
Mezzanine Floor Plan (3)
Drawer   3 Folder   3
Second Floor Plan (4)
Drawer   3 Folder   3
Third Floor Plan (5)
 
Architectural Construction Drawings,  2/9/1926 (Ink-on-linen drawings, 29x40 inches)
Drawer   3 Folder   3
Plot Plan (1)
Drawer   3 Folder   3
Foundation Plan (2)
Drawer   3 Folder   3
Basement Plan (3), revised  3/26/1926
Drawer   3 Folder   3
First Floor Plan (4), revised  5/17/1926
Drawer   3 Folder   3
Mezzanine Floor Plan (5), revised  3/26/1926
Drawer   3 Folder   3
Second Floor Plan (6), revised  3/26/1926
Drawer   3 Folder   3
Third Floor Plan (7), revised  3/26/1926
Drawer   3 Folder   3
Plan at Fan Room and Roof (8), revised  3/26/1926
Drawer   3 Folder   3
Elevations (9), revised  3/26/1926
Drawer   3 Folder   3
Elevations and Details (10), revised  3/26/1926
Drawer   3 Folder   4
Sections (11), revised  3/26/1926
Drawer   3 Folder   4
Exterior Details (12), revised  3/26/1926
Drawer   3 Folder   4
Plans: Elevators and Stairs #2 & 3 (13)
Drawer   3 Folder   4
Sections of Elevators and Stairs #2, 3 & 4 (14), revised  3/26/1926
Drawer   3 Folder   4
Plans and Sections of Stairs #1 & 6 (15), revised  3/26/1926
Drawer   3 Folder   4
Banking Room Interiors (16)
Drawer   3 Folder   4
Banking Room Interiors (17), revised  3/26/1926
Drawer   3 Folder   4
Banking Room and Safe Deposit Dept. Interiors (18), revised  3/26/1926
Drawer   3 Folder   4
Interior Scale Details (19)
Drawer   3 Folder   4
Interior Scale Details (20), revised  3/26/1926
Drawer   3 Folder   5
Structural Construction Drawings,  2/8/1926 (Ink-on-linen drawings, 29x40 inches)
Drawer   3 Folder   5
First Floor Framing (1S)
Drawer   3 Folder   5
Mezzanine Floor Framing (2S)
Drawer   3 Folder   5
Second Floor Framing (3S)
Drawer   3 Folder   5
Third Floor Framing (4S)
Drawer   3 Folder   5
Roofing and Attic Framing (5S), revised  2/16/1926
Drawer   3 Folder   5
Column Schedule; Footing Details (6S)
Drawer   3 Folder   5
Alterations in Present Building (7S)
Drawer   3 Folder   5
Second Floor Trusses and Girders (8S)
 
Mechanical Construction Drawings,  3/15/1926 revised  5/8/1926 (Ink-on-linen drawings, 29x40 inches)
Drawer   3 Folder   6
Foundation Plan (1M), revised  8/17/1926
Drawer   3 Folder   6
Basement Floor Plan (2M), revised  9/11/1926
Drawer   3 Folder   6
First Floor Plan (3M)
Drawer   3 Folder   6
Mezzanine Floor Plan (4M)
Drawer   3 Folder   6
Second Floor Plan (5M)
Drawer   3 Folder   6
Third Floor Plan (6M)
Drawer   3 Folder   6
Pipe Space Plan (7M)
Drawer   3 Folder   6
Heating Riser Diagram and Details (8M)
 
Electrical Construction Drawings,  4/12/1926 (Ink-on-linen drawings, 29x40 inches)
Drawer   3 Folder   6
Basement Plan and Riser Diagrams (9M), revised  9/11/1926
Drawer   3 Folder   6
First Floor Plan (10M), revised  9/30/1926
Drawer   3 Folder   6
Mezzanine Floor Plan (11M), revised  3/5/1926
Drawer   3 Folder   6
Second Floor Plan (12M), revised  9/11/1926
Drawer   3 Folder   6
Third Floor Plan (13M), revised  9/11/1926
Drawer   3 Folder   6
Fan Room and Roof Plan (14M)
 
Library Building, University of Michigan, Ann Arbor,  1916-1917,  1949,  1969,  1972 and  1977, Jobs No. 663 & 663-A-E [subseries]:
 
Library Building by Albert Kahn, Architect, Ernest Wilby, Associate (Job No. 663)
 
Design Development Drawings (Block Plans),  undated (Ink-on-linen drawings, 19-3/4x25 inches)
Drawer   8 Folder   7
First Floor Plan
Drawer   8 Folder   7
Second Floor Plan
Drawer   8 Folder   7
Third Floor Plan
 
Architectural Construction Drawings,  5/20/1916 revised  5/8/1917 (Ink-on-linen drawings with pencil, blue pencil and red ink notations, 35x38 to 35-1/2x43-1/2 inches)
Drawer   8 Folder   7
Plot Plan (1), revised  9/16/1916
Drawer   8 Folder   7
Footing and Foundation Plan (2)
Drawer   8 Folder   7
Basement Plan (3)
Drawer   8 Folder   7
First Floor Plan (4)
Drawer   8 Folder   7
Second Floor Plan (5)
Drawer   8 Folder   7
Third Floor Plan (6), revised  12/27/1917
Drawer   8 Folder   7
Fourth Floor Plan (7)
Drawer   8 Folder   7
Attic Plan (8)
Drawer   8 Folder   7
Roof Plan (9), revised  9/16/1916
Drawer   8 Folder   7
North and South Elevations (10), revised  9/16/1916
Drawer   8 Folder   7
East and West Elevations (11), revised  9/16/1916
Drawer   8 Folder   7
Sections on Lines "B-B" and "C-C" (12), revised  9/16/1916
Drawer   8 Folder   7
Sections through East and West Courts and on Line "J-J" (13)
Drawer   8 Folder   7
Sections through Outside Walls and on Line "A-A" (14)
Drawer   8 Folder   7
Sections on Lines "D-D" and "E-E" (15), revised  9/16/1916
Drawer   8 Folder   8
Sections on Line "B-B" and "G-G" (16)
Drawer   8 Folder   8
Section on Line "F-F" and Details of Main Stair (17), revised  9/16/1916
Drawer   8 Folder   8
Plan and Section Showing Run of Book Carrier and Details of Toilets (18), revised  9/16/1916
Drawer   8 Folder   8
Basement Plan (19), revised  12/26/1917
Drawer   8 Folder   8
Second, Third and Fourth Floor Plans (20)
Drawer   8 Folder   8
Typical Floor Plan of East Stack and Sections thru' Outside Walls of East and West Stacks (21)
Drawer   8 Folder   8
Exterior Detail of Front (22)
Drawer   8 Folder   8
Details of Main Entrance and of Windows, East End of Front Pavilion (23)
Drawer   8 Folder   8
Typical Details of Center Bay, East Elevation, and of Bay, South Wall of East Stack (24)
Drawer   8 Folder   8
Details of Entrances, West Elevation, of Rec. Entrance, East Elevation, and of Dormers on Stacks (25), revised  11/26/1917
Drawer   8 Folder   8
Plan and Elevations of Vestibule and Main and Rear Corridors (26), revised  7/6/1917
Drawer   8 Folder   8
Details of Delivery Corridor, Second Floor (27), revised  9/16/1916
Drawer   8 Folder   8
Details of Main Reading Room, Second Floor (28), revised  9/16/1916
Drawer   8 Folder   8
Details of Main Reading Room, Second Floor (29)
Drawer   8 Folder   8
Elevations of Periodical Room and Study Room, First Floor (30), revised  9/16/1916
Drawer   8 Folder   8
Alternate North Elevation, Alternate East Elevation of North Pavilion and Detail of Terra Cotta Ornament and Brick Pattern (31), revised  9/16/1916
 
Structural Construction Drawings,  undated (Ink-on-linen drawings, 35x41 inches)
Drawer   8 Folder   9
First Floor Framing Plan (1-S)
Drawer   8 Folder   9
Second Floor Framing Plan (2-S)
Drawer   8 Folder   9
Third Floor Framing Plan (3-S)
Drawer   8 Folder   9
Fourth Floor Framing Plan (4-S)
Drawer   8 Folder   9
Attic and Part Roof Framing Plan (5-S)
Drawer   8 Folder   9
Column and Footing Schedules (6-S)
 
Mechanical Construction Drawings,  6/5/1916 (Ink-on-linen drawings, 35x41 inches)
Drawer   8 Folder   9
Foundation Plan (1M), revised 10/1/1917
Drawer   8 Folder   9
Basement Plan (2M), revised  9/27/1917
Drawer   8 Folder   9
First Floor Plan (3M), revised  10/26/1917
Drawer   8 Folder   9
Second Floor Plan (4M), revised  8/24/1916
Drawer   8 Folder   9
Third Floor Plan (5M), revised  11/21/1917
Drawer   8 Folder   9
Fourth Floor Plan (6M), revised  11/21/1917
Drawer   8 Folder   9
Attic Plan (7M), revised  11/21/1917
Drawer   8 Folder   9
Steam Riser Diagram (8M), revised 10/1/1917
Drawer   8 Folder   9
Supply and Exhaust Air Riser Diagrams (9M), revised  7/7/1916
Drawer   8 Folder   9
Details (10M), revised  8/24/1916
Drawer   8 Folder   9
Typical Floor Plan of East Stack and First Floor Plans of West Stack and First and Eighth Tiers (11M),  8/5/1916
 
Stack Buildings for the Library , University of Michigan, by Albert Kahn, Architect, Ernest Wilby, Associate (Job No. 663-A)
 
Architectural Construction Drawings,  5/25/1916 (Ink-on-linen drawings, 28-1/2x41 inches)
Drawer   8 Folder   10
Plot Plan and Foundation and Basement Plans (1),  undated
Drawer   8 Folder   10
First and Second Floor Plans (2)
Drawer   8 Folder   10
Third Floor Plan and Attic and Roof Plan (3)
Drawer   8 Folder   10
South Elevation and Section on Line "C-C" (4)
Drawer   8 Folder   10
West Elevation, Sections thru' East and West Stacks and Details of Entrance (5)
 
Alterations and Addition to Library Building, University of Michigan, by Albert Kahn Associated Architects & Engineers, Inc. (Job No. 663-B).
 
Structural Construction Drawings,  1/31/1949 (Ink-on-linen drawings with yellow and red pencil revisions, 30-1/4x45-3/4 inches)
Drawer   9 Folder   1
Foundation Plan and Details (1-S)
Drawer   9 Folder   1
Column and Footing Schedules (2-S)
Drawer   9 Folder   1
First Floor Framing and Details (3-S)
Drawer   9 Folder   1
Second Floor Framing Plan (4-S)
Drawer   9 Folder   1
Third Floor Framing Plan (5-S)
Drawer   9 Folder   1
Framing Plan at Bottom Chord of Trusses and Details of Trusses (6-S)
Drawer   9 Folder   1
Roof Framing Plan (7-S)
Drawer   9 Folder   1
Ceiling Framing Plan and Details (8-S)
 
Mechanical Construction Drawings,  1/19/1949 (Ink and blue pencil drawings on linen, 29-1/2x44-01/4 to 30x45-1/2 inches)
Drawer   9 Folder   2
Plot Plan and Details (1-M)
Drawer   9 Folder   2
Foundation Plan (2-M)
Drawer   9 Folder   2
Basement Floor Plan, First Stack Floor (3-M)
Drawer   9 Folder   2
Basement Floor Mezzanine Plan, Second Stack Floor (4-M)
Drawer   9 Folder   2
First Floor Ventilation Plan, Third Stack Floor (5-M)
Drawer   9 Folder   2
First Floor Mezzanine Plan, Fourth Stack Floor (6-M)
Drawer   9 Folder   2
Second Floor Plan, Fifth Stack Floor (7-M)
Drawer   9 Folder   2
Second Floor Mezzanine Plan, Sixth Stack Floor (8-M)
Drawer   9 Folder   2
Third Floor Plan, Seventh Stack Floor (9-M)
Drawer   9 Folder   2
Third Floor Mezzanine Plan, Eighth Stack Floor, and Details (10-M)
Drawer   9 Folder   3
Pipe Space Plan and Details (11-M)
Drawer   9 Folder   3
Toilet Details (12-M)
Drawer   9 Folder   3
Plans and Sections of Fan Rooms # 4 & 5 (13-M) (Two drawings, one pencil-on-vellum)
Drawer   9 Folder   3
Plan and Sections of Fan Room # 2 (14-M) (Two drawings, one pencil and ink-on-vellum)
Drawer   9 Folder   3
Plan of Fan Room # 1 and Equipment Schedule (15-M) (Two drawings, one pencil-on-vellum)
Drawer   9 Folder   3
Section thru' Building (16-M)
Drawer   9 Folder   3
Heating Details (17-M)
Drawer   9 Folder   3
Heating Riser Diagram and Details (18-M)
 
Electrical Construction Drawings,  8/12/1949 (Ink, pencil and blue pencil drawings on linen, 29-1/2x44-1/4 inches)
Drawer   9 Folder   4
Plot Plan, Riser Diagram and Symbols (1-E)
Drawer   9 Folder   4
Basement Wiring Plan (2-E)
Drawer   9 Folder   4
First Floor Wiring Plan (3-E)
Drawer   9 Folder   4
Second Floor Wiring Plan (4-E)
Drawer   9 Folder   4
Third Floor Wiring Plan (5-E)
Drawer   9 Folder   4
Pipe Space Wiring Plan (6-E)
Drawer   9 Folder   4
Basement Floor Plan, Present Building (7-E)
Drawer   9 Folder   4
First Floor Plan, Present Building (8-E)
 
Alterations to General Library, University of Michigan (Job No. 663-C)
 
Mechanical Design Development Drawings by Albert Kahn Associated Architects & Engineers, Inc.,  3/3/1969 (Pencil drawings on sepia prints, 21x32inches)
Drawer   9 Folder   5
Basement Floor Plan with New Supply Air Units (1-MD)
Drawer   9 Folder   5
First Floor Plan with New Main Supply Air Duct (2-MD)
Drawer   9 Folder   5
Second Floor Plan (3-MD)
Drawer   9 Folder   5
Third Floor Plan with New Fan Room (4-MD)
Drawer   9 Folder   5
Fourth Floor Plan with New Fan Room (5-MD)
Drawer   9 Folder   5
Fifth Floor Plan (6-MD)
Drawer   9 Folder   5
Typical Cross-Section (7-MD) (Pencil-on-vellum drawing)
 
General Library Renovation, University of Michigan (Job No. 663-D)
 
Architectural Construction Drawings by Albert Kahn Associates, Inc., Architects & Engineers,  11/30/1972 (Pencil drawings on electrostatic prints on mylar, 23x37 inches)
Drawer   9 Folder   6
Site Plan (1)
Drawer   9 Folder   6
Basement Plan (2)
Drawer   9 Folder   6
First Floor Plan (3-A),  undated (Pencil drawing on sepia print)
Drawer   9 Folder   6
Second and Fourth Stack Floor Plans (4)
Drawer   9 Folder   6
Sixth and Ninth Stack Floor Plans (6)
Drawer   9 Folder   6
Third Floor Plan (7)
Drawer   9 Folder   6
Fourth Floor Plan (8)
Drawer   9 Folder   6
Attic and Tenth Stack Floor Plans (9)
Drawer   9 Folder   6
Roof Plan (10)
Drawer   9 Folder   6
West Elevation (12)
Drawer   9 Folder   6
South Elevation (13)
 
Graduate Library, University of Michigan, Revisions to Ventilation in Photo Duplication Area (Job No. 663-E)
 
Mechanical Construction Drawing by Albert Kahn Associates, Inc., Architects & Engineers,  7/29/1977 (Pencil-on-vellum drawing, 24x33-3/4 inches)
Drawer   9 Folder   6
Part Plan of Basement Photo Duplication Area -- Air-Conditioning and Ventilating (1-M)
 
Burroughs Adding Machine Company, Detroit, Michigan,  1916-1917, Job No. 300K [subseries]:
 
Construction Drawings by Albert Kahn, Architect, Ernest Wilby, Associate (Ink-on-linen drawings, 16-1/2x38-1/2 inches)
 
Architectural Drawings,  10/12/1916
Drawer   3 Folder   7
Plot Plan (1), revised 11/8/1916
Drawer   3 Folder   7
Excavation Plan (1-A),  9/26/1916 revised 11/8/1916
Drawer   3 Folder   7
Basement and Foundation Plan (2), revised 11/8/1916
Drawer   3 Folder   7
First Floor Plan (3), revised 11/8/1916
Drawer   3 Folder   7
Typical Floor Plan (4), revised 11/8/1916
Drawer   3 Folder   7
Roof Plan (5), revised  11/13/1916
Drawer   3 Folder   7
North and South Elevations (6), revised 11/8/1916
Drawer   3 Folder   7
Typical Section on Line B-B, East and West Elevations and Toilet Elevations (7), revised  11/13/1916
Drawer   3 Folder   7
First Floor Plan of Elevators-Wings #1 & 2, and Section thru' Elevator and Toilet Room on Line A-A (8), revised 11/8/1916
Drawer   3 Folder   7
Details of Doors, Stairs, Toilets and Cesspool (9), revised 11/816
Drawer   3 Folder   7
Details of Employees' Entrance to Basement (10), revised 11/7/1916
Drawer   3 Folder   7
[Details of Employees' Entrance to Basement] to Supersede Entrance Details on Sheet #10 (10A),  12/19/1916 (17x28 inches)
Drawer   3 Folder   7
Details of Steel Bridge and Column Caps and Floor Slabs (11), revised 11/8/1916
Drawer   3 Folder   7
[Details of Steel Bridge] to Supersede Bridge Details Shown on Old Sheet #11 (11A),  12/19/1916 revised  1/25/1917 (20x31-3/4 inches)
Drawer   3 Folder   7
Plan of Shipping Platform, Section thru' Shipping Platform, South Elevation, Typical Detail of Sash in Outside Walls and Sections A-A to H-H (12), revised 11/8/1916
 
Structural Drawing,  3/12/1917
Drawer   3 Folder   7
Roof over Kitchen (1-S) (19-3/4x22-1/4 inches)
 
Mechanical Drawings,  10/17/1916 revised 11/7/1916
Drawer   3 Folder   7
Foundation and Basement Plan (1M)
Drawer   3 Folder   7
First Floor Plan (2M)
Drawer   3 Folder   7
Second, Third and Fourth Floor Plan (3M)
Drawer   3 Folder   7
Fifth Floor Plan (4M)
Drawer   3 Folder   7
Layout of Plumbing Fixtures as Per Bulletin No. 53 (5M),  2/10/1917 revised  2/26/1917
 
Betsy Barbour Residence Hall, University of Michigan, Ann Arbor,  1917, Job No. 829 [subseries]:
 
Construction Drawings by Albert Kahn, Architect, Ernest Wilby, Associate
 
Architectural Drawings,  11/20/1917 (Ink-on-linen drawings with pencil and blue pencil revisions, 25x27 to 25-3/4x28 inches)
Drawer   9 Folder   7
Plot Plan (1)
Drawer   9 Folder   7
Basement and First Floor Plans (2)
Drawer   9 Folder   7
Second, Third and Fourth Floor Plans (3)
Drawer   9 Folder   7
North and South Elevations (4)
Drawer   9 Folder   7
Maynard and State Street Elevations, Section "A-A" and Interior Details (5)
Drawer   9 Folder   7
Details of Maynard Street Entrance (6)
Drawer   9 Folder   7
Details of Windows and Fireplace in Sewing and Games Room #19 (7)
Drawer   9 Folder   7
Interior Details (8)
Drawer   9 Folder   7
Sections and Details of Stairs (9)
Drawer   9 Folder   7
Interior Details (10)
 
Structural Drawings,  undated (Ink-on-linen drawing with blue pencil revisions, 25-3/4x28 inches)
Drawer   9 Folder   7
First, Second, Third and Fourth Floor Plans (1-S)
 
Mechanical Drawings,  12/20/1917 (Ink-on-linen drawings, 264x28 inches)
Drawer   9 Folder   7
Heating Riser Diagram and Foundation and Drainage Plan (1)
Drawer   9 Folder   7
Basement Plan (2)
Drawer   9 Folder   7
Second, Third and Fourth Floor Plans (3)
Drawer   9 Folder   7
Plumbing Riser Diagram and Details (4)
 
Ford Motor Company Eagle Shipbuilding Plant, River Rouge, Michigan,  1918, Job No. 847 [subseries]:
 
Construction Drawings by Albert Kahn, Architect
 
Architectural Drawings,  2/12/1918 revised  2/15/1918 (Ink-on-linen drawings)
Drawer   9 Folder   8
Plot Plan,  undated (14-1/2x32 inches)
Drawer   9 Folder   8
Plot Plan (1A) (30-1/2x41 inches)
Drawer   9 Folder   8
Building "A" Foundation Plan and Details (1), revised  3/1/1918 (30-3'4x 41-3/4 inches)
Drawer   9 Folder   8
Building "A" Floor Plan (2), revised  3/1/1918 (31-3/4x42 inches)
Drawer   9 Folder   8
Building "A" Roof Plan (3), revised  3/1/1918 (30-3/4x42 inches)
Drawer   9 Folder   8
Building "A" Elevations and Cross-Section (4), revised  2/26/1918 (32x42 inches)
Drawer   9 Folder   8
Elevation of Monitor and Typical Details (5), revised  2/26/1918 (31-1/2x42 inches)
Drawer   9 Folder   8
Building "B" Foundation Plan and Details (6)     (undated due to linen damage)  (33-3/4x49 inches)
Drawer   9 Folder   8
Building "B" Floor Plan and Details (7), revised  4/4/1918 (34-1/4x49 inches)
Drawer   9 Folder   8
Building "B" Roof Plan (8) (33-3/4x49 inches)
Drawer   9 Folder   8
Elevations and Sections thru' High Point and Monitor (9), revised  2/23/1918 (34-3/4x4 inches)
Drawer   9 Folder   8
Building "B" Sections (10), revised  2/23/1918 (34-3/4x49 inches)
 
Structural Drawings,  2/11/1918 revised  2/15/1918 (Ink-on-linen drawings with pencil and blue pencil revisions)
Drawer   9 Folder   9
Details of Girders in Monitor Walls and under Main Roof (1-S),  2/12/1918 (31-3/4x42-1/2 inches)
Drawer   9 Folder   9
Building "B" Half-Plan Showing Framing and Details (2-S) (34x49 inches)
Drawer   9 Folder   9
Elevations, Sections and Sway Frame Details (3-S) (34x49 inches)
Drawer   9 Folder   9
Details of Roof Trusses, Monitor Framing and Bottom Chord Bracing (4-S) (34x49 inches)
Drawer   9 Folder   9
Building "B" Cross-Sections thru' High and Low Portions (5-S) (34-3/4x48-3/4 inches)
 
Mechanical Drawings (Ink-on-linen drawings with pencil and blue pencil notations)
Tube   2  
[Plan and Section of] Service Tracks (1-MR)     (undated due to linen damage)  (28-1/4x54-1/2 inches)
Tube   2  
Plot Plan and Details of Septic Tank, Sludge Beds and Toilet, etc. (1M),  3/5/1918 (31-3/4x42 inches)
Tube   2  
Drinking Water Layout (2M),  5/10/1918 (21-1/4x35 inches)
Tube   2  
Layout of Steam Plant and Detail of Unit Heater and Connections     (not numbered or dated due to linen damage)  (23x55 inches)
Tube   2  
Building "B" Layout of Heating System and Details (4M),  8/1/1918 revised  8/10/1918 (23x56 inches)
Tube   2  
Plan of Existing Underground Pipe Lines (5M),  8/16/1918 (24x43-1/2 inches)
Tube   2  
Building "A" Heating Plan (6M),  undated (23x46-1/2 inches)
Tube   2  
Layout of Steam Piping (8M)     (undated due to linen damage)  (23-1/2x54-1/2 inches)
 
First and Old Detroit National Bank, Detroit, Michigan,  1919-1922, Job No. 803 [subseries]:
 
Construction Drawings by Albert Kahn, Architect
 
Architectural Drawings,  12/20/1919 revised  9/22/1920 (Ink-on-linen drawings with red ink, pencil and blue pencil revisions, 30-3/4x47 to 31-3/4x52-3/4 inches)
Tube   16  
Plot Plan (1)
Tube   16  
Sub-Basement and Mezzanine Floor Plans (2)     (revision date illegible) 
Tube   16  
Basement, Basement Mezzanine and First Floor Mezzanine Floor Plans (3), revised  2/15/1922
Tube   16  
First and Second Floor Plans (4), revised  2/14/1922
Tube   16  
Third, Fourth and Truss Space Floor Plans (5), revised  2/14/1922
Tube   16  
Sixth and Seventh Floor Plans (6), revised  5/29/1920
Tube   16  
Fifth and Eighth Floor Plans (7), revised  2/15/1922
Tube   16  
Ninth and Typical Floor Plans (8)
Tube   16  
Twenty-Second, Twenty-Third and Twenty-Fourth Floor Plans (9)
Tube   16  
Roof and Pipe Space Floor Plans (10),  undated
Tube   16  
Woodward Avenue Elevation (11)
Tube   16  
Cadillac Square Elevation (12)
Tube   16  
East Elevation (13)
Tube   16  
West Half of South Elevation and West Elevation of Court and Section on Line "F-F" (14)
Tube   16  
East Half of South Elevation, Section "G-G" and Cross-Section "B-B" (15)
Tube   16  
Transverse Section on Line "D-D" (16)
Tube   16  
Sections "A-A," "C-C" and "E-E" (17)
Tube   16  
Elevation of West Bay, Cadillac Square, and Details of Lower Stories (18)
Tube   16  
Detail of Upper Portion of Cadillac Square and Woodward Ave. Elevations (19)
Tube   16  
First Floor Exterior Details (20)
Tube   16  
Details of Rear Elevation (21)
Tube   16  
Details of Passenger Elevators, Pent House and Stairs #3 (22)
Tube   16  
Sections thru' Elevator Lobby and Freight Elevator (23), revised  January 1921
Tube   16  
Sections thru' Elevators and Details of Passenger Elevator Doors, etc. (24), revised  1/4/1921
Tube   17  
Details of Elevators (25)     (undated due to linen damage) 
Tube   17  
Sections and Details of Stairs (26)
Tube   17  
Sub-Basement Mezzanine, Basement Mezzanine and First Floor Plans (27)
Tube   17  
First Floor Mezzanine and Third and Fourth Floor Plans (28)
Tube   17  
Miscellaneous Floor Plan Details (29)
Tube   17  
Detail of Stack and Typical Wall Sections (30)
Tube   17  
Details of Typical Toilet Rooms and Corridor Office Partitions (31)
Tube   17  
Details of Typical Doors, Toilets and Barber Shop (32), undated,  revised 9/22/1920
Tube   17  
Details of Girders, Metal Louvres, Skylights, Columns and Walls, etc. (33)
Tube   17  
Details of Window Frames in Main Banking Room, Shop Fronts and Savings Bank (34)
Tube   17  
Plan and Interior Elevations of Directors' Room and Appurtenances on Sixth Floor (35)
Tube   17  
Basement Plan, Elevations and Details (36)
Tube   17  
Interior Designs for Entrance Lobby (37),  9/20/1919 revised  9/22/1920
Tube   17  
Interior Designs for Main Banking Room (38),  9/20/1920 revised  9/22/1920
Tube   17  
Interior Designs for Savings Bank (39)     (date illegible due to linen damage) 
Tube   17  
Typical Floor Plan Showing Revised Widths of Elevator Doors (41),  5/24/1920 revised  9/22/1920 (31-1/2x36-1/2 inches)
Tube   17  
First Floor Plan (47)     (undated due to linen damage)  (39-1/4x53-3/4 inches)
Tube   17  
[Floor Plan], untitled due to linen damage (48),  undated (39-1/4x53 inches)
Tube   17  
Details of Vaults in Sub-Basement Mezzanine, in Basement and at Eighth Floor (50),  11/22/1920 revised  12/21/1920 (32-3/4x37-3/4 inches)
Tube   17  
Details of Vault Furniture and Safe-Deposit Vault Floor Framing (52),  11/22/1920 revised  12/21/1920 (32-3/4x38 inches)
Tube   17  
Details of Furniture in Bank Vault (52A), undated, revised  12/21/1920 (33x38 inches)
Tube   17  
Typical Floor Plan (65)     (undated due to linen damage)  (36-1/2x49 inches)
Tube   17  
Part Plan of Public Elevator Lobby at Twenty-First through Twenty-Fouth Floors (65A),  undated (18x10-3/4 inches)
Tube   17  
Details of Ceiling of Second Floor (Low Part) (82),  3/10/1921 revised  9/7/1921 (27x44-1/2 inches)
 
Structural Drawings,  12/20/1919     (some not numbered or dated due to linen damage)  (Ink-on-linen drawings with pencil notations, 30x50-1/2 to 31-1/2x52-1/2 inches)
Tube   18  
Column Schedule (1-S)
Tube   18  
Column Schedule (2-S)
Tube   18  
Column Schedule (cont.)
Tube   18  
Foundation Plan and Details of Caissons
Tube   18  
[Details of] Foundation Girders and Grillage for Columns 86, 87, 88 and 90
Tube   18  
Sub-Basement Mezzanine and Basement Floor Framing Plans
Tube   18  
Basement Mezzanine and First Floor Framing Plans (7-S)
Tube   18  
First Floor Mezzanine and Second Floor Framing Plans (8-S)
Tube   18  
Third and Fourth Floor Framing Plans (9-S)
Tube   18  
Fifth Floor Framing Plan, revised  10/15/1920
Tube   18  
Sixth Floor and Truss Space Framing Plans
Tube   18  
Seventh and Eighth Floor Framing Plans (12-S)
Tube   18  
Ninth Floor Framing Plan, revised  8/24/1920
Tube   18  
Typical Floor Framing Plan
Tube   18  
Twenty-First, Twenty-Second and Twenty-Third Floor Framing Plans (15-S)
Tube   18  
Twenty-Fourth Floor and Pipe Space Floor Framing Plans (16-S), revised  9/10/1920
Tube   18  
Pent House Floor and Main Roof Framing Plan (17-S), revised  9/1/1920
Tube   18  
Fifth Floor Truss and Girder Details (18-S)
Tube   19  
Wind Bracing Systems A-A and M-M (19-S)
Tube   19  
Wind Bracing Systems D-D, J-J and K-K (22-S)
Tube   19  
Wind System F-F, Woodward Avenue Elevation (24-S)
Tube   19  
Wind System G-H, Rear Elevation (25-S)
Tube   19  
Longitudinal Wind Bracing System M-M.
Tube   19  
Wind System N-N, Cadillac Square Elevation (27-S)
Tube   19  
Wind Bracing Connections, Special Vault and D-Type (28-S),  3/15/1920
Tube   19  
Wind Bracing Systems, B-E and F-Type (29-S),  3/15/1920
Tube   19  
Wind Bracing Systems, C-Type (30-S),  3/15/1920
Tube   19  
Wind Bracing Systems, A, B, C and X-Type (31-S),  3/15/1920
Tube   19  
Wind Bracing Connections, 20, 26 and 30-Inch Spandrel Connections (32-S),  3/15/1920
Tube   19  
Wind Bracing Connections, 18 and 24-Inch Spandrel Connections (33-S),  3/15/1920
Tube   19  
Wind Bracing Connections, 15-Inch Spandrel Connections (34-S),  3/15/1920
Tube   19  
Wind Bracing Connections, 12 and 18-Inch Spandrel Connections
Tube   19  
Untitled drawing (36-S),  undated
Tube   19  
Elevation and Detail of Additional Girder at Caisson for Column #8 (38-S),  9/29/1920 (28-1/2x26 inches)
Tube   19  
Piling Plan (1000-S),  4/12/1920 (26-3/4x34-1/4 inches)
Tube   19  
Cornice Channels, Pipe Space (1016-S),  2/2/1921 (17-1/4x30-1/2 inches)
Tube   19  
Main Cornice Details (1026-S),  6/24/1921 revised  8/5/1921 (16-1/2x39 inches)
Tube   20  
Mechanical Drawings by Albert Kahn, Architects and Engineers,  1/5/1920 (Ink-on-linen drawings with pencil Tube notations, 31-1/4x50-1/4 to 31-1/2x52 inches)
Tube   20  
Section Details and Symbols (1-M), revised 12/3/1920
Tube   20  
Sub-Basement Mezzanine and Sub-Basement Floor Plans (2-M), revised  10/17/1921
Tube   20  
Basement Mezzanine and Basement Floor Plans (3-M), undated, revised  11/11/1921
Tube   20  
First Floor Mezzanine and First Floor Plans (4-M), revised  11/29/1921
Tube   20  
Second Floor Plan and Details of Typical Toilet Room (5-M), revised  5/6/1921
Tube   20  
Third and Fourth Floor Plans (6-M), revised  9/13/1921
Tube   20  
Fifth Floor and Truss Space Plans (7-M), revised  9/13/1921
Tube   20  
Sixth and Seventh Floor Plans (8-M), revised  5/18/1921
Tube   20  
Eighth and Ninth Floor Plans (9-M), revised  3/21/1922
Tube   20  
Typical Floor Plan for Electrical Work Only, Fifth to Twenty-Fourth Floors, and Typical Floor Plan, Tenth to Nineteenth Floors (10-M), revised  5/18/1921
Tube   20  
Twentieth through Twenty-Third Floors Plan and Twenty-Fourth Floor Plan (11-M), revised  5/18/1921
Tube   20  
Pipe Space Plan (12-M), revised 10/6/1921
Tube   20  
Riser Diagrams (13-M), revised5/6/1921
Tube   20  
[Riser Diagram], untitled (14-M), revised  5/6/1921
Tube   20  
[Riser Diagrams], untitled (15-M), revised  5/6/1921
Tube   20  
Sub-Basement Mezzanine and Basement [Electrical] Plans (16-M),  undated
Tube   20  
Riser Diagram-Lighting Feeders and Diagram of Telephone Risers (17-M),  undated
Tube   20  
Riser Diagram-Power Feeders (18-M),  undated (31-1/2x44 inches)
Tube   20  
Layouts of Fan Room in Basement and of Exhaust and Recirculating Duct in Truss Space and Details (19-M), 12/3/1920 revised  10/18/1921
Tube   20  
Typical [Pipe] Installation Plan and Front and Rear Sectional Elevations (20-M),  3/17/1921 revised  5/6/1921
Tube   21  
Sub-Basement Mezzanine [Electrical] Plan (21M),  5/9/1921 revised  8/23/1921
Tube   21  
Basement [Electrical] Plan (22-M),  3/2/1921 revised  8/2/1921
Tube   21  
First Floor [Electrical] Plan (23-M),  5/19/1921 revised  11/29/1921
Tube   21  
First Floor Mezzanine [Electrical] Plan (24-M),  4/27/1921 revised  8/2/1921 (30-1/4x50-3/4 inches)
Tube   21  
Second Floor [Electrical] Plan (25-M),  4/18/1920 revised  8/2/1921
Tube   21  
Third Floor [Electrical] Plan (26-M), revised  8/2/1921
Tube   21  
    (undated due to linen damage) 
Tube   21  
Fourth Floor [Electrical] Plan (27-M),  3/31/1921 revised  8/2/1921
Tube   21  
Fifth Floor [Electrical] Plan (28-M), revised  8/2/1921     (date illegible) 
Tube   21  
Sixth Floor [Electrical] Plan (29-M),  4/13/1921
Tube   21  
Seventh Floor [Electrical] Plan (31-M),  4/12/1921 revised  8/2/1921
Tube   21  
Eighth Floor [Electrical] Plan (32-M), undated, revised  8/2/1921
Tube   21  
Typical Floor [Electrical] Plan (33-M), revised  9/6/1921     (undated due to linen damage) 
Tube   21  
Riser Diagram (34-M),  4/7/1921 revised  6/8/1921
Tube   21  
Truss Space [Electrical] Plan (35-M),  5/19/1921 revised 10/6/1921
Tube   21  
Conduit Schedule and [Electrical] Plans and Sections (36-M),  10/24/1921 (30-3/4x47 inches)
Tube   21  
Wiring Diagram-Electric Sub-Station (37-M), 11/3/1921 (29-3/4x46-1/2 inches)
Tube   21  
[Electrical] Sections (38-M),  11/17/1921 revised  9/20/1922 (31-1/4x46-1/2 inches)
Tube   21  
Pipe Space Plan (39-M)     (undated due to linen damage) 
Tube   21  
Power Risers (40-M),  undated (36x38-3/4 inches)
Tube   21  
Main Distribution of A.C. and D.C. Current (42-M),  8/24/1921 (30-3/4x42-1/4 inches)
Tube   21  
Main Control Switchboard (44-M)     (undated due to linen damage)  (32x41-1/2 inches)
 
University Hospital, University of Michigan, Ann Arbor,  1919-1921, Job No. 850 [subseries]:
 
Construction Drawings by Albert Kahn, Architect (Ink-on-linen drawings)
 
Architectural Drawings,  10/4/1919 (35-1/2x60-1/2to37x64 inches)
Tube   3  
Plot Plan (1)
Tube   3  
Foundation Plan (2), revised  11/17/1919
Tube   3  
Sub-Basement Plan (3), revised  11/17/1919
Tube   3  
Basement Plan (4), revised  11/17/1919
Tube   3  
Ground Floor Plan (5)
Tube   3  
First Floor Plan (6), revised  11/17/1919
Tube   3  
Second Floor Plan (7), revised  11/17/1919
Tube   3  
Third Floor Plan (8)
Tube   3  
Fourth through Tenth Floors Plan (9)
Tube   3  
Roof Plan (10), revised  1/24/1921
Tube   4  
North and South Elevations of Ward Wings and Main Building (11), revised  11/17/1919
Tube   4  
East and West Elevations of Ward Wings and End Elevations of East and West Wings (12)
Tube   4  
East and West Elevations of Demonstration Wing and Sections D-D through GG (13)
Tube   4  
Elevations of Surgical Wing (14)
Tube   4  
Section on Line A-A Looking West and Elevations of Pent House (15), revised  11/17/1919
Tube   4  
Sections through Typical Ward and Demonstration Wings and Details of Fire Escapes (16), revised  11/17/1919
Tube   4  
Details of Ward Wings (17)
Tube   4  
North Elevation of Ward Wing and Main Building and Miscellaneous Details (18)
Tube   4  
Details of Surgical Building (19)
Tube   4  
Details of Amphitheater (20)
Tube   4  
Rear Elevation of Main Ward Building, East Elevation of Demonstration Wing and Miscellaneous Floor Plans (21),  10/30/1919 (17x28 inches)
Tube   4  
Plans, Elevations and Section of Diet Kitchen, Main Ward Building (22),  10/30/1919 revised  6/28/1920 (18x15 inches)
Tube   4  
Revised Plan of Wing between Administration Building and Main Building (27),  9/15/1920 revised 11/2/1920 (20x33 inches)
 
Structural Drawings, 10/4/1919 (36x56 to 37x57 inches)
Tube   5  
Sub-Basement and Basement Framing Plans (1-S), revised  5/7/1920
Tube   5  
Ground Floor Framing (2-S), revised  5/10/1920
Tube   5  
First Floor Framing (3-S), revised  5/10/1920
Tube   5  
Second Floor Framing Plan (4-S), revised  5/11/1920
Tube   5  
Typical Floor Framing Plan, Third through Tenth Floors (5-S), revised  5/12/1920
Tube   5  
Roof Framing (6-S)
Tube   5  
Column Schedule (7-S), revised  4/16/1920
Tube   5  
Plan of Revised Framing , Sub-Basement Floor at Teaching Lab (8-S),  4/15/1920 (19-1/2x23-1/4 inches)
Tube   5  
Change in Framing Adjacent to Administration Building (11-S),  9/15/1920 revised 11/1/1920 (12-1/2x32 inches)
Tube   5  
Detail of Columns Supporting Area Walls (13-S), 12/2/1920 (12-1/2x32 inches)
 
Tables of Electrical Outlets,  undated (16-3/4x36 inches)
Drawer   3 Folder   8
Sub-Basement, Basement and Foundation Floor Plans (101M)
Drawer   3 Folder   8
Basement, Ground and First Floor Plans (102M)
Drawer   3 Folder   8
First Floor Plan (103M)
Drawer   3 Folder   8
Second and Third Floor Plans (104M)
Drawer   3 Folder   8
Third and Fourth Floor Plans (105M)
Drawer   3 Folder   8
Fourth and Fifth Floor Plans (106M)
 
Block Plans,  12/30/1921 revised  4/20/1925 (23x33 inches)
Drawer   3 Folder   8
Sub-Basement Floor Plan (1)
Drawer   3 Folder   8
Basement Floor Plan (2)
Drawer   3 Folder   8
Ground Floor Plan (3)
Drawer   3 Folder   8
First Floor Plan (4)
Drawer   3 Folder   8
Second Floor Plan (5)
Drawer   3 Folder   8
Third Floor Plan (6)
Drawer   3 Folder   8
Fourth Floor Plan (7)
Drawer   3 Folder   8
Fifth Floor Plan (8)
Drawer   3 Folder   8
Sixth Floor Plan (9)
Drawer   3 Folder   8
Roof Plan (10)
 
General Motors (Durant) Building, Detroit, Michigan,  1919-1920, Job No. 902 [subseries]:
 
Project Records  8/2/1919
Box   2  
Specification for Office and Laboratory Building, Durant Building Corporation by Albert Kahn, Incorporated,  8/2/1919
 
Construction Drawings by Albert Kahn, Architect
 
Architectural Drawings,  8/2/1919 (Ink-on-linen drawings with pencil notations, 28-3/4x34 to 29x44 inches)
Drawer   12 Folder   6
Plot Plan Showing Present Buildings (A-1),  undated
Drawer   12 Folder   6
Plot Plan (1)
Drawer   12 Folder   6
Excavation Plan (A-2),  6/6/1919
Drawer   12 Folder   6
Details of Swimming Pools (2), revised  9/2/1919
Drawer   12 Folder   6
Grading Plan (A-3), revised  5/28/1921
Drawer   12 Folder   6
Details of Laboratory Foundations and Tunnel (3)     (undated due to linen damage) 
Drawer   12 Folder   6
Plan of Foundation and Sub-Basement (4), revised  1/3/1922
Drawer   12 Folder   6
Basement Plan (5-R), revised  1/3/1922
Drawer   12 Folder   6
First Floor Plan (6), revised  1/3/1922
Drawer   12 Folder   6
Plan of Mezzanine Floor and First Floor of Laboratory (7), revised  1/3/1922
Drawer   12 Folder   6
Second Floor Plan (8), revised  5/16/1921
Drawer   12 Folder   6
Third Floor Plan (9), revised  5/16/1921
Drawer   12 Folder   6
Fourth Floor Plan (10), revised  9/27/1920
Drawer   12 Folder   6
Fifth Floor Plan (11), revised  9/27/1920
Drawer   12 Folder   6
Typical Floor Plan (12), revised 11/1/1920
Drawer   12 Folder   6
Fourteenth Floor Plan (13), revised  6/23/1920
Drawer   12 Folder   6
Fifteenth Floor Plan (14), revised  6/23/1920
Drawer   12 Folder   6
Plan of Pipe Space and Sixteenth Floor (15), revised  7/20/1920
Drawer   12 Folder   6
Roof Plan (16), revised  6/10/1920
Drawer   12 Folder   7
North Elevation, Grand Boulevard     (not numbered or dated due to print damage)  (sepia print)
Drawer   12 Folder   7
South Elevation, Milwaukee Avenue (18), revised  9/2/1919
Drawer   12 Folder   7
West Elevation, Second Avenue (19), revised  9/2/1919
Drawer   12 Folder   7
Section "A-A" (20), revised  9/2/1919
Drawer   12 Folder   7
Section "B-B" (21), revised  1/3/1922
Drawer   12 Folder   7
Section "C-C" thru' Courts #1, 2 & 4, Looking towards Laboratory (22), revised  7/9/1920
Drawer   12 Folder   7
Section "D-D" thru' Courts # 1, 2 & 4, Looking North (23-R), revised  1/3/1922
Drawer   12 Folder   7
Sections "E-E" and "J-J" (24), revised  1/3/1922
Drawer   12 Folder   7
Elevations of Courts # 2 & 4 and Sections "G-G" and "H-H" (25), revised  5/5/1920
Drawer   12 Folder   7
Section "F-F" thru' Courts # 3 & 7, Looking East (26), revised  5/18/1920
Drawer   12 Folder   7
Section "I-I" thru' Courts # 1 & 8, Looking West (27), revised  1/3/1922
Drawer   12 Folder   7
Details of Driveway (28)     (undated due to linen damage) 
Drawer   12 Folder   7
Details of Main Entrance, West Grand Boulevard (29), revised  9/2/1919 (sepia print)
Drawer   12 Folder   7
Details of Main Entrance (30), revised  9/2/1919
Drawer   12 Folder   7
Details of First Story Windows (31), revised  2/24/1920
Drawer   12 Folder   7
Details of Entrances to Shops on Grand Boulevard and Second and Cass Avenues (32), revised  6/10/1920
Drawer   12 Folder   8
Details of Typical Window Frames and Typical Walls and Spandrels (33), revised  1/3/1922
Drawer   12 Folder   8
Basement Plan, East Half, Future Arrangement (34)     (undated due to linen damage) 
Drawer   12 Folder   8
Wall Sections (34-R), revised  1/3/1922
Drawer   12 Folder   8
Details of Fourteenth and Fifteenth Stories (35), revised  1/3/1922
Drawer   12 Folder   8
Details of Laboratory Entrance Portico, Milwaukee Street Elevation (36), revised  1/3/1922
Drawer   12 Folder   8
Details of Laboratory, Milwaukee Street Elevation (37), revised  7/9/1920
Drawer   12 Folder   8
Details of Laboratory Entrance Steps, Milwaukee Street Elevation (38), revised  7/9/1920
Drawer   12 Folder   8
Detail of Typical Bay for Laboratory (39)     (undated due to linen damage) 
Drawer   12 Folder   8
Details of Connection between Laboratory and Office Building (40), revised  1/3/1922
Drawer   12 Folder   8
Foundation Plan of Stairs, Elevators, etc. of Laboratory Building, Footing Plan of Exterior Columns and Area Walls, and Sections thru' Columns at Basement Floor (41), revised  5/10/1920
Drawer   12 Folder   8
Basement and First Floor Plans of Laboratory Building (42), revised  1/3/1922
Drawer   12 Folder   8
Mezzanine and Second Floor Plans of Laboratory Building (43), revised  1/3/1922
Drawer   12 Folder   8
Plans of Third Floor, Pent Houses at Fifth Floor and North Wall at Fourth Floor of Laboratory Building (44), revised  1/3/1922
Drawer   12 Folder   8
Detail Sections of Elevators L-1 to L-4 and Stairs # 9 (45), revised  1/3/1922
Drawer   12 Folder   8
Cross-Section thru' Laboratory at Fourth Floor, Typical Elevation of Half-Bay and Sections "T-T" and "U-U" thru' Fresh Air Intake and Shaft (46), revised  1/3/1922
Drawer   12 Folder   8
Plans of Stairs # 1 at Basement through Fourth Floors and at East Entrance (47), revised  6/10/1920
Drawer   12 Folder   8
Plans of Stairs # 1 at Eleventh through Fifteenth Floors (48-R),  1/2/1920 revised  9/3/1920
Drawer   12 Folder   9
Details of Elevators "A" to "M" & "Z" and Stairs # 7 & 8 (49), revised  6/10/1920
Drawer   12 Folder   9
Basement Plan of Elevators and Lobby and Details of Freight Elevators (50), revised  7/1920
Drawer   12 Folder   9
Detail Plans of Stairs # 8 & 12 and Elevators "A" to "M" & "W" to "Z" (51), revised  9/1/1920
Drawer   12 Folder   9
Details of Elevators "A" to "M" and Stairs # 2 (52), revised  9/1/1920
Drawer   12 Folder   9
Details of Elevators and Stairs (53), revised  1/3/1922
Drawer   12 Folder   9
Detail Plans of Stairs # 2, 5 & 15 and Elevators "A" to "M" & "Z" (54), revised  6/23/1920
Drawer   12 Folder   9
Plan of Pent House, Plan at Pipe Space and Details of Stairs (55), revised  1/3/1922
Drawer   12 Folder   9
Sections thru' Stairs # 1 & 6, 7 & 8 and 2 & 5 (56), revised  6/10/1920
Drawer   12 Folder   9
Typical Floor Plan Showing Men's Toilet and Stairs # 1 and Elevations and Details of Toilets (57), revised  1/3/1922
Drawer   12 Folder   9
Elevations of Corridors (58), revised  9/1/1920
Drawer   12 Folder   9
Detail Sections of Hollow Metal Doors, Frames and Trim and Section thru' Stair # 15 (59), revised  1/3/1922
Drawer   12 Folder   9
Details of Main Entrance Lobby #104 (60), revised  3/24/1920
Drawer   12 Folder   9
Reflected Ceiling Plans and Elevations of Elevator Lobby and Stairway # 3 (61), revised  9/2/1919
Drawer   12 Folder   9
Elevations and Ceiling Plan of East and West Corridors (62), revised  9/1/1920
Drawer   12 Folder   9
Details of Entrance Lobby # 105 to Laboratory (63), revised  1/3/1922
Drawer   12 Folder   9
Detail Sections thru' Stairs # 10 and Lobby # 210 (64)     (undated due to linen damage) 
Drawer   12 Folder   9
Plan of Sub-Basement and Machine Room (65),  9/9/1919 revised  1/3/1922
Drawer   12 Folder   10
Details of Laboratory Flues (66),  11/12/1919 revised  5/10/1920
Drawer   12 Folder   10
Sections "C-C" and "D-D" thru' Stair # 1 and Elevations and Details for Toilets (67),  1/2/1920 revised  1/3/1922
Drawer   12 Folder   10
Revised Marble and Plaster Work in Stairs # 3 & 4 and Lobbies # 104 & 105 (68),  1/2/1920 revised  2/17/1920
Drawer   12 Folder   10
Detail Sections thru' Stairs # 10 and Lobby # 210, Showing Revised Finish of Plaster and Marble Wainscot (70),  1/3/1920 revised  1/3/1922
Drawer   12 Folder   10
Details of Air Shaft and Revised Details Showing New Location of Two-Part Sliding Doors to Office Building from Driveway (71),  1/6/1920
Drawer   12 Folder   10
Details of West End of Driveway (72), revised  12/11/1920
Drawer   12 Folder   10
Details of Driveway at East End of Building (73),  1/20/1920 revised  12/11/1920
Drawer   12 Folder   10
Details of Doors in Basement (74),  5/11/1920 revised  7/26/1920
Drawer   12 Folder   10
Details of Mailing Room, Monorail and Men Janitors' Locker Room # 5-C (75),  5/11/1920 revised  1/3/1922
Drawer   12 Folder   10
Details of Women's Toilet Room # 21, Toilets # M-8, M-9 & M-13, and Utility Space (76), revised  1/3/1922
Drawer   12 Folder   10
Plan of Mezzanine Floor Utilities Space and Miscellaneous Details (77), revised  1/3/1922
Drawer   12 Folder   10
Basement Plan for Telephone Conduit Layout (78),  undated
Drawer   12 Folder   10
Revisions to Stairs # 8 between Sub-Basement and First Floor and Details of Stairs # 5 (270 & 274),  3/30/1920 revised  7/23/1920
 
Structural Drawings (Ink-on-linen drawings with pencil notations, 37-1/2x47 to 36-1/4x48 inches)
Drawer   12 Folder   11
Column Schedule (1-S), revised  9/2/1919
Drawer   12 Folder   11
Column Schedule (2-S), revised  9/2/1919
Drawer   12 Folder   11
Details of Columns (3-S),  8/11/1919
Drawer   12 Folder   11
Half Framing Plan of First Floor (4-S),  9/22/1919
Drawer   12 Folder   11
Half Framing Plan of Mezzanine Floor, revised  9/22/1919     (not numbered due to linen damage) 
Drawer   12 Folder   11
Half Framing Plan of Second Floor (6-S), revised  9/9/1919
Drawer   12 Folder   11
Third Floor Framing Plan (7-S), revised  9/2/1919
Drawer   12 Folder   11
Typical Floor Half Framing Plan of Fourth to Eleventh Floors (8-S),  6/28/1919 revised  9/10/1919
Drawer   12 Folder   11
Plan of Framing Adjoining Laboratory at First Floor of Laboratory (9-S),  6/28/1919 revised  9/13/1919
Drawer   12 Folder   11
Half Framing Plan of Twelfth and Thirteenth Floors (10-S),  7/1/1919 revised  8/2/1919
Drawer   12 Folder   11
Half Framing Plan of Fourteenth Floor (11-S),  8/1/1919
Drawer   12 Folder   11
Half Framing Plan of Fifteenth Floor (12-S), revised  9/2/1919
Drawer   12 Folder   11
Half Framing Plan of Pipe Gallery     (not numbered or dated due to linen damage) 
Drawer   12 Folder   11
Half Framing Plan of Roof (14-S), revised  9/15/1919
Drawer   12 Folder   11
Wind Bracing Details (15-S), revised  9/6/1919
Drawer   13 Folder   1
Girder Details (16-S),revised  8/6/1919
Drawer   13 Folder   1
Details of Girders and Trusses (17-S), revised  9/23/1919
Drawer   13 Folder   1
Penthouse Roof Plan and Truss Details (18-S), revised  9/16/1919
Drawer   13 Folder   1
Framing Plan of Ground, First, Second and Forty-Third Floors of Laboratory (19-S), revised  9/24/1919
Drawer   13 Folder   1
Framing Plan of Fourth Floor and Penthouses (20-S),  8/2/1919 revised  10/16/1919
Drawer   13 Folder   1
Beam Schedule for Laboratory Building,  10/17/1919     (not numbered due to linen damage) 
Drawer   13 Folder   1
Details of Trusses for Laboratoy (22-S),  8/1/1919 revised  8/15/1919
Drawer   13 Folder   1
Footing Schedule,  8/8/1919 revised 10/8/1919     (not numbered due to linen damage) 
Drawer   13 Folder   1
Details of Retaining Walls of Main Building (24-S),  undated
Drawer   13 Folder   1
Details of Retaining Walls around Sub-Basement (25-S), revised  10/15/1919
Drawer   13 Folder   1
Details of Men's and Women's Swimming Pools (26-S),  undated
Drawer   13 Folder   1
Details of Trusses (27-S)     (undated due to linen damage) 
Drawer   13 Folder   1
Column Schedule (28-S)     (undated due to linen damage) 
Drawer   13 Folder   1
Details of Roof and Pipe Gallery Framing     (not numbered or dated due to linen damage) 
 
Structural "Sketches" (Ink-on-linen drawings with pencil notations)
Drawer   13 Folder   2
Section thru' Vacuum Room of Laboratory Building (112-S),  9/9/1919 revised  9/15/1919 (12-1/2x22-3/4 inches)
Drawer   13 Folder   2
Plan and Revised Layout of Retaining Wall between Columns # 263 & 176A (113-S),  9/12/1919 (10-1/4x34 inches)
Drawer   13 Folder   2
Elevation of Retaining Walls at Driveways (114-S),  9/17/1919 revised  9/18/1919 (17x22 inches)
Drawer   13 Folder   2
Elevation Showing Location of Bolts for Beam Seats for Beams Connecting Laboratory with Durant Building (115-S),  9/29/1919 revised  10/13/1919 (15-1/4x37 inches)
Drawer   13 Folder   2
Elevation Showing Location of Bolts for Beam Seats for Beams Connecting Laboratory with Durant Building (117-S),  10/10/1919 (15-1/2x38-3/4 inches)
Drawer   13 Folder   2
Plan and Section of Proposed Walkway around Testing Machine Opening at Ground Floor Level-Laboratory Building (119-S),  1/10/1920 (14x22 inches)
Drawer   13 Folder   2
Elevation Showing Location of Bolts for Beam Seats for Beams Connecting Laboratory with Durant Building at Second Floor of Laboratory (120-S),  10/13/1919 (14-3/4x38-1/4 inches)
Drawer   13 Folder   2
Elevation Showing Location of Bolts for Beam Seats for Beams Connecting Laboratory with Durant Building at Third Floor of Laboratory (121-S),  10/15/1919 (15x38-1/2 inches)
Drawer   13 Folder   2
Details of Concrete Columns Supporting Steel Girders, Showing Base Plates and Anchor Bolts for Same-Laboratory Building (122-S),  10/21/1919 (13x26-1/4 inches)
Drawer   13 Folder   2
Details of Pipe Sleeves in Laboratory (124-S), 11/4/1919 revised  11/26/1919 (24-1/2x33-1/2 inches)
Drawer   13 Folder   2
Details of Instrument Tower-Laboratory Building (125-S),  11/12/1919 (26x32 inches)
Drawer   13 Folder   2
Plan and Section of Openings in Floors for Steam Risers (128-S), 12/3/1919 (15-1/2x20 inches)
 
Structural Drawings (cont.) (Black and red ink drawings on linen with pencil notations, 24-1/4x30 to 28x43-1/2 inches)
Drawer   13 Folder   3
Changes in Framing at Vents B and F (132-S),  1/19/1920 revised  4/22/1920 (Pencil-on-vellum drawing)
Drawer   13 Folder   3
Plans and Sections of Beams and Girders-Field Work, First and Second Floors (133-S),  1/19/1920 revised  2/20/1920
Drawer   13 Folder   3
Details of Brackets on Columns Supporting Girders and Trusses in Laboratory (136-S),  1/28/1920
Drawer   13 Folder   3
Details of Brackets Supporting Beams, Ground to Fourth Floors (139-S),  2/2/1920 revised  3/12/1920
Drawer   13 Folder   3
Details of Framing for Locker Rooms in Courts # 2 & 4 (140-S),  4/1/1920 revised  4/21/1920
Drawer   13 Folder   3
Details of Concrete Spandrels in Courts # 1 & 5 at Second Floor (141-S),  2/19/1920 revised  3/25/1920
Drawer   13 Folder   3
Details of Bracing for Girder G-36 (143-S),  3/22/1920
Drawer   13 Folder   3
Revised Details of Columns 77, 78 & 96-A at Fourteenth Floor, Elevator "A" (144-S),  4/21/1920
Drawer   13 Folder   3
Plan and Sections of Pit for Elevator "A" and Details of Pipe Chase in Sub-Basement (151-S),  4/20/1920
Drawer   13 Folder   3
Part Plans and Sections of Laboratory Floors over Openings for Tower and Machine Room (154-S),  4/15/1920
Drawer   13 Folder   3
Plans of Stairways # 17-20 (157-S),  4/26/1920 revised 10/6/1920
Drawer   13 Folder   3
Details of New Brackets on Columns 332 & X91-A (160-S),  4/29/1920 revised  5/7/1920
Drawer   13 Folder   3
Plans and Sections of Framing and Footings in Basement Truckway (161-S & 162-S),  5/11/1920 revised  5/22/1920
Drawer   13 Folder   3
Details of Floor over Vacuum Room Opening in Laboratory (165-S),  5/17/1920
Drawer   13 Folder   3
Record of Test Borings (188-S),  9/23/1920
 
Mechanical Drawings,  8/12/1919 (Ink-on-linen drawings with pencil notations, 36x44-1/4 to 36-1/4x48 inches)
Drawer   13 Folder   4
Plot Plan, revised  2/4/1920     (not numbered due to linen damage) 
Drawer   13 Folder   4
Sub-Basement Plan, East Half (2-M), revised 12/6/1920
Drawer   13 Folder   4
Sub-Basement Plan, West Half (3-M), revised  12/27/1922
Drawer   13 Folder   4
Basement Plan, East Half (4-M), revised  5/23/1921
Drawer   13 Folder   4
Basement Plan, West Half (5-M), revised  8/17/1922
Drawer   13 Folder   4
First Floor Plan, East Half (6-M), revised  10/26/1921
Drawer   13 Folder   4
First Floor Plan, West Half (7-M), revised  8/17/1922
Drawer   13 Folder   4
Mezzanine Floor Plan, East Half (8-M), revised  5/23/1921
Drawer   13 Folder   4
Mezzanine Floor Plan, West Half (9-M), revised  2/24/1922
Drawer   13 Folder   4
Second Floor Plan, East Half (10-M), revised  6/16/1920
Drawer   13 Folder   4
Second Floor Plan, West Half (11-M), revised  8/6/1920
Drawer   13 Folder   4
Typical Floor Plan of Floors # 3 to 12, East Half (12-M), revised  6/16/1920
Drawer   13 Folder   4
Typical Floor Plan of Floors # 3 to 13, West Half (13-M), revised  6/18/1920
Drawer   13 Folder   5
Fourteenth Floor Plan, East Half (14-M), revised  5/2/1922
Drawer   13 Folder   5
Fourteenth Floor Plan, West Half (15-M), revised  9/8/1920
Drawer   13 Folder   5
Fifteenth Floor Plan, East Half (16-M), revised  5/2/1922
Drawer   13 Folder   5
Fifteenth Floor Plan, West Half (17-M), revised  6/11/1920
Drawer   13 Folder   5
Pipe Space Plan, East Half (18-M), revised  9/8/1920
Drawer   13 Folder   5
Pipe Space Plan, West Half (19-M), revised  8/5/1920
Drawer   13 Folder   5
Pent House Plan and Vent Riser Details (20-M), revised  8/5/1920
Drawer   13 Folder   5
Drainage Plan, Laboratory (21-M), revised  4/20/1920
Drawer   13 Folder   5
Basement Plan, Laboratory (22-M), revised  8/24/1921
Drawer   13 Folder   5
Ground Floor Plan, Laboratory (23-M), revised  10/21/1921
Drawer   13 Folder   5
First Floor Plan, Laboratory (24-M), revised  10/21/1921
Drawer   13 Folder   5
Second Floor Plan, Laboratory (25-M), revised  8/24/1921
Drawer   13 Folder   5
Third Floor Plan, Laboratory (26-M), revised  8/24/1921
Drawer   13 Folder   6
Fourth Floor Plan, Laboratory (27-M)     (undated due to linen damage) 
Drawer   13 Folder   6
Machine Room Plan (28-M), revised  7/20/1920
Drawer   13 Folder   6
Swimming Pool Details (29-M), revised  1/28/1920
Drawer   13 Folder   6
Piping Diagrams (30-M)     (undated due to linen damage) 
Drawer   13 Folder   6
Piping Details (31-M), revised  5/18/1920
Drawer   13 Folder   6
Tunnel Piping Details (32-M),  9/13/1919 revised  7/6/1920
Drawer   13 Folder   6
Heating Riser Diagram (33-M), revised  6/11/1920
Drawer   13 Folder   6
Heating Riser Diagram (34-M), revised  6/11/1920
Drawer   13 Folder   6
Heating Riser Diagram (35-M), revised  1/31/1920
Drawer   13 Folder   6
Heating Riser Diagram (36-M), revised  10/19/1920
Drawer   13 Folder   6
Heating Riser Diagram (37-M), revised  1/31/1920
Drawer   13 Folder   6
Details of Pipe Shafts (38-M), revised  1/22/1920
 
Electrical Drawings (Ink-on-linen drawings with pencil notations, 36x48 to 36x51 inches)
Drawer   13 Folder   7
Sub-Basement Plan (39-M),  10/10/1919 revised  6/17/1920
Drawer   13 Folder   7
Basement Wiring Plan, East Half (40-M),  1/8/1920 revised  6/17/1920
Drawer   13 Folder   7
Basement Wiring Plan, West Half (41-M),  8/12/1919 revised 11/1/1920
Drawer   13 Folder   7
First Floor Plan (42-M),  10/10/1919 revised  11/26/1920
Drawer   13 Folder   7
Mezzanine Floor Plan (43-M),  10/10/1920 revised  6/1/1920
Drawer   13 Folder   7
Second Floor Plan (44-M),  10/10/1920 revised  5/29/1920
Drawer   13 Folder   7
Typical Floor Plan, East Half, Third to Twelfth Floors (45-M),  6/21/1920 revised  6/25/1920
Drawer   13 Folder   7
Plan of Center Connection between Main Building and Laboratory (46-M),  10/10/1919 revised  6/20/1920
Drawer   13 Folder   7
Fourteenth Floor Lighting Plan, East Half (47-M), revised  1/9/1922
Drawer   13 Folder   7
Fifteenth Floor Lighting Plan, East Half (48-M),  7/17/1920 revised  1/9/1922
Drawer   13 Folder   7
Fifteenth Floor Lighting Plan, West Half (49-M),  7/17/1920 revised  1/9/1922
Drawer   13 Folder   7
Fifteenth Floor and Pipe Space Plan, East Half-Kitchen Wiring (50-M),  1/8/1920 revised  1/9/1922
Drawer   13 Folder   7
Sixteenth Floor and Pipe Space Wiring Plan, West Half-Wiring (51-M),  1/8/1920 revised  1/9/1922     (letter from F. Gossman attached, 1/29/1965) 
Drawer   13 Folder   7
Pent House Plan (52-M),  10/10/1919 revised  3/26/1920
Drawer   13 Folder   8
Basement Plan, Laboratory (53-M),  9/21/1919 revised  1/9/1922
Drawer   13 Folder   8
Ground Floor Plan, Laboratory (54-M),  10/10/1919 revised  1/9/1922
Drawer   13 Folder   8
First Floor Plan, Laboratory (55-M),  10/10/1919 revised  1/9/1922
Drawer   13 Folder   8
Second Floor Plan, Laboratory (56-M),  10/10/1919 revised  1/9/1922
Drawer   13 Folder   8
Third Floor Plan, Laboratory (57-M),  10/10/1919 revised  10/17/1920
Drawer   13 Folder   8
Fourth Floor Plan, Laboratory (58-M),  8/12/1919 revised  1/9/1922
Drawer   13 Folder   8
Light and Power Riser Diagram (59-M),  10/10/1919 revised  1/9/1922
Drawer   13 Folder   8
Plan of Electrical Conduit Lines and Sections of Duct Lines (60-MR), revised  5/21/1920
Drawer   13 Folder   8
Site Plan of Additions to Sewers by Albert Kahn, Architect, Ernest Wilby, Associate (61-M), revised  12/16/1919 (17-1/2x30 inches)
Drawer   13 Folder   8
First Floor Plan, Laboratory by Albert Kahn, Architect, Ernest Wilby, Associate (62-M),  10/22/1919 (17-1/2x31-1/2 inches)
Drawer   13 Folder   8
Layout of Electrical Lab, East End of First Floor (63-M), revised  11/20/1919 (27-1/2x60 inches)
Drawer   13 Folder   8
Plan of Register Openings (64-M),  undated (17-1/2x31-1/2 inches)
Drawer   13 Folder   8
Layout of Electric Sub-Station in Laboratory Basement (64-M), ?/17/1920 revised  7/7/1921 (Pencil-on-paper drawing, 27x38-1/4 inches)
Drawer   13 Folder   8
Details of Power House Tunnel, revised  1/20/1920     (not numbered due to linen damage)  (30-1/4x54 inches)
Drawer   13 Folder   8
Plan Showing Location of Light Outlets in Typical Bays by Albert Kahn, Architect, Ernest Wilby, Associate (66-M),  12/16/1919 (17x30-3/4 inches)
Drawer   13 Folder   8
Riser Diagrams for Low Tension Conduit, Clock and Telephone Systems, Main Building and Laboratory (67-M),  2/3/1920 revised  1/9/1922
 
Mechanical and Electrical Drawings (Ink-on-linen drawings, 36x48 to 36x51 inches)
Drawer   13 Folder   9
Plan of Revised Machine Room Piping (68-M), revised  5/23/1921
Drawer   13 Folder   9
Layout of Sprinkler, Basement (69-M),  undated
Drawer   13 Folder   9
Thirteenth Floor Radiator Plan (70-M),  6/11/1920 revised  1/9/1922
Drawer   13 Folder   9
Thirteenth Floor Lighting Plan, revised  1/9/1922     (not numbered due to linen damage) 
Drawer   13 Folder   9
Detail of Special Manhole Cover (75-M),  6/23/1920 (17-1/2x30-3/4 inches)
Drawer   13 Folder   9
Details of Refrigerator Piping (76-M),  1/9/1922
Drawer   13 Folder   9
Elevations and Details of Laboratory Power Cabinets (77-M), revised  10/17/1920
Drawer   13 Folder   9
Fire Alarm Riser Diagram (80-M),  8/24/1920 (25-1/2x26 inches)
Drawer   13 Folder   9
Thirteenth and Fourteenth Floor Plans (83),  10/18/1920 revised  1/9/1922 (21-1/4x39-3/4 inches)
Drawer   13 Folder   9
Details of Supply and Return Connections to Vento Heaters for Fan Units (85-M),  11/18/1920 (17-1/2x31 inches)
Drawer   13 Folder   9
First Floor Electrical Plan by Albert Kahn Architect and Engineers (88-M), 12/9/1921 revised  1/9/1922
Drawer   13 Folder   9
Electrical Plan of Mezzanine over Sales Rooms # 106-B & 106-C by Albert Kahn Architects and Engineers (89-M),  1/12/1922 revised  1/9/1922
Drawer   13 Folder   9
Mezzanine Floor Electrical Plan by Albert Kahn Architects and Engineers (90-M),  1921 revised  1/9/1922
Drawer   13 Folder   9
First Floor Electrical Plan, West End     (not numbered or dated due to paper damage)  (Pencil-on-paper drawing, 19-3/4x28-1/2 inches)
Drawer   13 Folder   9
Details of Transformer Room No. 1     (not numbered or dated due to linen damage)  (29-1/2x41 inches)
Drawer   13 Folder   9
Details of Transformer Room No. 1,  5/26/1920     (not numbered due to linen damage)  (29-1/2x42 inches)
Drawer   13 Folder   9
Details of Transformer Room No. 2     (not numbered or dated due to linen damage)  (29-1/2x40-1/4 inches)
Drawer   13 Folder   9
Details of Transformer Room No. 2 (48-M),  5/20/1920 (30x41 inches)
 
The New Temple Beth El, Detroit, Michigan,  1920-1922, Job No. 821 [subseries]:
 
Construction Drawings by Albert Kahn, Architect,  undated (Ink-on-linen drawings, 26x33 inches)
 
Architectural Drawings
Drawer   4 Folder   1
Plot Plan (1),  4/18/1921 revised  5/17/1921
Drawer   4 Folder   1
Foundation Plan (2),  5/3/1921 revised  5/17/1921
Drawer   4 Folder   1
Basement Plan (3), revised  5/4/1922
Drawer   4 Folder   1
First Floor Plan (4), revised  2/14/1922
Drawer   4 Folder   1
Second Floor Plan (5), revised  2/14/1922
Drawer   4 Folder   1
Third Floor Plan (6), revised  2/14/1922
Drawer   4 Folder   1
Fourth Floor Plan (7), revised  2/14/1922
Drawer   4 Folder   1
Roof Plan (8),  11/11/1920 revised  5/17/1921
Drawer   4 Folder   1
Woodward Avenue and Gladstone Avenue Elevations (9), revised  5/17/1921
Drawer   4 Folder   1
Rear and North Elevations (10), revised 2/14/922
Drawer   4 Folder   1
Cross-Section, Main Auditorium, and Longitudinal Section (11), revised  5/17/1921
Drawer   4 Folder   1
Elevations of Basement Lobby and Sections C-C, D-D and E-E (12), revised  2/14/1922
Drawer   4 Folder   1
Exterior Details (13), revised  5/17/1921
Drawer   4 Folder   2
Plan of Columns, Door Elevations and Window Details (14), revised  5/17/1921
Drawer   4 Folder   2
Half-Plan of Ceiling under Balcony and Views Looking East and West (15), revised  2/14/1922
Drawer   4 Folder   2
South Elevation of Main Auditorium Line A-A and Elevations of Lobby #101 (16), revised  2/14/1922
Drawer   4 Folder   2
Corridor Elevations and Details of Men's Room #110 and Ladies Room #105 (18), revised  5/17/1921
Drawer   4 Folder   2
Interior Details of Assembly Room (19), revised  2/14/1922
Drawer   4 Folder   2
Details of Windows and Wardrobes in Class Rooms (20),  11/11/1920 revised  5/17/1921
Drawer   4 Folder   2
Details of Stair #3 (21), revised  5/17/1921
Drawer   4 Folder   2
Details of Main Stairs #2 (22),  11/11/1920 revised  5/17/1921
Drawer   4 Folder   2
Details of Passenger and Freight Elevators, Library Bookshelves and Dumbwaiter (23), revised  2/14/1922
Drawer   4 Folder   2
Details of Dining Room #1 and Women's and Men's Showers (24), revised  2/14/1922
Drawer   4 Folder   2
Revised Layout of Organ Space and Choir Gallery (30),  2/8/1922 (18x29 inches)
Drawer   4 Folder   2
West and South Elevations (38),  9/28/1922 revised  10/18/1922 (13x33 inches)
 
Structural Drawings
Drawer   4 Folder   3
Roof Framing Plan (1-S), revised  8/13/1921
Drawer   4 Folder   3
Fourth Floor Plan (2-S), revised  5/17/1921
Drawer   4 Folder   3
Third Floor Framing (3-S), revised  9/28/1921
Drawer   4 Folder   3
Second Floor Plan (4-S), revised  2/24/1922
Drawer   4 Folder   3
First Floor Framing (5-S), revised  8/20/1921
Drawer   4 Folder   3
Columns and Footings (6-S), revised  8/17/1921
Drawer   4 Folder   3
Truss Details (7-S), revised  8/13/1921
Drawer   4 Folder   3
Steel and Concrete Girders (8-S), revised  5/17/1921
Drawer   4 Folder   3
Main Dome Rib, Balcony Framing, Truss T2 and Details of Column Bases (9-S), revised  5/17/1921
 
Mechanical Drawings,  12/22/1920
Drawer   4 Folder   3
Foundation Plan (1M), revised  8/17/1921
Drawer   4 Folder   3
Basement Plan (2M), revised  2/8/1922
Drawer   4 Folder   3
First Floor Plan (3M), revised  6/2/1921
Drawer   4 Folder   3
Second Floor Plan (4M), revised  6/2/1921
Drawer   4 Folder   3
Third Floor Plan (5M), revised  6/2/1921
Drawer   4 Folder   3
Fourth Floor Plan (6M), revised  3/7/1922
Drawer   4 Folder   3
Detail of Ventilating Equipment in Basement (7M), revised  8/17/1921
Drawer   4 Folder   3
Heating Riser Diagram and Details (8M), revised  6/2/1921
Drawer   4 Folder   3
Boiler Room (9M), revised  8/17/1921
 
William L. Clements Library, University of Michigan, Ann Arbor,  1921-1922, Job No. 1001 & 1001-B [subseries]:
 
Program Document
Drawer   4 Folder   4
Campus of the University of Michigan at Ann Arbor [Site Plan] by Rippey and Newton,  8/27/1897 (Ink-on-linen drawing, 35x29 inches)
 
Design Development (Block Plans) Drawings by Albert Kahn, Architect,  undated (Ink-on-linen drawings, 20x20 inches)
Drawer   4 Folder   4
Basement Plan
Drawer   4 Folder   4
First Floor Plan
Drawer   4 Folder   4
Second Floor Plan
 
Construction Drawings by Albert Kahn, Architect (Ink-on-linen drawings, 27x42 inches)
 
Architectural Drawings,  12/14/1921
Drawer   4 Folder   4
Plot Plan (1), revised  5/23/1922
Drawer   4 Folder   4
Basement Plan and First Floor Plan (2)
Drawer   4 Folder   4
Attic Plan and Second Floor Plan (3)
Drawer   4 Folder   4
North, South and East Elevations and Section A-A (4), revised  12/24/1921
Drawer   4 Folder   4
Section thru' Window at Each Side of Entrance, Section on Line A-A, Elevation of Loggia and Section thru' Loggia (5)
Drawer   4 Folder   4
Detail Plans of Loggia, Details of Terrace Steps and Railing and Details of Fan Room (6)
Drawer   4 Folder   4
Plans and Sections of Windows in Main Reading Room, in Alcove and on North Elevation (7), revised  12/24/1921
Drawer   4 Folder   4
Details of Main Reading Room and Custodian's Room (8)
Drawer   4 Folder   4
Details of Main Reading Room, Rare Book Room, Men's and Women's Toilet, Balcony, Main Entrance-Vestibule, Doors and Windows (9)
Drawer   4 Folder   4
Details of Stairs and Dumb Waiter Door (10)
Drawer   4 Folder   4
Alternate Scheme for Approach (11), revised  12/24/1921
Drawer   4 Folder   4
Plan for New Pavement (3),  9/11/1925 (Pencil-on-vellum drawing, 18x23 inches)
 
Structural Drawings,  12/14/1921
Drawer   4 Folder   5
Roof and Ceiling Framing Plans and Truss Details (1S)
Drawer   4 Folder   5
First and Second Floor Framing Plan (2S)
 
Mechanical Drawings,  8/23/1921
Drawer   4 Folder   5
Basement and Foundation Plans (1M), revised 12/6/1921
Drawer   4 Folder   5
First and Second Floor Plans (2M), revised 12/6/1921
Drawer   4 Folder   5
Attic Plan (3M), revised 11/9/1921
Drawer   4 Folder   5
Ventilating Equipment by Albert Kahn, Inc., Architects & Engineers (1M), Job No. 1001-B,  10/11/1928
 
Ford Motor Company Glass Manufacturing Plant, River Rouge, Michigan,  1922-1923, Job No.  1071 [subseries]:
 
Construction Drawings by Albert Kahn, Architect (Ink-on-linen drawings, 28x63 inches)
 
Architectural Drawings,  10/9/1922
Tube   6  
[Site Plan], untitled (1)
Tube   6  
Foundation Plan (2), revised  5/23/1923
Tube   6  
First Floor Plan (3), revised  6/27/1923
Tube   6  
Roof Plan (4),  11/23/1922
Tube   6  
Elevations (5), revised  11/23/1922
Tube   6  
Sections thru' Main Building (6), revised  5/2/1923
Tube   6  
Plans of Storage Bins, Cross-Section thru' Furnace Room and Details (7), revised  5/23/1923 (One drawing and one electrostatic print on mylar)
Tube   6  
Details of Conveyor Bin, Rolling Curtain, Railroad Tracks and Exterior (8), revised  5/23/1923
Tube   6  
Details of Storage Bins and Conveyor Pits (9), revised  11/23/1922
Tube   6  
Details of Balcony, Sand Tanks, Toilets, Stairs and Loading Platform (10), revised  8/1/1923
Tube   6  
Details of Roof and Wall Sections (11), revised  11/23/1922
Tube   6  
Plans and Elevations of Sub-Station No. 9 (19-A), undated, revised  11/23/1923 (28-1/4x32-1/4 inches)
Tube   6  
Sections and Stair Details of Sub-Station No.9 (19-B), undated, revised  2/12/1923 (28-1/2x33-1/4 inches)
Tube   6  
General Plan of Grinder Foundations (20),  2/5/1923 revised  11/19/1923 (22-1/2x40-3/4 inches)
 
Structural Drawings,  undated
Tube   7  
Roof Plan and Column and Footing Schedules (1-S), revised  11/11/1922
Tube   7  
Sections (2-S), revised  11/23/1922
Tube   7  
Sections (3-S), revised  11/11/1922
Tube   7  
Plans of Balcony, Charging Floor and Toilets (4-S), revised  11/27/1922
Tube   7  
Elevations (5-S), revised  11/11/1922
Tube   7  
Plans and Sections of Concrete Storage Bins (6-S), revised  11/11/1922
Tube   7  
Details of Connections to Concrete Bins (7-S), revised  11/11/1922
 
Mechanical Drawings
Tube   7  
Foundation Plan (1M),  12/22/1922 revised  3/27/1923
Tube   7  
First Floor Plan and Section "AA" (2M), 11/3/1922 revised  3/27/1923
Tube   7  
First Floor Plan and Sections "AA" & "BB" (3M), undated, revised  7/6/1923
Tube   7  
Heating Plan (4M),  12/29/1922 revised  5/2/1923
 
Ford Motor Company Engineering Laboratory, Dearborn, Michigan,  1922-1926 1929-1930, Job Nos. 1077 1077-K, 1077-L & 1077-S [subseries]:
 
Engineering Laboratory Building by Albert Kahn, Architect (1922-1924) Job No. 1077
 
Architectural Construction Drawings,  9/14/1922 (Ink-on-linen drawings with pencil and blue and orange pencil revisions, 30-1/4x56-3/4 to 30-1/4x59-1/2 inches)
Tube   8  
Plot Plan (1A), revised  6/13/1923
Tube   8  
Foundation Plan and Schedule of Columns and Footings (1), revised  6/13/1923
Tube   8  
Basement Plan (2), revised  6/6/1923
Tube   8  
First Floor and Basement Plans (3), revised  6/13/1923
Tube   8  
Second Floor and Roof Plans (4), revised  4/25/1923
Tube   8  
Details of Monitors and Columns (5), revised  4/25/1923
Tube   8  
East and West Elevations, Sections and Details (6), revised  4/25/1923
Tube   8  
North, South, East and West Elevations (7), revised  6/19/1923
Tube   8  
Details of Front-Center (8), revised 10/6/1923
Tube   8  
Details of End Features (9), undated, revised  5/2/1923
Tube   8  
Details of Pylons and East Elevation (10), revised  4/25/1923
Tube   8  
Details of Toilet and Fan Rooms (11R),  6/24/1924 revised  7/14/1924
Tube   8  
Basement Wall Details (14),  6/19/1923 (30x28 inches)
 
Structural Construction Drawings (Ink-on-linen drawngs with red and blue pencil revisions, 30x56-1/2 to 30x57-1/2 inches)
Tube   9  
First Floor Framing Plan (11-S), undated, revised  7/27/1923
Tube   9  
Details of First Floor Beams (12-S),  5/29/1923 revised  8/16/1923
Tube   9  
Details of Concrete Columns (13-S), undated, revised  6/13/1923
Tube   9  
Second Floor and Roof Framing Plans and Truss Details (14-S),  5/21/1923
Tube   9  
Roof Framing Plan, Cross-Section and Beam Schedule (15-S),  undated
Tube   9  
Details of Roof Girders (16-S), undated, revised  7/31/1923
Tube   9  
Details of Roof Beams (17-S),  2/19/1923 revised  8/9/1923
Tube   9  
Details of Beams     (not numbered or dated due to linen damage) 
Tube   9  
Foundation and Floor Plans of Printing Press and Paper Storage Rooms (18),  8/2/1923
Tube   9  
Basement Floor Plan, Plans and Details of Office Building and Fan Rooms (19-S),  8/1/1923
Tube   9  
Details of Transformer Rooms (21-S),  12/19/1923 (Pencil-on-vellum drawing, 19-1/2x36 inches)
 
Mechanical Construction Drawings (Black and red ink-on-linen drawings with pencil and blue pencil revisions, 30-1/4x57-1/2 inches)
Tube   9  
Plans of Basement and Fan Rooms (2M), revised  6/13/1924     (undated due to linen damage) 
Tube   9  
First and Second Floor Plans and Details (3M),  5/16/1923 revised  6/18/1924
Tube   9  
Ventilating Details (4M),  6/27/1923 revised  9/24/1923
Tube   9  
Second Floor, Attic Space and Exhaust Fan Plans (5M),  10/10/1922 revised  7/3/1924
Tube   9  
Basement Electrical Plan (7M),  6/19/1923 revised  3/20/1924
Tube   9  
First Floor, Second Floor and Attic Space Electrical Plans (8M), revised  4/18/1924     (undated due to linen damage)  (31x56 inches)
Tube   9  
First and Second Floor Heating and Ventilating Plans (10M),  2/6/1924 revised  7/8/1924 (30-3/4x46 inches)
Tube   9  
Revised First and Second Floor Lighting Layout in Office Portion of Laboraory (11M), undated, revised  4/18/1924 (25-1/2x49-1/4 inches)
Tube   9  
Revised First Floor Lighting Layout in Office Portion of Laboratory (100M), undated, revised  2/20/1924 (22x54-1/2 inches)
Tube   9  
Plan and Longitudinal Elevation (117M)     (undated due to linen damage)  (24-3/4x55 inches)
 
Extension to Engineering Laboratory Building (1925) Job No. 1077-L
 
Architectural Construction Drawings by Albert Kahn, Inc., Architects,  4/29/1925 revised  9/11/1925 (Ink-on-linen drawings, 29x45-1/2 inches)
Drawer   9 Folder   10
Plot Plan (1)
Drawer   9 Folder   10
Present Floor Plan (1-A),  7/1/1925 (Pencil-on-vellum drawing, 28x44 inches)
Drawer   9 Folder   10
Present Building Foundation Plan (2), revised  8/7/1925
Drawer   9 Folder   10
First Floor Plan (3)
Drawer   9 Folder   10
Roof Plan (4)
Drawer   9 Folder   10
Elevations and Sections (5)
Drawer   9 Folder   10
Door Details (6)
Drawer   9 Folder   10
Roof Details (7)
Drawer   9 Folder   10
Elevations of Connecting Passage and Details (8)
 
Structural Construction Drawings by Albert Kahn, Inc., Architects (Ink-on-linen drawings)
Tube   9  
Typical Cross Section and Details (1-S), undated, revised  July 1925 (26-1/4x47-1/2 inches)
Tube   9  
Roof Framing Plan (2-S)     (undated due to linen damage)  (27-1/2x54-1/4 inches)
Tube   9  
Cross-Section Showing Alternate Design for Roof (3-S), undated, revised  7/3/1925 (27-1/4x56 inches)
 
Mechanical Construction Drawings by Albert Kahn, Inc., Architects (Ink-on-linen drawings with blue pencil revisions)
Drawer   10 Folder   1
First Floor Plan, Section "AA" and Details (2-M),  5/20/1925 revised  10/28/1925 (30x48 inches)
Drawer   10 Folder   1
Heating Details, etc. (3-M),  5/20/1925 revised  9/24/1925 (30-1/4x47-1/2 inches)
Drawer   10 Folder   1
First Floor Plan (4-M), undated, revised 11/9/1925 (29-1/2x48 inches)
Drawer   10 Folder   1
Plan of Ventilating Equipment (6-M), undated, revised  12/19/1925 (29x35-1/4 inches)
Drawer   10 Folder   1
Plan, Sections and Riser Detail of Cleaning Plant (7-M),  12/12/1925 (24-3/4x36-1/2 inches)
Drawer   10 Folder   1
Proposed Arrangement of Cafeteria (9-M),  12/28/1925 (29-3/4x35-1/2 inches)
Drawer   10 Folder   1
Part of Mezzanine and First Floor Plans (10-M), undated, revised  3/1/1926 (26-3/4x33-3/4 inches)
Drawer   10 Folder   1
Connection Plan of Cafeteria (101-M), 12/4/1925 (25-1/4x30-1/2 inches)
 
Addition to Power House, Engineering Laboratory Building (1923-1926) Job No. 1077-K
 
Architectural Construction Drawings by Albert Kahn, Architect,  8/22/1923 revised  7/1/1925 (Ink-on-linen drawings, 27x37-1/2 inches)
Drawer   10 Folder   2
Plot Plan (1)
Drawer   10 Folder   2
Basement Plan (2)
Drawer   10 Folder   2
First Floor Plan (3)
Drawer   10 Folder   2
Roof Plan (4)
Drawer   10 Folder   2
Elevations (5)
Drawer   10 Folder   2
Sections (6)
Drawer   10 Folder   2
Section "C" and Details of Monitor, etc. (7)
 
Structural Construction Drawings by Albert Kahn, Inc., Architect,  8/28/1923 revised  7/1/1925 (Ink-on-linen drawings, 26-3/4x37 inches)
Drawer   10 Folder   2
Foundation Plan and Sections (1-S)
Drawer   10 Folder   2
Boiler Room Framing Plan and Sections (2-S)
Drawer   10 Folder   2
Roof Framing Plan and Details (3-S)
Drawer   10 Folder   2
Details of New Platforms around Boilers (4-S),  1/6/1926 revised  3/13/1926 (Pencil-on-vellum drawing, 25-x34-1/2 inches)
Drawer   10 Folder   2
Layout of Walkways over Boilers (5-S),  1/6/1926 revised  3/16/1926 (26x40 inches)
Drawer   10 Folder   2
Details of First Floor Hand Rails (6-S),  3/16/1926 (26x45 inches)
 
Mechanical Construction Drawings by Albert Kahn, Inc., Architects and Engineers (Ink-on-linen drawings with pencil and blue pencil revisions, 26-1/4x45-1/2 inches)
Drawer   10 Folder   3
First Floor Plan (1-M),  6/16/1925
Drawer   10 Folder   3
Basement Floor Plan and Section "A-A" (2-M),  6/17/1925
Drawer   10 Folder   3
Sections thru' Power House (3-M),  6/16/1925
Drawer   10 Folder   3
Details of Feed Water Heater, Water Softener and Misc. Piping (4-M),  6/17/1925 revised  12/23/1925
Drawer   10 Folder   3
Details of Tunnel Piping Layout and Sump (5-M),  6/17/1925
Drawer   10 Folder   3
Details of Platform for Feed Water Heater and Breeching for Badenhauser Boilers (6-M),  6/19/1925
Drawer   10 Folder   3
Details of Setting for Badenhausen Boiler (7-M),  6/19/1925
Drawer   10 Folder   3
Drainage Plan (8-M),  6/18/1925
Drawer   10 Folder   3
Details of Jackets for Stacks and Breeching (9-M),  4/23/1926 (25-1/2x44-3/4 inches)
 
Addition to the Power House, Engineering Laboratory Building (1929-1930) Job No. 1077-S
 
Architectural Construction Drawings by Albert Kahn , Inc., Architects,  10/14/1929 (Ink-on-linen drawings with pencil and blue pencil revisions, 27x38 inches)
Drawer   10 Folder   4
Plot Plan and Details (1), revised  12/19/1929
Drawer   10 Folder   4
Foundation Plan and Details (2), revised  3/17/1930
Drawer   10 Folder   4
First Floor Plan and Details (3), revised  12/12/1929
Drawer   10 Folder   4
Roof Plan and Stack Details (4), revised  3/11/1930
Drawer   10 Folder   4
Sections (5), revised  12/12/1929
Drawer   10 Folder   4
Elevations (6), revised  11/12/1929
Drawer   10 Folder   4
Elevation at Northeast Corner of Building and Details (7), revised  12/12/1929
Drawer   10 Folder   4
Plot Plan and Tunnel Details (8), revised  12/19/1929
Drawer   10 Folder   4
North Elevation of Power House Showing Arrangement of Floodlights (10),  February 1930 (Pencil-on-vellum drawing, 29-3/4x24-3/4 inches)
Drawer   10 Folder   4
Details of Addition to Present Tunnel (13),  4/28/1930 (Pencil-on-vellum drawing, 27-3/4x36 inches)
Drawer   10 Folder   4
Plot Plan of Proposed Addition (100),  7/26/1929 (19x28-1/2 inches)
Drawer   10 Folder   4
[Plot Plan of] Proposed Addition (100-B),  7/25/1929 (18-3/4x33 inches)
Drawer   10 Folder   4
[Plot Plan of] Proposed Addition (100-C),  7/25/1929 (18-1/2x33-1/4 inches)
 
Structural Construction Drawings by Albert Kahn, Inc., Architects,  10/14/1929 (Ink-on-linen drawings with pencil and blue pencil revisions, 26-1/2x38 inches)
Drawer   10 Folder   5
Roof Framing Plan, Sections and Details (1-S), revised  11/21/1929
Drawer   10 Folder   5
Elevations and Sections (2-S), revised  4/7/1930
Drawer   10 Folder   5
Foundation Plan and Sections (3-S), revised  12/19/1929
Drawer   10 Folder   5
Underpinning and Footing Details (4-S), revised  11/21/1929
Drawer   10 Folder   5
Details of Walkways (7-S),  1/28/1930 revised  5/9/1930
Drawer   10 Folder   5
Stack Details (8-S),  3/7/1930 revised  7/8/1930 (Pencil-on-vellum drawing, 26x37-1/4 inches)
 
Mechanical Construction Drawings by Albert Kahn, Inc., Architects and Engineers (Ink-on-linen drawings with pencil revisions, 30-1/2x42-1/2 inches)
Drawer   10 Folder   6
Details of Tunnel Piping (2-M),  10/14/1929 revised 11/6/1929
Drawer   10 Folder   6
Details of Tunnel Piping (3-M),  10/16/1929 revised  1/10/1930
Drawer   10 Folder   6
Plan of Underground Lines (4-M),  11/12/1929 revised  1/9/1930
Drawer   10 Folder   6
First Floor Plan of Boiler Room (5-M), 12/9/1929 revised  5/22/1930
Drawer   10 Folder   6
Cross-Section and Elevation of Main Steam Header (6-M),  12/24/1929
Drawer   10 Folder   6
Details of Boiler Feed Heater and Auxiliaries (7-M),  12/18/1929 revised  8/25/1930
Drawer   10 Folder   6
Elevation and Sections of Boiler Setting (8-M),  6/9/1930
Drawer   10 Folder   6
Sections of Oil Storage Tanks (9-M),  2/4/1930
Drawer   10 Folder   6
Plan and Sections of Oil Burner Piping (10-M),  1/18/1930
Drawer   10 Folder   6
Breeching Details (11-M),  undated
Drawer   10 Folder   6
Plan and Section of Equalizing Pipe Line between East and West Pond (13-M),  2/26/1930 revised  3/15/1930
Drawer   10 Folder   6
Details of Tunnel Lighting and Power Conduit (1-E),  11/23/1929 revised  11/29/1929 (27x40 inches)
 
Mechanical Construction Drawings by Albert Kahn, Inc., Architects and Engineers (Pencil-on-vellum drawings, 29-1/2x41-1/2 inches)
Drawer   10 Folder   7
Details of Rearrangement of Piping in Tunnel #3 (15-M),  3/27/1930
Drawer   10 Folder   7
Details of Transite Boiler (17-M)     (undated due to paper damage) 
Drawer   10 Folder   7
Details of Transite Casing (18-M),  5/1/1930
Drawer   10 Folder   7
Details of Power House Gage Board (19-M),  undated
Drawer   10 Folder   7
[Piping Details], untitled due to paper damage     (undated due to damage) 
Drawer   10 Folder   7
Details of Foundation for Fan     (undated due to damage) 
Drawer   10 Folder   7
Details of Instrument Piping (22-M),  undated
Drawer   10 Folder   7
Details of Arrangement of Water Softener (119-M),  undated (27x33-3/4 inches)
Drawer   10 Folder   7
Plan and Sections of Oil Storage Tanks (121-M),  11/24/1930 (21-3/4x34 inches)
Drawer   10 Folder   7
Details of Oil Ret'n to Tanks, Scheme No. 1 (100-X),  10/29/1930
Drawer   10 Folder   7
[Details of Oil Ret'n to Tanks], untitled (100-X-M),  undated (29-1/2x35-1/2 inches)
 
Psi Upsilon Fraternity House, University of Michigan, Ann Arbor,  1924-1925, Job No. 1200-A [subseries]:
 
Construction Drawings by Albert Kahn, Inc., Architect
 
Architectural Drawings, undated, revised  2/21/1925 (Ink-on-linen drawings with pencil and blue pencil revisions, 25x34 inches)
Drawer   10 Folder   8
Plot Plan (1), revised  4/21/1925
Drawer   10 Folder   8
Basement Plan (2), revised  1/5/1925
Drawer   10 Folder   8
First Floor Plan (3
Drawer   10 Folder   8
Second Floor Plan (4
Drawer   10 Folder   8
Third Floor Plan (5)
Drawer   10 Folder   8
Roof Plan (6)
Drawer   10 Folder   8
North Elevation (7)
Drawer   10 Folder   8
South Elevation and Details (8)
Drawer   10 Folder   8
East and West Elevations (9), revised  1/5/1925
Drawer   10 Folder   8
Sections and Miscellaneous Details (10), revised  1/5/1925
Drawer   10 Folder   8
Interior Details(11), revised  1/5/1925
Drawer   10 Folder   8
Interior Details (12), revised  1/5/1925
Drawer   10 Folder   8
Details for Living Room (14),  2/5/1925 (Pencil-on-vellum drawing, 20-3/4x35 inches)
Drawer   10 Folder   8
Details for Solarium and Lobby (17),  3/19/1925 (Pencil-on-vellum drawing, 19-1/2x42 inches)
Drawer   10 Folder   8
Details for Library on Second Floor (19),  4/4/1925 (Pencil-on-vellum drawing, 20x26 inches)
Drawer   10 Folder   8
Details for Main Stairway (20-A),  4/27/1925 revised  6/24/1925 (Pencil-on-vellum drawing, 26-1/2x28-1/2 inches)
Drawer   10 Folder   8
Details for Main Stairway (20-B),  4/27/1925 (Pencil-on-vellum drawing, 21x17 inches)
 
Structural Drawings,  10/17/1924 revised  2/27/1924 (Pencil-on-vellum drawings, 24x33 inches)
Drawer   10 Folder   9
Basement and Foundation Plan (1-S)
Drawer   10 Folder   9
First Floor Framing Plan (2-S)
Drawer   10 Folder   9
Second Floor Framing Plan (3-S)
Drawer   10 Folder   9
Third Floor Framing Plan (4-S), revised  3/19/1925
Drawer   10 Folder   9
Roof Framing Plan (5-S), revised  3/19/1925
 
Mechanical Drawings, 12/3/1924 revised  4/4/1925 (Ink-on-linen drawings, 25x34 inches)
Drawer   10 Folder   9
Basement Plan (1-M)
Drawer   10 Folder   9
First Floor Plan (2-M)
 
The Thomas Henry Simpson Memorial Institute for Medical Research, Ann Arbor, Michigan,  1925-1926, Job. No. 1239 [subseries]:
 
Construction Drawings by Albert Kahn, Inc., Architects (Ink-on-linen drawings, 24x34 inches)
 
Architectural Drawings,  4/22/1925 revised  5/26/1925
Drawer   4 Folder   6
Plot Plan (1)
Drawer   4 Folder   6
Foundation Plan (2)
Drawer   4 Folder   6
Sub-Basement Plan (3), revised 10/1/1925
Drawer   4 Folder   6
Basement Plan (4)
Drawer   4 Folder   6
First Floor Plan (5), revised  9/25/1925
Drawer   4 Folder   6
Second Floor Plan (6)
Drawer   4 Folder   6
Third Floor Plan (7)
Drawer   4 Folder   6
Fourth Floor Plan (8)
Drawer   4 Folder   6
Roof Plan (9)
Drawer   4 Folder   6
Elevations (10)
Drawer   4 Folder   6
Detail of Center Bays (11)
Drawer   4 Folder   6
Scale Details of Exterior (12)
Drawer   4 Folder   6
Sections (13)
Drawer   4 Folder   6
Details (14)
Drawer   4 Folder   6
West Elevation of Corridors (15)
Drawer   4 Folder   6
East Elevation of Corridors (16)
Drawer   4 Folder   6
Interior Details (17)
 
Structural Drawings,  4/22/1925 revised  5/14/1925
Drawer   4 Folder   7
Basement Framing Plan; Column and Footing Schedule (1-S)
Drawer   4 Folder   7
First Floor Framing Plan (2-S)
Drawer   4 Folder   7
Second Floor Framing Plan (3-S)
Drawer   4 Folder   7
Third Floor Framing Plan (4-S)
Drawer   4 Folder   7
Fourth Floor Framing Plan (5-S), revised  6/12/1925
 
Mechanical Drawings,  5/13/1925
Drawer   4 Folder   7
Plot Plan (1M)
Drawer   4 Folder   7
Foundation Plan (2M), revised  1/15/1926
Drawer   4 Folder   7
Sub-Basement Plan (3M), revised  1/15/1926
Drawer   4 Folder   7
Basement Plan (4M), revised  1/15/1926
Drawer   4 Folder   7
First Floor Plan (5M), revised  1/15/1926
Drawer   4 Folder   7
Second Floor Plan (6M), revised  1/15/1926
Drawer   4 Folder   7
Third Floor Plan (7M), revised  10/10/1925
Drawer   4 Folder   7
Fourth Floor Plan (8M)
Drawer   4 Folder   7
Heating Riser Diagram (9M)
Drawer   4 Folder   7
Electric Feeder Layout (10M),  9/1/1925
 
University Museums, Ann Arbor, Michigan, Michigan,  1926-1927, Job No. 1319 [subseries]:
 
Construction Drawings by Albert Kahn, Inc. Architects (Ink-on-linen drawings, some with blue pencil revisions, 35x51-1/2 inches)
 
Architectural Drawings,  12/20/1926
Tube   10  
Plot Plan (1), revised  5/9/1927
Tube   10  
Foundation Plan (2), revised  2/25/1927
Tube   10  
Basement Floor Plan (3), revised  5/9/1927
Tube   10  
First Floor Plan (4), revised  5/3/1927
Tube   10  
Second Floor Plan (5), revised  8/17/1927
Tube   10  
Third Floor Plan (6), revised  8/17/1927
Tube   10  
Fourth Floor and Roof Plans (7), revised  8/17/1927
Tube   10  
Elevations # 1, 2 & 3 (8), revised  5/9/1927
Tube   10  
Elevations # 4,5,6,7 & 8 (9), revised  1/6/1927
Tube   10  
Detail of Exterior Elevation # 2 (10), revised  1/6/1927
Tube   10  
Details of Exterior Elevations # 1 & 3 (11), revised  1/6/1927
Tube   10  
Details of Exterior Elevations # 5, 6 & 7 (12), revised  1/6/1927
Tube   10  
Plan of Stair # 1 and Main Lobby (13), revised  5/3/1927
Tube   10  
Interior Elevations (14), revised  1/6/1927
Tube   10  
Miscellaneous Details (15), revised  3/31/1927
 
Structural Drawings,  12/20/1926 revised  1/6/1927
Tube   10  
Column Schedule and Details (1-S)
Tube   10  
First Floor Framing Plan (2-S)
Tube   10  
Second Floor Framing Plan (3-S)
Tube   10  
Third Floor Framing Plan (4-S)
Tube   10  
Fourth Floor Framing Plan (5-S)
Tube   10  
Roof Framing Plan (6-S), revised  6/1/1927
 
Mechanical Drawings,  12/27/1926
Tube   11  
Foundation Plan (1-M), revised  2/11/1927
Tube   11  
Basement Plan (2-M), revised  3/23/1927
Tube   11  
First Floor Plan (3-M)
Tube   11  
Second Floor Plan (4-M), revised  1/26/1927
Tube   11  
Third Floor Plan (5-M), revised  1/26/1927
Tube   11  
Fourth Floor Plan (6-M)
Tube   11  
Pipe Space Plan (7-M), revised  3/24/1927
Tube   11  
Heating Riser Plan (8-M)
 
Electrical Drawings,  2/22/1927
Tube   11  
Basement Plan (9-MR), revised  3/24/1927
Tube   11  
First Floor Plan (10-MR), revised  3/24/1927
Tube   11  
Second Floor Plan (11-MR), revised  8/17/1927
Tube   11  
Third Floor Plan (12-MR), revised  8/17/1927
Tube   11  
Fourth Floor Plan (13-MR), revised  8/17/1927
 
Edsel B. Ford Residence, Gaukler Pointe, Michigan,  1926-1932 and  1977-1991, Jobs No. 1334 & 1334-A, B, C, D, E, F, H, L, V, W, AA, AB & AD [subseries]:
 
Edsel B. Ford Residence (Job No. 1334)
 
Design Development Drawings (Block Plans) (Ink-on-linen drawings, 25-1/2x34 inches)
Drawer   4 Folder   8
First Floor Plan,  undated
Drawer   4 Folder   8
Second Floor Plan,  1/23/1931
 
Architectural Construction Drawings by Albert Kahn, Inc., Architects, 11/4/1926     (Prints of originals in Drawer 4, Folder 9)  (Ink-on-linen drawings with pencil revisions, 29x39-1/2 inches)
Drawer   4 Folder   8
Part Plan of the Estate of Edsel B. Ford, Esq.,  1/18/1927     (in Oversized Tube 12)  (31-3/4x59 inches)
Drawer   4 Folder   8
Plot Plan (1), revised  4/12/1927
Drawer   4 Folder   8
Excavation Plan (1-A), undated, revised  4/12/1927
Drawer   4 Folder   8
Wall Footing Plan (2), revised  8/8/1927
Drawer   4 Folder   8
Basement Plan (3), revised  7/19/1927
Drawer   4 Folder   8
First Floor Plan (4), revised  1/30/1928
Drawer   4 Folder   8
Second Floor Plan (5), revised  1/30/1928
Drawer   4 Folder   8
Attic Floor Plan (6), revised  3/3/1928
Drawer   4 Folder   8
Roof Plan (7), revised  4/12/1927
Drawer   4 Folder   8
First Floor Plan-Portion "A" (8), revised  3/1/1928
Drawer   4 Folder   8
Second Floor Plan-Portion "A" (9), revised  3/15/1928
Drawer   4 Folder   8
First Floor Plan-Portions "B" & "C" (10), revised  2/8/1928
Drawer   4 Folder   8
Second Floor Plan-Portion "B" and Basement Plan (11), revised  3/1/1928
 
Architectural Construction Prints, 11/4/1926 (Electrostatic prints of originals on mylar, 29-1/2x42 inches)
Drawer   4 Folder   9
Basement Plan (3), revised  7/19/1927
Drawer   4 Folder   9
First Floor Plan (4), revised  1/30/1928
Drawer   4 Folder   9
Second Floor Plan (5), revised  1/30/1928
Drawer   4 Folder   9
Attic Floor Plan (6), revised  3/3/1928
Drawer   4 Folder   9
Elevations # 1-7 Inclusive (12), revised  8/1/1927 (Sepia print, 29-1/2x39-1/2 inches)
Drawer   4 Folder   9
Elevations # 8-17 Inclusive (13), revised  6/6/1927 (Sepia print, 29-1/4x40-1/4 inches)
 
Architectural Construction Drawings by Albert Kahn, Inc., Architects, 11/4/1926 (Ink-on-linen drawings with pencil revisions, 29x39-1/2 inches)
Drawer   4 Folder   10
Elevations # 1-7 Inclusive (12), revised  8/1/1927
Drawer   4 Folder   10
Elevations # 8-17 Inclusive (13), revised  6/6/1927
Drawer   4 Folder   10
Sections (14), revised  4/12/1927
Drawer   4 Folder   10
Sections (15), revised  12/31/1927
Drawer   4 Folder   10
Details of Main Entrance and Drawing Room (16), revised  4/12/1927
Drawer   4 Folder   10
Exterior Details of Gallery Portion "C" (17), revised  4/12/1927
Drawer   4 Folder   10
Exterior Details of Loggia, Porch and Dining Room Bay (18), revised  8/1/1927