Peter Pollack papers   1965-2009  (bulk 1980-2005 )
full text File Size: 212 K bytes | Add this to my bookbag

Container / Location Title
 
International Business Machines Corporation Office Building, Southfield, Michigan,  1975-1995 [subseries]:
 
Architectural Records for Office Building
Box   79  
Architect's Conceptual Statement
Box   79  
Site Utilization Study,  2/3/1975
Box   79  
Preliminary Concept Submittals I and I,  4/18/1975
Box   79  
Final Concept Submittal,  6/12/1975
 
Specifications for General Contract, 12/1/1975
Box   79  
Bid and Contract Documents
Box   79  
Divisions # 1-2
Box   79  
Divisions # 3-7
Box   79  
Divisions # 8-11
Box   79  
Divisions # 14-15
Box   79  
Division # 16
Box   79  
Structural Drawing Book by Skilling, Helle, Christiansen, Robertson, Structural Engineers, 12/1/1975
Box   79  
Addenda # 1-7,  12/16/1975-1/8/1976
 
Memoranda
Box   79  
# 1-75, 12/23/1974-10/8/1975
Box   79  
# 76-150,  10/14/1975-12/23/1976
Box   79  
# 151-217, 1/5/1977-2/29/1979
Box   80  
Memoranda (cont.)
Box   80  
# 218-241, 3/5/1979-7/18/1980
Box   80  
Interiors Memoranda # 1-22,  7/27/1976-4/25/1980
 
Bulletins
Box   80  
# 1-2,  3/10/1976-3/24/1976
Box   80  
# 3-3R, 5/14/1976-6/8/1976
Box   80  
# 5-5A,  12/10/1976-11/18/1977
Box   80  
# 6-F15, 6/1/1976-8/18/1978
Box   80  
# 16-36,  5/27/1977-3/15/1979
Box   80  
Statement of Requirements and Building Provisions Report,  10/12/1977
Box   80  
Construction Photographs by Win Brunner Photographer,  5/4/1976-3/2/1979 (three folders of 138 8x10-inch, black-and-white prints)
Box   80  
Construction Photographs,  1977-1978 (eighty-six color slides)
Box   80  
"Restoration of Wind Damage to the Curtain Wall and Remediation of Panels to Reduce Risk of Future Wind Damage" by Gordon H. Smith Corporation,  1/17/1992 (two volumes)
Box   80  
Wind Damage Survey by Gunnar Birkerts and Associates, Inc.,  3/1992
Box   80  
Specifications for Curtainwall Wind Damage Repair,  9/1992
Box   80  
Memoranda for Curtainwall Repair # 1-23, 4/16/1992-2/3/1994
Box   80  
"Wind Damage Repair Specification for Facade Cleaning and Restoration" by Gordon H. Smith Corporation,  6/15/1995
Box   80  
Newspaper and Journal Articles,  1979-2005
 
Architectural Records for Southfield Centre Renovation
Box   81  
Specifications, Phase I,  3/25/1986
Box   81  
Specifications, Phase II,  2/20/1987
Box   81  
Specifications, Phase III,  3/17/1989
Box   81  
Phases I and II Addenda,  3/28/1986-3/19/1987
Box   81  
Revised Drawings,  1986-1988
 
Memoranda
Box   81  
# 1-50,  12/28/1984-5/18/1985
Box   81  
# 51-100, 5/14/1985-4/3/1986
Box   81  
# 101-150,  4/15/1986-8/29/1986
Box   81  
# 151-200, 9/4/1986-3/27/1987
Box   81  
# 201-279, 4/7/1987-8/22/1989
Box   81  
Art Program,  1986
Box   81  
Earth Station Specifications and Memoranda,  1983-1988
 
Architectural Drawings for Office Building
Tube   47  
Presentation Drawings, one dated  7/24/1984 (ink drawings on vellum and mylar with pantone and dot screen overlays and blue-line prints with pantone overlays)
Tube   48  
Construction Drawings
Tube   48  
Architectural Drawings (A-2 to A-40), 12/1/1975 revised  12/31/1975 (sepia and blue-line prints)
Tube   49  
Structural Drawings by Skilling, Helle, Christiansen, Robertson, Structural Engineers (S1-1 to S1-8, S2-1 to S2-2), 12/1/1975 revised  10/21/1976 (blue-line prints)
Tube   49  
Site Mechanical Drawings by Joseph R. Loring & Associates, Site, Mechanical, Electrical Engineers (C-1 to C-12), 12/1/1975 revised  10/16/1978 (blue-line prints)
Tube   50  
Mechanical Drawings by Joseph R. Loring & Associates, Site, Mechanical, Electrical Engineers (P-1 to P-9, FP-1 to FP-5, ME-1 to M-17), 12/1/1975 revised  4/14/1978 (blue-line and electrostatic prints)
 
Electrical Drawings by Joseph R. Loring & Associates, Site, Mechanical, Electrical Engineers
Tube   50  
(E-1 to E-35), 12/1/1975 revised  11/20/1978 (blue-line, sepia and electrostatic prints)
Tube   50  
(E-11 to E-14), 3/11/1977-4/9/1977 (pencil drawings on reverse sepia prints)
Tube   51  
Architectural and Electrical Drawings for Fitting-Up Work,  1/21/1977-6/15/1977 revised  11/22/1978 (thirty-nine blue-line and sepia prints)
 
Architectural Drawings for Southfield Centre Renovation
Tube   52  
Construction Drawings
Tube   52  
Architectural Drawings of Phases I, II and III (A-3 to A-36),  3/25/1986,  2/20/1987 &  3/17/1989 revised  8/22/1988 (electrostatic prints on mylar and blue-line prints)
Tube   53  
Mechanical Drawings and Specifications by Edelstein Associates, Consulting Engineers (ME-1 & ME-2, M-1 to M-33),  3/25/1986,  2/20/1987 &  3/17/1989 revised 10/7/1988 (blue-line prints)
Tube   54  
Electrical Drawings by Edelstein Associates, Consulting Engineers (E-1 to E-54),  3/25/1986,  2/20/1987 & 1/8/1988), revised 10/7/1988 (electrostatic prints on vellum and blue-line prints)
Tube   55  
Audio-Visual Systems Drawings by I.B.M. Midwestern Area Real Estate & Construction Division (AV-1 to AV-18),  March 1987 (electrostatic prints on vellum)
Tube   55  
Curtainwall Repair Drawings (A-1 & A-2),  9/9/1992 revised  10/13/1992 (electrostatic prints on vellum)
Tube   56  
Earth Station No. 2 Drawings and Specifications (0-1 to 0-4, A-1 to A-9, E-1 & E-2),  4/4/1988 &  4/11/1988 (electrostatic prints on vellum and mylar)