Peter Pollack papers: 1965-2009 (bulk 1980-2005)
full text File Size: 283 K bytes | how to request materials

Contents List

Request materials for use in the Bentley Library
Container / Location Title
 
Administrative Files and Promotional Materials [series]

Administrative Files and Promotional Materials (1 linear foot) contains information related to Pollack Design Associates and promotional materials for various projects.

Box   1  
American Society of Landscape Architects Application 1961
Box   1  
Awards 1988-1997
Box   1  
Background undated (2 folders)
 
Consultants
 
Architects
Box   1  
Herrmann Associates undated
Box   1  
Meneghini & Associates undated
Box   1  
Richard Neumann 1986
 
Landscape Architects
Box   1  
William J. Johnson Associates 1990-1991
 
Civil engineers
Box   1  
All Seasons Consulting Services 1995
Box   1  
Alpha Consulting Engineers undated
Box   1  
Boss Engineering Company undated
Box   1  
Washtenaw Engineering undated
 
Engineers
Box   1  
Neil Adams, Inc. undated
Box   1  
CJ Colein 1992
 
Specialty Consultants
Box   1  
Biological Mediation Systems undated
Box   1  
Miscellaneous consultants undated
Box   1  
Janet Frey Talbot undated
Box   1  
Design/Economics 1987
Box   1  
Letters of reference 1988-2002
Box   1  
Miscellaneous Projects (3 folders)
Box   1  
Natural features PR material 1994-1999
Box   1  
Press releases 1990
Box   1  
Project list undated
Box   1  
Resumes undated
Box   1  
Staff photographs (color and black-and-white)
Box   1  
Staff profiles undated
Box   1  
Wetland assessment services marketing 1991-1995
 
Project Summaries [series]

The Project Summaries (3.5 linear feet) series contains project lists and brief summaries of projects Pollack worked on, in addition to more comprehensive project reports for projects Pollack worked on in the state of Michigan.

 
Project Profiles [subseries]
Box   1  
Job lists 1984-1991 (8 folders)
Box   2  
Alpena Bi-path (Alpena, MI) 1995
Box   2  
Ann Arbor DDA (Ann Arbor, MI) 1985 (2 folders)
Box   2  
Ann Arbor Depot (Ann Arbor, MI) 1980
Box   2  
Huron River Corridor (Ann Arbor, MI) 1987
Box   2  
Pedestrian improvements (Ann Arbor, MI) 1984
Box   2  
Plan for Parks, Recreation, and Open Spaces (Ann Arbor, MI) 1981
Box   2  
Avis Farms (Pittsfield Township, MI) 1991
Box   2  
Bandemer Park (Ann Arbor, MI) 1992
Box   2  
Beach Lake (Livingston County, MI) 1991
Box   2  
Broadway Street intersection (Ann Arbor, MI) 1980
Box   2  
Burns Park School (Ann Arbor) 1993
Box   2  
Canton Recreation Complex (Canton, MI) 1991
Box   2  
Caseville County Park (Huron County, MI) 1997
Box   2  
Marina and Park Plan (Charlevoix, MI) 2002
Box   2  
Church of Latter-Day Saints (Ann Arbor, MI) 1993
Box   2  
Congregational Church (Ann Arbor) undated
Box   2  
Crosswinds Marsh (Wayne County, MI) undated
Box   2  
Elizabeth Dean Promenade (Ann Arbor, MI) 1985
Box   2  
Skyline Renewal (Denver, CO) undated
Box   2  
Dexter Community Schools (Dexter, MI) 1993
Box   2  
Dundee Village Center (Dundee, MI) undated
Box   2  
Ernst Property (1991)
Box   2  
First Congregational Church (Alpena, MI) 1976
Box   2  
Ford Heritage Park (Ypsilanti, MI) 1989
Box   2  
Furstenberg Park (Ann Arbor, MI) 1991-1992
Box   2  
Gandy Dancer (Ann Arbor, MI) 1976
Box   2  
Sports Park and Ski Hill (Gladstone, MI) 1995
Box   2  
Grand River Streetscape (Meridian, MI) 1995
Box   2  
Green Oaks Golf Course (Ypsilanti, MI) 1989
Box   2  
Haithco Recreation Area (Saginaw County, MI) 1989
Box   2  
Hall Road Village (Hamburg Township, MI) 1994
Box   2  
Hayden House (Ann Arbor, MI) 1986
 
Herman Miller
Box   2  
Powdercoat Technology 1991
Box   2  
SQA (Holland, MI) 1995 (2 folders)
Box   2  
Hillsdale Trail (Hillsdale, MI) 1990
Box   2  
Huntley Cove (Webster Township, MI) 1989
Box   2  
Huron River Bikeway (Ann Arbor, MI) 1984
Box   2  
Huron River Recreation Corridor (Ypsilanti, MI) 1988
Box   2  
Independence Lake Park (Washtenaw County, MI) undated
Box   2  
Jackson Road Design Study (Scio Township, MI) 1989
Box   2  
La Plaisance Industrial Park (Monroe County, MI) 1985
Box   2  
Lighthouse Park (Huron County, MI) 1994
Box   2  
Lincoln Schools (Washtenaw County, MI) 1984
Box   2  
Maineway Mall (Portland, ME) undated
Box   2  
Mallard Landing (Green Oak Township, MI) 1990
Box   2  
Cedar Street (Manistique, MI) 1995
Box   2  
Mills Property (Ann Arbor, MI) 1986
Box   2  
Montebemer Park undated
Box   2  
Moores Park (Lansing, MI) 1991
Box   2  
Murphy Farm (Saginaw, MI) 1988
Box   2  
North Bay Park (Ypsilanti, MI) undated
Box   2  
Oakbrook Park (Superior Township, MI) 1991
Box   2  
Oakland Oaks Commerce Center (Wixom, MI) 1985
Box   2  
Parkins Gravel Pit (Oxford Township, MI) 1982
Box   2  
Pepperwood (Grand Blanc, MI) 1991
Box   2  
Pere Marquette Rail-Trail (Midland, MI) 1992 (2 folders)
Box   2  
Plymouth Green Technology Center (Ann Arbor, MI) 2000
Box   2  
Sault Ste. Marie (Sault Ste. Marie, MI) 2000
Box   2  
Scio Town Center (Scio Township, MI) 1989
Box   2  
Warner-Lambert/Parke-Davis (Ann Arbor, MI) 1993
Box   2  
West Bloomfield Trail Network (West Bloomfield, MI) undated
Box   2  
West Willow Park (Ypsilanti, MI) 1986
Box   2  
River Street redevelopment (Ypsilanti, MI) 1986
 
Project Reports [subseries]
 
Ann Arbor
Box   3  
Ann Arbor's Central Area: A Vision and Agenda for the Future 1987
Box   3  
Ann Arbor Corridor Study 1983
Box   3  
Ann Arbor Corridor Study -- Summary Report 1983
Box   3  
Ann Arbor Depot 1979
Box   3  
Ann Arbor Downtown Plan 1988
Box   3  
Ann Arbor Trolley Feasibility Study 1977
Box   3  
Argo Framework Study 1993
Box   3  
Buhr Park -- Infrastructure Improvements 2007
Box   3  
City of Ann Arbor Bike Path Study 1973
Box   3  
Downtown Ann Arbor Development and Conservation Strategy 1975
Box   3  
General Development Plan for the City of Ann Arbor 1973
Box   3  
Hayden House Preliminary Land Use Study 1986
Box   3  
Hidden Lake 1987
Box   3  
Huron River Corridor: Detroit Edison and Mich Con Parcels 1987
Box   3  
Huron Valley Girl Scout Council 1986
Box   3  
Leslie Laboratories 1983
Box   3  
Master Plan for Pedestrian Improvements 1985
Box   3  
Master Plan for Pedestrian Improvements -- Preliminary Draft Materials 1983
Box   3  
Old Fourth Ward Historic District 1982
Box   3  
Pedestrian Improvements Project -- Phase 1 1983
Box   3  
Pedestrian Improvements Project -- Phase 1B 1984
Box   3  
Pedestrian Improvements Project -- Phase 2 1985
Box   3  
Plan for Park, Recreation, and Open Space 1981
Box   3  
Plan for Solving Circulation Problems 1977
Box   3  
Proposed Area Plan for the Mills Property 1985
Box   3  
Urban Design Workbook for Huron St, Division St, and Fifth Ave 2004
Box   3  
Vacant Land Inventory 1978
Box   3  
Zoning Chapter
 
Ypsilanti
Box   3  
Eastern Michigan University -- A Concept Plan for Campus 2004
Box   3  
Huron River Corridor 1986
Box   3  
Non-Motorized Trail System 1997
Box   4  
Non-Motorized Pathway System -- Updated 1999
Box   4  
Plan for Parks and Recreation 1985
Box   4  
Plan for Parks and Recreation 1989
Box   4  
Plan for Parks and Recreation 1991
Box   4  
West Willow Park -- Land and Water Fund Pre-Application 1985
Box   4  
West Willow Park -- Phase 2 1986
 
Washtenaw County
Box   4  
Fiscal Impacts of Growth 1982
Box   4  
Huntley Cove -- Webster Township 1989
Box   4  
Huron Valley Bikeway 1976
Box   4  
Huron-Whittaker Corridor 2000
Box   4  
Jackson Road Design Study -- Scio Township 1990
Box   4  
Parks and Recreation Plan 1985
Box   4  
Parks and Recreation Plan 1992
Box   4  
Parks and Recreation Plan 1998
Box   4  
Relocation and Restoration of the Original Superior Township Hall 1985
Box   4  
Scio Town Center Plaza 1988
Box   4  
Transportation Profile 1985
Box   4  
Addison Oaks County Park: 1992 Master Plan -- Oakland County, 1992 1992
Box   4  
BASF South Waterfront Recreational Design -- Wyandotte 1992
Box   4  
Central Park Master Plan Resource Group Meetings -- Ingham County 1986
Box   4  
Concepts for a Waterfront Village -- Gladstone 1994
Box   4  
Corridor Design Plan -- Alpena 1995
Box   4  
Costal Zone Management Study -- Rogers City 1980
Box   4  
Feasibility Study for the Potential Bicycle Path Projects -- Beverly Hills 1985
Box   4  
Hall Road Village -- Livingston County 1994
Box   4  
Hillsdale Pride: The Baw Beese Trail Systems -- Hillsdale 1990
Box   4  
Huron County Nature Center -- Huron County 1991
Box   4  
Huron County Parks and Recreation Plan -- Huron County 1991
Box   4  
Kent County Millennium Vision -- Kent County 2006
Box   4  
Land Use Plan -- Monroe County 2000
Box   5  
LaPlaisance Industrial Park Land Use and Development Plan -- Monroe County 1985
Box   5  
Lighthouse Park Trustfund Application -- Huron County 1995
Box   5  
Mallard Lake -- Livingston County 1990
Box   5  
Manistee Lake Management Plan: Summary Report -- Manistee County 1982
Box   5  
Manistee Lake Implementation Manual -- Manistee County 1982
Box   5  
Master Plan: Central Park -- Ingham County 1987
Box   5  
Master Plan for Lighthouse Park -- Huron County 1994
Box   5  
Murphy Farm: A Master Plan for Physical Restoration and Environmental Education -- Saginaw 1988
Box   5  
Oakland Oaks Commerce Center -- Farmington 1985
Box   5  
Parks and Recreation Master Plan -- West 2002
Box   5  
Portage Street Improvements -- Sault Ste Marie 1998
Box   5  
S & H Lake Park-Saginaw County 1987
Box   5  
Shelden Sculpture Garden -- Detroit 1982
Box   5  
William H. Haithco Recreation Center -- Saginaw County 1988
Box   5  
Consortium of International Earth Science Information Network Site Evaluation and Investigation 1992
 
Project Files [series]

The Project Files (20.5 linear feet, 51 tubes, 13 oversize folders) have been arranged into the following sub-series: Ann Arbor Projects, Herman Miller Projects, Pfizer Campus Projects, and Other Michigan Projects. Each subseries has been divided into Textual Files and Drawings and Plans. Drawings and Plans includes items in both folders and tubes. Folders are largely comprised of pencil drawings and sketches, while tubes are largely composed of project plans.

 
Ann Arbor Projects [subseries]

The Ann Arbor Projects (9.5 linear feet, 15 tubes, 6 oversize folders) subseries contains correspondence, minutes, permits, presentations, and working files related to various projects Pollack worked on in Ann Arbor. These projects include the Allen Creek Greenway Task Force; the Ann Arbor Corridor Study; the Farmer's Market commission; the Parks, Recreation, and Open Space Plan; the Commission on Art in Public Places; Downtown Design Guidelines; the Downtown Development Authority, Fuller Road; Furstenberg Park; Gandy Dancer; Huron-Division-Fifth St; Liberty Plaza; Mary Beth Doyle Park; the State Street Urban Design Project; and the University of Michigan. The subseries also contains sketches, plans, and drawings related to Pollack's projects in Ann Arbor.

 
Textual Records
 
Allen Creek Greenway Task Force (ACGTF)
Box   5  
Maps and Drawings
Box   5  
History and Site Booklet
Box   5  
Findings and Recommendations, Final
Box   5  
Findings and Recommendations, Draft
Box   5  
Meetings 2005
Box   5  
Workshop 1B, Site Specific Data
Box   5  
Meetings July-September 2006
Box   5  
General Information
Box   5  
Workshop 1A April 22, 2006
Box   5  
Floodway
Box   5  
Tonight's Meeting May 17, 2006
Box   5  
Materials for Meeting August 2, 2006
Box   5  
"Help Shape Allen Creek Greenway," Workbook
Box   5  
Greenway Plan
Box   5  
Correspondence
Box   5  
Powerpoint Presentations
Box   6  
Public Participation materials
Box   6  
Task Force Handouts
Box   6  
Principles
Box   6  
Interactive Public Design Project
Box   6  
Public Process
Box   6  
Supplemental Appendix (4 folders)
Box   6  
Washtenaw Avenue 2005-2009
Box   6  
Preliminary Planning
Box   6  
News clippings
Box   6  
City of Ann Arbor Parcel Options
Box   6  
Miscellaneous
Box   6  
Resolution Creating a New Greenway Taskforce
Box   6  
Communication (3 folders)
 
Ann Arbor Corridor Study
Box   6  
Original Artwork
Box   6  
Composite of Design Guidelines 1983
Box   6  
Final Draft Report 1983 (2 folders)
Box   6  
Draft Report 1983 (2 folders)
Box   6  
Preliminary Drafts 1983
Box   6  
Proposal for Services 1981
 
Ann Arbor Farmer's Market Commission
Box   7  
Binder: Minutes and agenda 2005
Box   7  
Market Commission Background
Box   7  
Farmer's Market Working Files 2005
Box   7  
Farmer's Market Master Plan (draft) 2004
Box   7  
Friends of the Market 2005
Box   7  
Agendas and Correspondence 2005-2006
Box   7  
Correspondence 2005
Box   7  
Meeting Agenda June 15, 2006
Box   7  
Market Commission Working Files (3 folders)
Box   7  
Information on Other Michigan Farmer's Markets
Box   7  
Site Planning
Box   7  
Complaints 2009
Box   7  
Seniority 2008
Box   7  
Market Commission
Box   7  
Public Market
Box   7  
Stark Complaint
Box   8  
Former Market Commission
Box   8  
Market Commission, J. Black
Box   8  
Market Commission, Current
Box   8  
Advisory Commission
Box   8  
Boundary and Topographic Survey 2003
Box   8  
Background Information
Box   8  
Farmers Market Working Files
Box   8  
Presentation
Box   8  
Public Meeting
 
Ann Arbor Parks, Recreation and Open Space Plan
Box   8  
Award Submission 1982
Box   8  
Final Draft and Appendix 1981
Box   8  
Park Maintenance Plan 1976
Box   8  
Proposed Parks and Open Space Plan 1978
Box   8  
Summary Plan 1981
Box   8  
Bandemer Park Plans 1993
 
Commission on Art in Public Places (CAPP)
Box   8  
Ann Arbor Public Art Commission 2004-2008
Box   8  
Annual Report 2003
Box   8  
Arts Alliance
Box   8  
CAPP meeting minutes 2004
Box   8  
CAPP Planning 2005
Box   8  
Community interviews 2003
Box   8  
Community resource book
Box   9  
Correspondence (3 folders)
Box   9  
Grant proposal
Box   9  
Jury process
Box   9  
Master plan 2004
Box   9  
Master plan RFP documents 2003
Box   9  
MDOT Slide Presentation 1994
Box   9  
Off the Wall Gallery
Box   9  
Park Advisory Commission meeting 2004
Box   9  
Plan preparation
 
Downtown Ann Arbor Design Guidelines
Box   9  
Ann Arbor Downtown Plan 2008
Box   9  
Comments from City Website 2009
Box   9  
Guidelines Drafts 2008-2010 (3 folders)
Box   9  
Memos 2006-2007
Box   9  
Miscellaneous
Box   9  
Planning commission meetings 2008
Box   9  
Recommended Policy Framework for Downtown Ann Arbor 2005
Box   9  
Working Files (3 folders)
Box   9  
Workshops
 
Downtown Development Authority (DDA)
 
Agendas
Box   9  
1986
Box   9  
1987 (2 folders)
Box   9  
1988 (3 folders)
Box   9  
1989
Box   10  
2002
Box   10  
2003 (2 folders)
Box   10  
2004
Box   10  
Meeting Agendas and Minutes
Box   10  
Misc. Correspondence
Box   10  
Huron/Fifth/Division (2 folders)
Box   10  
Pedestrian Improvements Master Plan materials (6 folders)
Box   10  
Pedestrian Improvements 4th Avenue
Box   10  
News Clippings
Box   10  
Preliminary Concepts
Box   10  
Contract
Box   10  
Preliminary Draft Materials
Box   10  
Walt's Letter
Box   10  
Light Fixtures (2 folders)
Box   10  
Memos and Attachments
Box   10  
Questionnaire
Box   10  
Projects Evaluation
Box   11  
Correspondence
Box   11  
Details
Box   11  
Master Plan, Construction Standards
Box   11  
Liberty Street (3 folders)
Box   11  
Master Plan, Base Maps
Box   11  
Graphics
Box   11  
Maps
Box   11  
Liberty Street Evaluation
Box   11  
Liberty Street Estimate
Box   11  
Library Lot
Box   11  
S. Fourth Street Estimate
Box   11  
Construction Engineering 2001
Box   11  
Pollack Designs Billing Summaries 1983-1985
Box   11  
Ann Arbor Transit Authority (AATA) Downtown Transfer Center Plans
Box   11  
Ann Arbor Walking Tours
Box   11  
Attachments 2003
Box   11  
"R" Items 2003, 2005
Box   11  
"The Ann Arbor Central Area -- A Program for the Future," 1987
Box   11  
Downtown Ann Arbor Revitalization Plan Maps 2005
 
Fuller Road Projects
Box   11  
Fuller Road/Fuller Park Site Information
 
Fuller Road/Maiden Lane Intersection
Box   11  
Correspondence (3 folders)
Box   11  
Plans 2006
Box   11  
Roundabouts research
 
Fuller Road Re-Alignment Wetland Mitigation
Box   11  
Correspondence (2 folders)
Box   11  
Monitoring Report and Drawings
Box   11  
Lee Skabelund's Notes
Box   12  
Revised Specifications
Box   12  
Wetland Mitigation (2 folders)
Box   12  
Wetland Slides 2000
Box   12  
Reports 1998-2002
Box   12  
Photographs and Slides 2001
Box   12  
Contract Documents for Fuller Road Wetland Mitigation and Tree Planting Project, File No. 94048 1994
Box   12  
Specifications 1992-1999 (scattered)
 
Glen/Fuller
Box   12  
Award Submission
Box   12  
Fuller/Glen Transit Project
Box   12  
Glenn/Fuller/Geddes Study 1981
Box   12  
Glen/Fuller Project Draft Negative Declaration 1980
Box   12  
Glen Fuller Project Environmental Assessment 1981 (2 folders)
Box   12  
Photographs (3 folders)
Box   12  
Plans and Drawings
Box   12  
Project planning
Box   12  
Drawings
 
Furstenberg Park
Box   12  
Award Submission
Box   12  
Furstenberg Park Development Request for Proposals 1990
Box   12  
Reconnaissance 1991
 
Gandy Dancer
Box   12  
Project Files 1976-1978
Box   12  
Photographs
Box   12  
Specifications for Site Development 1976
Box   13  
Huron, Division, Fifth streets (Ann Arbor)
Box   13  
ASLA Award Submission 2005
Box   13  
Presentations 2005
Box   13  
Project Proposal 2003
Box   13  
Public Hearing 2998
Box   13  
Urban Design Workbook 2004
 
Liberty Plaza
Box   13  
Submittals
 
Chronological File
Box   13  
March 2003
Box   13  
May-June, 2003
Box   13  
January-February, 2003
Box   13  
August-December, 2002
Box   13  
December 2001-July 2002
Box   13  
Contract Documents for the Liberty Plaza Improvements 2003
Box   13  
Specifications for Bidding March 13, 2003
Box   13  
Specifications for Review 2003
Box   13  
Community Meetings 2002
Box   13  
Construction Meeting notes 2003
 
Mary Beth Doyle Park (Brown Park) Detention Basin
 
Chronological File
Box   13  
March-April, 2003
Box   13  
May-August, 2003
Box   13  
Correspondence and presentations (5 folders)
Box   13  
DEQ Permit 2005
Box   14  
Mallet's Creek RFP
Box   14  
Meeting minutes 2006
Box   14  
Project Manual
Box   14  
Proposal 2003 (2 folders)
 
State Street Urban Design Project
Box   14  
Request for Qualifications
Box   14  
Construction Notes 2002-2003 (2 folders)
Box   14  
Correspondence 2000-2003 (3 folders)
Box   14  
Design Intent 2000-2001
Box   14  
General 2001
Box   14  
Plans and Drawings
Box   14  
State Street Area Project Pedestrian Improvement Plans November 2001
Box   14  
South State Street Two-Way Traffic Study 2000
Box   14  
South University Streetscape Improvements Proposal
 
University of Michigan
Box   14  
North Quad Site Improvements Technical Specifications 2009
Box   14  
North Quad Working Files 2009
Box   14  
Rackham Green Land Improvements Technical Specifications 2009
 
Drawings and Plans
Tube   42  
Allen Creek Greenway Taskforce -- Aerial Photographs and Overlays
 
Ann Arbor Corridor Study
Tube   2  
Aerial photographs and overlays
Tube   2  
Base Maps
Tube   2  
Sketches
 
Broadway Street Shopping Area
Drawer   1 Folder   1
Urban Design Plan January 10, 1981
Drawer   1 Folder   1
Richard Raab Parking Lot Schemes April 7, 1981
Drawer   1 Folder   1
Broadway Place Shopping Area Conceptual Sketches undated
Drawer   1 Folder   1
Broadway Wall Project Slope Cross Sections September 8, 1983
Drawer   1 Folder   1
Kroger Parking Lot Options March 24, 1982
Drawer   1 Folder   1
Site Plan for Expansion of Broadway Kroger July 15, 1977
Drawer   1 Folder   1
Broadway Wall -- Grading and Slope Stabilization September 8, 1983
Drawer   1 Folder   1
Retaining Wall Extension May 23, 1984
Drawer   1 Folder   1
Raab Shopping Center Site Plan Options August 17, 1983
Tube   45  
Urban Design Plan January 10, 1981
Tube   45  
Landscape Plan undated
Drawer   1 Folder   1
Cobblestone Farm 1985
Drawer   1 Folder   2
Downtown Development Authority
Drawer   1 Folder   2
Maynard Street
 
Pedestrian Improvements Project
Drawer   1 Folder   2
Detroit St/Farmers Market -- Misc. Plans and Drawings
Drawer   1 Folder   2
Fourth Street -- Miscellaneous Plans and Drawings
Drawer   1 Folder   2
Liberty Street
Drawer   1 Folder   2
Liberty Street and Fourth Avenue
Drawer   1 Folder   2
South University Pedestrian Way -- Plans and drawings
Tube   5  
Detroit St/Farmer's Market -- Miscellaneous Plans and Drawings
Tube   6  
Fourth Avenue -- Miscellaneous Plans and Drawings
Tube   7  
Kerrytown Lighting April 1997
Tube   7  
Phase I: Fall 1983, June 9, 1983
Tube   7  
Phase I: Fall 1985, July 17, 1985
Tube   8  
Phase II: Fall 1985
Tube   8  
Phase II January 19, 1990
Tube   9  
South University Pedestrian Way -- Miscellaneous Plans and drawings
Tube   9  
West Liberty Street
Tube   9  
Miscellaneous plans
Tube   10  
State Street Area Project Phase II Pedestrian Improvements -- Plans Issued for Bidding March 13, 2003
Tube   10  
Urban Design Concept
Tube   3  
Fourth and Catherine Parking Lot -- Plans
Tube   4  
Liberty Plaza Improvements -- Issued for Bidding March 13, 2003
Tube   4  
Miscellaneous Overlays
Tube   4  
North Corridor Campus Pathway
 
State Street
Drawer   1 Folder   3
Maynard and State Street Studies
Drawer   1 Folder   3
State Street Pedestrian Alley
 
Tally Hall
Drawer   1 Folder   4
Site Plan 1985
Drawer   1 Folder   4
Miscellaneous Plans
 
First Congregational Church
Drawer   1 Folder   4
Miscellaneous Sketches and Courtyard Plans
 
Fuller-Glen
 
Early Concept Studies
Drawer   1 Folder   4
Fuller/Glen Transit Project Preliminary Site Plans May 19, 1981
Drawer   1 Folder   4
Preliminary Bridge Railing Details May 19, 1981
Drawer   1 Folder   4
General Analysis Sketches October 26, 1979
Drawer   1 Folder   4
Conceptual Grading Plan May 1, 1981
Drawer   1 Folder   4
Early Site Studies
Drawer   1 Folder   4
Fuller Road Wetland Mitigation
 
Fuller Road Projects
 
Plans
Tube   11  
Fuller-Glen Project November 30, 1981
Tube   11  
State Street to Glen Plan and Profile November 3, 1982
Tube   11  
Fuller Rd/Oak Way Realignment May 19, 1993
 
Maps and Diagrams
Tube   12  
Fuller Penetrator Bike Route Study October 21, 1975
Tube   12  
Glen-Fuller Transit Project October 9, 1979
Tube   12  
Fuller-Glen Final Alignment (Proposed) November 11, 1980
Tube   12  
Fuller-Glen Shrub Bed Count September 22, 1983
Tube   12  
Fuller Pool Entrance Revisions
Tube   12  
Fuller Rd Survey September 10, 1991
Tube   13  
Fuller-Glenn Planting and Grading Studies
Tube   13  
Fuller-Glenn Public Hearing -- Overall Approach
Drawer   1 Folder   5
Furstenberg Park -- Miscellaneous Plans and Drawings 1991
Tube   14  
Furstenberg Park -- Miscellaneous Plans and Drawings 1991
 
Gandy Dancer
Drawer   1 Folder   5
Schematic Site Plan March 1976
Drawer   1 Folder   5
Sketches
Tube   14  
Plans June 24, 1976
Tube   14  
Planting Plan May 1976
Tube   14  
Schematic Site Plan March 1976
Tube   14  
Sketches
Drawer   1 Folder   6
Huron-Division-Fifth St
Drawer   1 Folder   6
Sketches and Drawings
Tube   15  
Site Surveys
Tube   15  
Sketches
Tube   15  
Sketches and drawings
Drawer   1 Folder   6
Huron River Corridor Study
Drawer   1 Folder   6
Master Plan Studies 1987
Drawer   1 Folder   6
Miscellaneous sketches
Tube   15  
One-Way to Two-Way Signage Conversion Plans July 30, 2003
Tube   15  
University of Michigan North Campus Hubbard-Hayward Street Proposed Realignment and Parking Lots Improvement Plan July 16, 1993
 
Herman Miller Projects [subseries]

The Herman Miller Projects (2 linear feet, 1 tube, 1 oversize folder) subseries documents various projects Pollack completed for Herman Miller, Inc. and their Zeeland and Holland, Michigan campuses. Materials include correspondence, permit applications, working files, sketches, and plans.

 
Textual Files
Box   15  
104th Avenue, Street Improvement (2 folders)
Box   15  
Building B East
Box   15  
Building C-1
Box   15  
Building F Entry
 
Burns
Box   15  
Post Ecological Prescription Burn Report and Landscape Management/Maintenance Observations
Box   15  
Prescribed Burn 2004
Box   15  
SQA Burn
Box   15  
Correspondence
Box   15  
Design Yard
Box   15  
General Contacts 2003
 
Greenhouse
Box   15  
General
Box   15  
LEED Greenhouse
Box   15  
Permanent Pavement
Box   15  
LEEDS Application
Box   15  
Main Site, B West
Box   15  
Main Site, Prescott B
Box   15  
MDC Planting
Box   15  
Phoenix Designs (2 folders)
Box   15  
Phoenix Designs Drawings 1996
Box   15  
Planters
 
Site/Landscape Management and Maintenance
Box   15  
Program 1996
Box   15  
Work session 1996
Box   15  
SQA (2 folders)
Box   15  
Technical Specifications for MDC Pond ~ Shoreline Plant Conversion 2004
Box   15  
Truck Parking
Box   15  
Van Wagoner Road
Box   15  
Zeeland Main Site
Box   15  
Zeeland Main Site plume
Box   15  
Zeeland Main Site Consumers Re-Alignment
Box   16  
Binders (many photographs included)
Box   16  
Powder Coat Technology facility
Box   16  
Miller SQA Facility
Box   16  
Phoenix Designs Project
Box   16  
Final site plan
 
Plans and Drawings
Drawer   2 Folder   7
Photographs
Drawer   2 Folder   7
Sketches
Tube   16  
Zeeland Mainsite drawings
Tube   16  
Powder Coat Technology 1991
Tube   16  
Dallas Schematic Site/Planting Plan
Tube   16  
SQA Greenhouse February 6, 2001
Tube   16  
Phase 1 Construction 1995
Tube   16  
New Phase 1 Plant and Offices January 17, 1995
Tube   16  
Miscellaneous
 
Pfizer Campus Projects [subseries]

The Pfizer Campus Projects (4.5 linear feet, 22 tubes, 5 oversize folders) subseries includes correspondence, minutes, permit applications, study results, plans, drawings, and sketches related to the Warner-Lambert, Parke-Davis, and Pfizer in Ann Arbor. There is a small amount of material related to the Kalamazoo campus as well. Major projects profiled include the Parke-Davis master plan, the 2800 Plymouth Road Facility, Pfizer's Planned Unit Development (PUD), and Stormwater Wetlands Management.

 
Textual Files
 
Parke-Davis/Warner Lambert
 
Master Plan
Box   17  
Relocation Master Plan 1984
Box   17  
Master Plan 1984
Box   17  
Master Plan 1985
Box   17  
Master Plan 1989-1990
Box   17  
Master Plan Update 1996
 
Master Plan with Heidi
Box   17  
Master Plan 1996-1997
Box   17  
Background Materials
Box   17  
Correspondence File 1996 (2 folders)
Box   17  
Master Plan III 2000
Box   17  
Building 20 Addition 1998
Box   17  
Documentation 1997
Box   17  
Graphics
Box   17  
Working Session 1998
Box   17  
Master Site Plan/Strategic 7 Year Plan 1997
Box   17  
Master Plan Report 1997 (2 folders)
 
2800 Plymouth Road Facility
Box   17  
Alternate
Box   17  
Building 26 Pre-Clinical Laboratory 1999
Box   17  
Building 26 Site Plan 2000
Box   17  
Cafeteria Conference Center Plan 1998
Box   17  
Childcare Center 1998
Box   17  
FAR Calculations 1999
Box   17  
Landscape Maintenance Proposal Form draft 1990
Box   17  
Materials Handling Center and Conference Cafeteria Center 1998
Box   17  
Materials Handling Center Plan 1998
Box   17  
Materials Handling Center Specs 1998
Box   17  
Power House Addition 1993
Box   17  
Power House Addition/South Parking Lot Site Plan 1993
Box   17  
Project Management and Communication 1999
Box   17  
Site Plan 1998
 
2800 Plymouth Road Facility
 
South 15 Acres
Box   17  
New Site Development 1993
 
Project Book
Box   17  
Construction Meetings 1993-1995
Box   17  
Submittals 1993-1994
Box   17  
Addendum 1993-1994
Box   17  
Pay Estimates 1993-1994
Box   17  
Miscellaneous 1993-1994
 
Technical Development Facility
Box   18  
General 1998
Box   18  
Submittal Originals 1996-1999
Box   18  
Site Plan 1998-2005 (2 folders)
Box   18  
Site Work -- Issued for Construction 1998
Box   18  
Preliminary Detention Study November 1, 1990
Box   18  
Re-Zoning Application September 14, 1992
Box   18  
Traffic Study 1990
 
Pfizer
 
Master Plan/Planned Unit Development (PUD)
Box   18  
Ann Arbor Planning Department Reports 1992-2001
Box   18  
Baxter Road Entrance and Guard Kiosk Plans 2005
Box   18  
Building 10 Executive Courtyard 2003
Box   18  
Building 28 Plans 2006
Box   18  
Building 35 Plans 2005
Box   18  
Buildings 85 and 75 2003
Box   18  
Campus Enhancements III 2005
 
Chronological File
Box   18  
January-October, 2001
Box   18  
September-October, 2001
Box   18  
November-December, 2001
Box   18  
January-February, 2002
Box   18  
August-October, 2002
Box   18  
November-December, 2002
Box   18  
January 2003
Box   18  
CGMP Warehouse Plans 2006
Box   18  
Community Context and Redevelopment Opportunities 2007
Box   18  
Concept Master Plan sketches 2001
Box   18  
Engineering 2000
Box   18  
Global Facilities Management Information Document 2002
Box   18  
Guard Kiosk and Site Improvements 2004
Box   18  
Informational 2000-2002
Box   18  
Land and Water Management -- Wetland Inventory 2000
Box   18  
Lawn Conversion -- Phase IV 2005
Box   18  
Lighting 2000
Box   18  
Master Plan Edits 2003
Box   18  
Master Planning 2001-2003 (3 folders)
Box   19  
Master Plan Meetings 2001-2003
Box   19  
Master Plan Overlays 2002
Box   19  
Master Plan Proposals 2000-2002
 
Natural Features
Box   19  
55 Acre Site Natural Features Inventory 2001
Box   19  
Landmark Tree Survey 2001
Box   19  
Natural Features 2002
Box   19  
Natural Features Data 2002
Box   19  
Natural Features Inventory 2002
Box   19  
Veridian Botanical Inventory and Landmark Tree Survey 2002
Box   19  
Parking 2008
Box   19  
Patrick Judd File 2001-2002
Box   19  
Plans and Graphics 2002
Box   19  
Prairie Conversion -- Phase II 2003
Box   19  
Project Review Coordination 1999
Box   19  
Sanitary Sewer Analysis 2001
Box   19  
Scanned Photos undated
Box   19  
Site Design Standards 2002
Box   19  
Site Options Study 2001
Box   19  
Site Photographs
Box   19  
Site Planning and Design Team Meeting 2004
Box   19  
Site Plans for Parking Structure and Wetlands Use Permit 2000
Box   19  
Strategic Facilities Plan 2004
Box   19  
Strategic Site Plan and Master Plan Review 2003
Box   19  
Strategic Site Plans 2000-2005 (5 folders)
 
Zoning
Box   19  
Rezoning and Area Plan 2002
Box   19  
Zoning 2001-2002
Box   19  
Zoning Petition 2001
Box   19  
Coordination Meeting 2003
Box   19  
Coordination Meeting Minutes 1998-2002 (3 folders)
Box   20  
Coordination Meeting Minutes 1998-2002 (2 folders)
 
Miller's Creek
Box   20  
Breakfast and Open House 2003
Box   20  
Correspondence 2001-2003 (2 folders)
Box   20  
Crossing Options 2004
Box   20  
Grant Application 2005-2006
Box   20  
Watershed Improvement Plan 2003
Box   20  
Site Acquisition 2001
 
Stormwater Wetlands Management
Box   20  
Building 14 Courtyard 2000
Box   20  
Detention Basin 3 2001-2002
 
Land and Water Management Master Plan
Box   20  
DEQ Permit Correspondence 2000
Box   20  
Site Improvement 2000
Box   20  
Specifications 2000
Box   20  
Photographs
 
Stormwater Management Master Plan
Box   20  
Bid Period 2000
Box   20  
Calculations 2000
 
Chronological File
Box   20  
September-December, 1999
Box   20  
January-May, 2000
Box   20  
June-July, 2000
Box   20  
March 2001
Box   20  
Storm Water Management Study 2001
Box   20  
Stormwater Research Introduction 2002
Box   20  
Stormwater Update 1984-1999
Box   21  
Wetland Annual Monitoring Report 2003
Box   21  
Wetland Investigation and Delineation 2001
Box   21  
Wetland Monitoring -- Basin 3 2001-2002
Box   21  
Wetland Use Permit 2000
 
Drawings and Plans
 
Parke-Davis/Warner-Lambert
Drawer   2 Folder   8
Building 10 Courtyard-Preliminary Planting Plan August 14, 1992
 
Child Care Center
Drawer   2 Folder   8
Miscellaneous sketches 1998
Drawer   2 Folder   8
Playground Concept Sketch March 31, 1999
 
The Courtyard
Drawer   2 Folder   8
Existing Conditions January 26, 1987
Drawer   2 Folder   8
Sketch Options January 1987
Drawer   2 Folder   8
Courtyard Planting Plan March 4, 1987
Drawer   2 Folder   8
Miscellaneous sketches
 
Entry Gate and Signage
Drawer   2 Folder   9
Miscellaneous Plans and Drawings 1992
Drawer   2 Folder   9
Signage sketches undated
Drawer   2 Folder   9
Master Plans Studies 1992-1993
 
North Entrance Court
Drawer   2 Folder   9
Miscellaneous sketches
Drawer   2 Folder   10
Parking Deck-Miscellaneous sketches and plans
Drawer   2 Folder   10
Switch Box Buffer-Concept Sketches June 21, 1999
Drawer   2 Folder   10
Toxicology Building-Planting Plans May 8, 1985
Drawer   2 Folder   10
Miscellaneous Plans
Tube   17  
Administration Support Facility Plans September 8, 2000
 
Building 26
Tube   17  
Building 23 & 26 Phase II Construction Drawings June 9, 2000
Tube   17  
Building 26 Phase II Construction Drawings August 1, 2000
Tube   18  
Building 26, Pre-Clinical Laboratory, and Parking Site Improvement Plans December 4, 2002
Tube   18  
Miscellaneous Sketches
Tube   18  
Building 35 Addition September 2, 2004
Tube   18  
Building PC-1 Preliminary Planting Plan Options undated
Tube   19  
Child Care Center-Plans Issued for Bidding June 1, 1999
 
Clinical Research Building 16
Tube   19  
General Trades September 4, 1990
Tube   20  
Site and Foundation Package April 19, 1990
Tube   20  
Cooling Towers -- Issued for Construction June 2, 1997
 
Entry Gate and Signage
Tube   21  
Miscellaneous Plans and Drawings 1992
Tube   21  
Signage sketches undated
 
Fitness Trail
Tube   21  
Seed Mix Layout Modifications May 1989
Tube   21  
Preliminary Parcour Layout August 1988
Tube   21  
Fitness Trail Layout Record November 2, 1988
Tube   21  
Future Development Plan Options undated
 
Granite Sculpture Site Improvements
Tube   21  
Issued for Owner's Review April 16, 2002
Tube   21  
Issued for Construction August 12, 2002
Tube   22  
Huron Parkway Connector Tunnel -- Construction Issue, Site Work December 14, 2000
 
Land and Water Management
Tube   22  
Plans Issued for Construction May 17, 2000
Tube   22  
Re-Application for Inland Lakes and Stream Permit May 12, 2000
Tube   23  
Master Plans Studies 1992-1993
Tube   23  
Materials Handling Center and Cafeteria Conference Center Site Improvement Plans March 22, 1999
 
New Site Development: South 15 Acres
Tube   23  
Plans Issued for Construction September 8, 1993
 
North Entrance Court
Tube   23  
Conclusion of Design Development Plans March 9, 2001
Tube   24  
Miscellaneous Plans 2001
Tube   24  
Program/Character Discussion Diagrams October 2000
Tube   24  
North Parking Addition July 11, 1997
Tube   24  
North Parking Lot Area and Southwest Trucking Dock July 11, 1989
 
Parking Deck
Tube   25  
Phase II Minor Modification February 1990
Tube   25  
Issued for Construction November 29, 1990
Tube   25  
Parking Lots B, C, and D Relocation and Minor Building Additions July 19, 1999
Tube   26  
Power House Addition, South Parking Lot, and Entry Drive
Tube   26  
Appendix A June 2, 1993
Tube   26  
Wetland Permit Application May 27, 1993
Tube   26  
Administrative Amendment April 4, 1994
Tube   26  
As-Built Record March 7, 1995
Tube   26  
Preliminary Sketch Landscape Plan April 29, 1993
Tube   27  
Southern Parking Area Earthwork and Reforestation February 26, 1990
Tube   27  
Southwest Entry Schematic Designs June 9, 2004
Tube   27  
Storm Sewer Tie-In Plans 1991
Tube   27  
Storm Water Management Master Plan 2000
 
Switch Box Buffer
Tube   27  
Plans Issued for Bidding August 1, 1999
Tube   28  
Technical Development Facility
Tube   28  
Plans Issued for Construction August 3, 1999
Tube   28  
Administrative Amendment October 18, 2005
Tube   28  
Site Capacity Diagram
Tube   28  
Temporary Modular Addition to Building 50 December 17, 1998
Tube   29  
Temporary Modular Office Addition
Tube   29  
Plans Issued for Bidding April 13, 1998
Tube   29  
Plan Submitted for Administrative Amendment April 1, 1998
Tube   29  
Temporary Parking Relocation -- Issued for Construction May 9, 2000
 
Toxicology Building
Tube   29  
Proposed Planting Plans April 1985
Tube   29  
Planting Plans May 8, 1985
Tube   29  
Tree Area Removal and Relocation Proposals April 1990
 
The Pond and Building Edge
Tube   30  
Preliminary Sketch Options January 1987
Tube   30  
Final Preliminary Plan February 10, 1987
Tube   30  
Planting Plan March 4, 1987
 
University of Michigan
Tube   30  
Preliminary Grading Plan November 1990
Tube   30  
Tree Relocation November 1990
Tube   30  
Regrading and Soil Stabilization Plan July 1992
Tube   30  
Miscellaneous Plans and Drawings
 
Pfizer
Drawer   2 Folder   11
1600 Site Plan Schematics April 2006
Drawer   2 Folder   11
Building 10Executive Courtyard Sketches 2003
Drawer   2 Folder   11
Building 28 Loading Dock Renovation and South End Distribution -- Sketches 2006
Drawer   2 Folder   11
Campus Green and Entrance Plaza July 2000
Drawer   2 Folder   11
Development Office Building Site Influences November 26, 2003
Drawer   2 Folder   11
ERIN Walks and Planting Schematic February 18, 1993
 
Kalamazoo Campus
Drawer   2 Folder   11
Final Schematic Options September 2008
Drawer   2 Folder   11
Lot 1 Options August 2008
Drawer   2 Folder   11
Rough Grading Options December 2005
Drawer   2 Folder   12
Sketches
Drawer   2 Folder   12
Studies 2000
 
Miller's Crossing
Drawer   2 Folder   12
Sketches April 23, 2003
Drawer   2 Folder   12
Evaluation Criteria April 18, 2003
Drawer   2 Folder   12
Site Options Study Sketches 2001
Drawer   2 Folder   12
Miscellaneous Plans and Drawings
Tube   31  
Area Plan undated
Tube   31  
Baxter Road Entrance and Guard Kiosk -- Issued for 100% Final Review September 9, 2005
Tube   32  
Building 10/20 Courtyard-Plans Issued for Bidding March 30, 2001
Tube   32  
Building 20 -- Stair Tower Addition, Submitted for Administrative Amendment February 5, 2004
Tube   32  
Building 28 Loading Dock Renovation and South End Distribution -- Submitted for PUD Site Plan Administrative Amendment March 10, 2006
 
Building 35
Tube   33  
Storm Water Infrastructure September 16, 2004
Tube   33  
Sitework Bid Package October 10, 2005
 
Building 85 -- Fire Pump House and Emergency Services
Tube   34  
Plans Submitted for PUD Site Plan April 9, 2003
Tube   34  
Building 85 and Building 75 -- Submitted for PUD Site Plan Construction Approval September 25, 2003
Tube   35  
Building 910 Site Demolition and Meadow Restoration -- Issued for Bidding March 17, 2008
Tube   35  
Campus Base Maps 2000
 
Guard Kiosk
Tube   35  
Plans, 5 March 2002
Tube   35  
Plans Issued for Construction October 5, 2004
Tube   36  
Huron Parkway Reconstruction Planting Plan September 3, 2004
Tube   36  
Huron Parkway Site Improvements -- Issued for Design Development Owner Review December 14, 2006
 
Master Plan
Tube   36  
Preliminary Framework Diagrams November 2002
Tube   36  
Sketches
Tube   37  
Submitted for PUD November 26, 2001
Tube   37  
Traffic Study -- Proposed Changes January 15, 2002
Tube   37  
Miscellaneous Plans and Sketches
 
Planting Enhancements
Tube   37  
Issued for Construction September 11, 2000
Tube   37  
Phase II April 11, 2001
 
Prairie Conversion
Tube   37  
Issued for Bidding October 28, 2002
Tube   37  
Sketches October 7, 2002
Tube   38  
Southwest Campus Site Restoration -- Check Set July 9, 2006
Tube   38  
Miscellaneous Plans and Drawings
 
Other Michigan Projects [subseries]

The Other Michigan Projects (4.5 linear feet, 13 tubes, 1 folder) subseries contains correspondence, working files, press clippings, minutes, permit applications, sketches, drawings, and plans relating to various Pollack projects in Michigan. These projects include Charlevoix, the Huron River Bikeway Study, the Huron-Whittaker Corridor Study, Independence Lake Park, and the Pere Marquette Rail Trail.

 
Textual Files
 
Charlevoix -- East Park and Marina Improvements
Box   21  
Agreement for parks project 2001
Box   21  
Bid period Addendum 2
 
Chronological File
 
Marina
Box   21  
May-July, 2002
Box   21  
August-October, 2002
 
Park
Box   21  
June 2001-June 2002
Box   21  
July-September, 2002
Box   21  
Clippings (2 folders)
Box   21  
Conference facility 2003
 
Correspondence
Box   21  
Miscellaneous (4 folders)
Box   21  
Park and Landslide facilities 2003
Box   22  
Cost estimates
Box   22  
Existing Conditions 2002
Box   22  
Meeting minutes 2006
Box   22  
Park plan and notes 2002-2003
Box   22  
Photographs -- Existing conditions 2001 (color)
Box   22  
Plan merger 2002-2003
Box   22  
Project meeting notes
Box   22  
Public meetings
Box   22  
Sketches 2004
Box   22  
Waterways Commission information
 
Huron River Bikeway Study (and related)
Box   22  
Huron River Greenway Trail
Box   22  
Huron River Greenway Planning Report 2000
Box   22  
Huron River Plan 2002
 
Permit
Box   22  
Application 2000-2006
Box   22  
Appeal 2006
Box   22  
Michigan Natural Rivers Report 1977
Box   22  
Huron Valley Corridor Study 1978
Box   22  
Waterworks Master Plan 1986
Box   22  
Proposal for Services -- Huron River Bikeway Study 1983
Box   22  
Proposal for Segment 'D' Nonmotorized Trail 2003
Box   22  
Segment 'D' Nonmotorized Trail Proposal file
Box   22  
Huron River Bipath -- Participatory Design 1976
Box   22  
Huron River Bikeway Study 1984
Box   22  
Segment 'D' Summary Report 2004
Box   22  
Segment 'D' Correspondence (2 folders)
Box   22  
Prelim Bike Study Report 1997
Box   22  
Public Meetings
Box   22  
Correspondence and Meetings (3 folders)
 
Huron -- Whittaker Corridor
Box   23  
Fund Applications 1999 (4 folders)
Box   23  
Huron-Whittaker Corridor Study Proposal 1998
Box   23  
Huron-Whittaker Corridor Study 1999
Box   23  
I-94 Huron Street Interchange Specifications 2000 (2 folders)
Box   23  
I-94 Huron Street Interchange Landscape Enhancement Plans 2000
Box   23  
TEA-21: North Campus Corridor Non-Motorized Pathway
 
Ypsilanti
Box   23  
Project Proposals 1999
Box   23  
Public Meetings 1999-2000 (2 folders)
Box   23  
Rolled drawings
 
Independence Lake Park
Box   24  
Awards 1986
Box   24  
Background
Box   24  
Water Spray Play Facility Drawings 2001
Box   24  
Drawings 1981-1982
 
Phase II
Box   24  
Notes
Box   24  
Plan Proposals
Box   24  
Master Plan
Box   24  
Pre-Applications 1978-1986
Box   24  
Graphics
Box   24  
Contract
Box   24  
Promotional Materials
Box   24  
Site location
Box   24  
Addendum #1
Box   24  
Correspondence
Box   24  
Master Plan
Box   24  
Notes
Box   24  
Site development plan 1978
Box   24  
Master plan update 2008
Box   24  
DEQ Permit 2001
Box   24  
Miscellaneous 2000
Box   24  
Water Spray Play Facility Construction 2001-2003 (2 folders)
Box   24  
Water Spray Play Facility specifications 2001-2002
Box   24  
Winter Parking Lot and Trails 2002
Box   24  
Winter Parking Lot and Trails Permits
Box   24  
Workshop Notes, 22 May 2000
Box   24  
Tree planting specifications 1988
Box   24  
Request for Proposal 2003
Box   24  
Park development proposal 2000
 
Pere Marquette Rail-Trail of Mid-Michigan (Midland County, Mich.)
Box   25  
Arbutus Bog signs 1998
Box   25  
ASLA Awards submission (includes slides) (binder)
Box   25  
A Vision for a Linear Park in Midland County 1992
Box   25  
Bike studies 2000
Box   25  
Bridge Diagrams
Box   25  
Bridge Stuff
Box   25  
City of Caseville 1996-1997
Box   25  
Clippings 1994-1996
Box   25  
Connecting Michigan 2000 2000
 
Grant applications
Box   25  
DNR/MDOT for Phase III 1993
Box   25  
ISTEA/MDOT applications 1993
Box   25  
ISTEA 1992
Box   25  
ISTEA applications 1992-1993
Box   25  
ISTEA general materials -- Phase II
Box   25  
Midland County Linear Park Proposal for Services 1991
Box   25  
Midland County Parks and Recreation Policies and Procedures 1992
Box   25  
Pere Marquette Rail-Trail: From Start to Finish 2000
Box   25  
Photographs and Negatives
 
Plans
Box   25  
Arbutus Bog
Box   25  
City of Coleman 1994
Box   25  
Dublin Avenue to Veterans Memorial Park
Box   25  
Project development 1994-1999
 
Surveys
Box   25  
Phase II
Box   25  
Phase III
Box   25  
Phase IV
Box   25  
Drawings and Plans
 
Drawings and plans
 
Alpena Bi-Path
Tube   39  
Potential Alignment May 14, 1975
Tube   39  
Plans June 11, 1975
Tube   39  
Plans May 20, 1975
Tube   39  
Miscellaneous Plans
 
Plans
Tube   39  
Preliminary Engineering Report December 3, 2003
Tube   40  
Proposed Phase 1 -- Marine Work November 14, 2005
Tube   41  
Proposed Phase 2 -- Floating Pier System November 9, 2005
Tube   41  
Miscellaneous sketches
Drawer   2 Folder   13
Miscellaneous sketches
Drawer   2 Folder   13
Cherry Hill (Superior Township) -- Sketches and Overlays
 
Independence Lake Park
Drawer   2 Folder   13
Miscellaneous Drawings and Sketches
Tube   1  
Concept Sketches January 13, 1978
 
Plans
Tube   43  
Water Spray Play Feature -- Issued for Construction March 15, 2001
Tube   43  
Boardwalks and Culvert Replacement -- Inland Lakes and Streams Permit November 10, 2000
Tube   43  
Site Construction March 7, 1988
Tube   44  
Parking Lot and Trails -- Issued for Construction October 13, 2000
Tube   44  
Plans February 21, 1979
Tube   3  
Presentation Drawings and Notes
Drawer   2 Folder   13
Pere Marquette Rail Trail
Drawer   2 Folder   13
City Midland -- Miscellaneous Sketches and Drawings 1992
Drawer   2 Folder   13
Currie Parkway Crossing Options June 1992
Drawer   2 Folder   13
Seating Area Locations June 1992
Tube   46  
City Midland -- Miscellaneous Sketches and Drawings 1992
Tube   46  
City of Coleman -- Miscellaneous Sketches and Drawings
Tube   47  
Sanford Lake Park -- Miscellaneous Plans and Sketches
Tube   47  
Overview
Tube   47  
Miscellaneous Plans and Sketches
Tube   48  
Plans
Tube   48  
Arbutus Bog Boardwalk April 3, 1995
Tube   48  
City of Coleman July 13, 1994
Tube   48  
City of Coleman Trailhead September 9, 1997
Tube   49  
City of Midland Section July 31, 1992
Tube   49  
City of Midland Section -- Supplementary Path Information August 14, 1992
Tube   49  
Dublin Ave (Midland, MI) to Cedar St (Sanford, MI) September 10, 1993
Tube   50  
Dublin Ave (Midland, MI) to North Bradley (Geneva Township, MI) July 8, 1994
Tube   50  
Dublin Ave (Midland, MI) to North Bradley (Geneva Township, MI) -- Sanford Village Restroom Building June 28, 1996
Tube   51  
Dublin Ave (Midland, MI) to Veterans Memorial Park (Jerome Township, MI) December 15, 1998
Tube   51  
North Bradley (Geneva Township, MI) to Coleman City Limits (Coleman, MI) September 26, 1994
Tube   51  
Rail Trail Amenities June 15, 1998
 
Teaching Files and Other Activities [series]

Teaching Files and Other Activities (2.5 linear feet) document Pollack's involvement with the Natural Areas Technical Advisory Committee (NATAC), his work at the University of Michigan, and various professional activities. Items include minutes, correspondence, course materials, and award applications.

 
Teaching Files
Box   26  
American Society of Landscape Architects' (ASLA) Annual Meeting 2005
Box   26  
Certified Hazardous Materials Managers Conference 2001
 
Correspondence
Box   26  
Ann Arbor development 2003-2005
Box   26  
General 2000-2005 (3 folders)
Box   26  
Detroit Charrette 2001-2002
Box   26  
Full professor application 1996-1997
Box   26  
Landscape Architecture -- 100th Anniversary 2007-2008
Box   26  
Landscape Architecture appointment 2007
Box   26  
Landscape Architecture faculty 2001-2002
Box   26  
Landscape Architecture re-accreditation 2008
Box   26  
Pollack Design Associates 1993
 
School of Natural Resources 587
Box   26  
Course materials 1998-2000 (3 folders)
Box   26  
Correspondence 2000
Box   26  
School of Natural Resources 590 -- Course Materials 1999
 
School of Natural Resources 791
Box   26  
Course materials 2001
Box   26  
Correspondence 2000-2001
 
School of Natural Resources 688
Box   26  
Course Materials 1998-2002 (2 folders)
Box   26  
Project proposals 1990-1998
Box   26  
School of Natural Resources Landscape Architecture Faculty Retreat 2001
Box   26  
Senior Graduation talk 2005
Box   26  
Teaching evaluations 2000-2001
Box   26  
Tour de Wetlands 2002
Box   26  
Urban Planning 505 2001
 
Natural Areas Technical Advisory Committee (NATAC)
 
Purchasing Cycles
Box   26  
Rounds 1 and 2
Box   26  
Round 3
Box   26  
Round 4
Box   26  
Round 7
 
Meetings and Correspondence
Box   26  
2001-2002
Box   27  
2002
Box   27  
2003-2004
Box   27  
2005 (2 folders)
Box   27  
2006
Box   27  
2007
Box   27  
2008
Box   27  
2009
Box   27  
2009-2010
Box   27  
Greenbelt Advisory Commission
Box   27  
Open Space Visioning Workshop 2005
Box   27  
Public Access Materials
 
Miscellaneous
Box   27  
ASLA Call for Proposals 1995
Box   27  
ASLA Community Service Award
Box   27  
ASLA Council on Education (2 folders)
Box   27  
Clippings
Box   27  
Design Michigan: Alpena Bipath
Box   27  
FASLA Nomination Forms
Box   27  
Landscape Architecture Accreditation Board (1 folder)
Box   28  
Landscape Architecture Body of Knowledge (3 folders)
Box   28  
Michigan Society of Planning Officials Award Application -- Ann Arbor Plan for Parks, Recreation and Open Space 1982
Box   28  
Miscellaneous
 
Collected Material
Box   28  
The 28th Street Study 1982
Box   28  
Collected Design Guidelines (2 folders)
Box   28  
Dayton Climate Project Working Papers 1981
Box   28  
Dayton Urban Design 1981
Box   28  
Michigan Department of State and Highways Pamphlet 1970
Box   28  
Mills/Hoyt Preservation Program 1982
Box   28  
Near Northeast Neighborhood News -- Ann Arbor
Box   28  
Project Grow Newsletter 2005-2006
Box   28  
School of Natural Resources Michigan Workshop 1976
Box   28  
Treyburn, NC Design Guidelines 1986
 
Videotapes [series]

The Videotapes (1 linear foot) series is comprised of VHS tapes that document the State Street Urban Design Project and various areas of Ann Arbor.

 
State Street Urban Design Project Construction Videos (VHS)
Box   29  
Drainage estimates 2002
Box   29  
E. Liberty 2002 (2 tapes)
Box   29  
E. Liberty and State 2002
Box   29  
Maynard 2002 (2 tapes)
Box   29  
Maynard and E. Williams 2002
Box   29  
S. State, William, and University 2002
Box   29  
Thayer and William 2002
Box   29  
Thompson and Washington 2002
Box   29  
Washington, Liberty, and William 2003 (2 tapes)
Box   29  
William, Thompson, and Thayer 2003 (2 tapes)
Box   29  
William and Thayer 2003 (2 tapes)
Box   29  
William and Washington 2002
 
NTSC
Box   29  
Ann Arbor Lower Town Area Auto Tour 2002
Box   29  
Ann Arbor Aerial Overview 2002
Box   29  
River Tour 2002
Box   29  
School of Natural Resources
Box   29  
Bandemer Park Development Simulations 1990
 
Digital Materials [series]

The Digital Material series has been arranged in the following sub series: Ann Arbor Projects, Herman Miller Projects, Pfizer Projects, and other Michigan Projects. The series consists of digital material related to a number of Pollack's projects and includes design files, presentations, photographs, and project plans. The digital material came to the library on CD-ROMs, which were then transferred to a computer using the Duke Data Accessioner and uploaded to the University of Michigan's Deep Blue digital repository.

  Online  
Ann Arbor Projects [subseries]

(zip file includes the following folders)

(zip file, 599450Kb) [download zip file]
 
Fuller Road Exhibits 2006
 
Great Street Toolkit
 
Mallets Creek -- Brown Park RFP
  Online  
Herman Miller Projects [subseries]

(zip file includes the following folders)

(zip file, 55243Kb) [download zip file]
 
Greenhouse Presentation 2003
 
Images
 
ZMS Master Plan 2005
  Online  
Other Michigan Projects [subseries]

(zip file includes the following folders and subfolders)

(zip file, 404570Kb) [download zip file]
 
Charlevoix Specification Issued for Bidding 2006
 
Huron River Bikeway Study
 
Huron River Bikeway Study General
 
Huron Whittaker Corridor Study Boards
 
Segment D Aerials
 
Segment D Revised Aerial Photographs
 
Segment D Trail Aerial Bases
 
WCPARC Border to Boarder Trail Meeting Materials
 
Sanford Lake Park Site Improvements 2007
  Online  
Pfizer Projects [subseries]

(zip file includes the following folders)

(zip file, 404570Kb) [download zip file]
 
2800 Site B10 entry 2002
 
Baxter Road Entrance Specifications
 
Huron Parkway Reconstruction
 
Master Plan Framework
 
Planned Unit Development