Peter Pollack papers   1965-2009  (bulk 1980-2005 )
full text File Size: 209 K bytes | Add this to my bookbag

   Container / Location    Title
 
Ann Arbor Projects [subseries]:

The Ann Arbor Projects (9.5 linear feet, 15 tubes, 6 oversize folders) subseries contains correspondence, minutes, permits, presentations, and working files related to various projects Pollack worked on in Ann Arbor. These projects include the Allen Creek Greenway Task Force; the Ann Arbor Corridor Study; the Farmer's Market commission; the Parks, Recreation, and Open Space Plan; the Commission on Art in Public Places; Downtown Design Guidelines; the Downtown Development Authority, Fuller Road; Furstenberg Park; Gandy Dancer; Huron-Division-Fifth St; Liberty Plaza; Mary Beth Doyle Park; the State Street Urban Design Project; and the University of Michigan. The subseries also contains sketches, plans, and drawings related to Pollack's projects in Ann Arbor.

 
Textual Records
 
Allen Creek Greenway Task Force (ACGTF)
Box   5  
Maps and Drawings
Box   5  
History and Site Booklet
Box   5  
Findings and Recommendations, Final
Box   5  
Findings and Recommendations, Draft
Box   5  
Meetings,  2005
Box   5  
Workshop 1B, Site Specific Data
Box   5  
Meetings,  July-September 2006
Box   5  
General Information
Box   5  
Workshop 1A,  April 22, 2006
Box   5  
Floodway
Box   5  
Tonight's Meeting,  May 17, 2006
Box   5  
Materials for Meeting,  August 2, 2006
Box   5  
"Help Shape Allen Creek Greenway," Workbook
Box   5  
Greenway Plan
Box   5  
Correspondence
Box   5  
Powerpoint Presentations
Box   6  
Public Participation materials
Box   6  
Task Force Handouts
Box   6  
Principles
Box   6  
Interactive Public Design Project
Box   6  
Public Process
Box   6  
Supplemental Appendix (4 folders)
Box   6  
Washtenaw Avenue,  2005-2009
Box   6  
Preliminary Planning
Box   6  
News clippings
Box   6  
City of Ann Arbor Parcel Options
Box   6  
Miscellaneous
Box   6  
Resolution Creating a New Greenway Taskforce
Box   6  
Communication (3 folders)
 
Ann Arbor Corridor Study
Box   6  
Original Artwork
Box   6  
Composite of Design Guidelines,  1983
Box   6  
Final Draft Report,  1983 (2 folders)
Box   6  
Draft Report,  1983 (2 folders)
Box   6  
Preliminary Drafts,  1983
Box   6  
Proposal for Services,  1981
 
Ann Arbor Farmer's Market Commission
Box   7  
Binder: Minutes and agenda,  2005
Box   7  
Market Commission Background
Box   7  
Farmer's Market Working Files,  2005
Box   7  
Farmer's Market Master Plan (draft),  2004
Box   7  
Friends of the Market,  2005
Box   7  
Agendas and Correspondence,  2005-2006
Box   7  
Correspondence,  2005
Box   7  
Meeting Agenda,  June 15, 2006
Box   7  
Market Commission Working Files (3 folders)
Box   7  
Information on Other Michigan Farmer's Markets
Box   7  
Site Planning
Box   7  
Complaints,  2009
Box   7  
Seniority,  2008
Box   7  
Market Commission
Box   7  
Public Market
Box   7  
Stark Complaint
Box   8  
Former Market Commission
Box   8  
Market Commission, J. Black
Box   8  
Market Commission, Current
Box   8  
Advisory Commission
Box   8  
Boundary and Topographic Survey,  2003
Box   8  
Background Information
Box   8  
Farmers Market Working Files
Box   8  
Presentation
Box   8  
Public Meeting
 
Ann Arbor Parks, Recreation and Open Space Plan
Box   8  
Award Submission,  1982
Box   8  
Final Draft and Appendix,  1981
Box   8  
Park Maintenance Plan,  1976
Box   8  
Proposed Parks and Open Space Plan,  1978
Box   8  
Summary Plan,  1981
Box   8  
Bandemer Park Plans,  1993
 
Commission on Art in Public Places (CAPP)
Box   8  
Ann Arbor Public Art Commission,  2004-2008
Box   8  
Annual Report,  2003
Box   8  
Arts Alliance
Box   8  
CAPP meeting minutes,  2004
Box   8  
CAPP Planning,  2005
Box   8  
Community interviews,  2003
Box   8  
Community resource book
Box   9  
Correspondence (3 folders)
Box   9  
Grant proposal
Box   9  
Jury process
Box   9  
Master plan,  2004
Box   9  
Master plan RFP documents,  2003
Box   9  
MDOT Slide Presentation,  1994
Box   9  
Off the Wall Gallery
Box   9  
Park Advisory Commission meeting,  2004
Box   9  
Plan preparation
 
Downtown Ann Arbor Design Guidelines
Box   9  
Ann Arbor Downtown Plan,  2008
Box   9  
Comments from City Website,  2009
Box   9  
Guidelines Drafts,  2008-2010 (3 folders)
Box   9  
Memos,  2006-2007
Box   9  
Miscellaneous
Box   9  
Planning commission meetings,  2008
Box   9  
Recommended Policy Framework for Downtown Ann Arbor,  2005
Box   9  
Working Files (3 folders)
Box   9  
Workshops
 
Downtown Development Authority (DDA)
 
Agendas
Box   9  
 1986
Box   9  
 1987 (2 folders)
Box   9  
 1988 (3 folders)
Box   9  
 1989
Box   10  
 2002
Box   10  
 2003 (2 folders)
Box   10  
 2004
Box   10  
Meeting Agendas and Minutes
Box   10  
Misc. Correspondence
Box   10  
Huron/Fifth/Division (2 folders)
Box   10  
Pedestrian Improvements Master Plan materials (6 folders)
Box   10  
Pedestrian Improvements 4th Avenue
Box   10  
News Clippings
Box   10  
Preliminary Concepts
Box   10  
Contract
Box   10  
Preliminary Draft Materials
Box   10  
Walt's Letter
Box   10  
Light Fixtures (2 folders)
Box   10  
Memos and Attachments
Box   10  
Questionnaire
Box   10  
Projects Evaluation
Box   11  
Correspondence
Box   11  
Details
Box   11  
Master Plan, Construction Standards
Box   11  
Liberty Street (3 folders)
Box   11  
Master Plan, Base Maps
Box   11  
Graphics
Box   11  
Maps
Box   11  
Liberty Street Evaluation
Box   11  
Liberty Street Estimate
Box   11  
Library Lot
Box   11  
S. Fourth Street Estimate
Box   11  
Construction Engineering,  2001
Box   11  
Pollack Designs Billing Summaries,  1983-1985
Box   11  
Ann Arbor Transit Authority (AATA) Downtown Transfer Center Plans
Box   11  
Ann Arbor Walking Tours
Box   11  
Attachments,  2003
Box   11  
"R" Items,  2003 and  2005
Box   11  
"The Ann Arbor Central Area -- A Program for the Future,"  1987
Box   11  
Downtown Ann Arbor Revitalization Plan Maps,  2005
 
Fuller Road Projects
Box   11  
Fuller Road/Fuller Park Site Information
 
Fuller Road/Maiden Lane Intersection
Box   11  
Correspondence (3 folders)
Box   11  
Plans,  2006
Box   11  
Roundabouts research
 
Fuller Road Re-Alignment Wetland Mitigation
Box   11  
Correspondence (2 folders)
Box   11  
Monitoring Report and Drawings
Box   11  
Lee Skabelund's Notes
Box   12  
Revised Specifications
Box   12  
Wetland Mitigation (2 folders)
Box   12  
Wetland Slides,  2000
Box   12  
Reports,  1998-2002
Box   12  
Photographs and Slides,  2001
Box   12  
Contract Documents for Fuller Road Wetland Mitigation and Tree Planting Project, File No. 94048  1994
Box   12  
Specifications,  1992-1999 (scattered)
 
Glen/Fuller
Box   12  
Award Submission
Box   12  
Fuller/Glen Transit Project
Box   12  
Glenn/Fuller/Geddes Study,  1981
Box   12  
Glen/Fuller Project Draft Negative Declaration,  1980
Box   12  
Glen Fuller Project Environmental Assessment,  1981 (2 folders)
Box   12  
Photographs (3 folders)
Box   12  
Plans and Drawings
Box   12  
Project planning
Box   12  
Drawings
 
Furstenberg Park
Box   12  
Award Submission
Box   12  
Furstenberg Park Development Request for Proposals,  1990
Box   12  
Reconnaissance,  1991
 
Gandy Dancer
Box   12  
Project Files,  1976-1978
Box   12  
Photographs
Box   12  
Specifications for Site Development,  1976
Box   13  
Huron, Division, Fifth streets (Ann Arbor)
Box   13  
ASLA Award Submission,  2005
Box   13  
Presentations,  2005
Box   13  
Project Proposal,  2003
Box   13  
Public Hearing,  2998
Box   13  
Urban Design Workbook,  2004
 
Liberty Plaza
Box   13  
Submittals
 
Chronological File
Box   13  
 March 2003
Box   13  
 May-June, 2003
Box   13  
 January-February, 2003
Box   13  
 August-December, 2002
Box   13  
 December 2001-July 2002
Box   13  
Contract Documents for the Liberty Plaza Improvements,  2003
Box   13  
Specifications for Bidding,  March 13, 2003
Box   13  
Specifications for Review,  2003
Box   13  
Community Meetings,  2002
Box   13  
Construction Meeting notes,  2003
 
Mary Beth Doyle Park (Brown Park) Detention Basin
 
Chronological File
Box   13  
 March-April, 2003
Box   13  
 May-August, 2003
Box   13  
Correspondence and presentations (5 folders)
Box   13  
DEQ Permit,  2005
Box   14  
Mallet's Creek RFP
Box   14  
Meeting minutes,  2006
Box   14  
Project Manual
Box   14  
Proposal,  2003 (2 folders)
 
State Street Urban Design Project
Box   14  
Request for Qualifications
Box   14  
Construction Notes,  2002-2003 (2 folders)
Box   14  
Correspondence,  2000-2003 (3 folders)
Box   14  
Design Intent,  2000-2001
Box   14  
General,  2001
Box   14  
Plans and Drawings
Box   14  
State Street Area Project Pedestrian Improvement Plans,  November 2001
Box   14  
South State Street Two-Way Traffic Study,  2000
Box   14  
South University Streetscape Improvements Proposal
 
University of Michigan
Box   14  
North Quad Site Improvements Technical Specifications,  2009
Box   14  
North Quad Working Files,  2009
Box   14  
Rackham Green Land Improvements Technical Specifications,  2009
 
Drawings and Plans
Tube   42  
Allen Creek Greenway Taskforce -- Aerial Photographs and Overlays
 
Ann Arbor Corridor Study
Tube   2  
Aerial photographs and overlays
Tube   2  
Base Maps
Tube   2  
Sketches
 
Broadway Street Shopping Area
Drawer   1 Folder 1  
Urban Design Plan,  January 10, 1981
Drawer   1 Folder 1  
Richard Raab Parking Lot Schemes,  April 7, 1981
Drawer   1 Folder 1  
Broadway Place Shopping Area Conceptual Sketches,  undated
Drawer   1 Folder 1  
Broadway Wall Project Slope Cross Sections,  September 8, 1983
Drawer   1 Folder 1  
Kroger Parking Lot Options,  March 24, 1982
Drawer   1 Folder 1  
Site Plan for Expansion of Broadway Kroger,  July 15, 1977
Drawer   1 Folder 1  
Broadway Wall -- Grading and Slope Stabilization,  September 8, 1983
Drawer   1 Folder 1  
Retaining Wall Extension,  May 23, 1984
Drawer   1 Folder 1  
Raab Shopping Center Site Plan Options,  August 17, 1983
Tube   45  
Urban Design Plan,  January 10, 1981
Tube   45  
Landscape Plan,  undated
Drawer   1 Folder 1  
Cobblestone Farm,  1985
Drawer   1 Folder 2  
Downtown Development Authority
Drawer   1 Folder 2  
Maynard Street
 
Pedestrian Improvements Project
Drawer   1 Folder 2  
Detroit St/Farmers Market -- Misc. Plans and Drawings
Drawer   1 Folder 2  
Fourth Street -- Miscellaneous Plans and Drawings
Drawer   1 Folder 2  
Liberty Street
Drawer   1 Folder 2  
Liberty Street and Fourth Avenue
Drawer   1 Folder 2  
South University Pedestrian Way -- Plans and drawings
Tube   5  
Detroit St/Farmer's Market -- Miscellaneous Plans and Drawings
Tube   6  
Fourth Avenue -- Miscellaneous Plans and Drawings
Tube   7  
Kerrytown Lighting,  April 1997
Tube   7  
Phase I:  Fall 1983 ,  June 9, 1983
Tube   7  
Phase I:  Fall 1985 ,  July 17, 1985
Tube   8  
Phase II:  Fall 1985
Tube   8  
Phase II,  January 19, 1990
Tube   9  
South University Pedestrian Way -- Miscellaneous Plans and drawings
Tube   9  
West Liberty Street
Tube   9  
Miscellaneous plans
Tube   10  
State Street Area Project Phase II Pedestrian Improvements -- Plans Issued for Bidding,  March 13, 2003
Tube   10  
Urban Design Concept
Tube   3  
Fourth and Catherine Parking Lot -- Plans
Tube   4  
Liberty Plaza Improvements -- Issued for Bidding,  March 13, 2003
Tube   4  
Miscellaneous Overlays
Tube   4  
North Corridor Campus Pathway
 
State Street
Drawer   1 Folder 3  
Maynard and State Street Studies
Drawer   1 Folder 3  
State Street Pedestrian Alley
 
Tally Hall
Drawer   1 Folder 4  
Site Plan,  1985
Drawer   1 Folder 4  
Miscellaneous Plans
 
First Congregational Church
Drawer   1 Folder 4  
Miscellaneous Sketches and Courtyard Plans
 
Fuller-Glen
 
Early Concept Studies
Drawer   1 Folder 4  
Fuller/Glen Transit Project Preliminary Site Plans,  May 19, 1981
Drawer   1 Folder 4  
Preliminary Bridge Railing Details,  May 19, 1981
Drawer   1 Folder 4  
General Analysis Sketches,  October 26, 1979
Drawer   1 Folder 4  
Conceptual Grading Plan,  May 1, 1981
Drawer   1 Folder 4  
Early Site Studies
Drawer   1 Folder 4  
Fuller Road Wetland Mitigation
 
Fuller Road Projects
 
Plans
Tube   11  
Fuller-Glen Project,  November 30, 1981
Tube   11  
State Street to Glen Plan and Profile,  November 3, 1982
Tube   11  
Fuller Rd/Oak Way Realignment,  May 19, 1993
 
Maps and Diagrams
Tube   12  
Fuller Penetrator Bike Route Study,  October 21, 1975
Tube   12  
Glen-Fuller Transit Project,  October 9, 1979
Tube   12  
Fuller-Glen Final Alignment (Proposed),  November 11, 1980
Tube   12  
Fuller-Glen Shrub Bed Count,  September 22, 1983
Tube   12  
Fuller Pool Entrance Revisions
Tube   12  
Fuller Rd Survey,  September 10, 1991
Tube   13  
Fuller-Glenn Planting and Grading Studies
Tube   13  
Fuller-Glenn Public Hearing -- Overall Approach
Drawer   1 Folder 5  
Furstenberg Park -- Miscellaneous Plans and Drawings,  1991
Tube   14  
Furstenberg Park -- Miscellaneous Plans and Drawings,  1991
 
Gandy Dancer
Drawer   1 Folder 5  
Schematic Site Plan,  March 1976
Drawer   1 Folder 5  
Sketches
Tube   14  
Plans,  June 24, 1976
Tube   14  
Planting Plan,  May 1976
Tube   14  
Schematic Site Plan,  March 1976
Tube   14  
Sketches
Drawer   1 Folder 6  
Huron-Division-Fifth St
Drawer   1 Folder 6  
Sketches and Drawings
Tube   15  
Site Surveys
Tube   15  
Sketches
Tube   15  
Sketches and drawings
Drawer   1 Folder 6  
Huron River Corridor Study
Drawer   1 Folder 6  
Master Plan Studies,  1987
Drawer   1 Folder 6  
Miscellaneous sketches
Tube   15  
One-Way to Two-Way Signage Conversion Plans,  30 July 2003
Tube   15  
University of Michigan North Campus Hubbard-Hayward Street Proposed Realignment and Parking Lots Improvement Plan,  16 July 1993