Albert Kahn papers   1896-2014
full text File Size: 2368 K bytes | Add this to my bookbag

 
   Container / Location    Title
 
Fisher Building (Building for New Center Development Corporation), Detroit, Michigan,  1927-1930, Job No. 1378 [subseries]:
 
Construction Drawings by Albert Kahn, Inc., Architects
 
Architectural Drawings,  10/27/1927 (Ink-on-linen drawings with pencil notations, 30x45 to 31x45-1/2 inches)
Drawer   11 Folder   1
Plot Plan (1),  undated
Drawer   11 Folder   1
Tunnel Details (1-B),  1/12/1927 corrected to  12/17/1927
Drawer   11 Folder   1
Work Plan (2), corrected to  2/25/1928
Drawer   11 Folder   1
Sub-Basement and Foundation Plan, Section "A" (3), corrected to  2/27/1928
Drawer   11 Folder   1
Sub-Basement Foundation Plan, Section "B" (4), corrected to  2/25/1928
Drawer   11 Folder   1
Basement Plan, Section "A" (5)
Drawer   11 Folder   1
Basement Plan, Section "B" (6), corrected to  5/17/1928
Drawer   11 Folder   1
First Floor Plan, Section "A" (7), corrected to  2/25/1928
Drawer   11 Folder   1
First Floor Plan, Section "B" (8), corrected to  4/13/1928
Drawer   11 Folder   1
Second Floor Plan, Section "A" (9), corrected to  2/25/1928
Drawer   11 Folder   1
Second Floor Plan of Garage and Shops, Section "B" (10), corrected to  3/17/1928
Drawer   11 Folder   1
Third Floor Plan, Section "A" (11), corrected to  2/25/1928
Drawer   11 Folder   1
Third and Fourth Floors of Garage and Third Floor of Office Building, Section "B" (12), corrected to  2/25/1928
Drawer   11 Folder   1
Fourth Floor Plan, Section "A" (13), corrected to  3/24/1928
Drawer   11 Folder   1
Fourth and Fifth Floor Plan, Section "B" (14), corrected to  2/11/1928
Drawer   11 Folder   1
Sixth Floor Plan, Section "B," and Sixth, Eighth and Tenth Floors of Garage (15), corrected to  2/25/1928
Drawer   11 Folder   2
Typical Fifth to Tenth Floor Plan (16), corrected to  3/24/1928
Drawer   11 Folder   2
Seventh to Ninth Floor Plan of Office Building, Section "B," and Eleventh Floor of Garage (17), corrected to  3/12/1928
Drawer   11 Folder   2
Tenth Floor Plan, Section "B," and Roof Plan of Garage (18), corrected to  3/12/1928
Drawer   11 Folder   2
Eleventh Floor Plan (19), corrected to  3/30/1928
Drawer   11 Folder   2
Elevations of Pent House for Elevators 11 to 16 and Eleventh Floor Plan, Section "B" (20), corrected to  3/20/1928
Drawer   11 Folder   2
Twelfth and Thirteenth Floor Plans (21), corrected to  4/13/1928
Drawer   11 Folder   2
Plans and Sections of Pent House for Elevators 11 to 16 (22), corrected to  2/25/1928
Drawer   11 Folder   2
Fourteenth and Fifteenth Floor Plans (23), corrected to  2/25/1928
Drawer   11 Folder   2
Sixteenth to Twenty-First Floor Plans (24), corrected to  2/25/1928
Drawer   11 Folder   2
Twenty-Second to Twenty-Fifth Floor Plans (25), corrected to  4/13/1928
Drawer   11 Folder   2
Twenty-Sixth to Twenty-Eighth Floor Plans (26), corrected to  3/17/1928
Drawer   11 Folder   2
West and South Elevations (27) (Electrostatic print on mylar, 32x45-3/4 inches)
Drawer   11 Folder   2
East and North Elevations (28), corrected to  2/24/1928
Drawer   11 Folder   3
Sections "A-A," "B-B" and "C-C" (29)
Drawer   11 Folder   3
Sections "D-D" and "E-E" (30), corrrected  2/25/1928
Drawer   11 Folder   3
Sections "F-F" and "G-G" (31), corrected to  2/25/1928
Drawer   11 Folder   3
Sections "H-H" and "I-I" (32), corrected to  2/25/1928
Drawer   11 Folder   3
Details of Ramps (33), corrected to  4/25/1928
Drawer   11 Folder   3
Details of Ramps (34), undated, corrected to  2/23/1928
Drawer   11 Folder   3
Detail of Boulevard Entrance and Southeast Corner of Building (35)
Drawer   11 Folder   3
Details of Arcade Entrance on West Elevation, Theatre Entrance on Second Blvd., Office Entrance on Second Blvd. and Theatre Marquise (36)
Drawer   11 Folder   3
Details of Ornamental Iron Work (37), corrected to  3/16/1928
Drawer   11 Folder   3
Details of Lothrop Avenue Elevation (38), corrected to  2/25/1928
Drawer   11 Folder   3
Exterior Details of West Grand Blvd. Elevation (39), corrected to  2/25/1928
Drawer   11 Folder   3
Exterior Details of Second Blvd. Elevation (40)
Drawer   11 Folder   3
Exterior Details of Eleventh Floor (41)
Drawer   11 Folder   3
Exterior Details of North and South Elevations (42), corrected to  12/11/1927
Drawer   11 Folder   3
Exterior Details of East Elevation (43), corrected to  3/19/1928
Drawer   11 Folder   4
Exterior Details of Upper Part of Grand Blvd. Elevation (44), corrected to  2/25/1928
Drawer   11 Folder   4
Exterior Details of Upper Part of Second Blvd. Elevation (45), corrected to  2/25/1928
Drawer   11 Folder   4
Details of Tower Roof (46), corrected to  2/25/1928
Drawer   11 Folder   4
Details of Stair 1 (47), corrected to  3/24/1928
Drawer   11 Folder   4
Details of Elevator Shafts (48), corrected to  3/17/1928
Drawer   11 Folder   4
Plan of Elevator Lobbies in Basement and Elevations of Elevator Passages, etc. (49), corrected to  12/11/1927
Drawer   11 Folder   4
Plans of Elevator Lobbies and Toilet Rooms, Fifth to Eleventh Floor (50)     (date illegible) 
Drawer   11 Folder   4
Plans of Elevator Lobbies and Toilet Rooms, Twelfth to Twenty-First Floor (51), corrected to  2/25/1928
Drawer   11 Folder   4
Plans of Service Unit, Twenty-Second toTwenty-Eighth Floors (52), corrected to  4/10/1928
Drawer   11 Folder   4
Sections of Stairs 2 and 4 (53), corrected to  2/25/1928
Drawer   11 Folder   4
Plans of Stair 3 and Elevators, Basement to Third Floors (54), corrected to  2/25/1928
Drawer   11 Folder   4
Typical Plan of Stair 3 and Elevators, Fourth to Tenth Floors, and Details of Main Chute, Mail Box and F. A. Intake on Roof (55), corrected to  4/16/1928
Drawer   11 Folder   4
Details of Stairs 3 and 6 (56)     (date illegible) 
Drawer   11 Folder   4
Details of Garage Stairs and Elevators (57), corrected to  4/20/1928
Drawer   11 Folder   4
Door Schedule (58), corrected to  5/16/1928
Drawer   11 Folder   5
Corridor Elevations (59), corrected to  2/25/1928
Drawer   11 Folder   5
Details of Lobby and Corridor (60), corrected to  2/7/1928
Drawer   11 Folder   5
Details of Office Finish (61), corrected to  2/25/1928
Drawer   11 Folder   5
Toilet Room Elevations (62), corrected to  2/25/1928
Drawer   11 Folder   5
Plans of First Floor Arcade and Lobby (63), corrected to  3/16/1928
Drawer   11 Folder   5
Plans and Details of Second Floor Arcade (64), corrected to  2/25/1928
Drawer   11 Folder   5
Plans and Details of Third Floor Arcade (65)
Drawer   11 Folder   5
Details of Theatre Foyer and Lobby (66), corrected to  3/14/1928
Drawer   11 Folder   5
Elevations of Arcade # 115 and Galleries #205 & 304 (67), corrected to  2/25/1928
Drawer   11 Folder   5
Elevations of Arcade #100 and Galleries #200 & 300 (68), undated, corrected to  2/25/1928
Drawer   11 Folder   5
Elevations and Details of Main Entrance Lobby and Theatre Foyer (69), corrected to  3/16/1928
Drawer   11 Folder   5
Details of Arcades (70), corrected to  2/25/1928
Drawer   11 Folder   5
Details of Main Stair #2 (71), corrected to  3/16/1928
Drawer   11 Folder   5
Details of Elevator Lobbies, First, Second and Third Floors (72)
Drawer   11 Folder   5
Details of Foyer and Arcades (73), corrected to  2/4/1928
Drawer   11 Folder   5
Plan and Details of Tunnel between G. M. and Fisher Building (82), 12/2/1927 corrected to  5/21/1928
Drawer   11 Folder   5
Details of Ramps (87), undated, corrected to  2/25/1928
Drawer   11 Folder   5
Details of Additions to First Floor of Garage (115)     (undated due to linen damage)  (32-1/4x38-1/2 inches)
 
Structural Drawings,  10/27/1927 (Ink-on-linen drawings with pencil notations, 28-1/2x47-1/2 to 32-3/4x48 inches)
Drawer   11 Folder   6
Diagram of Wind-Bracing System (5-S), corrected to  11/17/1927
Drawer   11 Folder   6
First Floor Framing Plan (6-S), corrected to  8/6/1928
Drawer   11 Folder   6
Second Floor Framing Plan (7-S), corrected to  8/6/1928
Drawer   11 Folder   6
Third Floor Framing Plan (8-S), corrected to  8/6/1928
Drawer   11 Folder   6
Pipe Floor Framing Plan at Fourth Floor Elevation (9-S), corrected to  8/6/1928
Drawer   11 Folder   6
Fourth Floor Framing Plan (10-S), corrected to  8/6/1928
Drawer   11 Folder   6
Beam Schedule and Typical Floor Plan (11-S), corrected to  1/16/1928
Drawer   11 Folder   6
Pipe Floor Framing Plan at Eleventh Floor Elevation (12-S), corrected to  12/27/1927
Drawer   11 Folder   6
Eleventh Floor Framing Plan (13-S), corrected to  6/23/1928
Drawer   11 Folder   6
Twelfth Floor Framing Plan at Tower and Roof Framing Plan at Main Building (14-S), corrected to  6/23/1928
Drawer   11 Folder   6
Thirteenth to Twentieth Floors Framing Plans (15-S), corrected to  4/11/1928
Drawer   11 Folder   6
Twenty-First to Twenty-Sixth Floors Framing Plans (16-S), corrected to  2/22/1928
Drawer   11 Folder   6
Pipe Floor Framing Plan below Twenty-Second Floor and Twenty-Seventh and Twenty-Eighth Floor Framing Plans (17-S), corrected to  5/14/1928
Drawer   11 Folder   7
Tower Roof Framing (18-S), corrected to  6/20/1928
Drawer   11 Folder   7
Foundation Plan (19-S),  8/3/1927 corrected to  11/11/1927
Drawer   11 Folder   7
Caisson Details (19A-S), corrected to  11/11/1927
Drawer   11 Folder   7
Plan of Basement Walls (21-S), corrected to  12/17/1927
Drawer   11 Folder   7
Typical Pier Details (22-S), corrected to 11/2/1927
Drawer   11 Folder   7
Key Sheet for Pier Details and Stone Arches at Second Floor (23-S), corrected to  12/17/1927
Drawer   11 Folder   7
Eleventh Floor Garage Framing Plan and Ramp Sections (24-S), corrected to  4/4/1928
Drawer   11 Folder   7
Garage Roof Plan and Partial Plan, Tenth Floor Office (25-S), corrected to  5/8/1928
Drawer   11 Folder   7
Details of Apartment House Underpinning (26-S),  9/6/1927 corrected to  9/15/1927
Drawer   11 Folder   7
Basement Floor Framing Plan (27-S), corrected to  6/14/1928
Drawer   11 Folder   7
Details of Spires on Tower (28-S), corrected to  10/13/1927
Drawer   11 Folder   7
Details of Tunnel Across Grand Blvd. (30-S)
Drawer   11 Folder   7
Roof Framing Plan     (undated due to paper damage)  (Pencil-on-vellum drawing)
 
Mechanical/Electrical Drawings by Albert Kahn Architects and Engineers,  12/10/1927 (Ink-on-linen drawings with pencil notations, 32-1/4x48 to 32-1/2x49-1/2 inches)
Drawer   11 Folder   8
Foundation Plan, Section "A" (1M), revised  8/2/1928
Drawer   11 Folder   8
Foundation Plan, Section "B" (2M), revised  8/2/1928
Drawer   11 Folder   8
Basement Plan, Section "A" (3M), revised  7/18/1928
Drawer   11 Folder   8
Basement Plan, Section "B" (4M), revised  7/18/1928
Drawer   11 Folder   8
First Floor Plan, Section "A" (5M), revised  7/18/1928
Drawer   11 Folder   8
First Floor Plan, Section "B: (6M), revised  7/18/1928
Drawer   11 Folder   8
Second Floor Plan, Section "A" (7M), revised  7/18/1928
Drawer   11 Folder   8
Second Floor Plan, Section "B" (8M), revised  7/18/1928
Drawer   11 Folder   8
Third Floor Plan, Section "A" (9M), revised  7/18/1928
Drawer   11 Folder   8
Plans of Third and Fourth Floors of Garage and Third Floor of Office Building, Section "B" (10M), revised  8/20/1928
Drawer   11 Folder   8
Plan of Pipe Space above Third Floor, Section "A" (11M), revised  7/18/1928
Drawer   11 Folder   8
Plan of Pipe Space above Third Floor, Section "B," and Details (12M), revised  8/20/1928
Drawer   11 Folder   8
Fourth Floor Plan, Section "A" (13M), revised  7/18/1928
Drawer   11 Folder   8
Plan of Fifth, Seventh and Ninth Floors of Garage and Fourth and Fifth Floors of Office Building, Section "B" (14M), revised  7/18/1928
Drawer   11 Folder   9
Typical Fifth to Tenth Floor Plan (15M), revised  7/18/1928
Drawer   11 Folder   9
Plans of Sixth Floor, Section "B," and Sixth, Eighth and Tenth Floors of Garage (16M), revised  7/18/1928
Drawer   11 Folder   9
Plans of Seventh, Eighth and Ninth Floors of Office Building, Section "B," and Eleventh Floor of Garage (17M), revised  8/2/1928
Drawer   11 Folder   9
Plans of Tenth and Eleventh Floors, Section "B," and Roof of Garage (18M), revised  4/11/1928
Drawer   11 Folder   9
Plan of Pipe Space above Tenth Floor, Section "A" (19M), revised  8/27/1928
Drawer   11 Folder   9
Plan of Pipe Space above Tenth Floor, Section "B," and Details (20M), revised  8/27/1928
Drawer   11 Folder   9
Eleventh Floor Plan, Section "A" (21M), revised  3/2/1928
Drawer   11 Folder   9
Plans of Twelfth and Thirteenth Floors (22M)
Drawer   11 Folder   9
Plans of Fourteenth and Fifteenth Floors (23M)
Drawer   11 Folder   9
Plans of Sixteenth to Twenty-First Floors, including Pipe Space above Twenty-First Floor (24M)
Drawer   11 Folder   9
Plans of Twenty-Second to Twenty-Seventh Floors (25M), revised  5/5/1928
Drawer   11 Folder   9
Twenty Eighth Floor Plan and Details (26M), revised  9/19/1930
Drawer   11 Folder   9
Heating Riser Diagrams (27M-29M), revised  8/27/1928 (Three drawings, only one revised)
Drawer   11 Folder   10
Plans of Machine Room (30M), revised  8/28/1928
Drawer   11 Folder   10
Piping Details (31M & 32M), revised  8/28/1928 (Two drawings)
Drawer   11 Folder   10
Details of Arcade Ventilation (33M),  11/10/1927
Drawer   11 Folder   10
Details of Vestibule and Lobby Ventilation (34M),  11/10/1927
Drawer   11 Folder   10
Electrical Plan of Sub-Basement Machine Room and Tunnel (35M),  undated
Drawer   11 Folder   10
Basement Electrical Plan, Section A (36M), undated, revised  4/18/1928
Drawer   11 Folder   10
Basement Electrical Plan, Section B (37M), undated, revised  3/5/1928
Drawer   11 Folder   10
First Floor Electrical Plan, Section A (38M), undated, revised  2/11/1928
Drawer   11 Folder   10
First Floor Electrical Plan, Section B (39M), undated, revised  3/5/1928
Drawer   11 Folder   10
Second Floor Electrical Plan, Section A (40M), undated, revised  7/30/1930
Drawer   11 Folder   10
Second Floor Electrical Plan, Section B (41M), undated, revised  7/30/1930
Drawer   11 Folder   10
Third Floor Electrical Plan, Section A (42M), undated, revised  7/30/1930
Drawer   11 Folder   10
Electrical Plan of Third Floor, Section B, and Third and Fourth Floors of Garage (43), undated, revised  7/30/1930
Drawer   11 Folder   10
Fourth Floor Electrical Plan, Section A (44M), undated, revised  7/30/1930
 
Mechanical/Electrical Drawings (cont.), undated, revised  7/30/1930 (Ink-on-linen drawings with pencil notations, 32x48 inches)
Drawer   12 Folder   1
Electrical Plan of Fourth and Fifth Floors of Section B and Fifth, Seventh and Ninth Floors of Garage (45M)
Drawer   12 Folder   1
Electrical Plan of Fifth to Tenth Floors, Inclusive, Section A (46M)
Drawer   12 Folder   1
Electrical Plan of Sixth Floor of Section B and Sixth, Eighth and Tenth Floors of Garage (47M)
Drawer   12 Folder   1
Electrical Plan of Seventh, Eighth and Ninth Floors of Section B and Eleventh Floor of Garage (48M)
Drawer   12 Folder   1
Electrical Plans of Tenth and Eleventh Floors of Section B and Roof of Garage (49M)
Drawer   12 Folder   1
Eleventh Floor Electrical Plan, Section A (50M)
Drawer   12 Folder   1
Electrical Plans of Twelfth and Thirteenth Floors (51M)
Drawer   12 Folder   1
Electrical Plans of Twelfth, Thirteenth, Fourteenth and Fifteenth Floors (52M)
Drawer   12 Folder   1
Electrical Plans of Sixteenth to Twenty-First Floors, Inclusive (53M)
Drawer   12 Folder   1
Electrical Plans of Twenty-Second to Twenty-Seventh Floors (54M)
Drawer   12 Folder   1
Electrical Plans of Fan Room, Machine Room and Twenty-Eighth Floor, and Riser Diagrams of Flood Lighting and Watchman and Fire Alarm Systems (55M), revised  4/18/1928
Drawer   12 Folder   1
Lighting and Power Riser Diagrams (56M), revised  4/18/1928
Drawer   12 Folder   1
Plans and Sections of Transformer Banks No. 1 & 2 (63M),  3/3/1928
Drawer   12 Folder   1
Plan and Sections of Transformer Bank No. 3 (64M),  3/21/1928
 
Mechanical Drawings (cont.) (Ink-on-linen drawings with pencil notations, 32x46 to 31-1/2x50-1/2 inches)
Drawer   12 Folder   2
Fourth Floor Plan of Children's Play Room and Barber Shop (67M), revised  8/8/1928     (undated due to linen damage) 
Drawer   12 Folder   2
Basement Plan, Section A (68M),  4/7/1928 revised  9/27/1928
Drawer   12 Folder   2
Ventilation Plan of Basement, Section B (69M), undated, revised  8/13/1928
Drawer   12 Folder   2
Plan of Children's Play Room and Barber Shop (70M),  undated
Drawer   12 Folder   2
Part Plan of Tenth Floor Transformer and Fan Room and Details (75M),  7/29/1928 revised  8/27/1928
Drawer   12 Folder   2
Vent Layout of Eleventh and Twelfth Floor Kitchens (76M),  6/21/1928 revised  8/27/1928
Drawer   12 Folder   2
Eleventh Floor Plan (77M), undated, revised  7/13/1928
Drawer   12 Folder   2
Ventilation Plan of Thirteenth and Fourteenth Floors of Pent House (105M),  4/9/1928 revised  8/27/1928
Drawer   12 Folder   2
Ventilating Unit Schedule (108M),  7/15/1928 (24-1/4x31 inches)
Drawer   12 Folder   2
Proposed Method of Pipe Identification (111M),  5/21/1928 (13-1/2x20 inches)
 
Mechanical Drawings (cont.) (Ink-on-linen drawings with pencil notations, 29-1/2x40-1/4 to 30-1/4x40-1/2 inches)
Drawer   12 Folder   3
Plan at Twenty-Third Floor (Preliminary) (114M),  6/9/1928 revised  6/25/1928
Drawer   12 Folder   3
Plan at Twenty-Fourth Floor (Preliminary) (115M),  6/9/1928 revised  8/1/1928
Drawer   12 Folder   3
Plan at Twenty-Fifth Floor (Preliminary) (116M),  6/9/1928 revised  9/29/1928
Drawer   12 Folder   3
Plan at Twenty-Sixth Floor (Preliminary) (117M),  6/9/1928 revised  7/1/1928
Drawer   12 Folder   3
Plan at Twenty-Seventh Floor (Preliminary) (118M),  6/9/1928 revised  7/1/1928
Drawer   12 Folder   3
Plan at Twenty-Eighth Floor (119M),  6/9/1928 revised  8/8/1928
Drawer   12 Folder   3
Schedule of Louvres and Dampers (127M),  undated (21-1/2x31-1/2 inches)
Drawer   12 Folder   3
Layout of Main Switchroom Exhaust (128M),  8/3/1928 (33x47-3/4 inches)
Drawer   12 Folder   3
Plumbing Riser Diagram (134M & 135M),  9/19/1930 (Two drawings, 32-3/4x48-3/4 inches)
 
Mechanical Drawings (cont.) (Ink and pencil-on-vellum drawings)
Drawer   12 Folder   4
Plan, Elevations and Details of Fan Unit (59M),  undated (16-3/4x34-3/4 inches)
Drawer   12 Folder   4
Details of Cafeteria Supply Unit (62M),  2/29/1928 (32x47-1/2 inches)
Drawer   12 Folder   4
Drainage Plan for Storage Rooms in Theatre Building (66M), undated, revised  3/16/1928 (23x35 inches)
Drawer   12 Folder   4
Primary Room and Underground Layout and Manhole Details (87M),  undated (30-1/2x47-1/2inches)
Drawer   12 Folder   4
Electrical Plan and Elevations of Basement Barber Shop (78M),  undated (33-1/2x35-1/2 inches)
Drawer   12 Folder   4
Detail of Ducts thru' Telegraph Office, Schemes A & B (103M & 104M),  4/6/1928 (Two drawings, 25-3/4x29-1/2 & 25-1/2x30 inches)
Drawer   12 Folder   4
Garage Offices Lighting Layout (107M),  4/11/1928 (32x33-1/2 inches)
Drawer   12 Folder   4
Basement Cafeteria and Kitchen Layout (110M),  undated (32-1/2x48-3/4 inches)
Drawer   12 Folder   4
Ventilation Plan of Pipe Space (122M), undated, revised  7/31/1928 (32-3/4x48-1/2 inches)
Drawer   12 Folder   4
Ventilation Plan of Barber Shop, Locker Rooms and Vent Registers (126M), undated, revised  7/13/1928 (32-1/4x36-3/4 inches)
Drawer   12 Folder   4
Supply System for Receiving Room (133M), 10/2/1928 (24-3/4x34-1/2 inches)
 
Electrical Drawings,  undated (Ink-on-linen drawings with pencil notations, 31-1/4x49-1/2 to 32x50 inches)
Drawer   12 Folder   5
Electrical Layout of the Noon-Day Club (1E),  8/24/1928 (22-3/4x49-3/4 inches)
Drawer   12 Folder   5
Riser Diagram for Cove Lighting (2E)
Drawer   12 Folder   5
Riser Diagram (3E)
Drawer   12 Folder   5
Plan of Cove Lighting of First Floor Lobby 105 and Passage 104 (4E)
Drawer   12 Folder   5
Plan of Cove Lighting of First Floor Elevator Lobby 112 and Vestibule 113 (5E)