Albert Kahn papers   1896-2014
full text File Size: 2368 K bytes | Add this to my bookbag

 
   Container / Location    Title
 
General Motors (Durant) Building, Detroit, Michigan,  1919-1920, Job No. 902 [subseries]:
 
Project Records  8/2/1919
Box   2  
Specification for Office and Laboratory Building, Durant Building Corporation by Albert Kahn, Incorporated,  8/2/1919
 
Construction Drawings by Albert Kahn, Architect
 
Architectural Drawings,  8/2/1919 (Ink-on-linen drawings with pencil notations, 28-3/4x34 to 29x44 inches)
Drawer   12 Folder   6
Plot Plan Showing Present Buildings (A-1),  undated
Drawer   12 Folder   6
Plot Plan (1)
Drawer   12 Folder   6
Excavation Plan (A-2),  6/6/1919
Drawer   12 Folder   6
Details of Swimming Pools (2), revised  9/2/1919
Drawer   12 Folder   6
Grading Plan (A-3), revised  5/28/1921
Drawer   12 Folder   6
Details of Laboratory Foundations and Tunnel (3)     (undated due to linen damage) 
Drawer   12 Folder   6
Plan of Foundation and Sub-Basement (4), revised  1/3/1922
Drawer   12 Folder   6
Basement Plan (5-R), revised  1/3/1922
Drawer   12 Folder   6
First Floor Plan (6), revised  1/3/1922
Drawer   12 Folder   6
Plan of Mezzanine Floor and First Floor of Laboratory (7), revised  1/3/1922
Drawer   12 Folder   6
Second Floor Plan (8), revised  5/16/1921
Drawer   12 Folder   6
Third Floor Plan (9), revised  5/16/1921
Drawer   12 Folder   6
Fourth Floor Plan (10), revised  9/27/1920
Drawer   12 Folder   6
Fifth Floor Plan (11), revised  9/27/1920
Drawer   12 Folder   6
Typical Floor Plan (12), revised 11/1/1920
Drawer   12 Folder   6
Fourteenth Floor Plan (13), revised  6/23/1920
Drawer   12 Folder   6
Fifteenth Floor Plan (14), revised  6/23/1920
Drawer   12 Folder   6
Plan of Pipe Space and Sixteenth Floor (15), revised  7/20/1920
Drawer   12 Folder   6
Roof Plan (16), revised  6/10/1920
Drawer   12 Folder   7
North Elevation, Grand Boulevard     (not numbered or dated due to print damage)  (sepia print)
Drawer   12 Folder   7
South Elevation, Milwaukee Avenue (18), revised  9/2/1919
Drawer   12 Folder   7
West Elevation, Second Avenue (19), revised  9/2/1919
Drawer   12 Folder   7
Section "A-A" (20), revised  9/2/1919
Drawer   12 Folder   7
Section "B-B" (21), revised  1/3/1922
Drawer   12 Folder   7
Section "C-C" thru' Courts #1, 2 & 4, Looking towards Laboratory (22), revised  7/9/1920
Drawer   12 Folder   7
Section "D-D" thru' Courts # 1, 2 & 4, Looking North (23-R), revised  1/3/1922
Drawer   12 Folder   7
Sections "E-E" and "J-J" (24), revised  1/3/1922
Drawer   12 Folder   7
Elevations of Courts # 2 & 4 and Sections "G-G" and "H-H" (25), revised  5/5/1920
Drawer   12 Folder   7
Section "F-F" thru' Courts # 3 & 7, Looking East (26), revised  5/18/1920
Drawer   12 Folder   7
Section "I-I" thru' Courts # 1 & 8, Looking West (27), revised  1/3/1922
Drawer   12 Folder   7
Details of Driveway (28)     (undated due to linen damage) 
Drawer   12 Folder   7
Details of Main Entrance, West Grand Boulevard (29), revised  9/2/1919 (sepia print)
Drawer   12 Folder   7
Details of Main Entrance (30), revised  9/2/1919
Drawer   12 Folder   7
Details of First Story Windows (31), revised  2/24/1920
Drawer   12 Folder   7
Details of Entrances to Shops on Grand Boulevard and Second and Cass Avenues (32), revised  6/10/1920
Drawer   12 Folder   8
Details of Typical Window Frames and Typical Walls and Spandrels (33), revised  1/3/1922
Drawer   12 Folder   8
Basement Plan, East Half, Future Arrangement (34)     (undated due to linen damage) 
Drawer   12 Folder   8
Wall Sections (34-R), revised  1/3/1922
Drawer   12 Folder   8
Details of Fourteenth and Fifteenth Stories (35), revised  1/3/1922
Drawer   12 Folder   8
Details of Laboratory Entrance Portico, Milwaukee Street Elevation (36), revised  1/3/1922
Drawer   12 Folder   8
Details of Laboratory, Milwaukee Street Elevation (37), revised  7/9/1920
Drawer   12 Folder   8
Details of Laboratory Entrance Steps, Milwaukee Street Elevation (38), revised  7/9/1920
Drawer   12 Folder   8
Detail of Typical Bay for Laboratory (39)     (undated due to linen damage) 
Drawer   12 Folder   8
Details of Connection between Laboratory and Office Building (40), revised  1/3/1922
Drawer   12 Folder   8
Foundation Plan of Stairs, Elevators, etc. of Laboratory Building, Footing Plan of Exterior Columns and Area Walls, and Sections thru' Columns at Basement Floor (41), revised  5/10/1920
Drawer   12 Folder   8
Basement and First Floor Plans of Laboratory Building (42), revised  1/3/1922
Drawer   12 Folder   8
Mezzanine and Second Floor Plans of Laboratory Building (43), revised  1/3/1922
Drawer   12 Folder   8
Plans of Third Floor, Pent Houses at Fifth Floor and North Wall at Fourth Floor of Laboratory Building (44), revised  1/3/1922
Drawer   12 Folder   8
Detail Sections of Elevators L-1 to L-4 and Stairs # 9 (45), revised  1/3/1922
Drawer   12 Folder   8
Cross-Section thru' Laboratory at Fourth Floor, Typical Elevation of Half-Bay and Sections "T-T" and "U-U" thru' Fresh Air Intake and Shaft (46), revised  1/3/1922
Drawer   12 Folder   8
Plans of Stairs # 1 at Basement through Fourth Floors and at East Entrance (47), revised  6/10/1920
Drawer   12 Folder   8
Plans of Stairs # 1 at Eleventh through Fifteenth Floors (48-R),  1/2/1920 revised  9/3/1920
Drawer   12 Folder   9
Details of Elevators "A" to "M" & "Z" and Stairs # 7 & 8 (49), revised  6/10/1920
Drawer   12 Folder   9
Basement Plan of Elevators and Lobby and Details of Freight Elevators (50), revised  7/1920
Drawer   12 Folder   9
Detail Plans of Stairs # 8 & 12 and Elevators "A" to "M" & "W" to "Z" (51), revised  9/1/1920
Drawer   12 Folder   9
Details of Elevators "A" to "M" and Stairs # 2 (52), revised  9/1/1920
Drawer   12 Folder   9
Details of Elevators and Stairs (53), revised  1/3/1922
Drawer   12 Folder   9
Detail Plans of Stairs # 2, 5 & 15 and Elevators "A" to "M" & "Z" (54), revised  6/23/1920
Drawer   12 Folder   9
Plan of Pent House, Plan at Pipe Space and Details of Stairs (55), revised  1/3/1922
Drawer   12 Folder   9
Sections thru' Stairs # 1 & 6, 7 & 8 and 2 & 5 (56), revised  6/10/1920
Drawer   12 Folder   9
Typical Floor Plan Showing Men's Toilet and Stairs # 1 and Elevations and Details of Toilets (57), revised  1/3/1922
Drawer   12 Folder   9
Elevations of Corridors (58), revised  9/1/1920
Drawer   12 Folder   9
Detail Sections of Hollow Metal Doors, Frames and Trim and Section thru' Stair # 15 (59), revised  1/3/1922
Drawer   12 Folder   9
Details of Main Entrance Lobby #104 (60), revised  3/24/1920
Drawer   12 Folder   9
Reflected Ceiling Plans and Elevations of Elevator Lobby and Stairway # 3 (61), revised  9/2/1919
Drawer   12 Folder   9
Elevations and Ceiling Plan of East and West Corridors (62), revised  9/1/1920
Drawer   12 Folder   9
Details of Entrance Lobby # 105 to Laboratory (63), revised  1/3/1922
Drawer   12 Folder   9
Detail Sections thru' Stairs # 10 and Lobby # 210 (64)     (undated due to linen damage) 
Drawer   12 Folder   9
Plan of Sub-Basement and Machine Room (65),  9/9/1919 revised  1/3/1922
Drawer   12 Folder   10
Details of Laboratory Flues (66),  11/12/1919 revised  5/10/1920
Drawer   12 Folder   10
Sections "C-C" and "D-D" thru' Stair # 1 and Elevations and Details for Toilets (67),  1/2/1920 revised  1/3/1922
Drawer   12 Folder   10
Revised Marble and Plaster Work in Stairs # 3 & 4 and Lobbies # 104 & 105 (68),  1/2/1920 revised  2/17/1920
Drawer   12 Folder   10
Detail Sections thru' Stairs # 10 and Lobby # 210, Showing Revised Finish of Plaster and Marble Wainscot (70),  1/3/1920 revised  1/3/1922
Drawer   12 Folder   10
Details of Air Shaft and Revised Details Showing New Location of Two-Part Sliding Doors to Office Building from Driveway (71),  1/6/1920
Drawer   12 Folder   10
Details of West End of Driveway (72), revised  12/11/1920
Drawer   12 Folder   10
Details of Driveway at East End of Building (73),  1/20/1920 revised  12/11/1920
Drawer   12 Folder   10
Details of Doors in Basement (74),  5/11/1920 revised  7/26/1920
Drawer   12 Folder   10
Details of Mailing Room, Monorail and Men Janitors' Locker Room # 5-C (75),  5/11/1920 revised  1/3/1922
Drawer   12 Folder   10
Details of Women's Toilet Room # 21, Toilets # M-8, M-9 & M-13, and Utility Space (76), revised  1/3/1922
Drawer   12 Folder   10
Plan of Mezzanine Floor Utilities Space and Miscellaneous Details (77), revised  1/3/1922
Drawer   12 Folder   10
Basement Plan for Telephone Conduit Layout (78),  undated
Drawer   12 Folder   10
Revisions to Stairs # 8 between Sub-Basement and First Floor and Details of Stairs # 5 (270 & 274),  3/30/1920 revised  7/23/1920
 
Structural Drawings (Ink-on-linen drawings with pencil notations, 37-1/2x47 to 36-1/4x48 inches)
Drawer   12 Folder   11
Column Schedule (1-S), revised  9/2/1919
Drawer   12 Folder   11
Column Schedule (2-S), revised  9/2/1919
Drawer   12 Folder   11
Details of Columns (3-S),  8/11/1919
Drawer   12 Folder   11
Half Framing Plan of First Floor (4-S),  9/22/1919
Drawer   12 Folder   11
Half Framing Plan of Mezzanine Floor, revised  9/22/1919     (not numbered due to linen damage) 
Drawer   12 Folder   11
Half Framing Plan of Second Floor (6-S), revised  9/9/1919
Drawer   12 Folder   11
Third Floor Framing Plan (7-S), revised  9/2/1919
Drawer   12 Folder   11
Typical Floor Half Framing Plan of Fourth to Eleventh Floors (8-S),  6/28/1919 revised  9/10/1919
Drawer   12 Folder   11
Plan of Framing Adjoining Laboratory at First Floor of Laboratory (9-S),  6/28/1919 revised  9/13/1919
Drawer   12 Folder   11
Half Framing Plan of Twelfth and Thirteenth Floors (10-S),  7/1/1919 revised  8/2/1919
Drawer   12 Folder   11
Half Framing Plan of Fourteenth Floor (11-S),  8/1/1919
Drawer   12 Folder   11
Half Framing Plan of Fifteenth Floor (12-S), revised  9/2/1919
Drawer   12 Folder   11
Half Framing Plan of Pipe Gallery     (not numbered or dated due to linen damage) 
Drawer   12 Folder   11
Half Framing Plan of Roof (14-S), revised  9/15/1919
Drawer   12 Folder   11
Wind Bracing Details (15-S), revised  9/6/1919
Drawer   13 Folder   1
Girder Details (16-S),revised  8/6/1919
Drawer   13 Folder   1
Details of Girders and Trusses (17-S), revised  9/23/1919
Drawer   13 Folder   1
Penthouse Roof Plan and Truss Details (18-S), revised  9/16/1919
Drawer   13 Folder   1
Framing Plan of Ground, First, Second and Forty-Third Floors of Laboratory (19-S), revised  9/24/1919
Drawer   13 Folder   1
Framing Plan of Fourth Floor and Penthouses (20-S),  8/2/1919 revised  10/16/1919
Drawer   13 Folder   1
Beam Schedule for Laboratory Building,  10/17/1919     (not numbered due to linen damage) 
Drawer   13 Folder   1
Details of Trusses for Laboratoy (22-S),  8/1/1919 revised  8/15/1919
Drawer   13 Folder   1
Footing Schedule,  8/8/1919 revised 10/8/1919     (not numbered due to linen damage) 
Drawer   13 Folder   1
Details of Retaining Walls of Main Building (24-S),  undated
Drawer   13 Folder   1
Details of Retaining Walls around Sub-Basement (25-S), revised  10/15/1919
Drawer   13 Folder   1
Details of Men's and Women's Swimming Pools (26-S),  undated
Drawer   13 Folder   1
Details of Trusses (27-S)     (undated due to linen damage) 
Drawer   13 Folder   1
Column Schedule (28-S)     (undated due to linen damage) 
Drawer   13 Folder   1
Details of Roof and Pipe Gallery Framing     (not numbered or dated due to linen damage) 
 
Structural "Sketches" (Ink-on-linen drawings with pencil notations)
Drawer   13 Folder   2
Section thru' Vacuum Room of Laboratory Building (112-S),  9/9/1919 revised  9/15/1919 (12-1/2x22-3/4 inches)
Drawer   13 Folder   2
Plan and Revised Layout of Retaining Wall between Columns # 263 & 176A (113-S),  9/12/1919 (10-1/4x34 inches)
Drawer   13 Folder   2
Elevation of Retaining Walls at Driveways (114-S),  9/17/1919 revised  9/18/1919 (17x22 inches)
Drawer   13 Folder   2
Elevation Showing Location of Bolts for Beam Seats for Beams Connecting Laboratory with Durant Building (115-S),  9/29/1919 revised  10/13/1919 (15-1/4x37 inches)
Drawer   13 Folder   2
Elevation Showing Location of Bolts for Beam Seats for Beams Connecting Laboratory with Durant Building (117-S),  10/10/1919 (15-1/2x38-3/4 inches)
Drawer   13 Folder   2
Plan and Section of Proposed Walkway around Testing Machine Opening at Ground Floor Level-Laboratory Building (119-S),  1/10/1920 (14x22 inches)
Drawer   13 Folder   2
Elevation Showing Location of Bolts for Beam Seats for Beams Connecting Laboratory with Durant Building at Second Floor of Laboratory (120-S),  10/13/1919 (14-3/4x38-1/4 inches)
Drawer   13 Folder   2
Elevation Showing Location of Bolts for Beam Seats for Beams Connecting Laboratory with Durant Building at Third Floor of Laboratory (121-S),  10/15/1919 (15x38-1/2 inches)
Drawer   13 Folder   2
Details of Concrete Columns Supporting Steel Girders, Showing Base Plates and Anchor Bolts for Same-Laboratory Building (122-S),  10/21/1919 (13x26-1/4 inches)
Drawer   13 Folder   2
Details of Pipe Sleeves in Laboratory (124-S), 11/4/1919 revised  11/26/1919 (24-1/2x33-1/2 inches)
Drawer   13 Folder   2
Details of Instrument Tower-Laboratory Building (125-S),  11/12/1919 (26x32 inches)
Drawer   13 Folder   2
Plan and Section of Openings in Floors for Steam Risers (128-S), 12/3/1919 (15-1/2x20 inches)
 
Structural Drawings (cont.) (Black and red ink drawings on linen with pencil notations, 24-1/4x30 to 28x43-1/2 inches)
Drawer   13 Folder   3
Changes in Framing at Vents B and F (132-S),  1/19/1920 revised  4/22/1920 (Pencil-on-vellum drawing)
Drawer   13 Folder   3
Plans and Sections of Beams and Girders-Field Work, First and Second Floors (133-S),  1/19/1920 revised  2/20/1920
Drawer   13 Folder   3
Details of Brackets on Columns Supporting Girders and Trusses in Laboratory (136-S),  1/28/1920
Drawer   13 Folder   3
Details of Brackets Supporting Beams, Ground to Fourth Floors (139-S),  2/2/1920 revised  3/12/1920
Drawer   13 Folder   3
Details of Framing for Locker Rooms in Courts # 2 & 4 (140-S),  4/1/1920 revised  4/21/1920
Drawer   13 Folder   3
Details of Concrete Spandrels in Courts # 1 & 5 at Second Floor (141-S),  2/19/1920 revised  3/25/1920
Drawer   13 Folder   3
Details of Bracing for Girder G-36 (143-S),  3/22/1920
Drawer   13 Folder   3
Revised Details of Columns 77, 78 & 96-A at Fourteenth Floor, Elevator "A" (144-S),  4/21/1920
Drawer   13 Folder   3
Plan and Sections of Pit for Elevator "A" and Details of Pipe Chase in Sub-Basement (151-S),  4/20/1920
Drawer   13 Folder   3
Part Plans and Sections of Laboratory Floors over Openings for Tower and Machine Room (154-S),  4/15/1920
Drawer   13 Folder   3
Plans of Stairways # 17-20 (157-S),  4/26/1920 revised 10/6/1920
Drawer   13 Folder   3
Details of New Brackets on Columns 332 & X91-A (160-S),  4/29/1920 revised  5/7/1920
Drawer   13 Folder   3
Plans and Sections of Framing and Footings in Basement Truckway (161-S & 162-S),  5/11/1920 revised  5/22/1920
Drawer   13 Folder   3
Details of Floor over Vacuum Room Opening in Laboratory (165-S),  5/17/1920
Drawer   13 Folder   3
Record of Test Borings (188-S),  9/23/1920
 
Mechanical Drawings,  8/12/1919 (Ink-on-linen drawings with pencil notations, 36x44-1/4 to 36-1/4x48 inches)
Drawer   13 Folder   4
Plot Plan, revised  2/4/1920     (not numbered due to linen damage) 
Drawer   13 Folder   4
Sub-Basement Plan, East Half (2-M), revised 12/6/1920
Drawer   13 Folder   4
Sub-Basement Plan, West Half (3-M), revised  12/27/1922
Drawer   13 Folder   4
Basement Plan, East Half (4-M), revised  5/23/1921
Drawer   13 Folder   4
Basement Plan, West Half (5-M), revised  8/17/1922
Drawer   13 Folder   4
First Floor Plan, East Half (6-M), revised  10/26/1921
Drawer   13 Folder   4
First Floor Plan, West Half (7-M), revised  8/17/1922
Drawer   13 Folder   4
Mezzanine Floor Plan, East Half (8-M), revised  5/23/1921
Drawer   13 Folder   4
Mezzanine Floor Plan, West Half (9-M), revised  2/24/1922
Drawer   13 Folder   4
Second Floor Plan, East Half (10-M), revised  6/16/1920
Drawer   13 Folder   4
Second Floor Plan, West Half (11-M), revised  8/6/1920
Drawer   13 Folder   4
Typical Floor Plan of Floors # 3 to 12, East Half (12-M), revised  6/16/1920
Drawer   13 Folder   4
Typical Floor Plan of Floors # 3 to 13, West Half (13-M), revised  6/18/1920
Drawer   13 Folder   5
Fourteenth Floor Plan, East Half (14-M), revised  5/2/1922
Drawer   13 Folder   5
Fourteenth Floor Plan, West Half (15-M), revised  9/8/1920
Drawer   13 Folder   5
Fifteenth Floor Plan, East Half (16-M), revised  5/2/1922
Drawer   13 Folder   5
Fifteenth Floor Plan, West Half (17-M), revised  6/11/1920
Drawer   13 Folder   5
Pipe Space Plan, East Half (18-M), revised  9/8/1920
Drawer   13 Folder   5
Pipe Space Plan, West Half (19-M), revised  8/5/1920
Drawer   13 Folder   5
Pent House Plan and Vent Riser Details (20-M), revised  8/5/1920
Drawer   13 Folder   5
Drainage Plan, Laboratory (21-M), revised  4/20/1920
Drawer   13 Folder   5
Basement Plan, Laboratory (22-M), revised  8/24/1921
Drawer   13 Folder   5
Ground Floor Plan, Laboratory (23-M), revised  10/21/1921
Drawer   13 Folder   5
First Floor Plan, Laboratory (24-M), revised  10/21/1921
Drawer   13 Folder   5
Second Floor Plan, Laboratory (25-M), revised  8/24/1921
Drawer   13 Folder   5
Third Floor Plan, Laboratory (26-M), revised  8/24/1921
Drawer   13 Folder   6
Fourth Floor Plan, Laboratory (27-M)     (undated due to linen damage) 
Drawer   13 Folder   6
Machine Room Plan (28-M), revised  7/20/1920
Drawer   13 Folder   6
Swimming Pool Details (29-M), revised  1/28/1920
Drawer   13 Folder   6
Piping Diagrams (30-M)     (undated due to linen damage) 
Drawer   13 Folder   6
Piping Details (31-M), revised  5/18/1920
Drawer   13 Folder   6
Tunnel Piping Details (32-M),  9/13/1919 revised  7/6/1920
Drawer   13 Folder   6
Heating Riser Diagram (33-M), revised  6/11/1920
Drawer   13 Folder   6
Heating Riser Diagram (34-M), revised  6/11/1920
Drawer   13 Folder   6
Heating Riser Diagram (35-M), revised  1/31/1920
Drawer   13 Folder   6
Heating Riser Diagram (36-M), revised  10/19/1920
Drawer   13 Folder   6
Heating Riser Diagram (37-M), revised  1/31/1920
Drawer   13 Folder   6
Details of Pipe Shafts (38-M), revised  1/22/1920
 
Electrical Drawings (Ink-on-linen drawings with pencil notations, 36x48 to 36x51 inches)
Drawer   13 Folder   7
Sub-Basement Plan (39-M),  10/10/1919 revised  6/17/1920
Drawer   13 Folder   7
Basement Wiring Plan, East Half (40-M),  1/8/1920 revised  6/17/1920
Drawer   13 Folder   7
Basement Wiring Plan, West Half (41-M),  8/12/1919 revised 11/1/1920
Drawer   13 Folder   7
First Floor Plan (42-M),  10/10/1919 revised  11/26/1920
Drawer   13 Folder   7
Mezzanine Floor Plan (43-M),  10/10/1920 revised  6/1/1920
Drawer   13 Folder  
Second Floor Plan (44-M),  10/10/1920 revised  5/29/1920
Drawer   13 Folder   7
Typical Floor Plan, East Half, Third to Twelfth Floors (45-M),  6/21/1920 revised  6/25/1920
Drawer   13 Folder   7
Plan of Center Connection between Main Building and Laboratory (46-M),  10/10/1919 revised  6/20/1920
Drawer   13 Folder   7
Fourteenth Floor Lighting Plan, East Half (47-M), revised  1/9/1922
Drawer   13 Folder   7
Fifteenth Floor Lighting Plan, East Half (48-M),  7/17/1920 revised  1/9/1922
Drawer   13 Folder   7
Fifteenth Floor Lighting Plan, West Half (49-M),  7/17/1920 revised  1/9/1922
Drawer   13 Folder   7
Fifteenth Floor and Pipe Space Plan, East Half-Kitchen Wiring (50-M),  1/8/1920 revised  1/9/1922
Drawer   13 Folder   7
Sixteenth Floor and Pipe Space Wiring Plan, West Half-Wiring (51-M),  1/8/1920 revised  1/9/1922     (letter from F. Gossman attached, 1/29/1965) 
Drawer   13 Folder   7
Pent House Plan (52-M),  10/10/1919 revised  3/26/1920
Drawer   13 Folder   8
Basement Plan, Laboratory (53-M),  9/21/1919 revised  1/9/1922
Drawer   13 Folder   8
Ground Floor Plan, Laboratory (54-M),  10/10/1919 revised  1/9/1922
Drawer   13 Folder   8
First Floor Plan, Laboratory (55-M),  10/10/1919 revised  1/9/1922
Drawer   13 Folder   8
Second Floor Plan, Laboratory (56-M),  10/10/1919 revised  1/9/1922
Drawer   13 Folder   8
Third Floor Plan, Laboratory (57-M),  10/10/1919 revised  10/17/1920
Drawer   13 Folder   8
Fourth Floor Plan, Laboratory (58-M),  8/12/1919 revised  1/9/1922
Drawer   13 Folder   8
Light and Power Riser Diagram (59-M),  10/10/1919 revised  1/9/1922
Drawer   13 Folder   8
Plan of Electrical Conduit Lines and Sections of Duct Lines (60-MR), revised  5/21/1920
Drawer   13 Folder   8
Site Plan of Additions to Sewers by Albert Kahn, Architect, Ernest Wilby, Associate (61-M), revised  12/16/1919 (17-1/2x30 inches)
Drawer   13 Folder   8
First Floor Plan, Laboratory by Albert Kahn, Architect, Ernest Wilby, Associate (62-M),  10/22/1919 (17-1/2x31-1/2 inches)
Drawer   13 Folder   8
Layout of Electrical Lab, East End of First Floor (63-M), revised  11/20/1919 (27-1/2x60 inches)
Drawer   13 Folder   8
Plan of Register Openings (64-M),  undated (17-1/2x31-1/2 inches)
Drawer   13 Folder   8
Layout of Electric Sub-Station in Laboratory Basement (64-M), ?/17/1920 revised  7/7/1921 (Pencil-on-paper drawing, 27x38-1/4 inches)
Drawer   13 Folder   8
Details of Power House Tunnel, revised  1/20/1920     (not numbered due to linen damage)  (30-1/4x54 inches)
Drawer   13 Folder   8
Plan Showing Location of Light Outlets in Typical Bays by Albert Kahn, Architect, Ernest Wilby, Associate (66-M),  12/16/1919 (17x30-3/4 inches)
Drawer   13 Folder   8
Riser Diagrams for Low Tension Conduit, Clock and Telephone Systems, Main Building and Laboratory (67-M),  2/3/1920 revised  1/9/1922
 
Mechanical and Electrical Drawings (Ink-on-linen drawings, 36x48 to 36x51 inches)
Drawer   13 Folder   9
Plan of Revised Machine Room Piping (68-M), revised  5/23/1921
Drawer   13 Folder   9
Layout of Sprinkler, Basement (69-M),  undated
Drawer   13 Folder   9
Thirteenth Floor Radiator Plan (70-M),  6/11/1920 revised  1/9/1922
Drawer   13 Folder   9
Thirteenth Floor Lighting Plan, revised  1/9/1922     (not numbered due to linen damage) 
Drawer   13 Folder   9
Detail of Special Manhole Cover (75-M),  6/23/1920 (17-1/2x30-3/4 inches)
Drawer   13 Folder   9
Details of Refrigerator Piping (76-M),  1/9/1922
Drawer   13 Folder   9
Elevations and Details of Laboratory Power Cabinets (77-M), revised  10/17/1920
Drawer   13 Folder   9
Fire Alarm Riser Diagram (80-M),  8/24/1920 (25-1/2x26 inches)
Drawer   13 Folder   9
Thirteenth and Fourteenth Floor Plans (83),  10/18/1920 revised  1/9/1922 (21-1/4x39-3/4 inches)
Drawer   13 Folder   9
Details of Supply and Return Connections to Vento Heaters for Fan Units (85-M),  11/18/1920 (17-1/2x31 inches)
Drawer   13 Folder   9
First Floor Electrical Plan by Albert Kahn Architect and Engineers (88-M), 12/9/1921 revised  1/9/1922
Drawer   13 Folder   9
Electrical Plan of Mezzanine over Sales Rooms # 106-B & 106-C by Albert Kahn Architects and Engineers (89-M),  1/12/1922 revised  1/9/1922
Drawer   13 Folder   9
Mezzanine Floor Electrical Plan by Albert Kahn Architects and Engineers (90-M),  1921 revised  1/9/1922
Drawer   13 Folder   9
First Floor Electrical Plan, West End     (not numbered or dated due to paper damage)  (Pencil-on-paper drawing, 19-3/4x28-1/2 inches)
Drawer   13 Folder   9
Details of Transformer Room No. 1     (not numbered or dated due to linen damage)  (29-1/2x41 inches)
Drawer   13 Folder   9
Details of Transformer Room No. 1,  5/26/1920     (not numbered due to linen damage)  (29-1/2x42 inches)
Drawer   13 Folder   9
Details of Transformer Room No. 2     (not numbered or dated due to linen damage)  (29-1/2x40-1/4 inches)
Drawer   13 Folder   9
Details of Transformer Room No. 2 (48-M),  5/20/1920 (30x41 inches)