Michigan Historical Collections
Bentley Historical Library
University of Michigan

Finding aid for
Peter Pollack papers, 1965-2009

Finding aid created by
Julia Corrin and Michigan Historical Collections Staff, 2011

Summary Information
Title: Peter Pollack papers
Creator: Pollack, Peter, 1939-2010.
Inclusive dates: 1965-2009
Bulk dates: 1980-2005
Extent: 29 linear feet, 51 tubes, 13 folders in 2 drawers, and 4 digital items (1.97 GB or 2,012.93 MB)
Abstract:
Peter Pollack was a landscape architect who primarily worked in the Ann Arbor area. He also served as a professor at the University of Michigan’s School of Natural Resources. The collection includes correspondence, minutes, and working files that document Pollack’s involvement with various urban design and landscape projects in the state of Michigan in addition to his teaching career. The collection also includes drawings and plans for Pollack’s major projects.

Call number: 2011178 Aa 2
Language: The material is in English
Repository: Bentley Historical Library, University of Michigan
1150 Beal Ave.
Ann Arbor, MI 48109-2113
Phone: 734-764-3482
Fax: 734-936-1333
e-mail: bentley.ref@umich.edu
Home Page: http://www.bentley.umich.edu/


Access and Use
Acquisition Information:

This collection was donated by Eleanor Pollack (donor no. 10510) in April 2011.

Access Restrictions:

The collection is open to research.

Copyright:

Copyright is held by the Regents of the University of Michigan.

Preferred Citation:

[item], folder, box, Peter Pollack papers, Bentley Historical Library, University of Michigan


Biography

Peter Pollack, founder of Pollack Design Associates, worked as a landscape architect in the Ann Arbor area. He was heavily involved with local urban design projects. Pollack also served as a member of the faculty at the University of Michigan's School of Natural Resources.

Pollack was born and raised in Philadelphia, PA. He received his bachelor's degree from Pennsylvania State University in 1963 and his master's degree from Harvard University's Graduate School of Design in 1965. While at Harvard he also worked at Sasaki, Dawson, DeMay and Associates. Pollack was named a fellow in landscape architecture by the American Academy in Rome (FAAR) in 1971. He moved to Ann Arbor in 1973 to teach at the University of Michigan's School of Natural Resources. He was also named a fellow by the American Society of Landscape Architects (FASLA) in 1993.

While in Ann Arbor he founded Pollack Design Associates. The firm was involved in the design of Mary Beth Doyle Park and Wetland Preserve, the Furstenberg Interpretive Park, and projects at the former Pfizer site on Plymouth Road. Pollack was heavily involved in projects affiliated with Ann Arbor's Downtown Development Authority, including the development of Ann Arbor's downtown design guidelines and the Ann Arbor Corridor Study.


Collection Scope and Content Note

The Peter Pollack collection (29.5 linear feet, 51 tubes, 13 oversized folders) documents Pollack's professional involvement in the field of landscape architecture. While the collection includes material relating to his teaching career and his involvement in landscape architecture organizations, the bulk of the collection relates to specific projects Pollack worked on. The collection documents his entire career, but includes a greater depth of information related to projects Pollack was involved with in the Ann Arbor area. In addition to the working files for these projects, the collection includes copious sketches drawn by Pollack and official project plans. The material relating to the Ann Arbor Downtown Development Authority and the Pfizer campus is particularly strong.

The collection has been arranged into the following series: Administrative Files and Promotional Materials; Project Summaries; Project Files; Teaching Files and Other Activities; Digital Materials; and Videotapes.

Subject Terms

This collection is indexed under the following headings in the finding aid database and catalog of The Bentley Historical Library/University of Michigan. Researchers desiring additional information about related topics should search the catalog using these headings.


    Subjects:
    • Pollack, Peter, 1939-2010.
    • Ann Arbor Downtown Development Authority.
    • Ann Arbor Farmer's Market (Mich.)
    • Herman Miller, Inc.
    • Pfizer Inc.
    • Pollack Design Associates.
    • University of Michigan--Faculty.
    • University of Michigan. School of Natural Resources.
    • Landscape architecture--Michigan.
    • Landscape design--Michigan.
    • Rail-trails--Michigan.
    • Ann Arbor (Mich.)
    • Charlevoix (Mich.)
    • Zeeland (Mich.)
    Genre Terms:
    • Landscape architecture drawings.
    • Videotapes
    Contents List
    Container / Location Title
     
    Administrative Files and Promotional Materials [series]:

    Administrative Files and Promotional Materials (1 linear foot) contains information related to Pollack Design Associates and promotional materials for various projects.

    Box   1  
    American Society of Landscape Architects Application,  1961
    Box   1  
    Awards,  1988-1997
    Box   1  
    Background,  undated (2 folders)
     
    Consultants
     
    Architects
    Box   1  
    Herrmann Associates,  undated
    Box   1  
    Meneghini & Associates,  undated
    Box   1  
    Richard Neumann,  1986
     
    Landscape Architects
    Box   1  
    William J. Johnson Associates,  1990-1991
     
    Civil engineers
    Box   1  
    All Seasons Consulting Services,  1995
    Box   1  
    Alpha Consulting Engineers,  undated
    Box   1  
    Boss Engineering Company,  undated
    Box   1  
    Washtenaw Engineering,  undated
     
    Engineers
    Box   1  
    Neil Adams, Inc.,  undated
    Box   1  
    CJ Colein,  1992
     
    Specialty Consultants
    Box   1  
    Biological Mediation Systems,  undated
    Box   1  
    Miscellaneous consultants,  undated
    Box   1  
    Janet Frey Talbot,  undated
    Box   1  
    Design/Economics,  1987
    Box   1  
    Letters of reference,  1988-2002
    Box   1  
    Miscellaneous Projects (3 folders)
    Box   1  
    Natural features PR material,  1994-1999
    Box   1  
    Press releases,  1990
    Box   1  
    Project list,  undated
    Box   1  
    Resumes,  undated
    Box   1  
    Staff photographs (color and black-and-white)
    Box   1  
    Staff profiles,  undated
    Box   1  
    Wetland assessment services marketing,  1991-1995
     
    Project Summaries [series]:

    The Project Summaries (3.5 linear feet) series contains project lists and brief summaries of projects Pollack worked on, in addition to more comprehensive project reports for projects Pollack worked on in the state of Michigan.

     
    Project Profiles
    Box   1  
    Job lists,  1984-1991 (8 folders)
    Box   2  
    Alpena Bi-path (Alpena, MI),  1995
    Box   2  
    Ann Arbor DDA (Ann Arbor, MI),  1985 (2 folders)
    Box   2  
    Ann Arbor Depot (Ann Arbor, MI),  1980
    Box   2  
    Huron River Corridor (Ann Arbor, MI),  1987
    Box   2  
    Pedestrian improvements (Ann Arbor, MI),  1984
    Box   2  
    Plan for Parks, Recreation, and Open Spaces (Ann Arbor, MI),  1981
    Box   2  
    Avis Farms (Pittsfield Township, MI),  1991
    Box   2  
    Bandemer Park (Ann Arbor, MI),  1992
    Box   2  
    Beach Lake (Livingston County, MI),  1991
    Box   2  
    Broadway Street intersection (Ann Arbor, MI),  1980
    Box   2  
    Burns Park School (Ann Arbor),  1993
    Box   2  
    Canton Recreation Complex (Canton, MI),  1991
    Box   2  
    Caseville County Park (Huron County, MI),  1997
    Box   2  
    Marina and Park Plan (Charlevoix, MI),  2002
    Box   2  
    Church of Latter-Day Saints (Ann Arbor, MI),  1993
    Box   2  
    Congregational Church (Ann Arbor),  undated
    Box   2  
    Crosswinds Marsh (Wayne County, MI),  undated
    Box   2  
    Elizabeth Dean Promenade (Ann Arbor, MI),  1985
    Box   2  
    Skyline Renewal (Denver, CO),  undated
    Box   2  
    Dexter Community Schools (Dexter, MI),  1993
    Box   2  
    Dundee Village Center (Dundee, MI),  undated
    Box   2  
    Ernst Property (1991)
    Box   2  
    First Congregational Church (Alpena, MI),  1976
    Box   2  
    Ford Heritage Park (Ypsilanti, MI),  1989
    Box   2  
    Furstenberg Park (Ann Arbor, MI),  1991-1992
    Box   2  
    Gandy Dancer (Ann Arbor, MI),  1976
    Box   2  
    Sports Park and Ski Hill (Gladstone, MI),  1995
    Box   2  
    Grand River Streetscape (Meridian, MI),  1995
    Box   2  
    Green Oaks Golf Course (Ypsilanti, MI),  1989
    Box   2  
    Haithco Recreation Area (Saginaw County, MI),  1989
    Box   2  
    Hall Road Village (Hamburg Township, MI),  1994
    Box   2  
    Hayden House (Ann Arbor, MI),  1986
     
    Herman Miller
    Box   2  
    Powdercoat Technology,  1991
    Box   2  
    SQA (Holland, MI),  1995 (2 folders)
    Box   2  
    Hillsdale Trail (Hillsdale, MI),  1990
    Box   2  
    Huntley Cove (Webster Township, MI),  1989
    Box   2  
    Huron River Bikeway (Ann Arbor, MI)  1984
    Box   2  
    Huron River Recreation Corridor (Ypsilanti, MI),  1988
    Box   2  
    Independence Lake Park (Washtenaw County, MI),  undated
    Box   2  
    Jackson Road Design Study (Scio Township, MI),  1989
    Box   2  
    La Plaisance Industrial Park (Monroe County, MI)  1985
    Box   2  
    Lighthouse Park (Huron County, MI),  1994
    Box   2  
    Lincoln Schools (Washtenaw County, MI)  1984
    Box   2  
    Maineway Mall (Portland, ME),  undated
    Box   2  
    Mallard Landing (Green Oak Township, MI),  1990
    Box   2  
    Cedar Street (Manistique, MI),  1995
    Box   2  
    Mills Property (Ann Arbor, MI),  1986
    Box   2  
    Montebemer Park,  undated
    Box   2  
    Moores Park (Lansing, MI),  1991
    Box   2  
    Murphy Farm (Saginaw, MI),  1988
    Box   2  
    North Bay Park (Ypsilanti, MI),  undated
    Box   2  
    Oakbrook Park (Superior Township, MI),  1991
    Box   2  
    Oakland Oaks Commerce Center (Wixom, MI),  1985
    Box   2  
    Parkins Gravel Pit (Oxford Township, MI),  1982
    Box   2  
    Pepperwood (Grand Blanc, MI),  1991
    Box   2  
    Pere Marquette Rail-Trail (Midland, MI),  1992 (2 folders)
    Box   2  
    Plymouth Green Technology Center (Ann Arbor, MI),  2000
    Box   2  
    Sault Ste. Marie (Sault Ste. Marie, MI),  2000
    Box   2  
    Scio Town Center (Scio Township, MI),  1989
    Box   2  
    Warner-Lambert/Parke-Davis (Ann Arbor, MI),  1993
    Box   2  
    West Bloomfield Trail Network (West Bloomfield, MI),  undated
    Box   2  
    West Willow Park (Ypsilanti, MI),  1986
    Box   2  
    River Street redevelopment (Ypsilanti, MI),  1986
     
    Project Reports [subseries]:
     
    Ann Arbor
    Box   3  
    Ann Arbor's Central Area: A Vision and Agenda for the Future,  1987
    Box   3  
    Ann Arbor Corridor Study,  1983
    Box   3  
    Ann Arbor Corridor Study -- Summary Report,  1983
    Box   3  
    Ann Arbor Depot,  1979
    Box   3  
    Ann Arbor Downtown Plan,  1988
    Box   3  
    Ann Arbor Trolley Feasibility Study,  1977
    Box   3  
    Argo Framework Study,  1993
    Box   3  
    Buhr Park -- Infrastructure Improvements,  2007
    Box   3  
    City of Ann Arbor Bike Path Study,  1973
    Box   3  
    Downtown Ann Arbor Development and Conservation Strategy,  1975
    Box   3  
    General Development Plan for the City of Ann Arbor,  1973
    Box   3  
    Hayden House Preliminary Land Use Study,  1986
    Box   3  
    Hidden Lake,  1987
    Box   3  
    Huron River Corridor: Detroit Edison and Mich Con Parcels,  1987
    Box   3  
    Huron Valley Girl Scout Council,  1986
    Box   3  
    Leslie Laboratories,  1983
    Box   3  
    Master Plan for Pedestrian Improvements,  1985
    Box   3  
    Master Plan for Pedestrian Improvements -- Preliminary Draft Materials,  1983
    Box   3  
    Old Fourth Ward Historic District,  1982
    Box   3  
    Pedestrian Improvements Project -- Phase 1,  1983
    Box   3  
    Pedestrian Improvements Project -- Phase 1B,  1984
    Box   3  
    Pedestrian Improvements Project -- Phase 2,  1985
    Box   3  
    Plan for Park, Recreation, and Open Space,  1981
    Box   3  
    Plan for Solving Circulation Problems,  1977
    Box   3  
    Proposed Area Plan for the Mills Property,  1985
    Box   3  
    Urban Design Workbook for Huron St, Division St, and Fifth Ave,  2004
    Box   3  
    Vacant Land Inventory,  1978
    Box   3  
    Zoning Chapter
     
    Ypsilanti
    Box   3  
    Eastern Michigan University -- A Concept Plan for Campus,  2004
    Box   3  
    Huron River Corridor,  1986
    Box   3  
    Non-Motorized Trail System,  1997
    Box   4  
    Non-Motorized Pathway System -- Updated,  1999
    Box   4  
    Plan for Parks and Recreation,  1985
    Box   4  
    Plan for Parks and Recreation,  1989
    Box   4  
    Plan for Parks and Recreation,  1991
    Box   4  
    West Willow Park -- Land and Water Fund Pre-Application,  1985
    Box   4  
    West Willow Park -- Phase 2,  1986
     
    Washtenaw County
    Box   4  
    Fiscal Impacts of Growth,  1982
    Box   4  
    Huntley Cove -- Webster Township,  1989
    Box   4  
    Huron Valley Bikeway,  1976
    Box   4  
    Huron-Whittaker Corridor,  2000
    Box   4  
    Jackson Road Design Study -- Scio Township,  1990
    Box   4  
    Parks and Recreation Plan,  1985
    Box   4  
    Parks and Recreation Plan,  1992
    Box   4  
    Parks and Recreation Plan,  1998
    Box   4  
    Relocation and Restoration of the Original Superior Township Hall,  1985
    Box   4  
    Scio Town Center Plaza,  1988
    Box   4  
    Transportation Profile,  1985
    Box   4  
    Addison Oaks County Park:  1992 Master Plan -- Oakland County,  1992
    Box   4  
    BASF South Waterfront Recreational Design -- Wyandotte,  1992
    Box   4  
    Central Park Master Plan Resource Group Meetings -- Ingham County,  1986
    Box   4  
    Concepts for a Waterfront Village -- Gladstone,  1994
    Box   4  
    Corridor Design Plan -- Alpena,  1995
    Box   4  
    Costal Zone Management Study -- Rogers City,  1980
    Box   4  
    Feasibility Study for the Potential Bicycle Path Projects -- Beverly Hills,  1985
    Box   4  
    Hall Road Village -- Livingston County,  1994
    Box   4  
    Hillsdale Pride: The Baw Beese Trail Systems -- Hillsdale,  1990
    Box   4  
    Huron County Nature Center -- Huron County,  1991
    Box   4  
    Huron County Parks and Recreation Plan -- Huron County,  1991
    Box   4  
    Kent County Millennium Vision -- Kent County,  2006
    Box   4  
    Land Use Plan -- Monroe County,  2000
    Box   5  
    LaPlaisance Industrial Park Land Use and Development Plan -- Monroe County,  1985
    Box   5  
    Lighthouse Park Trustfund Application -- Huron County,  1995
    Box   5  
    Mallard Lake -- Livingston County,  1990
    Box   5  
    Manistee Lake Management Plan: Summary Report -- Manistee County,  1982
    Box   5  
    Manistee Lake Implementation Manual -- Manistee County,  1982
    Box   5  
    Master Plan: Central Park -- Ingham County,  1987
    Box   5  
    Master Plan for Lighthouse Park -- Huron County,  1994
    Box   5  
    Murphy Farm: A Master Plan for Physical Restoration and Environmental Education -- Saginaw,  1988
    Box   5  
    Oakland Oaks Commerce Center -- Farmington,  1985
    Box   5  
    Parks and Recreation Master Plan -- Westland,  2002
    Box   5  
    Portage Street Improvements -- Sault Ste Marie,  1998
    Box   5  
    S & H Lake Park-Saginaw County,  1987
    Box   5  
    Shelden Sculpture Garden -- Detroit,  1982
    Box   5  
    William H. Haithco Recreation Center -- Saginaw County,  1988
    Box   5  
    Consortium of International Earth Science Information Network Site Evaluation and Investigation,  1992
     
    Project Files [series]:

    The Project Files (20.5 linear feet, 51 tubes, 13 oversize folders) have been arranged into the following sub-series: Ann Arbor Projects, Herman Miller Projects, Pfizer Campus Projects, and Other Michigan Projects. Each subseries has been divided into Textual Files and Drawings and Plans. Drawings and Plans includes items in both folders and tubes. Folders are largely comprised of pencil drawings and sketches, while tubes are largely composed of project plans.

     
    Ann Arbor Projects [subseries]:

    The Ann Arbor Projects (9.5 linear feet, 15 tubes, 6 oversize folders) subseries contains correspondence, minutes, permits, presentations, and working files related to various projects Pollack worked on in Ann Arbor. These projects include the Allen Creek Greenway Task Force; the Ann Arbor Corridor Study; the Farmer's Market commission; the Parks, Recreation, and Open Space Plan; the Commission on Art in Public Places; Downtown Design Guidelines; the Downtown Development Authority, Fuller Road; Furstenberg Park; Gandy Dancer; Huron-Division-Fifth St; Liberty Plaza; Mary Beth Doyle Park; the State Street Urban Design Project; and the University of Michigan. The subseries also contains sketches, plans, and drawings related to Pollack's projects in Ann Arbor.

     
    Textual Records
     
    Allen Creek Greenway Task Force (ACGTF)
    Box   5  
    Maps and Drawings
    Box   5  
    History and Site Booklet
    Box   5  
    Findings and Recommendations, Final
    Box   5  
    Findings and Recommendations, Draft
    Box   5  
    Meetings,  2005
    Box   5  
    Workshop 1B, Site Specific Data
    Box   5  
    Meetings,  July-September 2006
    Box   5  
    General Information
    Box   5  
    Workshop 1A,  April 22, 2006
    Box   5  
    Floodway
    Box   5  
    Tonight's Meeting,  May 17, 2006
    Box   5  
    Materials for Meeting,  August 2, 2006
    Box   5  
    "Help Shape Allen Creek Greenway," Workbook
    Box   5  
    Greenway Plan
    Box   5  
    Correspondence
    Box   5  
    Powerpoint Presentations
    Box   6  
    Public Participation materials
    Box   6  
    Task Force Handouts
    Box   6  
    Principles
    Box   6  
    Interactive Public Design Project
    Box   6  
    Public Process
    Box   6  
    Supplemental Appendix (4 folders)
    Box   6  
    Washtenaw Avenue,  2005-2009
    Box   6  
    Preliminary Planning
    Box   6  
    News clippings
    Box   6  
    City of Ann Arbor Parcel Options
    Box   6  
    Miscellaneous
    Box   6  
    Resolution Creating a New Greenway Taskforce
    Box   6  
    Communication (3 folders)
     
    Ann Arbor Corridor Study
    Box   6  
    Original Artwork
    Box   6  
    Composite of Design Guidelines,  1983
    Box   6  
    Final Draft Report,  1983 (2 folders)
    Box   6  
    Draft Report,  1983 (2 folders)
    Box   6  
    Preliminary Drafts,  1983
    Box   6  
    Proposal for Services,  1981
     
    Ann Arbor Farmer's Market Commission
    Box   7  
    Binder: Minutes and agenda,  2005
    Box   7  
    Market Commission Background
    Box   7  
    Farmer's Market Working Files,  2005
    Box   7  
    Farmer's Market Master Plan (draft),  2004
    Box   7  
    Friends of the Market,  2005
    Box   7  
    Agendas and Correspondence,  2005-2006
    Box   7  
    Correspondence,  2005
    Box   7  
    Meeting Agenda,  June 15, 2006
    Box   7  
    Market Commission Working Files (3 folders)
    Box   7  
    Information on Other Michigan Farmer's Markets
    Box   7  
    Site Planning
    Box   7  
    Complaints,  2009
    Box   7  
    Seniority,  2008
    Box   7  
    Market Commission
    Box   7  
    Public Market
    Box   7  
    Stark Complaint
    Box   8  
    Former Market Commission
    Box   8  
    Market Commission, J. Black
    Box   8  
    Market Commission, Current
    Box   8  
    Advisory Commission
    Box   8  
    Boundary and Topographic Survey,  2003
    Box   8  
    Background Information
    Box   8  
    Farmers Market Working Files
    Box   8  
    Presentation
    Box   8  
    Public Meeting
     
    Ann Arbor Parks, Recreation and Open Space Plan
    Box   8  
    Award Submission,  1982
    Box   8  
    Final Draft and Appendix,  1981
    Box   8  
    Park Maintenance Plan,  1976
    Box   8  
    Proposed Parks and Open Space Plan,  1978
    Box   8  
    Summary Plan,  1981
    Box   8  
    Bandemer Park Plans,  1993
     
    Commission on Art in Public Places (CAPP)
    Box   8  
    Ann Arbor Public Art Commission,  2004-2008
    Box   8  
    Annual Report,  2003
    Box   8  
    Arts Alliance
    Box   8  
    CAPP meeting minutes,  2004
    Box   8  
    CAPP Planning,  2005
    Box   8  
    Community interviews,  2003
    Box   8  
    Community resource book
    Box   9  
    Correspondence (3 folders)
    Box   9  
    Grant proposal
    Box   9  
    Jury process
    Box   9  
    Master plan,  2004
    Box   9  
    Master plan RFP documents,  2003
    Box   9  
    MDOT Slide Presentation,  1994
    Box   9  
    Off the Wall Gallery
    Box   9  
    Park Advisory Commission meeting,  2004
    Box   9  
    Plan preparation
     
    Downtown Ann Arbor Design Guidelines
    Box   9  
    Ann Arbor Downtown Plan,  2008
    Box   9  
    Comments from City Website,  2009
    Box   9  
    Guidelines Drafts,  2008-2010 (3 folders)
    Box   9  
    Memos,  2006-2007
    Box   9  
    Miscellaneous
    Box   9  
    Planning commission meetings,  2008
    Box   9  
    Recommended Policy Framework for Downtown Ann Arbor,  2005
    Box   9  
    Working Files (3 folders)
    Box   9  
    Workshops
     
    Downtown Development Authority (DDA)
     
    Agendas
    Box   9  
     1986
    Box   9  
     1987 (2 folders)
    Box   9  
     1988 (3 folders)
    Box   9  
     1989
    Box   10  
     2002
    Box   10  
     2003 (2 folders)
    Box   10  
     2004
    Box   10  
    Meeting Agendas and Minutes
    Box   10  
    Misc. Correspondence
    Box   10  
    Huron/Fifth/Division (2 folders)
    Box   10  
    Pedestrian Improvements Master Plan materials (6 folders)
    Box   10  
    Pedestrian Improvements 4th Avenue
    Box   10  
    News Clippings
    Box   10  
    Preliminary Concepts
    Box   10  
    Contract
    Box   10  
    Preliminary Draft Materials
    Box   10  
    Walt's Letter
    Box   10  
    Light Fixtures (2 folders)
    Box   10  
    Memos and Attachments
    Box   10  
    Questionnaire
    Box   10  
    Projects Evaluation
    Box   11  
    Correspondence
    Box   11  
    Details
    Box   11  
    Master Plan, Construction Standards
    Box   11  
    Liberty Street (3 folders)
    Box   11  
    Master Plan, Base Maps
    Box   11  
    Graphics
    Box   11  
    Maps
    Box   11  
    Liberty Street Evaluation
    Box   11  
    Liberty Street Estimate
    Box   11  
    Library Lot
    Box   11  
    S. Fourth Street Estimate
    Box   11  
    Construction Engineering,  2001
    Box   11  
    Pollack Designs Billing Summaries,  1983-1985
    Box   11  
    Ann Arbor Transit Authority (AATA) Downtown Transfer Center Plans
    Box   11  
    Ann Arbor Walking Tours
    Box   11  
    Attachments,  2003
    Box   11  
    "R" Items,  2003 and  2005
    Box   11  
    "The Ann Arbor Central Area -- A Program for the Future,"  1987
    Box   11  
    Downtown Ann Arbor Revitalization Plan Maps,  2005
     
    Fuller Road Projects
    Box   11  
    Fuller Road/Fuller Park Site Information
     
    Fuller Road/Maiden Lane Intersection
    Box   11  
    Correspondence (3 folders)
    Box   11  
    Plans,  2006
    Box   11  
    Roundabouts research
     
    Fuller Road Re-Alignment Wetland Mitigation
    Box   11  
    Correspondence (2 folders)
    Box   11  
    Monitoring Report and Drawings
    Box   11  
    Lee Skabelund's Notes
    Box   12  
    Revised Specifications
    Box   12  
    Wetland Mitigation (2 folders)
    Box   12  
    Wetland Slides,  2000
    Box   12  
    Reports,  1998-2002
    Box   12  
    Photographs and Slides,  2001
    Box   12  
    Contract Documents for Fuller Road Wetland Mitigation and Tree Planting Project, File No. 94048  1994
    Box   12  
    Specifications,  1992-1999 (scattered)
     
    Glen/Fuller
    Box   12  
    Award Submission
    Box   12  
    Fuller/Glen Transit Project
    Box   12  
    Glenn/Fuller/Geddes Study,  1981
    Box   12  
    Glen/Fuller Project Draft Negative Declaration,  1980
    Box   12  
    Glen Fuller Project Environmental Assessment,  1981 (2 folders)
    Box   12  
    Photographs (3 folders)
    Box   12  
    Plans and Drawings
    Box   12  
    Project planning
    Box   12  
    Drawings
     
    Furstenberg Park
    Box   12  
    Award Submission
    Box   12  
    Furstenberg Park Development Request for Proposals,  1990
    Box   12  
    Reconnaissance,  1991
     
    Gandy Dancer
    Box   12  
    Project Files,  1976-1978
    Box   12  
    Photographs
    Box   12  
    Specifications for Site Development,  1976
    Box   13  
    Huron, Division, Fifth streets (Ann Arbor)
    Box   13  
    ASLA Award Submission,  2005
    Box   13  
    Presentations,  2005
    Box   13  
    Project Proposal,  2003
    Box   13  
    Public Hearing,  2998
    Box   13  
    Urban Design Workbook,  2004
     
    Liberty Plaza
    Box   13  
    Submittals
     
    Chronological File
    Box   13  
     March 2003
    Box   13  
     May-June, 2003
    Box   13  
     January-February, 2003
    Box   13  
     August-December, 2002
    Box   13  
     December 2001-July 2002
    Box   13  
    Contract Documents for the Liberty Plaza Improvements,  2003
    Box   13  
    Specifications for Bidding,  March 13, 2003
    Box   13  
    Specifications for Review,  2003
    Box   13  
    Community Meetings,  2002
    Box   13  
    Construction Meeting notes,  2003
     
    Mary Beth Doyle Park (Brown Park) Detention Basin
     
    Chronological File
    Box   13  
     March-April, 2003
    Box   13  
     May-August, 2003
    Box   13  
    Correspondence and presentations (5 folders)
    Box   13  
    DEQ Permit,  2005
    Box   14  
    Mallet's Creek RFP
    Box   14  
    Meeting minutes,  2006
    Box   14  
    Project Manual
    Box   14  
    Proposal,  2003 (2 folders)
     
    State Street Urban Design Project
    Box   14  
    Request for Qualifications
    Box   14  
    Construction Notes,  2002-2003 (2 folders)
    Box   14  
    Correspondence,  2000-2003 (3 folders)
    Box   14  
    Design Intent,  2000-2001
    Box   14  
    General,  2001
    Box   14  
    Plans and Drawings
    Box   14  
    State Street Area Project Pedestrian Improvement Plans,  November 2001
    Box   14  
    South State Street Two-Way Traffic Study,  2000
    Box   14  
    South University Streetscape Improvements Proposal
     
    University of Michigan
    Box   14  
    North Quad Site Improvements Technical Specifications,  2009
    Box   14  
    North Quad Working Files,  2009
    Box   14  
    Rackham Green Land Improvements Technical Specifications,  2009
     
    Drawings and Plans
    Tube   42  
    Allen Creek Greenway Taskforce -- Aerial Photographs and Overlays
     
    Ann Arbor Corridor Study
    Tube   2  
    Aerial photographs and overlays
    Tube   2  
    Base Maps
    Tube   2  
    Sketches
     
    Broadway Street Shopping Area
    Drawer   1 Folder   1
    Urban Design Plan,  January 10, 1981
    Drawer   1 Folder   1
    Richard Raab Parking Lot Schemes,  April 7, 1981
    Drawer   1 Folder   1
    Broadway Place Shopping Area Conceptual Sketches,  undated
    Drawer   1 Folder   1
    Broadway Wall Project Slope Cross Sections,  September 8, 1983
    Drawer   1 Folder   1
    Kroger Parking Lot Options,  March 24, 1982
    Drawer   1 Folder   1
    Site Plan for Expansion of Broadway Kroger,  July 15, 1977
    Drawer   1 Folder   1
    Broadway Wall -- Grading and Slope Stabilization,  September 8, 1983
    Drawer   1 Folder   1
    Retaining Wall Extension,  May 23, 1984
    Drawer   1 Folder   1
    Raab Shopping Center Site Plan Options,  August 17, 1983
    Tube   45  
    Urban Design Plan,  January 10, 1981
    Tube   45  
    Landscape Plan,  undated
    Drawer   1 Folder   1
    Cobblestone Farm,  1985
    Drawer   1 Folder   2
    Downtown Development Authority
    Drawer   1 Folder   2
    Maynard Street
     
    Pedestrian Improvements Project
    Drawer   1 Folder   2
    Detroit St/Farmers Market -- Misc. Plans and Drawings
    Drawer   1 Folder   2
    Fourth Street -- Miscellaneous Plans and Drawings
    Drawer   1 Folder   2
    Liberty Street
    Drawer   1 Folder   2
    Liberty Street and Fourth Avenue
    Drawer   1 Folder   2
    South University Pedestrian Way -- Plans and drawings
    Tube   5  
    Detroit St/Farmer's Market -- Miscellaneous Plans and Drawings
    Tube   6  
    Fourth Avenue -- Miscellaneous Plans and Drawings
    Tube   7  
    Kerrytown Lighting,  April 1997
    Tube   7  
    Phase I:  Fall 1983 ,  June 9, 1983
    Tube   7  
    Phase I:  Fall 1985 ,  July 17, 1985
    Tube   8  
    Phase II:  Fall 1985
    Tube   8  
    Phase II,  January 19, 1990
    Tube   9  
    South University Pedestrian Way -- Miscellaneous Plans and drawings
    Tube   9  
    West Liberty Street
    Tube   9  
    Miscellaneous plans
    Tube   10  
    State Street Area Project Phase II Pedestrian Improvements -- Plans Issued for Bidding,  March 13, 2003
    Tube   10  
    Urban Design Concept
    Tube   3  
    Fourth and Catherine Parking Lot -- Plans
    Tube   4  
    Liberty Plaza Improvements -- Issued for Bidding,  March 13, 2003
    Tube   4  
    Miscellaneous Overlays
    Tube   4  
    North Corridor Campus Pathway
     
    State Street
    Drawer   1 Folder   3
    Maynard and State Street Studies
    Drawer   1 Folder   3
    State Street Pedestrian Alley
     
    Tally Hall
    Drawer   1 Folder   4
    Site Plan,  1985
    Drawer   1 Folder   4
    Miscellaneous Plans
     
    First Congregational Church
    Drawer   1 Folder   4
    Miscellaneous Sketches and Courtyard Plans
     
    Fuller-Glen
     
    Early Concept Studies
    Drawer   1 Folder   4
    Fuller/Glen Transit Project Preliminary Site Plans,  May 19, 1981
    Drawer   1 Folder   4
    Preliminary Bridge Railing Details,  May 19, 1981
    Drawer   1 Folder   4
    General Analysis Sketches,  October 26, 1979
    Drawer   1 Folder   4
    Conceptual Grading Plan,  May 1, 1981
    Drawer   1 Folder   4
    Early Site Studies
    Drawer   1 Folder   4
    Fuller Road Wetland Mitigation
     
    Fuller Road Projects
     
    Plans
    Tube   11  
    Fuller-Glen Project,  November 30, 1981
    Tube   11  
    State Street to Glen Plan and Profile,  November 3, 1982
    Tube   11  
    Fuller Rd/Oak Way Realignment,  May 19, 1993
     
    Maps and Diagrams
    Tube   12  
    Fuller Penetrator Bike Route Study,  October 21, 1975
    Tube   12  
    Glen-Fuller Transit Project,  October 9, 1979
    Tube   12  
    Fuller-Glen Final Alignment (Proposed),  November 11, 1980
    Tube   12  
    Fuller-Glen Shrub Bed Count,  September 22, 1983
    Tube   12  
    Fuller Pool Entrance Revisions
    Tube   12  
    Fuller Rd Survey,  September 10, 1991
    Tube   13  
    Fuller-Glenn Planting and Grading Studies
    Tube   13  
    Fuller-Glenn Public Hearing -- Overall Approach
    Drawer   1 Folder   5
    Furstenberg Park -- Miscellaneous Plans and Drawings,  1991
    Tube   14  
    Furstenberg Park -- Miscellaneous Plans and Drawings,  1991
     
    Gandy Dancer
    Drawer   1 Folder   5
    Schematic Site Plan,  March 1976
    Drawer   1 Folder   5
    Sketches
    Tube   14  
    Plans,  June 24, 1976
    Tube   14  
    Planting Plan,  May 1976
    Tube   14  
    Schematic Site Plan,  March 1976
    Tube   14  
    Sketches
    Drawer   1 Folder   6
    Huron-Division-Fifth St
    Drawer   1 Folder   6
    Sketches and Drawings
    Tube   15  
    Site Surveys
    Tube   15  
    Sketches
    Tube   15  
    Sketches and drawings
    Drawer   1 Folder   6
    Huron River Corridor Study
    Drawer   1 Folder   6
    Master Plan Studies,  1987
    Drawer   1 Folder   6
    Miscellaneous sketches
    Tube   15  
    One-Way to Two-Way Signage Conversion Plans,  30 July 2003
    Tube   15  
    University of Michigan North Campus Hubbard-Hayward Street Proposed Realignment and Parking Lots Improvement Plan,  16 July 1993
     
    Herman Miller Projects [series]:

    The Herman Miller Projects (2 linear feet, 1 tube, 1 oversize folder) subseries documents various projects Pollack completed for Herman Miller, Inc. and their Zeeland and Holland, Michigan campuses. Materials include correspondence, permit applications, working files, sketches, and plans.

     
    Textual Files
    Box   15  
    104th Avenue, Street Improvement (2 folders)
    Box   15  
    Building B East
    Box   15  
    Building C-1
    Box   15  
    Building F Entry
     
    Burns
    Box   15  
    Post Ecological Prescription Burn Report and Landscape Management/Maintenance Observations
    Box   15  
    Prescribed Burn,  2004
    Box   15  
    SQA Burn
    Box   15  
    Correspondence
    Box   15  
    Design Yard
    Box   15  
    General Contacts,  2003
     
    Greenhouse
    Box   15  
    General
    Box   15  
    LEED Greenhouse
    Box   15  
    Permanent Pavement
    Box   15  
    LEEDS Application
    Box   15  
    Main Site, B West
    Box   15  
    Main Site, Prescott B
    Box   15  
    MDC Planting
    Box   15  
    Phoenix Designs (2 folders)
    Box   15  
    Phoenix Designs Drawings,  1996
    Box   15  
    Planters
     
    Site/Landscape Management and Maintenance
    Box   15  
    Program,  1996
    Box   15  
    Work session,  1996
    Box   15  
    SQA (2 folders)
    Box   15  
    Technical Specifications for MDC Pond ~ Shoreline Plant Conversion,  2004
    Box   15  
    Truck Parking
    Box   15  
    Van Wagoner Road
    Box   15  
    Zeeland Main Site
    Box   15  
    Zeeland Main Site plume
    Box   15  
    Zeeland Main Site Consumers Re-Alignment
    Box   16  
    Binders (many photographs included)
    Box   16  
    Powder Coat Technology facility
    Box   16  
    Miller SQA Facility
    Box   16  
    Phoenix Designs Project
    Box   16  
    Final site plan
     
    Plans and Drawings
    Drawer   2 Folder   7
    Photographs
    Drawer   2 Folder   7
    Sketches
    Tube   16  
    Zeeland Mainsite drawings
    Tube   16  
    Powder Coat Technology,  1991
    Tube   16  
    Dallas Schematic Site/Planting Plan
    Tube   16  
    SQA Greenhouse,  February 6, 2001
    Tube   16  
    Phase 1 Construction,  1995
    Tube   16  
    New Phase 1 Plant and Offices,  January 17, 1995
    Tube   16  
    Miscellaneous
     
    Pfizer Campus Projects [series]:

    The Pfizer Campus Projects (4.5 linear feet, 22 tubes, 5 oversize folders) subseries includes correspondence, minutes, permit applications, study results, plans, drawings, and sketches related to the Warner-Lambert, Parke-Davis, and Pfizer in Ann Arbor. There is a small amount of material related to the Kalamazoo campus as well. Major projects profiled include the Parke-Davis master plan, the 2800 Plymouth Road Facility, Pfizer's Planned Unit Development (PUD), and Stormwater Wetlands Management.

     
    Textual Files
     
    Parke-Davis/Warner Lambert
     
    Master Plan
    Box   17  
    Relocation Master Plan,  1984
    Box   17  
    Master Plan,  1984
    Box   17  
    Master Plan,  1985
    Box   17  
    Master Plan,  1989-1990
    Box   17  
    Master Plan Update,  1996
     
    Master Plan with Heidi
    Box   17  
    Master Plan,  1996-1997
    Box   17  
    Background Materials
    Box   17  
    Correspondence File,  1996 (2 folders)
    Box   17  
    Master Plan III,  2000
    Box   17  
    Building 20 Addition,  1998
    Box   17  
    Documentation,  1997
    Box   17  
    Graphics
    Box   17  
    Working Session,  1998
    Box   17  
    Master Site Plan/Strategic 7 Year Plan,  1997
    Box   17  
    Master Plan Report,  1997 (2 folders)
     
    2800 Plymouth Road Facility
    Box   17  
    Alternate
    Box   17  
    Building 26 Pre-Clinical Laboratory,  1999
    Box   17  
    Building 26 Site Plan,  2000
    Box   17  
    Cafeteria Conference Center Plan,  1998
    Box   17  
    Childcare Center,  1998
    Box   17  
    FAR Calculations,  1999
    Box   17  
    Landscape Maintenance Proposal Form draft,  1990
    Box   17  
    Materials Handling Center and Conference Cafeteria Center,  1998
    Box   17  
    Materials Handling Center Plan,  1998
    Box   17  
    Materials Handling Center Specs,  1998
    Box   17  
    Power House Addition,  1993
    Box   17  
    Power House Addition/South Parking Lot Site Plan,  1993
    Box   17  
    Project Management and Communication,  1999
    Box   17  
    Site Plan,  1998
     
    2800 Plymouth Road Facility
     
    South 15 Acres
    Box   17  
    New Site Development,  1993
     
    Project Book
    Box   17  
    Construction Meetings,  1993-1995
    Box   17  
    Submittals,  1993-1994
    Box   17  
    Addendum,  1993-1994
    Box   17  
    Pay Estimates,  1993-1994
    Box   17  
    Miscellaneous,  1993-1994
     
    Technical Development Facility
    Box   18  
    General,  1998
    Box   18  
    Submittal Originals,  1996-1999
    Box   18  
    Site Plan,  1998-2005 (2 folders)
    Box   18  
    Site Work -- Issued for Construction,  1998
    Box   18  
    Preliminary Detention Study,  November 1, 1990
    Box   18  
    Re-Zoning Application,  September 14, 1992
    Box   18  
    Traffic Study,  1990
     
    Pfizer
     
    Master Plan/Planned Unit Development (PUD)
    Box   18  
    Ann Arbor Planning Department Reports,  1992-2001
    Box   18  
    Baxter Road Entrance and Guard Kiosk Plans,  2005
    Box   18  
    Building 10 Executive Courtyard,  2003
    Box   18  
    Building 28 Plans,  2006
    Box   18  
    Building 35 Plans,  2005
    Box   18  
    Buildings 85 and 75,  2003
    Box   18  
    Campus Enhancements III,  2005
     
    Chronological File
    Box   18  
     January-October, 2001
    Box   18  
     September-October, 2001
    Box   18  
     November-December, 2001
    Box   18  
     January-February, 2002
    Box   18  
     August-October, 2002
    Box   18  
     November-December, 2002
    Box   18  
     January 2003
    Box   18  
    cGMP Warehouse Plans,  2006
    Box   18  
    Community Context and Redevelopment Opportunities,  2007
    Box   18  
    Concept Master Plan sketches,  2001
    Box   18  
    Engineering,  2000
    Box   18  
    Global Facilities Management Information Document,  2002
    Box   18  
    Guard Kiosk and Site Improvements,  2004
    Box   18  
    Informational,  2000-2002
    Box   18  
    Land and Water Management -- Wetland Inventory,  2000
    Box   18  
    Lawn Conversion -- Phase IV,  2005
    Box   18  
    Lighting,  2000
    Box   18  
    Master Plan Edits,  2003
    Box   18  
    Master Planning,  2001-2003 (3 folders)
    Box   19  
    Master Plan Meetings,  2001-2003
    Box   19  
    Master Plan Overlays,  2002
    Box   19  
    Master Plan Proposals,  2000-2002
     
    Natural Features
    Box   19  
    55 Acre Site Natural Features Inventory,  2001
    Box   19  
    Landmark Tree Survey,  2001
    Box   19  
    Natural Features,  2002
    Box   19  
    Natural Features Data,  2002
    Box   19  
    Natural Features Inventory,  2002
    Box   19  
    Veridian Botanical Inventory and Landmark Tree Survey,  2002
    Box   19  
    Parking,  2008
    Box   19  
    Patrick Judd File,  2001-2002
    Box   19  
    Plans and Graphics,  2002
    Box   19  
    Prairie Conversion -- Phase II,  2003
    Box   19  
    Project Review Coordination,  1999
    Box   19  
    Sanitary Sewer Analysis,  2001
    Box   19  
    Scanned Photos,  undated
    Box   19  
    Site Design Standards,  2002
    Box   19  
    Site Options Study,  2001
    Box   19  
    Site Photographs
    Box   19  
    Site Planning and Design Team Meeting,  2004
    Box   19  
    Site Plans for Parking Structure and Wetlands Use Permit,  2000
    Box   19  
    Strategic Facilities Plan,  2004
    Box   19  
    Strategic Site Plan and Master Plan Review,  2003
    Box   19  
    Strategic Site Plans,  2000-2005 (5 folders)
     
    Zoning
    Box   19  
    Rezoning and Area Plan,  2002
    Box   19  
    Zoning,  2001-2002
    Box   19  
    Zoning Petition,  2001
    Box   19  
    Coordination Meeting,  2003
    Box   19  
    Coordination Meeting Minutes,  1998-2002 (3 folders)
    Box   20  
    Coordination Meeting Minutes,  1998-2002 (2 folders)
     
    Miller's Creek
    Box   20  
    Breakfast and Open House,  2003
    Box   20  
    Correspondence,  2001-2003 (2 folders)
    Box   20  
    Crossing Options,  2004
    Box   20  
    Grant Application,  2005-2006
    Box   20  
    Watershed Improvement Plan,  2003
    Box   20  
    Site Acquisition,  2001
     
    Stormwater Wetlands Management
    Box   20  
    Building 14 Courtyard,  2000
    Box   20  
    Detention Basin 3,  2001-2002
     
    Land and Water Management Master Plan
    Box   20  
    DEQ Permit Correspondence,  2000
    Box   20  
    Site Improvement,  2000
    Box   20  
    Specifications,  2000
    Box   20  
    Photographs
     
    Stormwater Management Master Plan
    Box   20  
    Bid Period,  2000
    Box   20  
    Calculations,  2000
     
    Chronological File
    Box   20  
     September-December, 1999
    Box   20  
     January-May, 2000
    Box   20  
     June-July, 2000
    Box   20  
     March 2001
    Box   20  
    Storm Water Management Study,  2001
    Box   20  
    Stormwater Research Introduction,  2002
    Box   20  
    Stormwater Update,  1984-1999
    Box   21  
    Wetland Annual Monitoring Report,  2003
    Box   21  
    Wetland Investigation and Delineation,  2001
    Box   21  
    Wetland Monitoring -- Basin 3,  2001-2002
    Box   21  
    Wetland Use Permit,  2000
     
    Drawings and Plans
     
    Parke-Davis/Warner-Lambert
    Drawer   2 Folder   8
    Building 10 Courtyard-Preliminary Planting Plan,  August 14, 1992
     
    Child Care Center
    Drawer   2 Folder   8
    Miscellaneous sketches,  1998
    Drawer   2 Folder   8
    Playground Concept Sketch,  March 31, 1999
     
    The Courtyard
    Drawer   2 Folder   8
    Existing Conditions,  January 26, 1987
    Drawer   2 Folder   8
    Sketch Options,  January 1987
    Drawer   2 Folder   8
    Courtyard Planting Plan,  March 4, 1987
    Drawer   2 Folder   8
    Miscellaneous sketches
     
    Entry Gate and Signage
    Drawer   2 Folder   9
    Miscellaneous Plans and Drawings,  1992
    Drawer   2 Folder   9
    Signage sketches,  undated
    Drawer   2 Folder   9
    Master Plans Studies,  1992-1993
     
    North Entrance Court
    Drawer   2 Folder   9
    Miscellaneous sketches
    Drawer   2 Folder   10
    Parking Deck-Miscellaneous sketches and plans
    Drawer   2 Folder   10
    Switch Box Buffer-Concept Sketches,  June 21, 1999
    Drawer   2 Folder   10
    Toxicology Building-Planting Plans,  May 8, 1985
    Drawer   2 Folder   10
    Miscellaneous Plans
    Tube   17  
    Administration Support Facility Plans,  September 8, 2000
     
    Building 26
    Tube   17  
    Building 23 & 26 Phase II Construction Drawings,  June 9, 2000
    Tube   17  
    Building 26 Phase II Construction Drawings,  August 1, 2000
    Tube   18  
    Building 26, Pre-Clinical Laboratory, and Parking Site Improvement Plans,  December 4, 2002
    Tube   18  
    Miscellaneous Sketches
    Tube   18  
    Building 35 Addition,  September 2, 2004
    Tube   18  
    Building PC-1 Preliminary Planting Plan Options,  undated
    Tube   19  
    Child Care Center-Plans Issued for Bidding,  June 1, 1999
     
    Clinical Research Building 16
    Tube   19  
    General Trades,  September 4, 1990
    Tube   20  
    Site and Foundation Package,  April 19, 1990
    Tube   20  
    Cooling Towers -- Issued for Construction,  June 2, 1997
     
    Entry Gate and Signage
    Tube   21  
    Miscellaneous Plans and Drawings,  1992
    Tube   21  
    Signage sketches,  undated
     
    Fitness Trail
    Tube   21  
    Seed Mix Layout Modifications,  May 1989
    Tube   21  
    Preliminary Parcour Layout,  August 1988
    Tube   21  
    Fitness Trail Layout Record,  November 2, 1988
    Tube   21  
    Future Development Plan Options,  undated
     
    Granite Sculpture Site Improvements
    Tube   21  
    Issued for Owner's Review,  April 16, 2002
    Tube   21  
    Issued for Construction,  August 12, 2002
    Tube   22  
    Huron Parkway Connector Tunnel -- Construction Issue, Site Work,  December 14, 2000
     
    Land and Water Management
    Tube   22  
    Plans Issued for Construction,  May 17, 2000
    Tube   22  
    Re-Application for Inland Lakes and Stream Permit,  May 12, 2000
    Tube   23  
    Master Plans Studies,  1992-1993
    Tube   23  
    Materials Handling Center and Cafeteria Conference Center Site Improvement Plans,  March 22, 1999
     
    New Site Development: South 15 Acres
    Tube   23  
    Plans Issued for Construction,  September 8, 1993
     
    North Entrance Court
    Tube   23  
    Conclusion of Design Development Plans,  March 9, 2001
    Tube   24  
    Miscellaneous Plans,  2001
    Tube   24  
    Program/Character Discussion Diagrams,  October 2000
    Tube   24  
    North Parking Addition,  July 11, 1997
    Tube   24  
    North Parking Lot Area and Southwest Trucking Dock,  July 11, 1989
     
    Parking Deck
    Tube   25  
    Phase II Minor Modification,  February 1990
    Tube   25  
    Issued for Construction,  November 29, 1990
    Tube   25  
    Parking Lots B, C, and D Relocation and Minor Building Additions,  July 19, 1999
    Tube   26  
    Power House Addition, South Parking Lot, and Entry Drive
    Tube   26  
    Appendix A,  June 2, 1993
    Tube   26  
    Wetland Permit Application,  May 27, 1993
    Tube   26  
    Administrative Amendment,  April 4, 1994
    Tube   26  
    As-Built Record,  March 7, 1995
    Tube   26  
    Preliminary Sketch Landscape Plan,  April 29, 1993
    Tube   27  
    Southern Parking Area Earthwork and Reforestation,  February 26, 1990
    Tube   27  
    Southwest Entry Schematic Designs,  June 9, 2004
    Tube   27  
    Storm Sewer Tie-In Plans,  1991
    Tube   27  
    Storm Water Management Master Plan,  2000
     
    Switch Box Buffer
    Tube   27  
    Plans Issued for Bidding,  August 1, 1999
    Tube   28  
    Technical Development Facility
    Tube   28  
    Plans Issued for Construction,  August 3, 1999
    Tube   28  
    Administrative Amendment,  October 18, 2005
    Tube   28  
    Site Capacity Diagram
    Tube   28  
    Temporary Modular Addition to Building 50,  December 17, 1998
    Tube   29  
    Temporary Modular Office Addition
    Tube   29  
    Plans Issued for Bidding,  April 13, 1998
    Tube   29  
    Plan Submitted for Administrative Amendment,  April 1, 1998
    Tube   29  
    Temporary Parking Relocation -- Issued for Construction,  May 9, 2000
     
    Toxicology Building
    Tube   29  
    Proposed Planting Plans,  April 1985
    Tube   29  
    Planting Plans,  May 8, 1985
    Tube   29  
    Tree Area Removal and Relocation Proposals,  April 1990
     
    The Pond and Building Edge
    Tube   30  
    Preliminary Sketch Options,  January 1987
    Tube   30  
    Final Preliminary Plan,  February 10, 1987
    Tube   30  
    Planting Plan,  March 4, 1987
     
    University of Michigan
    Tube   30  
    Preliminary Grading Plan,  November 1990
    Tube   30  
    Tree Relocation,  November 1990
    Tube   30  
    Regrading and Soil Stabilization Plan,  July 1992
    Tube   30  
    Miscellaneous Plans and Drawings
     
    Pfizer
    Drawer   2 Folder   11
     1600 Site Plan Schematics,  April 2006
    Drawer   2 Folder   11
    Building 10Executive Courtyard Sketches,  2003
    Drawer   2 Folder   11
    Building 28 Loading Dock Renovation and South End Distribution -- Sketches,  2006
    Drawer   2 Folder   11
    Campus Green and Entrance Plaza,  July 2000
    Drawer   2 Folder   11
    Development Office Building Site Influences,  November 26, 2003
    Drawer   2 Folder   11
    ERIN Walks and Planting Schematic,  February 18, 1993
     
    Kalamazoo Campus
    Drawer   2 Folder   11
    Final Schematic Options,  September 2008
    Drawer   2 Folder   11
    Lot 1 Options,  August 2008
    Drawer   2 Folder   11
    Rough Grading Options,  December 2005
    Drawer   2 Folder   12
    Sketches
    Drawer   2 Folder   12
    Studies,  2000
     
    Miller's Crossing
    Drawer   2 Folder   12
    Sketches,  April 23, 2003
    Drawer   2 Folder   12
    Evaluation Criteria,  April 18, 2003
    Drawer   2 Folder   12
    Site Options Study Sketches,  2001
    Drawer   2 Folder   12
    Miscellaneous Plans and Drawings
    Tube   31  
    Area Plan,  undated
    Tube   31  
    Baxter Road Entrance and Guard Kiosk -- Issued for 100% Final Review,  September 9, 2005
    Tube   32  
    Building  10/20 Courtyard-Plans Issued for Bidding,  March 30, 2001
    Tube   32  
    Building 20 -- Stair Tower Addition, Submitted for Administrative Amendment,  February 5, 2004
    Tube   32  
    Building 28 Loading Dock Renovation and South End Distribution -- Submitted for PUD Site Plan Administrative Amendment,  March 10, 2006
     
    Building 35
    Tube   33  
    Storm Water Infrastructure,  September 16, 2004
    Tube   33  
    Sitework Bid Package,  October 10, 2005
     
    Building 85 -- Fire Pump House and Emergency Services
    Tube   34  
    Plans Submitted for PUD Site Plan,  April 9, 2003
    Tube   34  
    Building 85 and Building 75 -- Submitted for PUD Site Plan Construction Approval,  September 25, 2003
    Tube   35  
    Building 910 Site Demolition and Meadow Restoration -- Issued for Bidding,  March 17, 2008
    Tube   35  
    Campus Base Maps,  2000
     
    Guard Kiosk
    Tube   35  
    Plans, 5  March 2002
    Tube   35  
    Plans Issued for Construction,  October 5, 2004
    Tube   36  
    Huron Parkway Reconstruction Planting Plan,  September 3, 2004
    Tube   36  
    Huron Parkway Site Improvements -- Issued for Design Development Owner Review,  December 14, 2006
     
    Master Plan
    Tube   36  
    Preliminary Framework Diagrams,  November 2002
    Tube   36  
    Sketches
    Tube   37  
    Submitted for PUD,  November 26, 2001
    Tube   37  
    Traffic Study -- Proposed Changes,  January 15, 2002
    Tube   37  
    Miscellaneous Plans and Sketches
     
    Planting Enhancements
    Tube   37  
    Issued for Construction,  September 11, 2000
    Tube   37  
    Phase II,  April 11, 2001
     
    Prairie Conversion
    Tube   37  
    Issued for Bidding,  October 28, 2002
    Tube   37  
    Sketches,  October 7, 2002
    Tube   38  
    Southwest Campus Site Restoration -- Check Set,  July 9, 2006
    Tube   38  
    Miscellaneous Plans and Drawings
     
    Other Michigan Projects [subseries]:

    The Other Michigan Projects (4.5 linear feet, 13 tubes, 1 folder) subseries contains correspondence, working files, press clippings, minutes, permit applications, sketches, drawings, and plans relating to various Pollack projects in Michigan. These projects include Charlevoix, the Huron River Bikeway Study, the Huron-Whittaker Corridor Study, Independence Lake Park, and the Pere Marquette Rail Trail.

     
    Textual Files
     
    Charlevoix -- East Park and Marina Improvements
    Box   21  
    Agreement for parks project,  2001
    Box   21  
    Bid period Addendum 2
     
    Chronological File
     
    Marina
    Box   21  
     May-July, 2002
    Box   21  
     August-October, 2002
     
    Park
    Box   21  
     June 2001-June 2002
    Box   21  
     July-September, 2002
    Box   21  
    Clippings (2 folders)
    Box   21  
    Conference facility,  2003
     
    Correspondence
    Box   21  
    Miscellaneous (4 folders)
    Box   21  
    Park and Landslide facilities,  2003
    Box   22  
    Cost estimates
    Box   22  
    Existing Conditions,  2002
    Box   22  
    Meeting minutes,  2006
    Box   22  
    Park plan and notes,  2002-2003
    Box   22  
    Photographs -- Existing conditions,  2001 (color)
    Box   22  
    Plan merger,  2002-2003
    Box   22  
    Project meeting notes
    Box   22  
    Public meetings
    Box   22  
    Sketches,  2004
    Box   22  
    Waterways Commission information
     
    Huron River Bikeway Study (and related)
    Box   22  
    Huron River Greenway Trail
    Box   22  
    Huron River Greenway Planning Report,  2000
    Box   22  
    Huron River Plan,  2002
     
    Permit
    Box   22  
    Application,  2000-2006
    Box   22  
    Appeal,  2006
    Box   22  
    Michigan Natural Rivers Report,  1977
    Box   22  
    Huron Valley Corridor Study,  1978
    Box   22  
    Waterworks Master Plan,  1986
    Box   22  
    Proposal for Services -- Huron River Bikeway Study,  1983
    Box   22  
    Proposal for Segment 'D' Nonmotorized Trail,  2003
    Box   22  
    Segment 'D' Nonmotorized Trail Proposal file
    Box   22  
    Huron River Bipath -- Participatory Design,  1976
    Box   22  
    Huron River Bikeway Study,  1984
    Box   22  
    Segment 'D' Summary Report,  2004
    Box   22  
    Segment 'D' Correspondence (2 folders)
    Box   22  
    Prelim Bike Study Report,  1997
    Box   22  
    Public Meetings
    Box   22  
    Correspondence and Meetings (3 folders)
     
    Huron -- Whittaker Corridor
    Box   23  
    Fund Applications,  1999 (4 folders)
    Box   23  
    Huron-Whittaker Corridor Study Proposal,  1998
    Box   23  
    Huron-Whittaker Corridor Study,  1999
    Box   23  
    I-94 Huron Street Interchange Specifications,  2000 (2 folders)
    Box   23  
    I-94 Huron Street Interchange Landscape Enhancement Plans,  2000
    Box   23  
    TEA-21: North Campus Corridor Non-Motorized Pathway
     
    Ypsilanti
    Box   23  
    Project Proposals,  1999
    Box   23  
    Public Meetings,  1999-2000 (2 folders)
    Box   23  
    Rolled drawings
     
    Independence Lake Park
    Box   24  
    Awards,  1986
    Box   24  
    Background
    Box   24  
    Water Spray Play Facility Drawings,  2001
    Box   24  
    Drawings,  1981-1982
     
    Phase II
    Box   24  
    Notes
    Box   24  
    Plan Proposals
    Box   24  
    Master Plan
    Box   24  
    Pre-Applications,  1978-1986
    Box   24  
    Graphics
    Box   24  
    Contract
    Box   24  
    Promotional Materials
    Box   24  
    Site location
    Box   24  
    Addendum #1
    Box   24  
    Correspondence
    Box   24  
    Master Plan
    Box   24  
    Notes
    Box   24  
    Site development plan,  1978
    Box   24  
    Master plan update,  2008
    Box   24  
    DEQ Permit,  2001
    Box   24  
    Miscellaneous,  2000
    Box   24  
    Water Spray Play Facility Construction,  2001-2003 (2 folders)
    Box   24  
    Water Spray Play Facility specifications,  2001-2002
    Box   24  
    Winter Parking Lot and Trails,  2002
    Box   24  
    Winter Parking Lot and Trails Permits
    Box   24  
    Workshop Notes, 22  May 2000
    Box   24  
    Tree planting specifications,  1988
    Box   24  
    Request for Proposal,  2003
    Box   24  
    Park development proposal,  2000
     
    Pere Marquette Rail-Trail of Mid-Michigan (Midland County, Mich.)
    Box   25  
    Arbutus Bog signs,  1998
    Box   25  
    ASLA Awards submission (includes slides) (binder)
    Box   25  
    A Vision for a Linear Park in Midland County,  1992
    Box   25  
    Bike studies,  2000
    Box   25  
    Bridge Diagrams
    Box   25  
    Bridge Stuff
    Box   25  
    City of Caseville,  1996-1997
    Box   25  
    Clippings,  1994-1996
    Box   25  
    Connecting Michigan 2000,  2000
     
    Grant applications
    Box   25  
    DNR/MDOT for Phase III,  1993
    Box   25  
    ISTEA/MDOT applications,  1993
    Box   25  
    ISTEA,  1992
    Box   25  
    ISTEA applications,  1992-1993
    Box   25  
    ISTEA general materials -- Phase II
    Box   25  
    Midland County Linear Park Proposal for Services,  1991
    Box   25  
    Midland County Parks and Recreation Policies and Procedures,  1992
    Box   25  
    Pere Marquette Rail-Trail: From Start to Finish,  2000
    Box   25  
    Photographs and Negatives
     
    Plans
    Box   25  
    Arbutus Bog
    Box   25  
    City of Coleman,  1994
    Box   25  
    Dublin Avenue to Veterans Memorial Park
    Box   25  
    Project development,  1994-1999
     
    Surveys
    Box   25  
    Phase II
    Box   25  
    Phase III
    Box   25  
    Phase IV
    Box   25  
    Drawings and Plans
     
    Drawings and plans
     
    Alpena Bi-Path
    Tube   39  
    Potential Alignment,  May 14, 1975
    Tube   39  
    Plans,  June 11, 1975
    Tube   39  
    Plans,  May 20, 1975
    Tube   39  
    Miscellaneous Plans
     
    Plans
    Tube   39  
    Preliminary Engineering Report,  December 3, 2003
    Tube   40  
    Proposed Phase 1 -- Marine Work,  November 14, 2005
    Tube   41  
    Proposed Phase 2 -- Floating Pier System,  November 9, 2005
    Tube   41  
    Miscellaneous sketches
    Drawer   2 Folder   13
    Miscellaneous sketches
    Drawer   2 Folder   13
    Cherry Hill (Superior Township) -- Sketches and Overlays
     
    Independence Lake Park
    Drawer   2 Folder   13
    Miscellaneous Drawings and Sketches
    Tube   1  
    Concept Sketches,  January 13, 1978
     
    Plans
    Tube   43  
    Water Spray Play Feature -- Issued for Construction,  March 15, 2001
    Tube   43  
    Boardwalks and Culvert Replacement -- Inland Lakes and Streams Permit,  November 10, 2000
    Tube   43  
    Site Construction,  March 7, 1988
    Tube   44  
    Parking Lot and Trails -- Issued for Construction,  October 13, 2000
    Tube   44  
    Plans,  February 21, 1979
    Tube   3  
    Presentation Drawings and Notes
    Drawer   2 Folder   13
    Pere Marquette Rail Trail
    Drawer   2 Folder   13
    City Midland -- Miscellaneous Sketches and Drawings,  1992
    Drawer   2 Folder   13
    Currie Parkway Crossing Options,  June 1992
    Drawer   2 Folder   13
    Seating Area Locations,  June 1992
    Tube   46  
    City Midland -- Miscellaneous Sketches and Drawings,  1992
    Tube   46  
    City of Coleman -- Miscellaneous Sketches and Drawings
    Tube   47  
    Sanford Lake Park -- Miscellaneous Plans and Sketches
    Tube   47  
    Overview
    Tube   47  
    Miscellaneous Plans and Sketches
    Tube   48  
    Plans
    Tube   48  
    Arbutus Bog Boardwalk,  April 3, 1995
    Tube   48  
    City of Coleman,  July 13, 1994
    Tube   48  
    City of Coleman Trailhead,  September 9, 1997
    Tube   49  
    City of Midland Section,  July 31, 1992
    Tube   49  
    City of Midland Section -- Supplementary Path Information,  August 14, 1992
    Tube   49  
    Dublin Ave (Midland, MI) to Cedar St (Sanford, MI),  September 10, 1993
    Tube   50  
    Dublin Ave (Midland, MI) to North Bradley (Geneva Township, MI),  July 8, 1994
    Tube   50  
    Dublin Ave (Midland, MI) to North Bradley (Geneva Township, MI) -- Sanford Village Restroom Building,  June 28, 1996
    Tube   51  
    Dublin Ave (Midland, MI) to Veterans Memorial Park (Jerome Township, MI),  December 15, 1998
    Tube   51  
    North Bradley (Geneva Township, MI) to Coleman City Limits (Coleman, MI),  September 26, 1994
    Tube   51  
    Rail Trail Amenities,  June 15, 1998
     
    Teaching Files and Other Activities [series]:

    Teaching Files and Other Activities (2.5 linear feet) document Pollack's involvement with the Natural Areas Technical Advisory Committee (NATAC), his work at the University of Michigan, and various professional activities. Items include minutes, correspondence, course materials, and award applications.

     
    Teaching Files
    Box   26  
    American Society of Landscape Architects' (ASLA) Annual Meeting,  2005
    Box   26  
    Certified Hazardous Materials Managers Conference,  2001
     
    Correspondence
    Box   26  
    Ann Arbor development,  2003-2005
    Box   26  
    General,  2000-2005 (3 folders)
    Box   26  
    Detroit Charrette,  2001-2002
    Box   26  
    Full professor application,  1996-1997
    Box   26  
    Landscape Architecture -- 100th Anniversary,  2007-2008
    Box   26  
    Landscape Architecture appointment,  2007
    Box   26  
    Landscape Architecture faculty,  2001-2002
    Box   26  
    Landscape Architecture re-accreditation,  2008
    Box   26  
    Pollack Design Associates,  1993
     
    School of Natural Resources 587
    Box   26  
    Course materials,  1998-2000 (3 folders)
    Box   26  
    Correspondence,  2000
    Box   26  
    School of Natural Resources 590 -- Course Materials,  1999
     
    School of Natural Resources 791
    Box   26  
    Course materials,  2001
    Box   26  
    Correspondence,  2000-2001
     
    School of Natural Resources 688
    Box   26  
    Course Materials,  1998-2002 (2 folders)
    Box   26  
    Project proposals,  1990-1998
    Box   26  
    School of Natural Resources Landscape Architecture Faculty Retreat,  2001
    Box   26  
    Senior Graduation talk,  2005
    Box   26  
    Teaching evaluations,  2000-2001
    Box   26  
    Tour de Wetlands,  2002
    Box   26  
    Urban Planning 505,  2001
     
    Natural Areas Technical Advisory Committee (NATAC)
     
    Purchasing Cycles
    Box   26  
    Rounds 1 and 2
    Box   26  
    Round 3
    Box   26  
    Round 4
    Box   26  
    Round 7
     
    Meetings and Correspondence
    Box   26  
     2001-2002
    Box   27  
     2002
    Box   27  
     2003-2004
    Box   27  
     2005 (2 folders)
    Box   27  
     2006
    Box   27  
     2007
    Box   27  
     2008
    Box   27  
     2009
    Box   27  
     2009-2010
    Box   27  
    Greenbelt Advisory Commission
    Box   27  
    Open Space Visioning Workshop,  2005
    Box   27  
    Public Access Materials
     
    Miscellaneous
    Box   27  
    ASLA Call for Proposals,  1995
    Box   27  
    ASLA Community Service Award
    Box   27  
    ASLA Council on Education (2 folders)
    Box   27  
    Clippings
    Box   27  
    Design Michigan: Alpena Bipath
    Box   27  
    FASLA Nomination Forms
    Box   27  
    Landscape Architecture Accreditation Board (1 folder)
    Box   28  
    Landscape Architecture Body of Knowledge (3 folders)
    Box   28  
    Michigan Society of Planning Officials Award Application -- Ann Arbor Plan for Parks, Recreation and Open Space,  1982
    Box   28  
    Miscellaneous
     
    Collected Material
    Box   28  
    The 28th Street Study,  1982
    Box   28  
    Collected Design Guidelines (2 folders)
    Box   28  
    Dayton Climate Project Working Papers,  1981
    Box   28  
    Dayton Urban Design,  1981
    Box   28  
    Michigan Department of State and Highways Pamphlet,  1970
    Box   28  
    Mills/Hoyt Preservation Program,  1982
    Box   28  
    Near Northeast Neighborhood News -- Ann Arbor
    Box   28  
    Project Grow Newsletter,  2005-2006
    Box   28  
    School of Natural Resources Michigan Workshop,  1976
    Box   28  
    Treyburn, NC Design Guidelines,  1986
     
    Videotapes [series]:

    The Videotapes (1 linear foot) series is comprised of VHS tapes that document the State Street Urban Design Project and various areas of Ann Arbor.

     
    State Street Urban Design Project Construction Videos (VHS)
    Box   29  
    Drainage estimates,  2002
    Box   29  
    E. Liberty,  2002 (2 tapes)
    Box   29  
    E. Liberty and State,  2002
    Box   29  
    Maynard,  2002 (2 tapes)
    Box   29  
    Maynard and E. Williams,  2002
    Box   29  
    S. State, William, and University,  2002
    Box   29  
    Thayer and William,  2002
    Box   29  
    Thompson and Washington,  2002
    Box   29  
    Washington, Liberty, and William,  2003 (2 tapes)
    Box   29  
    William, Thompson, and Thayer,  2003 (2 tapes)
    Box   29  
    William and Thayer,  2003 (2 tapes)
    Box   29  
    William and Washington,  2002
     
    NTSC
    Box   29  
    Ann Arbor Lower Town Area Auto Tour,  2002
    Box   29  
    Ann Arbor Aerial Overview,  2002
    Box   29  
    River Tour,  2002
    Box   29  
    School of Natural Resources
    Box   29  
    Bandemer Park Development Simulations,  1990
     
    Digital Materials [series]:

    The Digital Material series has been arranged in the following sub series: Ann Arbor Projects, Herman Miller Projects, Pfizer Projects, and other Michigan Projects. The series consists of digital material related to a number of Pollack's projects and includes design files, presentations, photographs, and project plans. The digital material came to the library on CD-ROMs, which were then transferred to a computer using the Duke Data Accessioner and uploaded to the University of Michigan's Deep Blue digital repository.

      Online  
    Ann Arbor Projects [subseries]:     (zip file includes the following folders)  (zip fille, 599450Kb) [download zip file]
     
    Fuller Road Exhibits,  2006
     
    Great Street Toolkit
     
    Mallets Creek -- Brown Park RFP
      Online  
    Herman Miller Projects [subseries]:     (zip file includes the following folders)  (zip fille, 55243Kb) [download zip file]
     
    Greenhouse Presentation,  2003
     
    Images
     
    ZMS Master Plan,  2005
      Online  
    Other Michigan Projects [subseries]:     (zip file includes the following folders and subfolders)  (zip fille, 404570Kb) [download zip file]
     
    Charlevoix Specification Issued for Bidding,  2006
     
    Huron River Bikeway Study
     
    Huron River Bikeway Study General
     
    Huron Whittaker Corridor Study Boards
     
    Segment D Aerials
     
    Segment D Revised Aerial Photographs
     
    Segment D Trail Aerial Bases
     
    WCPARC Border to Boarder Trail Meeting Materials
     
    Sanford Lake Park Site Improvements,  2007
      Online  
    Pfizer Projects [subseries]:     (zip file includes the following folders)  (zip fille, 404570Kb) [download zip file]
     
     2800 Site B10 entry,  2002
     
    Baxter Road Entrance Specifications
     
    Huron Parkway Reconstruction
     
    Master Plan Framework
     
    Planned Unit Development