Albert Kahn papers   1896-2014
full text File Size: 2368 K bytes | Add this to my bookbag

 
   Container / Location    Title
 
Police Headquarters Building and First Precinct Police Station, Beaubien and Clinton Streets, Detroit, Michigan ( 1921-1923) Job No. 990-R [subseries]:
 
Construction Drawings by Albert Kahn, Architect
 
Architectural Drawings,  8/4/1921 General Revision,  9/15/1921 (ink-on-linen drawings, 35x36 inches)
Drawer   29 Folder   5
Plot Plan (1), revised  11/18/1921
Drawer   29 Folder   5
Foundation Plan (2)
Drawer   29 Folder   5
Basement Plan (3), revised  8/8/1922
Drawer   29 Folder   5
First Floor Plan (4), revised  9/1/1922
Drawer   29 Folder   5
Second Floor Plan (5), revised  9/12/1922
Drawer   29 Folder   5
Third Floor Plan (6), revised  1/5/1922
Drawer   29 Folder   5
Fourth Floor Plan (7), revised  1/9/1922
Drawer   29 Folder   5
Fifth Floor Plan and Column Details (8), revised  11/13/1922
Drawer   29 Folder   5
Sixth and Seventh Floor Plans (9), revised  5/6/1922
Drawer   29 Folder   5
Eighth and Ninth Floor Plans (10), revised  11/18/1921
Drawer   29 Folder   5
Pipe Space Floor Plan and Roof Plan (11)
Drawer   29 Folder   5
Details of Elevators (12), revised  10/26/1921
Drawer   29 Folder   5
West Elevation (13), revised  10/26/1921
Drawer   29 Folder   5
North Elevation (14), revised  10/26/1921
Drawer   29 Folder   5
South Elevation (15), revised  10/26/1921
Drawer   29 Folder   5
East Elevation (16), revised  10/26/1921
Drawer   29 Folder   6
Court Elevations and Details of Mezzanine and Metal Grilles (17), revised  10/26/1921
Drawer   29 Folder   6
Elevation of Northwest Corner and Details of Lower Stories of Main Building (18), revised  11/18/1921
Drawer   29 Folder   6
Exterior Details of Upper Stories of Main Building (19), revised  1/19/1922
Drawer   29 Folder   6
Details of Front Entrance and Entrance to First Precinct Police Station (North Elevation) (20), revised  11/18/1921
Drawer   29 Folder   6
Details of North Wall of Armory Building (21), revised  10/26/1921
Drawer   29 Folder   6
Exterior Details of Armory Building (22), revised  10/26/1921
Drawer   29 Folder   6
Cross-Section at Center Line of Building and South Elevation of Court (23), revised  10/26/1921
Drawer   29 Folder   6
Details of Running Track and Monitor in Armory (24), revised  10/26/1921
Drawer   29 Folder   6
Details of Roof over Wagon Court (25), revised  10/26/1921
Drawer   29 Folder   6
Details of Stairs (26), revised  11/18/1921
Drawer   29 Folder   6
Details of Stairs (27), revised  11/18/1921
Drawer   29 Folder   6
Details of Pistol Range, Steel Doors, Cell Fronts and Eighth & Ninth Floor Windows (28), revised  11/18/1921
Drawer   29 Folder   6
Miscellaneous Details (29), revised  10/26/1921
Drawer   29 Folder   6
Details of Partitions, Corridors, Dumb Waiter and Cabinets (30), revised  11/18/1921
Drawer   29 Folder   6
Details of First Floor Lobby (31), revised  10/26/1921
Drawer   29 Folder   6
Details of Police Commissioner's Room and Other Offices (32), revised  9/1/1922
Drawer   29 Folder   6
Details of Toilet Rooms (33), revised  1/9/1922
Drawer   29 Folder   7
Structural Drawings,  8/4/1921 except as noted, General Revision  9/15/1921 (ink-on-linen drawings, 36x36 inches, except as noted)
Drawer   29 Folder   7
Column Schedule (1-S), revised  11/9/1921
Drawer   29 Folder   7
Armory Column Schedule and Footing Details (2-S)
Drawer   29 Folder   7
First Floor Framing Plan and Beam Schedule (3-S)
Drawer   29 Folder   7
Second Floor Framing Plan and Beam Schedule (4-S)
Drawer   29 Folder   7
Third Floor Framing Plan and Beam Schedule (5-S), revised  10/31/1921
Drawer   29 Folder   7
Fourth Floor Framing Plan and Beam Schedule (6-S), revised  11/4/1921
Drawer   29 Folder   7
Fifth Floor Framing Plan and Beam Schedule (7-S), revised  11/7/1921
Drawer   29 Folder   7
Sixth Floor Framing Plan and Beam Schedule (8-S), revised  11/9/1921
Drawer   29 Folder   7
Seventh Floor Framing Plan and Beam Schedule (9-S), revised  11/10/1921
Drawer   29 Folder   7
Eighth Floor Framing Plan and Beam Schedule (10-S), revised  11/18/1921
Drawer   29 Folder   7
Ninth Floor Framing Plan and Beam Schedule (11-S)
Drawer   29 Folder   8
Roof and Attic Framing Plans, Details of Trusses and Beam Schedule (12-S), revised  2/10/1922
Drawer   29 Folder   8
Garage Floor Framing Plan, Key Plan for Basement Walls and Beam Schedule (13-S)
Drawer   29 Folder   8
Armory Floor Framing Plan and Beam Schedule (14-S), revised  12/8/1921
Drawer   29 Folder   8
Running Track Balcony Floor Plan and Details (15-S)
Drawer   29 Folder   8
Armory and Wagon Court Roof Plans and Truss Details (16-S)
Drawer   29 Folder   8
Armory Roof Framing Details (17-S)
Drawer   29 Folder   8
Plan of Eighth Floor Framing around Cells (18-S),  12/5/1921 (34x44 inches)
Drawer   29 Folder   8
Plan of Ninth Floor Framing at Cells (19-S),  1/7/1922 (33-1/2x44 inches)
Drawer   29 Folder   8
Details of Towers (20-S),  2/13/1922 (27-1/2x35-1/2 inches)
Drawer   29 Folder   8
Alternate Design for Wireless Towers "A" and "C" (21-S),  2/13/1922 (27-1/2x36-1/2 inches)
Drawer   29 Folder   9
Mechanical Drawings,  8/6/1921 except as noted (ink-on-linen drawings, 36x36 inches, except as noted)
Drawer   29 Folder   9
Foundation Plan (1-M), revised  11/28/1921
Drawer   29 Folder   9
Basement Plan for Plumbing (2-M), revised  11/28/1921
Drawer   29 Folder   9
Basement Plan for Heating, Ventilating and Electrical Work (3-M), revised  8/8/1922
Drawer   29 Folder   9
First Floor Plan (4-M), revised  11/28/1921
Drawer   29 Folder   9
Second Floor Plan (5-M), revised  11/28/1921
Drawer   29 Folder   9
Third Floor Plan (6-M), revised  1/7/1922
Drawer   29 Folder   9
Fourth and Fifth Floor Plans (7-M), revised  1/7/1922
Drawer   29 Folder   9
Sixth and Seventh Floor Plans (8-M), revised  8/10/1922
Drawer   29 Folder   9
Plan of Pipe Space above Seventh Floor and Details of Pipe Shafts (9-M), revised  11/28/1921
Drawer   29 Folder   9
Eighth and Ninth Floor Plans (10), revised  11/28/1921
Drawer   29 Folder   9
Pipe Space Floor Plan and Details of Pipe Shafts (11), revised  11/28/1921
Drawer   29 Folder   9
Heating Riser Diagrams for Main Building and Armory (12-M), revised  8/12/1922
Drawer   29 Folder   9
Section thru' Gymnasium and Court and Heating Riser Diagram (13-M), revised  8/10/1922
Drawer   29 Folder   10
Ventilation Details (14-M), revised  11/28/1921
Drawer   29 Folder   10
Service Details (15-M), revised  11/28/1921
Drawer   29 Folder   10
Machine Room Details (16-M), revised  11/28/1921
Drawer   29 Folder   10
Details of Transformer Room and Switch Vault (17-M & 17-MR), revised  9/23/1921 (two drawings)
Drawer   29 Folder   10
Electrical Riser Diagram and Details (18-M), revised  11/28/1921
Drawer   29 Folder   10
Plan of Rotary and Transformer Rooms (19-M), revised  5/22/1922
Drawer   29 Folder   10
Wiring Diagram of Rotary Converters (20-M), revised  7/27/1922 (29-1/2x45 inches)
Drawer   29 Folder   10
Plan and Front Elevation of Switchboard (21-M),  5/11/1922 (26-1/2x35 inches)
Drawer   29 Folder   10
Sixth and Seventh Floor Plans, Showing Piping and Connections for Kitchen Equipment (21-M),  1/15/1923 revised  3/14/1923 (15x23-1/2 inches)
Drawer   29 Folder   10
Electrical Plan of Transformer and Rotary Rooms and Switch Vault (22-M),  5/20/1922 (24-1/2x37 inches)
Drawer   29 Folder   10
Details of Fan Motor for Police Station Garage (100-M),  7/24/1922 (12-1/2x18 inches)
Drawer   29 Folder   10
Revised Fifth Floor Plan, Prosecuting Attorney's Division (106-M),  11/16/1922 revised  3/14/1923 (17-1/2x23-1/4 inches)