Albert Kahn papers   1896-2014
full text File Size: 2368 K bytes | Add this to my bookbag

 

Contents List

   Container / Location    Title
 
Personal Papers,  1903-1970 [series]:

The Personal Papers series contains correspondence to and from Kahn from 1917 to 1942 and to a few principals of his firm through 1970. These documents were probably saved in a special file by Kahn because they are letters of appreciation, commendation and reference from admiring clients and government officials, including such historic figures as Henry Ford, George G. Booth, James C. Couzens, Henry B. Joy, William L. Clements, C. S. Mott, Alfred P. Sloan, Jr. and The Honorable Ferry K. Heath, Assistant Secretary of the Treasury. The letters have been described at the item-level in this finding aid because of the importance of the authors and their own contributions to American industrial and political history.

 
Correspondence,  1917-1970 [subseries]:
 
Letters of Appreciation, Commendation and Reference
 
 1917-1929
Box   1  
To Kahn from George G. Booth, President, The Evening News Association, Detroit, 10/8/1917
Box   1  
To Kahn from F. L. Klingensmith, Vice President and Treasurer, Ford Motor Company,  2/21/1918
Box   1  
To Kahn from Malcolm McGregor, President, Detroit Golf Club,  1/2/1919
Box   1  
To Kahn from Alvan Macauley, President, Packard Motor Car Company,  4/7/1919
Box   1  
To Kahn from H. W. Chapin, Treasurer and General Manager, Brown-Lipe-Chapin Co., Syracuse, NY,  4/30/1919
Box   1  
To Kaufman Rubber Co., Ltd., Kitchener, Ontario, from H. W. Chapin, General Manager, Brown-Lipe-Chapin Company,  4/30/1919
Box   1  
To Kahn from C. G. Edgar, W. H. Edgar & Son, Detroit,  6/13/1919
Box   1  
To Frank A. Seiberling, President, Goodyear Tire & Rubber Company, Akron, OH, from C. J. Butler,  10/17/1919
Box   1  
To Kahn from George G. Booth, President, The Evening News Association,  8/19/1920
Box   1  
To Kahn from B. W. Peterson, President, Dollar Savings & Trust Co., Wheeling, WV,  8/26/1920
Box   1  
To Whom It May Concern from Dr. James W. Inches, Commissisoner of Police, City of Detroit,  9/23/1920
Box   1  
To Whom It May Concern from James Couzens, Mayor, City of Detroit,  9/23/1920
Box   1  
To A. Gaddis, President, Citizens Title & Trust Company, Uniontown, PA, from BWP,  1/20/1921
Box   1  
To Kahn from B. W. Peterson, President, Dollar Savings & Trust Co., Wheeling, WV,  6/2/1921
Box   1  
To Kahn from Charles C. Bowen, Secretary, Standard Accident Insurance Company of Detroit,  6/2/1921
Box   1  
To Kahn from [signature illegible], President, The Detroit Savings Bank,  6/6/1921
Box   1  
To Kahn from Howard Van Doren Shaw, Architect, Chicago,  7/22/1921
Box   1  
To Cramer Smith, President, Pontiac Commercial & Savings Bank, from Ralph Stone, President, Detroit Trust Co.,  8/1/1921
Box   1  
To Kahn from H. A. Austin, General Manager, General Motors Building Corporation, 11/8/1921
Box   1  
To Clyde H. Burroughs, Detroit Museum of Art, from J. J. Crowley, Crowley Brothers,  11/11/1921
Box   1  
To Austin Lynch, First National Bank of Canton, OH, from Eugene W. Lewis, House Financing Corporation of Detroit,  11/12/1921
Box   1  
To Kahn from Louis J. Horowitz, New York, NY,  11/30/1921
Box   1  
To Kahn from C. G. Edgar, W. H. Edgar & Son, Detroit,  3/20/1922
Box   1  
To Kahn from CHLF [signature illegible], Disteel Wheels, Detroit Pressed Steel Company,  3/20/1922
Box   1  
To Kahn from Lawrence Veiller, Secretary, The Committee on Criminal Courts, New York, NY, 11/9/1922
Box   1  
To Henry Swan, Vice President, Bankers' Trust Company, Denver, CO, from B. W. Peterson, President, Dollar Savings & Trust Co., Wheeling, WV, 12/5/1922
Box   1  
To Kahn from Emory W. Clark, President, First National Bank, Detroit,  1/9/1923
Box   1  
To Kahn from Henry B. Joy, "Fairacres," Grosse Pointe Farms, MI,  3/13/1923
Box   1  
To Kahn from W. C. Durant, New York, NY,  10/18/1923
Box   1  
To Kahn from John R. Searles, Michigan Smelting & Refining Co., Detroit,  11/27/1923
Box   1  
To Kahn froom George R. Cooke, The George R. Cooke Co., Detroit,  12/26/1923
Box   1  
To Kahn from Charles Harris Whitaker, Editor, The Journal of The American Institute of Architects, New York, NY,  1/10/1924
Box   1  
To Kahn from R. B. Mann, General Manager, Packard Motor Car Company,  5/5/1924
Box   1  
To Kahn from Alvan [Macauley],  5/24/1924
Box   1  
To Kahn from C. B. Ferguson, President, The Ohio Valley Trust Company, Goraopolis, PA,  6/21/1924
Box   1  
To Kahn from James Couzens, U. S. Senate,  8/8/1924
Box   1  
To Kahn from John R. Effinger, Dean, College of Literature, Science, and the Arts, University of Michigan,  12/22/1924
Box   1  
To Kahn from Kirby B. White, Jr., Vice President, D. M. Ferry & Co., Detroit,  1/16/1925
Box   1  
To William W. Tefft, Chief Engineer, Consumers Power Company, Jackson, MI, from H. A. Austin, General Manager, General Motors Building Corporation,  1/19/1925
Box   1  
To William Teft, Chief Engineer, Consumers Power Company, Jackson, MI, from W. J. Roberts, Vice President, The Mahoning National Bank, Youngstown, OH,  1/23/1925
Box   1  
To Kahn from G. G. Atkins, Minister, The First Congregational Church, Detroit,  5/29/1925
Box   1  
To Kahn from Katherine G. Kimmick, Director, Henry Ford Hospital School of Nursing and Hygiene, Detroit,  6/27/1925
Box   1  
To Kahn from John G. C. [signature illegible], St. Mary's of Redford, Detroit,  7/14/1925
Box   1  
To Kahn from W. L. Graham, Superintendent, Henry Ford Hospital, Detroit,  9/20/1925
Box   1  
To Kahn from Frank J. Sladen, Physician-in-Chief, Henry Ford Hospital, Detroit,  9/25/1925
Box   1  
To Kahn from R. D. McClure, Surgeon-in-Chief, Henry Ford Hospital, Detroit,  9/30/1925
Box   1  
To Kahn from G. W. Brown, Vice President, Citizens Title & Trust Company, Uniontown, PA,  10/16/1925
Box   1  
To Kahn from G. W. Brown, Vice President, Citizens Title & Trust Company, Uniontown, PA,  11/16/1925
Box   1  
To Kahn from W. J. Roberts, Vice President, The Mahoning National Bank, Youngstown, OH,  11/17/1925
Box   1  
To Kahn from Frank E. Quisenberry, President, Highland Park Trust Company, Highland Park, MI,  12/11/1925
Box   1  
To Kahn from James O. Murfin, Board of Regents, University of Michigan,  1/5/1926
Box   1  
To Kahn from Dr. Walter H. Sawyer, Board of Regents, University of Michigan,  1/8/1926
Box   1  
To Kahn from Victor M. Gore, Gore & Harvey and Board of Regents, University of Michigan,  1/9/1926
Box   1  
To Kahn from Junius E. Beal, Board of Regents, University of Michigan,  1/10/1926
Box   1  
To Kahn from William L. Clements, Board of Regents, University of Michigan,  1/11/1926
Box   1  
To Kahn from C. C. Little, President, University of Michigan,  1/18/1926
Box   1  
To Kahn from Ella K. Winter, Secretary to Ralph Stone, President, Detroit Trust Company,  1/19/1926
Box   1  
To Kahn from John F. Shepard, University of Michigan,  1/29/1926
Box   1  
To Kahn from A. Barit,  2/13/1926
Box   1  
To Kahn from William L. Clements, Board of Regents, University of Michigan,  3/3/1926
Box   1  
To Kahn from Harry Whyel, President, Whyel Coke Company, Uniontown, PA,  3/5/1926
Box   1  
To Kahn from C. S. Mott, General Motors Corporation, Detroit,  6/4/1926
Box   1  
To Kahn from Alfred P. Sloan, Jr., General Motors Corporation, New York, NY,  6/4/1926
Box   1  
To Kahn from Alvan Macauley, President, Packard Motor Company,  6/15/1926
Box   1  
To Kahn from Jacob M. Loeb, Insurance Exchange, Chicago,  6/15/1926
Box   1  
To Kahn from Ralph Stone, President, Detroit Trust Company,  7/19/1926
Box   1  
To Otto Kahn from Lucius L. Hubbard, Board of Regents, Unversity of Michigan,  8/1/1926
Box   1  
To Kahn from Jacob M. Loeb, Insurance Exchange, Chicago, 11/9/1926
Box   1  
To Jacob M. Loeb, Insurance Exchange, Chicago, from Julius Kahn,  12/28/1926
Box   1  
To August Gatzert, Standard Club, Chicago, from Henry X. Strauss,  12/28/1926
Box   1  
Remarks Made at Dinner in Honor of Albert Kahn, Standard Club, Chicago,  12/28/1926
Box   1  
To Kahn from Bayer Brothers, Detroit,  1/27/1927
Box   1  
To C. C. Wilcox, Studebaker Corporation, South Bend, IN, from Albert Kahn,  4/29/1927
Box   1  
To John French, Briggs Manufacturing Co., Detroit, from C. C. Wiolcox, Superintendent, Power Division, South Bend, IN,  4/29/1927
Box   1  
To Kahn from Ralph Stone, President, Detroit Trust Company,  5/13/1927
Box   1  
To Kahn from Ralph Stone, President, Detroit Trust Company,  5/19/1927
Box   1  
To Kahn from Ralph Stone, President, Detroit Trust Company,  5/19/1927
Box   1  
To Kahn from Ralph Stone, President, Detroit Trust Company,  5/28/1927
Box   1  
To Kahn from [signature illegible], Hodenpyl, Hardy & Co., New York, NY,  7/28/1927
Box   1  
To Kahn from C. W. Tippy, Vice President, Consumers Power Co., Jackson, MI,  8/2/1927
Box   1  
To Arthur C. Bloomfield, Vice President, National Union Bank, Jackson, MI, from H. N. Davock, 12/1/1927
Box   1  
To Messrs. Strawbridge & Clothier, Philadelphia, from Alvan Macauley, President, Packard Motor Car Company,  1/7/1928
Box   1  
To Kahn from Moritz Kahn,  2/23/1928
Box   1  
To Kahn from William L. Clements,  3/26/1928
Box   1  
To Alfred P. Sloan, Jr., President, General Motors Corporation, New York, NY, from Albert Kahn,  4/3/1928
Box   1  
To Kahn from Alfred P. Sloan, Jr., President, General Motors Corporation, New York, NY,  4/5/1928
Box   1  
To Kahn from A. R. Glancy, President, Oakland Motor Car Company, Pontiac, MI,  4/27/1928
Box   1  
To William J. Sampson, Jr., Vice President, Steel & Tubes, Inc., Cleveland, OH, from William J. Massey, Plant Engineer, Chevrolet Motor Company,  5/26/1928
Box   1  
To Kahn from R. B. Palmer, District Manager, Consumers Power Company, Saginaw, MI,  7/11/1928
Box   1  
To George W. Cook, Flint P. Smith Building, Flint, MI, from C. C. Hyatt,  7/26/1928
Box   1  
To T. G. Stone, Spencer Kellogg & Sons, Inc., Buffalo, NY, from H. E. Beyster, Fisher Body Corporation,  8/14/1928
Box   1  
To T. G. Stone, Spencer Kellogg & Sons, Inc., Buffalo, NY, from Edward G. Budd, Edward G. Budd Manufacturing Co., Philadelphia, PA,  8/17/1928
Box   1  
To Louis Kahn from John. F. Phillips, Vice President, The Foreman Trust and Savings Bank, Chicago, IL,  8/20/1928
Box   1  
To T. G. Stone, Spencer Kellogg & Sons, Inc., Buffalo, NY, from Gordon Lefebvre, Vice President, Oakland Motor Car Company, Pontiac, MI,  8/22/1928
Box   1  
To T. G. Stone, Spencer Kellogg & Sons., Inc., Buffalo, NY, from A. Johnston, Ford Motor Company,  8/27/1928
Box   1  
To Kahn from Alvan Macauley, Jr., Director, Guardian Detroit Bank,  9/24/1928
Box   1  
To Kahn from McPherson Browning, President, Detroit and Security Trust Company, 11/8/1928
Box   1  
To Kahn from Alvan Macauley, President, Packard Motor Car Company, 12/4/1928
Box   1  
To Kahn from Benton Hanchett regarding The Bank of Saginaw,  12/31/1928
Box   1  
To R. E. Daugherty, New York Central Railroad, New York, NY, from Alvan Macauley, President, Packard Motor Car Company,  1/24/1929
Box   1  
To Kahn from L. R. Flook, The University of Chicago,  1/31/1929
Box   1  
To Kahn from James Couzens, U. S. Senator,  2/15/1929
Box   1  
To Kahn from William L. Clements,  3/14/1929
Box   1  
To Kahn from James Couzens, U. S. Senator,  4/24/1929
Box   1  
To Kahn from Dr. A. G. Studer, General Secretary, Detroit Young Men's Christian Associaion,  5/3/1929
Box   1  
To Kahn from Lilian S. Holt, President, Woman's Hospital, Detroit,  6/10/1929
Box   1  
To Kahn from Donald L. Brown, Pratt & Whitney Aircraft Company,  12/10/1929
Box   1  
To George G. Booth from Ferry K. Heath, Assistant Secretary of the Treasury,  12/26/1929
Box   1  
To Ferry K. Heath, Assistant Secretary, U. S. Treasury Department, from Roger M. Andrews, President, Detroit Times,  12/30/1929
Box   1  
To Kahn from W. E. Anderman, Assistant Publisher, Detroit Times,  12/30/1929
 
 1930-1970
Box   1  
To Kahn from George D. Mason, Detroit,  1/28/1930
Box   1  
To Mrs. Wright, Albert Kahn, Inc., from Arthur C. Bloomfield, Chairman, Union & Peoples National Bank, Jackson, MI,  4/3/1930
Box   1  
To Kahn from Charles N. Liqued, Aeronautical Consultant, Silver Lake, CT,  7/2/1930
Box   1  
To Andrew W. Mellon, Secretary of the Treasury, from Alvan Macauley, President, Packard Motor Car Company,  7/10/1930
Box   1  
To Major Ferry K. Heath, Assistant U. S. Treasurer, from Charles M Greenway, Grand Rapids Press,  7/10/1930
Box   1  
To Ferry K. Heath, Assistant Secretary of the Treasury, from Charles B. Van Dusen, S. S. Kresge Company,  7/12/1930
Box   1  
To Kahn from Ralph Stone, Chairman of the Board, Detroit and Security Trust Company,  7/14/1930
Box   1  
To Hon. Ferry K. Heath, Assistant Secretary of the Treasury, from Ralph Stone, Detroit and Security Trust Company,  7/14/1930
Box   1  
To Kahn from Alvan T. Fuller, Boston Packard Showroom,  7/17/1930
Box   1  
To Kahn from Ira L. Berk, President, Packard Motor Company of Pittsburgh,  7/17/1930
Box   1  
To Hon. A. W. Mellon, Secretary of the Treasury, from Ira L. Berk, President, Packard Motor Company of Pittsburgh,  7/17/1930
Box   1  
To Arthur Sixsmith, Secretary to A. W. Mellon, from Seth Hughes, Packard Motor Company of Pittsburgh,  7/17/1930
Box   1  
To Alvan T. Fuller, Boston Packard Showroom, from Kahn,  7/21/1930
Box   1  
To Ira L. Berk, Packard Motor Co. of Pittsburgh, from Kahn,  7/21/1930
Box   1  
To Kahn from Henry B. Joy, Watch Hill, RI,  8/7/1930
Box   1  
To Hon. Andrew W. Mellon, Secretary of the Treasury, from Henry B. Joy, President, Packard Motor Company,  8/7/1930
Box   1  
To Henry B. Joy, Watch Hill, RI, from Kahn,  8/12/1930
Box   1  
To Ferry K. Heath, Assistant Secretary of the Treasury, from Henry Ford,  8/14/1930
Box   1  
To Kahn from E. G. Liebold, General Secretary to Henry Ford,  8/15/1930
Box   1  
Kahn from [signature illegible], The New York Times,  9/3/1930
Box   1  
To Kahn from Alvan Macauley,  9/23/1930
Box   1  
To Kahn from Isabella MacKay, YWCA, Detroit,  11/24/1930
Box   1  
To Hon. Ferry Heath, Assistant Secretary of the Treasury, from Henry B. Joy,  2/20/1931
Box   1  
To C. M. Greenway, Grand Rapids Press, from Ferry Heath, Assistant Secretary of the Treasury,  2/24/1931
Box   1  
To Hon. Ferry K. Heath, Assistant Secretary of the Treasury, from Phelps Newberry,  3/5/1931
Box   1  
To Ferry Heath, Assistant Secretary of the Treasury, from Howard E. Coffin,  3/10/1931
Box   1  
To Kahn from Roy D. Chapin,  3/18/1931
Box   1  
To Roy D. Chapin, Hudson Motor Car Company, from Ferry K. Heath, Assistant Secretary, Treasury Department,  3/20/1931
Box   1  
To Kahn from H. C. Anderson, Treasurer, H. J. Heinz Company, Pittsburgh, PA,  4/14/1931
Box   1  
To W. E. Levis, President, Owens-Illinois Glass Company, Toledo, OH, from Acting Comptroller, Parke Davis & Company,  5/27/1931
Box   1  
To M. Kahn from Hugh Dean, Manager, Chevrolet Motor Company Forge Plant, Detroit,  6/27/1931
Box   1  
To Kahn from Alvan Macauley, 12/1/1931
Box   1  
To Ferry Heath, Assistant Secretary of the Treasury, from Ralph Stone, Detroit Trust Company,  9/14/1932
Box   1  
To Kahn from Jess Lilienfield,  5/28/1933
Box   1  
To Kahn from James A. Grier, Resident Manager, General Motors Corporation "A Century of Progress" Exhibition, Chicago, IL,  6/16/1933
Box   1  
To Kahn from MEC [signature illegible], General Manager, Chevrolet Motor Company, Detroit,  4/18/1935
Box   1  
To Kahn from L. N. Upjohn, President, The Upjohn Company, Kalamazoo, MI,  12/10/1936
Box   1  
To Kahn from Tom M. Girdler, Chairman, Republic Steel Corporation, Cleveland, OH,  12/15/1936
Box   1  
To Kahn from Arvid Nelson, Factory Manager, Hamilton Standard Propellers, East Hartford, CT,  2/11/1937
Box   1  
To Glenn Martin, Glenn-Martin Airplane Company, Baltimore, MD, from R. R. Rees, Plant Engineer, Packard Motor Car Company,  2/22/1937
Box   1  
To Kahn from E. L. Patton, Director, Pittsburgh Glass Institute, New York, NY,  6/22/1937
Box   1  
To Moritz Kahn from D. L. Brown, President, United Aircraft Corporation, East Hartford, CT,  6/24/1937
Box   1  
To Kahn from J. A. Herlihy, Vice President, United Airlines, Chicago, IL, 10/6/1938
Box   1  
To Philip O. Geier, Cincinnati Milling Machine Co., from JEG, The Ohio Steel Foundry Company,  6/23/1939
Box   1  
To Kahn from W. A. Fink, Treasurer, Toledo Scale Company,  7/26/1939
Box   1  
To Kahn from B. Moreell, Navy Department, Bureau of Yards and Docks, Wachington, DC,  1/23/1940
Box   1  
To Kahn from Harry W. Benton, Plant Engineer, Pratt & Whitney, Hartford, CT,  1/27/1940
Box   1  
To Kahn fromn B. Moreell, Chief, Bureau of Yards and Docks, Navy Department, Washington, DC,  5/9/1940
Box   1  
To Kahn from G. R. Bennett, Vice President, Toledo Scale Company,  6/7/1940
Box   1  
To Kahn from R. R. Rees, General Plant Engineer, Packard Motor Company,  12/24/1940
Box   1  
To Kahn from E. E. Talmadge, Engineering Department, General Electric Realty Corporation, Schenectady, NY,  1/22/1941
Box   1  
To Kahn from A. M. Stoner, Secretary, The Jacobs Manufaturing Company, Hartford, CT,  2/26/1941
Box   1  
To Kahn from R. C. Wilson, New York, NY,  4/3/1941
Box   1  
To Kahn from R. C. Wilson, New York, NY,  5/20/1941
Box   1  
To Kahn from Leon W. Frost, General Secretary, Children's Aid Society, Detroit,  6/9/1941
Box   1  
To Kahn from R. C. Wilson, New York, NY  7/8/1941
Box   1  
To Harrison Hoblitzelle, President, General Steel Castings Corporation, Eddystone, PA, from J. E. Galvin, The Ohio Steel Foundry Company, Lima, OH,  10/30/1941
Box   1  
Resolution of Commendation for Glenn-Martin Bomber Plant, Fort Crook, Nebraska, from A. H. Clarke, President, Omaha Chamber of Commerce,  11/11/1941
Box   1  
To Kahn from R. F. Gagg, Assistant to General Manager, Wright Aeronautical Corporation, Paterson, NJ,  11/25/1941
Box   1  
To Kahn from E. W. Niles, Captain, Corps of Engineers, War Department, U. S. Engineer Office, Omaha, Nebraska,  12/22/1941
Box   1  
To Kahn from M. B. Gordon, Vice-President, Wright Aeronautical Corporation, Paterson, NJ,  1/26/1942
Box   1  
To Kahn from G. W. Vaughan, President, Curtiss-Wright Corporation, New York, NY,  3/10/1942
Box   1  
To Kahn from H. H. Hoyt, Managing Director, Carter Products, Inc., New York, NY,  3/11/1942
Box   1  
To Kahn from John F. Harbeson, Chairman of the Exhibition Board, The Philadelphia Art Alliance,  3/19/1942
Box   1  
To Kahn from W. P. Graham, Chancellor, Syracuse University, Syracuse, NY,  4/13/1942
Box   1  
To Kahn from E. E. Wilson, President, United Aircraft Corporation, East Hartford, CT,  6/10/1942
Box   1  
To Kahn, upon his acceptance of AIA award, from R. H. Shreve, President, The American Institute of Architects, Washington, DC,  7/9/1942
Box   1  
To George H. Miehls, Albert Kahn Associated Archiects & Engineers, Inc., from Karr Parker, President, McCarthy Bros. & Ford, Buffalo, NY,  7/21/1942
Box   1  
To Kahn from Lieut. Don L. Clark, U. S. Naval Ordnance Plant, Forest Park, IL,  9/30/1942
Box   1  
To Louis Kahn from L. J. Carney, Albert Kahn Associated Architects & Engineers,  10/10/1942
Box   1  
To Kahn from K. T. Keller, President, Chrysler Corporation,  11/19/1942
Box   1  
To Kahn from Lee H. Smith, Branch Manager, Fairchild Aircraft, Burlington, NC,  11/20/1942
Box   1  
To Kahn from J. A. Coulter, Vice President, Colgate-Palmolive-Peet Company, Jersey City, NJ,  11/24/1942
Box   1  
To Kahn from Thomas Drever, President, American Steel Foundries, Chicago, IL,  11/27/1942
Box   1  
To Myron B. Gordon, Vice-President, Wright Aeronautical Corporation, from George T. Lucas, Division Engineer, Defense Plant Corporation,  12/16/1942
Box   1  
To Louis Kahn from M. B. Gordon, Vice-President, Wright Aeronautical Corporation, Paterson, NJ,  12/22/1942
Box   1  
To Louis Kahn from I. J. Gunther, Wright Aeronautical Corporation,  3/9/1943
Box   1  
Commendation from B. Moreell, Chief, Bureau of Yards and Docks, The Navy War Construction Program,  3/29/1943
Box   1  
To Albert Kahn, Inc. from B. Moreell, Chief, Bureau of Yards and Docks, Navy Department,  4/2/1943
Box   1  
To Louis Kahn from E. Wilson, President, United Aricraft Corporation, East Hartford, CT,  4/9/1943
Box   1  
Nomination of Albert Kahn Associated Archiects & Engineers, Inc. for Army-Navy "E" Award by S. G. Nordlinger, Major, Air Corps,  5/11/1943
Box   1  
To Charles, R. Swinford, Albert Kahn Associated Archiects & Engineers, Inc., Chicago, from Foster R. Phillips, Supervising Engineer, Defense Plant Corporation, Chicago, IL, 11/5/1943
Box   1  
To George H. Miehls, Albert Kahn Associated Architects & Engineers, Inc., from P. N. Jansen, General Manager, Curtiss-Wright Corporation, Buffalo, NY, 12/1/1943
Box   1  
To Louis Kahn from A. Tamaro, Major, Corps of Engineers, War Department, U. S. Engineer Office, Detroit,  12/20/1943
Box   1  
To Louis Kahn from F. E. Lamphere, Assistant Chief Engineer, Defense Plant Corporation, Washington, DC,  6/2/1944
Box   1  
To Louis Kahn from Brehon Somervell, Commanding General, U. S. Army Service Forces, Washington, DC,  9/7/1945
Box   1  
To George H. Miehls, Albert Kahn Associated Architects & Engineers, from F. E. Lamphere, Reconstruction Finance Corporation, Office of Defense Plants, Washington, DC,  9/18/1945
Box   1  
To Mr. Saulson, Albert Kahn Associated Archiects & Engineers, from Frank N. Isbey, Chairman, U. S. Treasury Department, War Finance Committee for Michigan, Detroit,  12/13/1945
Box   1  
To Sol King, President, Albert Kahn Associates, from Karel Yasko, U. S. General Services Administration, Washington, DC,  7/27/1970
Box   1  
To Wally from Hawkins Ferry,  8/27/1970
 
Professional Papers,  1905-2008 [series]:

The Professional Papers series includes five sub-series, Transcripts of Speeches, 1918-1942, Albert Kahn's Personal Cost Ledger, Publications, the AIA 2003 Gold Medal Submission and Newspaper and Journal Articles, 1905-2014. The four linear feet of narrative materials in this series offer researchers a view of Kahn's own writings on a number of subjects and detailed accounts of the news of the day related to his speeches, awards and the construction and dedication of his buildings.

 
Transcripts of Speeches [subseries]:

The four folders of Transcripts of Speeches contain his typed presentations with annotations and corrections by Kahn's own hand. The reader can imagine him reading over his transcripts before a lecture with a discerning eye to punctuation and content. The topics of Kahn's talks in the early years range from "Reinforced Concrete," the innovative structural material which he used in his early automobile factories for Henry Joy and Henry Ford, to tributes to George D. Mason and George G. Booth. During the 1930s, his speeches run the gamut from the challenges of industrial architecture to his love of architectural and art history. His collection of Impressionist art was the focus of his Torch Club talk at his own home on 5/14/1935. Kahn's well-publicized speech entitled "Building Program for National Defense" to the Adcraft Club on 11/28/1941 enriches our understanding of his major contribution to America's "Arsenal of Democracy." Taken as a whole, the transcripts capture his immense genius, sense of humor, humility and intellect.

 
 1918-1929
Box   1  
"Reinforced Concrete,"  11/18/1918
Box   1  
"Post-War Reconstruction," Peace and Prosperity Dinner, Detroit Real Estate Board,  1/22/1919
Box   1  
"What Will the Detroit of the Future Be Like," Vortex Club at Fellowcraft Club,  9/28/1921
Box   1  
"Tribute to George D. Mason," Masonic Temple dedication dinner honoring Mason, given by Michigan Society of Architects, c.  1923
Box   1  
"Reinforced Concrete Architecture These Past Twenty Years," 20th Anniversary of the American Concrete Institute,  1924
Box   1  
"Industrial and Commercial Buildings: Their Probable Life, Obsolescence and Depreciation,"  11/27/1925
Box   1  
"Tribute to George Booth," upon his receiving honorary membership into The American Institute of Architects,  1926
Box   1  
"What Are the Characteristics of Good Architecture?," Teachers' Convention,  10/28/1927
Box   1  
"The Story of Architecture and Its Present Day Status," Tuesday Musical,  11/15/1927
Box   1  
"Architecture and Business," Women's Advertising Club, 12/8/1927
Box   1  
"Improvements in American Architecture," Business Women's Club, Hotel Statler,  1928
Box   1  
"The Architecture of Garages," Society of Automotive Engineers, Toronto,  11/15/1929
 
 1930-1935
Box   1  
"Putting Architecture on a Business Basis," Cleveland Engineering Society,  12/16/1930
Box   1  
"Architectural Trend," Maryland Academy of Science,  4/15/1931
Box   1  
"What Does Archiecture Demand of a Young Man Who Hopes for Success in It?," Interview for "Life Saver" radio program,  12/1931
Box   1  
"The Planning of Children's Hospitals," American Hospital Association,  9/13/1932
Box   1  
"Problems of Architecture Today," Torch Club,  1/16/1933
Box   1  
"Plans for the Ford Exposition at Chicago Fair," Illinois Society of Architects, Chicago,  3/20/1934
Box   1  
"Eugene Manet and the French Impressionists," Torch Club Meeting at Kahn's home,  5/14/1935
 
 1936-1939
Box   1  
"Slum Clearance," WWJ radio speech, 12/6/1936
Box   1  
"Thirty Minutes with American Architecture and Architects," Adcraft Club,  1/22/1937
Box   1  
"Progress in Industrial Building Design,"  2/22/1938
Box   1  
"Industrial Architecture," Torch Club Building Industry Luncheon and Builders and Trades Exchange,  12/21/1938
Box   1  
"The Modern Administration Building," National Office Management Association,  3/14/1939
Box   1  
"Industrial Architecture," Torch Club,  5/25/1939
Box   1  
"Industrial Architeture," Detroit Institute of Arts,  10/24/1939
Box   1  
"How Building Design Affects Production Efficiency," speech by A. Kahn, read by Louis Kahn, American Management Association,  11/15/1939
 
 1940-1942
Box   1  
"Industrial Architecture-An Opportunity and Challenge," New York State Architects, Rochester,  9/27/1940
Box   1  
"Industrial Architecture-Its Problems and Obligations," Boston Society of Architects,  11/12/1940
Box   1  
"Architecture in the National Defense Program," Society of Automotive Engineers, Detroit,  4/28/1941
Box   1  
"Building Program for National Defense," Adcraft Club,  11/28/1941
Box   1  
"The Businessman-Architect of Today: Challenges and Opportunities," Speech of acceptance of American Institute of Architects Medal,  6/24/1942
Box   1  
"F.O.B. Detroit," WJR radio speech,  7/18/1942
Box   1  
"Challenges for the Industrial Architect,"  undated
Box   1  
"Problems in City Development," Wednesday Night Club,  undated
 
Cost Ledger [subseries]:

A sub-series of Professional Papers, Albert Kahn's Personal Cost Ledger, 1907-1913, is perhaps the most valuable piece in this collection. The leather-covered, 4x6-inch binder includes cost summaries, dimensions, descriptions of construction materials and structural sketches for Kahn's projects during this period, written and drawn in his own hand. The inscription, "Valuable," inside the front cover signifies that Kahn considered this an important notebook of building data. The meticulously written records give the researcher a sense of the master's hands-on involvement in all of his projects, as well as his strong interest in structural design and his adherence to financial budgets. The original notebook has been restored by Bentley Conservator James Craven and is being held in the Bentley Library vault. A photocopy of the ledger is available for research.

Vault  
Albert Kahn's Personal Cost Ledger,  1907-1913 [Restricted access: photocopy available for use.]     (Includes cost summaries, descriptions of construction materials and structural sketches for projects from 1907-1913 in Kahn's own hand. Contains inscription inside front cover, "Valuable. Albert Kahn, 58 Lafayette Blvd, Detroit.")  (Leather-covered, loose-leaf binder, 6x4 inches)
Box   9  
Photocopy of Albert Kahn's Personal Cost Ledger,  1907-1913
 
Publications [subseries]:

The Publications sub-series of the Professional Papers series includes, among others, three volumes which offer perspective on Kahn's career as well as photographs of the master's most important projects. Albert Kahn, Architect, Architectural Catalog, published in October 1921, is a 90-page book containing full-page photographs of the General Motors Building, Detroit Athletic Club, Hill Auditorium and many other buildings, as well as trade advertisements which document the construction technologies and materials used by Kahn at that time. The editors of Architectural Forum chose to dedicate the entire issue of August 1938 to Albert Kahn's accomplishments, the organization of his firm and photographs of numerous manufacturing plants which had advanced his reputation as America's greatest industrial architect. The Michigan Society of Architects' Weekly Bulletin, Albert Kahn Memorial Issue of March 30, 1943 is an important journal in bringing together many contemporary tributes to Kahn, written by friends and colleagues. The high regard in which he was held at the time of his death, even before historians could offer perspective on his contributions, may be of particular interest to researchers.

Box   9  
Albert Kahn, Architect, Architectural Catalog,  October 1921     (Includes trade advertisements and photographs of General Motors Building, Kresge Office Building, Detroit Athletic Club, Hill Auditorium, Packard Motor Car Company Main Factory, John S. Newberry Residence and other buildings.)  (Cloth-bound, 90-page book, 13-1/2x10-1/4 inches, published by Architectural Catalog Co., New York.)
Box   9  
"Albert Kahn Commissions with Pewabic Tile," compiled by Dr. Thomas W. Brunk,  1/7/2007 unpublished
Box   9  
Architectural Forum,  August 1938     (Issue devoted to Albert Kahn. Articles include "Albert Kahn," "Organization of Albert Kahn, Inc." and "Portfolio of Industrial Buildings, Albert Kahn, Inc.," 87-142.) 
Box   9  
City of Windsor's Heritage Planner. Walkerville, Ontario: A Brief Tour of Walkerville, an Edwardian Company Town, Now Part of Windsor, Ontario. Windsor: Windsor Architectural Conservation Advisory Committee,  1997     (includes descriptions of Kahn's buildings in Walkerville) 
Box   9  
Weekly Bulletin, Michigan Society of Architects, Albert Kahn Memorial Issue,  March 30, 1943     (Includes 240 pages of tributes, articles and photographs.) 
Box   12  
Scarth, W. M. "Description of Bas Relief in Entablature over the Entrance on the South Elevation of the General Motors Building Annex." Unpublished,  1/26/1965
Box   12  
Detroit Athletic Club . Detroit: Detroit Athletic Club,  undated
Box   12  
Langley, 1916-1996.Langle AFB, Virginia: Office of History, Air Combat Command,  1996
 
AIA 2003 Gold Medal Submission [subseries]:

The AIA 2003 Gold Medal Submission sub-series of the Professional Papers series includes printed and CD copies of the presentation, which was made to the Board of Directors of the American Institute of Architects. It was prepared by Albert Kahn Associates, Inc. in its unsuccessful attempt to have Kahn receive this award posthumously in 2003. With photographs and text, the nomination materials effectively summarize the significance of Kahn's industrial, commercial, institutional and residential architecture in American history.

Box   1  
Gold Medal Submission Booklets,  5/29/2002
 
Newspaper and Journal Articles, 1903-2014 [subseries]:

The Newspaper and Journal Articles, 1903-2014 sub-series of the Professional Papers series encompasses three linear feet of documents, which have been electrostatically copied on acid-free paper. The originals were collected and preserved in large binders by Albert Kahn Associates, Inc., and have been returned to the firm. These materials offer an in-depth perspective on issues surrounding the design, construction technologies, budgets, politics and dedications of many of Kahn's buildings. Articles often include Kahn's own comments about the buildings, as well as construction and opening-day photographs which document the artistic detailing and technological advancements of his structures. Researchers interested in the work which Kahn's firm did in Russia between 1929 and 1932, during which time he designed 521 factories for Stalin's First Five-Year Industrial Plan, will find two leather binders of newspaper articles documenting this period in Box 13.

A number of journal articles written by Kahn himself summarize his views on defense architecture and the business of industrial architecture. The researcher will note the proliferation of articles from 1939 to 1942, when such national journals asAero Digest, Engineering News-Record, Heating and Ventilating, American Builder and Architectural Forum covered in detail his design and construction of aircraft factories, tank arsenals and U. S. Navy air stations. Articles written after his death include analytical pieces by historians Grant Hildebrand (1970 and 1998), David Lewis (1975), Anatole Senkevich, Jr. (1996) and Janet Kreger (1998). Post-1942 materials, documenting the demolition, restoration and adaptive re-use of a number of Kahn's buildings up to the present time, have been included in the collection.

Box   7  
 1903-1908
Box   7  
 1910-1914
Box   7  
 1915-1919
Box   7  
 1920-1923
Box   7  
 1925-1928
Box   7  
 1929
Box   7  
 1930
Box   7  
 1931
Box   7  
 1932-1933
Box   7  
 1934
Box   7  
 1935-1936
Box   7  
 1937
 
 1938
Box   7  
 January-May,1938
Box   7  
 July-December, 1938
 
 1939
Box   7  
 January-June, 1939
Box   7  
 July-December, 1939
 
 1940
Box   7  
 January-March, 1940
Box   7  
 April-June, 1940
Box   7  
 July-September, 1940
Box   7  
 October-December, 1940
 
 1941
Box   7  
 January, 1941
Box   7  
 February-June, 1941
Box   7  
 July-September, 1941
Box   7  
 October, 1941
Box   8  
 November, 1941
Box   8  
 December, 1941
 
 1942
Box   8  
 January-February, 1941
Box   8  
 March, 1942
Box   8  
April-May,  1942
Box   8  
 June, 1942 (2 folders)
Box   8  
 July, 1942
Box   8  
 August-September, 1952
Box   8  
 October-December, 1942
Box   8  
 1943-1949
Box   8  
 1950-1957
Box   8  
 1960-1969
Box   8  
 1970-1971
Box   8  
 1972-1973
Box   8  
 1974
Box   8  
 1975-1976
Box   8  
 1977-1979
Box   8  
 1980-1983
Box   8  
 1984
Box   8  
 1985-1986
Box   8  
 1987-1989
Box   8  
 1990-2008
Box   8  
Restoration and Re-opening of Hill Auditorium,  2002-2005
Box   13  
Russian Work Scrapbooks,  1929-1978
Box   13  
Volume I-1929-1932
Box   13  
Volume II-1932-1978
Box   13  
General Work Scrapbook,  1929-1938
Box   12  
Clayton Lewis, "Architecture and Artifacts, The Quarto, No. 35., Ann Arbor: Clements Library, University of Michigan, (Spring-Summer 2011), Pp. 3-5.
Box   12  
Chris Meister, "Albert Kahn's Partners in Industrial Architecture,"Journal of the Society of Architectural Historians, Vol. 72, No. 1, (2013)
Box   12  
Sonia Melnikova-Raich, "The Soviet Problem with Two 'Unknowns': How an American Architect and a Soviet Negotiator Jump-Started the Industrialization of Russia, Part I: Albert Kahn,"The Journal of the Society for Industrial Archeology, Vol. 36, No. 2, (2013), Pp. 57-80.
 
Photographs of Completed Buildings in Leather Portfolios, [series]: (1326 prints in 83 volumes and 1 box)

The Photographs of Completed Buildings in Leather Portfolios series is an important collection of large-format, black-and-white images of 96 of Kahn's projects, built between 1907 and 1941. With the exception of the Hudson Motor Car Company Factory photographs, which document the project under construction in a series of fold-out images, all of the photographs in this collection were taken after the buildings were completed and measure between 4-1/2x6-1/2 and 10x14 inches, with the majority at the larger end of this range. These 1366 prints are housed in their original 79 leather portfolios, with marbled end-papers. A few smaller leather albums can be found in Box 11. The series is listed alphabetically by project title. The volume numbers were assigned by the Bentley Historical Library during processing of the collection.

The full dimensions of Kahn's work are represented here, from institutional, residential, commercial, and industrial buildings to such important First and Second World War projects as Langley Field (Hampton, VA), Buick Airplane Engine Plant (Melrose Park, IL), Chrysler Tank Arsenal (Warren, MI), Curtiss Wright Corporation Aeroplane Division Buildings (Buffalo, NY), and Thompson Aircraft Products Building (Euclid, OH). The twenty-three photographs of Langley Field (1917) are particularly interesting, because they document views of several military and civilian structures, even before the roads were completed. The portfolio photographic collection offers researchers an unparalleled opportunity to view in rich detail the exteriors and interiors of Kahn's buildings, representing the entire range of his industrial-modern and historically influenced projects. Two buildings photographed in the portfolio collection were not designed by Kahn: the Detroit Institute of Arts by Paul P. Cret and the University of Michigan Lawyers' Club by York and Sawyer. These photographs were probably housed in this collection because, during the 1920s, Kahn served as both an advisor to the board of the D.I.A. and as "Consulting Architect" to the Committee of Five, which supervised all of the building projects at the University of Michigan. Five of the leather portfolios contain photographs of important buildings by other architects, including Paul P. Cret, York & Sawyer, Malcomson & Higgenbotham, Ayman Embury, Charles Platt, Walker & Gillette and McKim, Mead & White.

The photographers whose work is represented in the portfolio collection were among the most respected architectural photographers of their day, including the Hedrich-Blessing Studio of Chicago, John Wallace Gillies of New York, and Thomas Ellison of Detroit. The partnership of Ken and Bill Hedrich and Phillip Blessing, established in 1929, is particularly noteworthy, as the firm became the premier, architectural, photographic studio in the country, with such other famous architects as Frank Lloyd Wright, Mies van der Rohe, and Skidmore, Owings and Merrill also using their services. Albert Kahn hired Hedrich-Blessing to photograph four of the projects in the portfolio collection: Curtiss Wright Corporation Aeroplane Division Buildings (Buffalo), W. K. Kellogg Auditorium and High School (Battle Creek), Southeastern Junior High School (Battle Creek), and Thompson Aircraft Products Building (Euclid, Ohio). The archives of the Hedrich-Blessing Studio have been housed at the Chicago Historical Society since 1991.

(4-1/2x6-1/2-inch to 10x14-inch, black and-white prints)
 
American Blower Corporation, Detroit, Michigan (1935), Job No. 1701
Vol.   1  
Photographs of exterior by Fred Eggert, Detroit (two prints)
 
Ann Arbor Daily News Building, Ann Arbor, Michigan (1935), Job No. 1697
Vol.   2  
Photograph of exterior by Fred Eggert, Detroit (one print)
 
Bank of Saginaw, Saginaw, Michigan (1927), Job No. 1375
Vol.   3  
Photographs of exterior and interior by Thomas Ellison, Detroit (twelve prints)
 
George G. Booth Residence at Cranbrook, Bloomfield Hills, Michigan (1908), Job No. 333
Box   11  
Photographs of "Cranbrook Farm" (house exteriors) by unknown photographer (eighteen prints)
Vol.   4  
Photographs of exterior and interior by John Wallace Gillies, New York (fifteen prints)
Box   11  
Photographs of exterior, grounds, and interior by unknown photographer (fifty prints)
 
Buick Airplane Engine Plant, Melrose Park, Illinois (1941), Job No. 1883
Vol.   5  
Photographs of exterior and interior by unknown photographer (three prints)
 
Charles J. Butler Residence, Indian Village, Detroit, Michigan (1914), Job No. 627      (the portfolio is labeled "L. K. Butler," but residence is that of Charles J. Butler) 
 
Exterior and interior photographs of all residences included in the portfolio
Vol.   6  
Photos by John Wallace Gillies, New York (twenty prints)
Vol.   6  
Photos by Hance (one print)
Vol.   6  
Photos by unknown photographer (ten prints)
 
Cadillac Motor Car Company Service Building, Detroit, Michigan (1920), Job No. 900
Vol.   7  
Photographs of exterior and interior by Hance (seven prints, two not identified, but most probably of Cadillac Service Building)     (building is located in Detroit, not in NY, as is noted on portfolio cover) 
 
Children's Aid Society, Detroit, Michigan (1931), Job No. 1603
Vol.   8  
Photograph of exterior by Thomas Ellison, Detroit (one print)
 
Children's Hospital of Michigan, Detroit, Michigan (1922), Job No. 1098
Vol.   9  
Photographs of interior by Thomas Ellison, Detroit (three prints)
 
Children's Hospital of Michigan Nurses' Home, Detroit, Michigan (1922), Job No. 1098
Vol.   10  
Photographs of exterior and interior by Thomas Ellison, Detroit (eight prints)
 
Chrysler Corporation Administration Building, Mr. K. T. Keller's Office, Detroit, Michigan (ca. 1937), Job number unknown
Vol.   11  
Photographs by Multi-Color, Detroit (two prints)
 
Chrysler Tank Arsenal, Warren, Michigan (1942), Job No.  1867
Vol.   5  
Photographs of exterior and interior by unknown photographer (four prints)
 
William L. Clements Library, University of Michigan, Ann Arbor (1922), Job No. 1001
Vol.   12  
Photographs of exterior and interior by John Wallace Gillies, New York (nine prints, six not identified, but most probably by Gillies)
 
William L. Clements Residence, Bay City, Michigan (1909), Job No. 362
Box   11  
Photographs of exterior, interior, and grounds by unknown photographer (thirty-four prints)
 
H. E. Coffin Residence, Grosse Pointe, Michigan (1910), Job No. 429
Box   11  
Photographs of exterior and interior by unknown photographer (nine prints)
 
James C. Couzens Residence, Second and Longfellow Avenues, Detroit, Michigan (1910), Job No. 411
Vol.   13  
Photographs of exterior by unknown photographer (eight prints)
 
Curtiss-Wright Corporation Factory, Columbus, Ohio (date and job number unknown)
Vol.   5  
Photographs of exterior and interior by unknown photographer (five prints)
 
Curtiss-Wright Corporation, Curtiss Aeroplane Division Buildings, Tonawanda (Buffalo), New York (1938), Job No.  1785
Vol.   14  
Photographs of exterior and interior by Hedrich-Blessing Studio, Chicago (thirty-four prints)
 
Dearborn Inn, Dearborn, Michigan (1929), Job No.  1504
Vol.   15  
Photographs of exterior and interior by Thomas Ellison, Detroit (seven prints)
 
Detroit Athletic Club, Detroit, Michigan (1915), Job No. 593
Vol.   16  
Photographs of exterior and interior by unknown photographer (thirty-two prints)
 
Detroit Free Press Building, Detroit, Michigan (1925), Job No.  1170
Vol.   17  
Photographs of exterior by Thomas Ellison, Detroit (two prints)
 
Detroit Golf Club, Detroit, Michigan (1917), Job No. 740
 
Photographs of exterior and interior
Vol.   18  
Photos by John Wallace Gillies, New York (ten prints)
Vol.   18  
Photos by Hance (eleven prints)
Vol.   18  
Photos by Thomas Ellison, Detroit (one print)
Vol.   18  
Photos by unknown photographers (seven prints)
 
Detroit Institute of Arts. Detroit, Michigan, by Paul P. Cret, Architect (1927)
Vol.   19  
Photostatic prints of architectural drawings by Paul P. Cret, prepared for the Art Commission of the City of Detroit,  1920 (eleven prints of drawings and renderings)
Vol.   20  
Photographs of exterior and interior by Thomas Ellison, Detroit, (thirteen prints)
 
Detroit Police Headquarters, Detroit, Michigan (1923), Job No. 990
 
Photographs of exterior
Vol.   21  
Photos by Thomas Ellison, Detroit (four prints)
Vol.   21  
Photos by John Wallace Gillies, New York (six prints)
 
Detroit Savings Bank Building, Detroit, Michigan (1915), Job No. 689
 
Photographs of exterior and interior
Vol.   22  
Photos by John Wallace Gillies, New York (one print)
Vol.   22  
Photos by Hance (five prints)
Vol.   22  
Photos by unidentified photographer (seven prints)
 
Detroit Times Building, Detroit, Michigan (1928), Job No. 1451
Vol.   23  
Photographs of exterior and interior by Thomas Ellison, Detroit (five prints with interleaving)
 
Detroit Trust Company Building, Detroit, Michigan (1915), Job No. 637
Vol.   24  
Photographs of exterior and interior by Thomas Ellison, Detroit (ten prints)
Vol.   22  
Photographs of exterior by unknown photographer (two prints)
 
Horace Elgin Dodge Residence, Grosse Pointe, Michigan (1911), Job No. 423
Vol.   25  
Photographs of exterior and interior by unknown photographer (nineteen prints)
 
Dollar Savings & Trust Company Building, Wheeling, West Virginia (1910), Job No. 464
Vol.   26  
Photographs of exterior and interior by unknown photographer (twelve prints)
 
C. C. Edgar Residence, Grosse Pointe, Michigan (1915), Job No. 693
Vol.   27  
Photographs of exterior and interior by unknown photographer (seven prints)
 
Ethyl Gasoline Corporation Building, Livonia, Michigan (1940), Job No. 1854
Vol.   28  
Photographs of exterior by unknown photographer (five prints)
 
Evening News Association (Detroit News) Building, Detroit, Michigan (1916), Job No.641
 
Photographs of exterior and interior
Vol.   29  
Photos by Hance (fifty-nine prints and duplicates)
Vol.   29  
Photos by unknown photographer (five prints)
 
First Congregational Church Alterations and Additions, Detroit, Michigan (1924), Job No. 1008
Vol.   30  
Photographs of interior by Thomas Ellison, Detroit (three prints)
 
First National Bank Building, Detroit, Michigan (1922), Job No. 803
 
Photographs of exterior and interior
Vol.   31  
Photos by Hance (sixteen prints)
Vol.   31  
Photos by John Wallace Gillies, New York (one print)
Vol.   31  
Photos by unknown photographer (sixteen prints)
 
First National Bank Building, Youngstown, Ohio (1908), Job No. 340
Vol.   32  
Photographs of exterior and interior by unknown photographer (eleven prints)
 
First State Bank Building, Detroit, Michigan (1923), Job No. 1141
 
Photographs of exterior and interior
Vol.   33  
Photos by Thomas Ellison, Detroit (seven prints)
Vol.   33  
Photos by Hance (one print)
 
Fisher Building, Detroit, Michigan (1929), Job No. 1378
Vol.   34  
Photographs of exterior and interior by Thomas Ellison, Detroit (eleven prints)
 
Ford Motor Company Airport and Hangar, Dearborn, Michigan (1925), Job No. 1290
Vol.   35  
Photograph of exterior of hangar by Thomas Ellison, Detroit (one print)
 
Ford Motor Company "Century of Progress" Exposition Buildings, Chicago, Illinois (1934), Job No. 1657
 
Photographs of exterior and interior
Vol.   36  
Photos by John Stara (one print)
Vol.   36  
Photos by unknown photographer (fifteen prints)
 
Ford Motor Company Engineering Laboratory, Dearborn, Michigan (1925), Job No. 1077
 
Photographs of exterior and interior
Vol.   35  
Photos by Thomas Ellison, Detroit (twenty-five prints)
Vol.   35  
Photos by B. G. Miller, Detroit (one print)
 
Ford Motor Company Open Hearth Mills and Glass Manufacturing Plant (Job No. 1071), Rouge Plant, Dearborn, Michigan (1922-1925)
Vol.   35  
Photographs of exteriors, six dated  1936 by unknown photographers (fifteen prints)
 
Ford Motor Company Plant, Edgewater, New Jersey (1929), Job No. 1501
Vol.   35  
Photographs of exterior by unknown photographer, one dated  9/4/1930 (three prints)
 
Ford Motor Company Plant, Hotel (unidentified)     (Possibly Longbeach, CA, adn Twin Cities, St. Paul, MN) 
 
Photographs of exteriors and interiors
Vol.   35  
Photos by John Wallace Gillies, New York (one print)
Vol.   35  
Photos by unknown photographer (four prints)
 
Ford Motor Company Building, 54th & Broadway, New York, New York (1919), Job No. 807
Vol.   7  
Photographs of exterior and interior by John Wallace Gillies, New York (eleven prints, one not identified, but is most probably by Gillies)
 
Ford Motor Company Tire Plant, Dearborn, Michigan (1936), Job No. 1747
Vol.   5  
Photographs of exterior and interior by unknown photographer (three prints)
 
Clara Ford Nurses' Home, Detroit, Michigan (1923), Job No. 1119
 
Photographs of exterior and interior
Vol.   37  
Photos by Thomas Ellison, Detroit (nineteen prints)
Vol.   37  
Photos by unknown photographer (seven prints)
 
Fort Shelby Garage, Detroit, Michigan (1920), Job No. 983
Vol.   38  
Photograph of exterior by John Wallace Gillies, New York (one print)
 
Franklin Hills Country Club, Franklin, Michigan (1926), Job No. 1374
 
Photographs of exterior and interior
Vol.   39  
Photos by Thomas Ellison, Detroit (twelve prints)
Vol.   39  
Photos by Forester Studio, Detroit (two prints)
Vol.   39  
Photos by unknown photographer (twenty-four prints)
 
General Motors (Durant) Building, Detroit, Michigan (1922), Job No. 902
Box   11  
Photographs of floor plans, exterior, and interior by unknown photographer (seventy-nine prints)
 
Photographs of exterior and interior
Vol.   40  
Photos by Hillis-McGregor, Detroit (one print)
Vol.   40  
Photos by McGregor and Vallin, Detroit (one print)
Vol.   40  
Photos by John Wallace Gillies, New York (seventeen prints)
Vol.   40  
Photos by unknown photographer (fourteen prints)
 
General Necessities Building (Park Boulevard Building/Jerome Ackerman Building), Detroit, Michigan (1922), Job No. 1058
Vol.   41  
Photographs of exterior by John Wallace Gillies, New York (two prints)     (one not identified, but most probably by Gillies) 
 
Grace Hospital Nurses' Home, Detroit, Michigan (1929), Job No. 1525
Vol.   42  
Photograph of exterior by Thomas Ellison, Detroit (one print)
 
Grosse Pointe Country Club, Grosse Point, Michigan (1922), Job No. 1049
 
Photographs of exterior and interior
Vol.   43  
Photos by Thomas Ellison, Detroit (twenty-one prints)
Vol.   43  
Photos by John Wallace Gillies, New York (six prints)
Vol.   43  
Photos and by unknown photographer (four prints)
 
Harper Hospital Nurses' Home, Detroit, Michigan (1917), Job No. 780
Vol.   44  
Photographs of exterior and interior
Vol.   44  
Photos by Thomas Ellison, Detroit (one print)
Vol.   44  
Photos by John Wallace Gillies, New York (four prints)     (one print identified and three most probably by Gillies) 
 
Hudson Motor Car Company Factory, Detroit, Michigan (1910), Job No. 450
Vol.   45  
Construction photographs of exterior and interior by Spooner and Wells, Detroit,  4/30/1910-11/23/1910 (sixteen photographs)     (in folded, panoramic views, sizes vary) 
Vol.   46  
Photograph of exterior by Thomas Ellison, Detroit (one print)
 
Albert Kahn Residence, Detroit, Michigan (1906), Job No. 293
 
Photographs of exterior and interior
Vol.   47  
Photos by Thomas Ellison, Detroit (five prints)
Vol.   47  
Photos by unknown photographer (one print)
Vol.   27  
Photographs of exterior by unknown photographer (three prints)
Box   11  
Photographs of exterior and interior by unknown photographer (six prints)
 
W. K. Kellogg Auditorium and High School, Battle Creek, Michigan (1931), Job No. 1610
Vol.   48  
Photographs of exterior and interior by Hedrich-Blessing Studio, Chicago (ten prints and eight enlargements)
 
King's (National) Theater, Detroit, Michigan (1911), Job No. 478
Vol.   49  
Photographs of exterior and interior by unknown photographer (seven prints)
 
S. S. Kresge Company Building, Detroit, Michigan (1929), Job No. 1476
 
Photographs of exterior and interior
Vol.   50  
Photos by Thomas Ellison, Detroit (twenty-one prints)
Vol.   50  
Photos by unknown photographer (two prints and three duplicates)
 
Herman Krolik Residence, Detroit, Michigan (1909), Job No. 439
Box   11  
Photographs of exterior and interior by unknown photographer (fifteen prints)
 
Robert and Frank Kuhn Residence, Grosse Pointe, Michigan (1914), Job No. 642
 
Exterior and interior photographs of all residences included in the portfolio
Vol.   6  
Photos by John Wallace Gillies, New York (twenty prints)
Vol.   6  
Photos by Hance (one print)
Vol.   6  
Photos by unknown photographer (ten prints)
 
Langley Field, Hampton, Virginia (1917), Job No. 796
Vol.   51-A  
Suede album with photographs by John Wallace Gillies, New York (twenty-three prints)     (album belonged to Brigadier General Benedict Crowell (1869-1952) Assistant Secretary of War and Director of Munitions, WWII) 
Vol.   51-B  
Photographs of exteriors of several buildings by unknown photographer (twenty-three prints)
 
Livingstone Memorial Lighthouse, Belle Isle, Detroit, Michigan (1930), Job No. 1400
Vol.   52  
Photographs of exterior by Thomas Ellison, Detroit (seven prints)
 
Alvan Macauley Residence Library, Indian Village, Detroit, Michigan (1914), Job No. 611
Vol.   54  
Photographs of interior by John Wallace Gillies, New York (two prints)
 
Alvan Macauley Residence, Grosse Point, Michigan (1928), Job No. 1435
 
Photographs of exterior and interior
Vol.   53  
Photos by Thomas Ellison, Detroit (twenty-five prints)
Vol.   53  
Photos and by unknown photographer (twenty-two prints)
 
Maccabees Building, Detroit, Michigan (1927), Job No. 1262
 
Photographs of exterior and interior
Vol.   55  
Photos by Thomas Ellison, Detroit (twenty-four prints)
Vol.   55  
Photos by Hance (one print)
Vol.   55  
Photos by unknown photographer (three prints)
 
Mishawaka Woolen Manufacturing Company Mill, Mishawaka, Indiana (1920), Job No. 668
Vol.   56  
Photograph of exterior by unknown photographer (one print)
 
Hayward Murphy Residence, Detroit, Michigan (1914), Job No. 633
 
Exterior and interior photographs of all residences included in the portfolio
Vol.   6  
Photos by John Wallace Gillies, New York (twenty prings)
Vol.   6  
Photos by Hance (one print)
Vol.   6  
Photos by unknown photographer (ten prints)
 
National Bank of Commerce, Detroit, Michigan (1916), Job No. 725
 
Photographs of exterior and interior
Vol.   22  
Photos by John Wallace Gillies, New York (three prints)
Vol.   22  
Photos by Detroit Publishing Company (one print and one copy)
Vol.   22  
Photos by unknown photographer (two prints)
 
J. S. Newberry Residence, Grosse Pointe, Michigan (1914), Job No. 604
Vol.   54  
Exterior and interior photographs by John Wallace Gillies, New York (fifteen prints)
 
New York Times Building, New York, New York (1931), Job No. 1478
Vol.   57  
Photographs of exterior and interior by Wurts Brothers, New York (four prints)     (two not identified, but most probably by Wurts) 
 
Packard Motorcar Company Salesroom, Detroit, Michigan (1923), Job No. 1125A
Vol.   58  
Photographs of exterior and interior by Thomas Ellison, Detroit (five prints)
 
Parke-Davis Company Factory, Detroit, Michigan (1928), Job No. 1434
Vol.   59  
Photograph of exterior by Thomas Ellison, Detroit (one print)
 
Psi Upsilon Fraternity House, Ann Arbor, Michigan (1925), Job No. 1200A
Vol.   60  
Photographs of exterior and interior by Thomas Ellison, Detroit (ten prints)
 
Republic Steel Corporation Factory, Cleveland, Ohio (1937), Job No. 1743
Vol.   5  
Photographs of exterior and interior by unknown photographer (five prints)
 
Security Trust Bank, Detroit, Michigan (1923), Job No. 1140
Vol.   61  
Photographs of exterior by Thomas Ellison, Detroit (three prints)
 
Joseph Siegel Residence, Detroit, Michigan (1914), Job No. 644
 
Exterior and interior photographs of all residences included in the portfolio
Vol.   6  
Photos by John Wallace Gillies, New York (twenty prints)
Vol.   6  
Photos by Hance (one print)
Vol.   6  
Photos by unknown photographer (ten prints)
 
Samuel Francis Smith Memorial, Belle Isle, Detroit, Michigan (1931), Job No. 1605
 
Photographs of exterior
Vol.   62  
Photos by Thomas Ellison, Detroit (three prints)
Vol.   62  
Photos Davis B. Hillmer (one print)
 
Standard Club Building, Chicago, Illinois (1923), Job No. 1174
Vol.   63  
Photographs of exterior and interior
Vol.   63  
Photos by Thomas Ellison, Detroit (thirty-two prints)
Vol.   63  
Photos by unknown photographer (two prints)
 
Southeastern Junior High School, Battle Creek, Michigan (1930), Job No. 1593
Vol.   48  
Photographs of exterior and interior by Hedrich-Blessing Studio, Chicago (three prints and two enlargements)
 
Studebaker Corporation Factory, Detroit, Michigan (1920), Job No. 966
Vol.   64  
Photograph of exterior by unknown photographer (one print)
 
C. M. Swift Residence, Grosse Pointe, Michigan (1903), Job No. 168
Vol.   65  
Photographs of exterior by unknown photographer (five prints)
 
The New Temple Beth El, Detroit, Michigan (1922), Job No. 821
 
Photographs of exterior and interior
Vol.   66  
Photos by John Wallace Gillies, New York (three prints)
Vol.   66  
Photosby Thomas Ellison, Detroit (eleven prints)
 
Thompson Aircraft Products Building, Euclid, Ohio (1941), Job No. 1885
Vol.   67  
Photographs of exterior and interior by Hedrich-Blessing Studio, Chicago (eighteen prints)
 
University Hospital, University of Michigan, Ann Arbor, Michigan (1921), Job No. 850
Vol.   68  
Photographs of exterior by Thomas Ellison, Detroit (four prints)
 
University of Michigan Carillon (Burton) Tower, Ann Arbor, Michigan (1936)
Vol.   69  
Photograph of a model by Fred Eggert, Detroit (one print)
 
University of Michigan Lawyers' Club, by York and Sawyer, Architects (1924)
Vol.   76  
Photographs of exterior by Thomas Ellison, Detroit (thirty-four prints)
Vol.   76  
Photographs of interior by Thomas Ellison, Detroit (eighteen prints)
 
University of Michigan Literary Building (Angell Hall), Ann Arbor, Michigan (1924), Job No. 1025
Vol.   70  
Photographs of exterior by Thomas Ellison, Detroit (five prints)
 
University of Michigan Medical (C. C. Little) Building, Ann Arbor, Michigan (1924), Job No.  1023
Vol.   68  
Photographs of exterior by Thomas Ellison, Detroit (two prints)
 
University of Michigan Science (Natural Science) Building, Ann Arbor, Michigan (1914), Job No. 605
Vol.   71  
Photographs of exterior by unknown photographer (five prints)
 
Youngstown Hospital, Youngstown, Ohio (1928), Job No. 1423
Vol.   72  
Photograph of exterior by unknown photographer (one print)
 
Ypsilanti State Hospital, Ypsilanti, Michigan (1929), Job No. 1553
Vol.   73  
Photographs of exterior by Thomas Ellison, Detroit (two prints)
 
Wayne County (Home Savings) Bank, Detroit, Michigan (1915), Job No. 695
 
Photographs of exterior and interior
Vol.   22  
Photos by John Wallace Gillies, New York (two prints)
Vol.   22  
Photos unidentified photographer (ten prints)
 
Women's Hospital (Free Hospital & Infants' Home), Detroit, Michigan (1927), Job No. 1395
 
Photographs of exterior and interior
Vol.   74  
Photos by Thomas Ellison, Detroit (seven prints)
Vol.   74  
Photos by unknown photographer (one print)
 
WWJ (Detroit News Radio Broadcasting) Building, Detroit, Michigan (1934), Job No. 203
Vol.   75  
Photographs of exterior by R.W. Tibbs, New York and Detroit (four prints)
 
Hill Auditorium, University of Michigan, Ann Arbor (1913) Job 494
Vol.   78  
Photographs of exterior and interior by Manning Bros., Detroit (twelve prints)
 
Packard Motor Car Company Factories, Detroit, (1905-1910) Jobs No. 201, 277, 289, etc.
Vol.   79  
Photographs of exteriors and interior by unknown photographer (twenty-eight prints)
 
Miscellaneous Buildings by Other Architects,  undated
Box   11  
Photographs of exteriors and interiors [Part 1] (sixty prints)     (Includes photos by unknown photographer of the Princeton Club by Ayman Embury; Passaic National Bank & Trust Co. by Harry L. Walker; Cumberland Street Hospital (Brooklyn, NY) by Ludlow & Peabody; Percy Rockefeller Residence (New York), Ives Library (New Haven, CT) by Cass Gilbert; William Ziegler, Jr. Residence (New York) by Fk. Stevens; and Hogarth House by W. & J. Sloane) 
Box   12  
Photographs of exteriors and interiors [Part 2] (ninety-five prints)     (Includes photos by John Wallace Gillies, New York, of Eugene Meyer Residence (Mt. Kisco, NY) by Clarles Platt, Harkness Dormitories, Yale University, Coe House (Long Island) by Walker & Gillette, John J. Raskob Residence (Wilmington, DE), Rogers House by Walker & Gillette, Richmond Station, Brooklyn Trust Co. by York & Sawyer, Bush Terminal Sales Building, Metropolitan Museum of Art by McKim, Mead & White) 
Box   12  
Photographs of exteriors and interiors [Part 3] (twenty-four prints)     (Includes photos by John Wallace Gillies, New York, of Barbour Intermediate School (Detroit) by Malcomson & Higgenbotham, Hutchins School (Detroit) by Malcomson & Higgenbotham, Southwestern High School by Malcomson & Higgenbotham(Detroit), Temple Israel (New York) by Tachau & Vought, St. Benedict's Church School (Detroit) by Malcomson & Higgenbotham) 
 
Photographs (Construction and Miscellaneous) [series]:

The Photographs series includes construction photographs of 49 of Kahn's significant buildings, representing the range of industrial, commercial, residential and institutional projects which he built in Detroit, Ann Arbor and across the nation. The evolution of construction technology through the first half of the twentieth century is captured in these dynamic, black-and-white prints. Researchers interested in the innovative structure of his industrial designs will find the construction photographs of the Detroit News Building, Glenn L. Martin Company Factory Buildings (Baltimore), Chrysler Half-Ton Truck Plant (Warren, MI) and Ford Motor Company Willow Run Bomber Plant (Ypsilanti, MI) of particular value. Other icon buildings represented in this photographic collection include the General Motors (Durant) Building and Ford Motor Company Engineering Laboratory in Detroit and the University of Michigan Natural Science Building and Hospital in Ann Arbor.

 
Temple Beth El, Detroit, Michigan,  1902, Jobs No. 89 and 136-A [subseries]:
Box   1  
Interior Hall,  undated (One 8x10-inch, black-and-white print and one copy print)
 
Ford Motor Company, Highland Park Plant Extension Buildings 29 & 30, Highland Park, Michigan,  1916, Job No. 375 W [subseries]:
 
Construction of Building by Charles R. Messinger, Commercial Photographer,  3/19/1916-12/10/1916 (Eighty 7-1/2x9-1/2-inch, black and white prints)
Box   4  
3/19/1916-6/11/1916 (Forty prints, fourteen by Manning Bros., Commercial Photographers)
Box   4  
 6/18/1916-12/10/1916 (Forty prints)
 
Science Building, University of Michigan, Ann Arbor,  1914-1915), Job No. 605 [subseries]:     (Natural Science Building) 
Box   1  
Construction of Building, 5/19/1914-4/5/1915 (Twenty-two 7-1/2x9-1/2-inch and one 7-1/2x19-1/2-inch, black-and-white prints)
Box   1  
Details of Rejected Stone,  undated (Four 3-3/4x4-3/4-inch, black-and-white prints)
 
Detroit Trust Company, Detroit, Michigan,  1914-1915 &  1926-1927, Job Nos. 637 & 637-F [subseries]:
Box   1  
Construction of Original Building by Mannning Bros., Commercial Photographers,  1915 (One 7-1/2x9-1/2-inch, black-and-white print)
Box   1  
Construction of Building Addition (Job No. 637-F) by Manning Bros., Commercial Photographers,  5/6/1926-6/5/1927 ( Nineteen 7-1/2x9-1/2-inch, black-and-white prints)
 
Detroit News (Evening News) Building, Detroit, Michigan,  1915-1916 &  1920, Job Nos. 641, 641-BN, 641-BM & 641-HR [subseries]:
Box   1  
Construction of Building (Job No. 641) by Charles R. Messinger, Commercial Photographer,  11/11/1915-11/22/1916 (Forty-seven 7-1/2x9-1/2-inch, black-and-white prints)
Box   1  
Façade and Interior Views of New Presses, Switchboard and Substation (Job No. 641-BN & BM) by MacGregor and Company, Commercial Photography,  undated (Thirteen 8x10-inch, black-and-white prints)
Box   1  
Construction of Building Addition (Job No. 641-HR) by Manning Bros., Commercial Photographers,  5/14/1920-11/22/1920 (Twenty-three 7-1/2x9-1/2-inch, black-and-white prints)
 
Ford Motor Company Building, 54th & Broadway, New York, New York,  1917-1918, Job No. 807 [subseries]:
Box   4  
Construction of Building by Camera Craft Photographers,  10/26/1917-12/19/1918 (Seventeen 8x10-inch, black-and-white prints and nineteen 7-1/2x9-1/2 inch, black-and-white prints)
 
Ford Motor Company Eagle Shipbuilding Plant, River Rouge, Michigan,  ca. 1918 &  1926, Job No. 847 [subseries]:
Box   4  
Trucson Steel Building under Construction by unknown photographer,  undated (One 7-1/2x9-1/2-inch, black-and-white print)
Box   4  
Eagle Avenue Grade Separation by unknown photographer,  5/24/1926 (Two 7-1/2x 9-1/2 inch, black-and-white prints)
 
University Hospital, University of Michigan, Ann Arbor,  1919-1921, Job No. 850 [subseries]:
Box   1  
Construction of Building (7-1/2x9-1/2-inch, black-and-white prints)
Box   1  
(1) 3/23/1920 -- 11/4/1920 (Thirty-four prints)
Box   1  
(2)  11/18/1920 -- 10/10/1921 (Thirty-two prints)
 
General Motors (Durant) Building, Detroit, Michigan,  1919-1920, Job No. 902 [subseries]:
Box   1  
Material Storage Yards for General Motors Building by Manning Bros., Commercial Photographers, 9/4/1919-12/8/1919 (Thirty-five 7-1/2x9-1/2-inch, black-and-white prints)
 
Construction of Building by Mannning Bros., Commercial Photographers (7-1/2x9-1/2-inch, black-and-white prints)
Box   1  
(1)  6/2/1919-7/7/1919 (Thirty-three prints)
Box   1  
(2) 7/14/1919-8/11/1919 (Thirty-nine prints, one by Alliance Commercial Photo Co.)
Box   1  
(3) 8/18/1919-9/22/1919 (Thirty-four prints)
Box   1  
(4)  9/29/1919-10/28/1919 (Thirty-six prints)
Box   2  
(5)  11/3/1919-12/1/1919 (Thirty-one prints)
Box   2  
(6)  12/10/1919-1/12/1920 (Thirty-six prints)
Box   2  
(7) 1/19/1920-2/24/1920 (Thirty-six prints)
Box   2  
(8)  3/1/1920-3/30/1920 (Thirty-six prints)
Box   2  
(9)  4/5/1920-5/5/1920 (Thirty-three prints)
Box   2  
(10) 5/10/1920-6/26/1920 (Thirty-six prints)
Box   2  
(11) 6/29/1920-8/9/1920 (Thirty-nine prints)
Box   2  
(12) 8/17/1920-9/20/1920 (Thirty-five prints)
Box   2  
(13)  9/27/1920-12/2/1920 (Forty prints)
 
Cracks in Stone in Durant Building (7-1/2x9-1/2-inch, black-and-white prints)
Box   2  
By J. W. Hughes, Photographer,  undated (Three prints)
Box   2  
By Manning Bros., Commercial Photographers,  12/23/1920 (Thirty-five prints, only two dated)
 
Construction of General Motors Building Power Plant by Manning Bros., Commercial Photographers,  12/1/1919-11/26/1920 (7-1/2x9-1/2-inch, black-and-white prints)
Box   2  
(1)  12/1/1919-5/17/1920 (Twenty-eight prints)
Box   2  
(2)  6/14/1920-11/26/1920 (Twenty-nine prints)
 
Ford Motor Company Engineering Laboratory Building and Power House Extension, Dearborn, Michigan,  1923-1924 &  1929-1930, Job No. 1077 & 1077-S [subseries]:
 
Construction of Engineering Laboratory Building (Job No. 1077) by J. W. Hughes, Photographer
Box   2  
(1)  4/11/1923-10/1/1923 (Twenty-two 7-1/2x9-1/2-inch, one 7-1/2x18-inch and one 7-1/2x16-1/2-inch, black-and-white prints)
Box   2  
(2)  10/15/1923-5/15/1924 (Twenty-seven 7-1/2x9-1/2-inch, black-and-white prints)
Box   2  
Beam Testing by Manning Bros., Commercial Photographers, received  5/14/1923 (Eight 7-1/2x9-1/2-inch, black-and-white prints)
Box   2  
Entry Facade and Corner Piers,  undated (Two 7-1/2x9-1/2-inch, black-and-white prints)
Box   2  
Construction of Power House Extension (Job No. 1077-S),  12/2/1929-5/20/1930 (Forty-three 7-1/2x9-1/2-inch, black-and-white prints)
Box   2  
Construction of Power House Tunnel Extension, 1/15/1930-1/29/1930 (Five 7-1/2x91/2-inch, black-and-white prints)
 
Senator James Couzens Residence, Bloomfield Hills, Michigan,  1926-1927, Job No. 1335 [subseries]:
Box   4  
Construction of Building by Spencer and Wyckoff Photographers,  12/15/1926-3/9/1927 (Nine 8x10-inch, black-and-white prints)
 
New York Times Annex Addition, New York, New York,  1930-1931, Job No. 1528 [subseries]:
Box   4  
Construction of Building, 8/27/1930-4/21/1931 (7-1/2x 9-1/2-inch, black-and-white prints, thirteen by N. L. Coe and Son and twenty-three by Irving Underhill, Photographer, Inc.)
 
Ann J. Kellogg School, Battle Creek, Michigan,  1930-1931, Job No. 1549 [subseries]:
Box   4  
Connstruction of Building by unknown photographer,  5/5/1930-3/12/1931 (Thirty-six 8x10-inch, black-and-white prints)
 
General Motors Exhibition Building, Chicago, Illinois,  1932-1933, Job No. 1614 [subseries]:
Box   4  
Construction of Building by Hedrich-Blessing Studio,  5/23/1932-3/9/1933 (Thirty-five 7-1/2x9-1/2-inch, black-and-white prints and two 8x10-inch, black-and-white prints by unknown photographer)
 
Ford Motor Company Exposition Building (Rotunda), Chicago, Illinois,  1934, Job No. 1657 [subseries]:
Box   4  
Construction of Building by Kaufmann-Fabry Commercial Photographers, 2/26/1934-5/23/1934 (Twenty-five 7-1/2x9-1/2-inch, black-and-white prints and one 8x10-inch black-and-white print by unknown photographer)
 
Lady Esther, Inc., Manufacturing Building, Clearing, Illinois,  1937, Job No. 1736A [subseries]:
Box   4  
Construction of Building by Chicago Architectural Photographing Company,  8/30/1937-11/22/1937 (Twenty-one 7-1/2x9-1/2-inch, black-and-white prints)
 
Glenn L. Martin Company Factory Buildings, Baltimore, Maryland,  1937-1942, Job Nos. 1752 (Assembly Building) & 1752A (Engineering Building) [subseries]:
 
Construction of Buildings by unknown photographer (8x10-inch, black-and-white prints)
Box   4  
(1)  5/5/1937-6/10/1937 (Thirty-five prints)
Box   4  
(2) 6/11/1937-7/14/1937 (Thirty-three prints)
Box   4  
(3) 7/16/1937-8/27/1937 (Thirty-four prints)
Box   4  
(4) 9/1/1937-10/06/1937 (Thirty-five prints)
Box   4  
(5)  10/7/1937-12/10/1937 (Thirty prints)
Box   4  
Factory Building F by unknown photographer, 2/14/1939-4/25/1939 (Seven 8-1/2x10-inch, black-and-white prints)
Box   4  
Trailer Camps by unknown photographer,  8/5/1941 (Seven 8x10-inch, black-and-white prints)
 
Work Done by Others (8x10-inch, black-and-white prints)
Box   4  
(1) Apron Rear Gate to Building D, 8/5/1941-12/22/1941 (Three prints)
Box   4  
(2) Plant #1 Incinerator, 9/8/1941-12/22/1941 (Twelve prints)
Box   4  
(3) Plant #2 Incinerator, 9/8/1941-12/22/1941 (Fifteen prints)
 
(4) Eastern Avenue Cloverleaf
Box   4  
(a)  11/10/1941-1/5/1942 (Thirty-one prints)
Box   4  
(b) 1/13/1942-3/23/1942 (Twenty-five prints)
Box   4  
(5) River Channel Dredging,  11/28/1941-12/22/1941 (Four prints)
Box   4  
(6) Lookout Tower,  1/13/1942 (One print)
 
Chrysler Corporation Half-Ton Truck Plant, Warren, Michigan,  1937-1938, Job No. 1766 [subseries]:
 
Construction of Building by Manning Bros., Inc. (Black-and-white prints)
Box   4  
(1)  9/3/1937-1/7/1938 (Thirty 7-1/2x9-1/2-inch prints and one 8x10-inch print by Don Walker, Detroit News Airphoto)
Box   4  
(2) 1/25/1938-4/26/1938 (Twenty-five 7-1/2x9-1/2-inch prints and three 8x10-inch prints by Fred Eggert)
 
Curtiss-Wright Corporation, Curtiss Airplane Division, Buffalo, New York,  1938, Job No. 1785 [subseries]:
Box   4  
Construction of Dope Room and Zinc Foundry by unknown photographer, 3/19/1938-4/9/1938 (Fourteen 2-3/4x4-1/2-inch, black-and-white prints)
 
Chrysler Corporation Tank Arsenal, Warren, Michigan,  1940-1943, Job No. 1867 [subseries]:
 
Construction of Plant by unknown photographers (7-1/2x10-inch, black-and-white prints)
Box   5  
(1) 8/29/1940-9/27/1940 (Thirty-three prints)
Box   5  
(2)  10/4/1940-10/25/1940 (Thirty-five prints)
Box   5  
(3)  11/1/1940-11/22/1940 (Thirty-eight prints)
Box   5  
(4)  11/29/1940-12/20/1940 (Thirty-eight prints)
Box   5  
(5)  12/27/1940-1/17/1941 (Forty-four prints)
Box   5  
(6) 1/20/1941-2/14/1941 (Thirty-four prints)
Box   5  
(7) 2/21/1941-3/21/1941 (Thirty-two prints)
Box   5  
(8) 3/24/1941-5/29/1941 (Thirty-five prints)
Box   5  
(9) 6/17/1941-1/4/1943 (Seven 7x9-inch prints and thirty-nine 8x10-inch prints)
 
Ford Motor Company Willow Run Bomber Plant, Ypsilanti, Michigan,  1941-1943, Job No. 1888 [subseries]:
 
Construction of Plant (Eight-hundred-fourteen 8x10-inch, black-and-white prints by unknown photographer)
Box   5  
(1) #1-42, Spring and Early Summer  1941 (Forty prints)
Box   5  
(2) #43-82, Spring and Summer1941 (Forty prints)
Box   5  
(3) #83-122, Summer  1941 (Forty prints)
Box   5  
(4) #123-164, Summer  1941 (Forty-two prints)
Box   5  
(5) #165-194, Late Summer 1941-10/21/1941 (Thirty-nine prints, ten without numbers by Stegeman)
Box   5  
(6) #195-234,  11/3/1941-12/1/1941 (Forty prints)
Box   5  
(7) #235-275,  12/1/1941-1/5/1942 (Forty-one prints)
Box   5  
(8) #276-315,  1/5/1942-2/2/1942 (Forty prints)
Box   5  
(9) #316-355,  2/2/1942-2/18/1942 (Forty prints)
Box   6  
(10) #356-396, 2/18/1942-4/2/1942 (Forty-one prints)
Box   6  
(11) #397-435,  4/2/1942-4/23/1942 (Forty prints)
Box   6  
(12) #436-476, 4/23/1942-5/12/1942 (Forty-four prints)
Box   6  
(13) #473-523, 5/19/1942-6/5/1942 (Fifty prints)
Box   6  
(14) #524-571, 6/19/1942-7/6/1942 (Forty-six prints)
Box   6  
(15) #572-593, 7/1942-8/19/1942 (Nineteen prints)
Box   6  
(16) #595-639, 9/ 1942-1943 (Thirty-nine prints)
Box   6  
(17) #640-694,  1943 (Forty-one prints)
Box   6  
(18) #695-734,  1943 (Forty prints)
Box   6  
(19) #735-775, 1943-11/4/1943 (Forty prints)
Box   6  
(20) #776-827,  11/12/1943-12/24/1943 (Fifty-two prints)
 
Construction of Plant by unknown photographer (3-1/2x4-3/4-inch, black-and-white prints with typed descriptions on reverse side)
Box   6  
(1)  9/12/1941-10/21/1941 (Forty prints)
Box   6  
(2)  10/25/1941-2/1942 (Thirty-two prints)
 
Nash-Kelvinator Corporation Motor Assembly Building, Kenosha, Wisconsin,  1942-1943, Job No. 1922 [subseries]:
Box   6  
Construction of Building by A & E Woodworth Commericial Photography, 5/18/1942-1/10/1943 (Thirty-one 7-1/2x9-1/2-inch, black-and-white prints)
 
Ford Service Building ("Boulevard Building"), Grand Boulevard and Woodward Avenue, Detroit,  1910, Job No. 462 [subseries]:
Box   9  
Construction of Building by unknown photographer,  undated (Four 7-1/2x9-1/2-inch, black-and-white prints)
 
Krolik Building, Jefferson and Randolph Streets, Detroit,  1917, Job No. 766 [subseries]:
Box   9  
Construction of Building by unknown photographer, with exception of one photograph by Manning Brothers, Commercial Photographers,  6/21/1917-12/6/1917 (Twelve 7-1/2x9-1/2-inch, black-and-white prints)
 
Vinton Building, Woodward and Congress Streets, Detroit,  1917, Job No. 770 [subseries]:
Box   9  
Construction of Building by Manning Brothers, Commercial Photographers,  1/10/1917-11/3/1917 (Twenty-five 7-1/2x9-1/2-inch, black-and-white prints)
 
Y. W. C. A Building, Adams and Witherell Streets, Detroit,  1928-1929, Job No. 1362 [subseries]:
Box   9  
Construction of Building by Manning Bros., Commercial Photographers (7-1/2x9-1/2-inch, black-and-white prints)
Box   9  
(1)  6/21/1928-10/2/1928 (Forty prints)
Box   9  
(2)  10/9/1928-3/6/1929 (Thirty-nine prints)
Box   9  
(3) 3/13/1929-7/23/1929 (Thirty-six prints)
 
The Women's Hospital, Beaubien Street and Forest Avenue, Detroit,  1927-1929, Job No. 1395 [subseries]:
Box   9  
Completed Exterior of Building by Manning Bros., Commercial Photographers,  5/22/1929 (Two 7-1/2x9-1/2-inch, black-and-white prints)
 
William Livingstone Memorial Lighthouse, Belle Isle, Detroit,  1929-1930, Job No. 1400 [subseries]:
Box   9  
Construction of Building by Spencer and Wyckoff, Commercial Photographers,  8/30/1929-4/25/1930 (Eighteen 8x10-inch, black-and-white prints)
 
S. S. Kresge Company Administration Building, Cass Park, Detroit,  1929-1930, Job No. 1476 [subseries]:
Box   9  
Construction of Building by Manning Bros., Commercial Photographers,  7/11/1929-3/6/1930 (Twenty-seven 7-1/2x9-1/2-inch, black-and-white prints)
Box   9  
Interior Pardee-Grueby Tile by Haas Studios, Photographers,  5/15/1930 (Two 7-1/2x10-inch, black-and-white prints)
Box   9  
Completed Building by Manning Bros., Commercial Photographers,  undated (One 7-1/2x9-1/2-inch, black-and-white print)
 
Grace Hospital Addition, Brush and Willis Streets, Detroit, Michigan,  1930-1931, Job No. 1527 [subseries]:
Box   9  
Completed Interiors and Exterior of Building by O. R. Forster Co., Commercial Photographers,  11/4/1930-10/2/1931 (Five 7-1/2x9-3/4-inch, black-and-white prints)
 
Burroughs Adding Machine Company Factory Building, Plymouth, Michigan (1937) Job No. 1737 [subseries]:
Box   9  
Construction of Building by Manning Bros., Inc., Commercial Photographers,  2/22/1937-11/1/1937 (fifty-six 8x10-inch, black-and-white prints)
Box   9  
Construction of Building by Multi-Color, late  1937 (three 8x10-inch, black-and-white prints)
Box   9  
Aerial View of Construction by Don Walker, Detroit News Airphoto,  8/25/1937 (one 8x10-inch, black-and-white print)
 
Charles J. Butler Residence, 1507 Iroquois Avenue, Detroit, Michigan,  1914, Job No. 627 [subseries]:
Bos   9  
Main and Side Facades by unknown photographer,  ca. 1915 (one 6-1/2x9-1/2-inch, black-and-white print)
 
Jennison Hardware Company Warehouse, Bay City, Michigan,  1924, Job No. 1184 [subseries]:
Bos   9  
Exterior of Original Building by unknown photographer,  ca. 1950s (one 4x6-inch, black-and-white print)
Bos   9  
Exterior of Renovated Building after Completion of Condominium Development, "Jennison Place," by John and Judy Lore, ca.  2004 (19 4x6-inch, color prints)
Bos   9  
"Water Street Home Tour" Brochure,  4/25/2004
 
Ford Motor Company Exposition Building,  1939 New York World's Fair, (1938-1940) Job No. 1783 [subseries]:
Box   9  
Early Construction of Building by Knickerbocker Photo Service,  3/15/1938-4/26/1938 (twelve 7-1/2x9-1/2-inch, black-and-white prints)
 
Construction of Building by Albert Rothschild, Commercial Photographer (104 7-1/2x9-1/2-inch, black-and-white prints)
Box   9  
(1) 5/4/1938-10/27/1938 (fifty-one prints)
Box   9  
(2)  11/3/1938-4/28/1939 (fifty-three prints)
 
Construction of Building Alterations by unknown photographer (ninety-six 7-1/2x9-1/2-inch, black-and-white prints)
Box   9  
(1)  1/18/1940-2/29/1940 (forty-five prints)
Box   9  
(2)  3/7/1940-5/1/1940 (fifty-one prints)
Box   9  
Albert Kahn and Others, Surveying Construction,  8/20/1940 (one 5x7-1/2-inch, black-and-white print)
 
General Motors Corporation Exposition Building,  1939 New York World's Fair, (1938-1939) Job No. 1784-A [subseries]:
Box   10  
Construction of Building by Eric J. Baker, Elizabeth, N. J. (seventy-seven 7-1/2x9-1/2-inch, black-and-white prints, sixty-four by Baker and thirteen by unknown photographers)
Box   10  
(1) 8/1/1938-10/20/1938 (thirty-six prints)
Box   10  
(2)  10/25/1938-3/21/1939 (forty-one prints)
Box   10  
Construction of Foundation by unknown photographer,  8/10/1938-8/30/1938 (twenty-five 2-3/4x4-1/2 inch, black-and-white prints and four 3x5-inch, black and white prints)
 
Stalingrad Tractor Plant, Amtorg Trading Corporation, Stalingrad, U.S.S.R. (1929-1930) Job No. 1503 [subseries]:
Box   10  
Construction of Foundation by unknown photographer, 7/8/1929-10/23/1929 (five 4x6-1/4-inch, one 4x13-inch, seven 6-1/4x9-inch, one 6x26-inch, one 5-1/2x17-inch, and one 6x17-1/2-inch, black-and-white prints)
Box   10  
Construction of Steel Structure, received by Albert Kahn, Inc. 7/24/1929-5/5/1930 (twelve 8x10-inch, black-and-white prints, nine by Santangelo Studio, Pottstown, PA and three by unknown photographer)
 
Autotrust Corporation Forge Shop, Moscow, U.S.S.R. (1930) Job No. 1563 [subseries]:
Box   10  
Construction of Steel Structure, received by Albert Kahn, Inc.5/5/1930 (four 8x10-inch, black-and-white prints by The Conrad Studio, Allentown, PA)
 
Ford Motor Company "Rotunda" Building, Dearborn, Michigan (1941) Job Nos. 1673-N & O [subseries]:
Box   10  
Construction of Alterations and Addition, one dated  10/21/1941 (three 5x8-inch, black-and-white prints by Sheill, six 5x7-inch, black-and-white prints by unknown photographer, and one 8x10-inch, black-and-white print by unknown photographer)
 
Alvan T. Fuller Service and Sales Buildings Additions (Packard), Commonwealth Avenue and Malvern Street, Boston, MA (1916-1917 & 1928-1929) Job Nos. 413-A & 413-F [subseries]:
Box   10  
Construction of Addition to Service Building (Job No. 413-A) by unknown photographer,  7/28/1916-5/25/1917 (thirty-two 7-3/4x9-3/4-inch, black-and-white prints)
Box   10  
Construction of Addition to Sales Building (Job No. 413-F) by George E. Lawrence Co., Commercial Photographers, Boston,  10/27/1928-8/27/1929 (thirty-six 7x9-1/2-inch, black-and-white prints)
 
A. Krolik & Co. Warehouse Building, Detroit (1917) Job No. 766 [subseries]:
Box   10  
Construction of Building by unknown photographer, except for one by A. R. Wilson and two by Manning Bros., Commercial Photographers,  6/21/1917-11/13/1917 (sixteen 7-1/2x9-1/2-inch, black-and-white prints)
 
Dearborn Inn (Henry Ford Hotel), Dearborn, Michigan (1930-1932) Job No. 1504-A & 1504-B [subseries]:
Box   10  
Construction of Building (Job No. 1504-A) by Manning Bros.,  6/25/1930-6/23/1931 (fifty-three 7-1/4x9-1/2-inch, black-and-white prints)
Box   10  
Construction of Addition (Job No. 1504-B) by Manning Bros.,  7/14/1932-9/23/1932 (twenty-two 7-1/2x9-1/2-inch, black-and-white prints)
 
Ford Motor Company, Highland Park Plant, Extension to Building "A" (1916) Job No. 375-Y [subseries]:
Box   4  
Construction of Extension to Building "A" by Charles R. Messinger, Commercial Photographer, 8/5/1916-11/14/1916 (seventeen 7-1/2x9-1/2-inch, black-and-white prints)
 
Ford Motor Company, Highland Park Plant Building "A," Section "A-A" (1917) Job No. 375-BB [subseries]:
Box   4  
Construction of Building "A," Section "A-A" by Jeffrey White Studio, Commercial Photographers,  8/21/1917-10/16/1917 (eighteen 7-1/2x9-1/2-inch, black-and-white prints)
 
Chrysler Corporation DeSoto Plant, Wyoming Avenue, Detroit, Michigan (1941) Job No. 1719-D [subseries]:
Box   10  
Construction of Addition to Press Shop by Manning Bros., Inc., Commercial Photographers,  4/28/1941-11/13/1941 (fourteen 7-1/2x9-1/2-inch and one 8x10-inch, black-and-white prints)
Box   10  
Completed Building by Manning Bros., Inc., received  1/21/1942 (three 8x10-inch, black-and-white prints)
 
Hudson Motor Car Company Plant Additions, Detroit, Michigan (1925-1929) Job Nos. 450-BE, BP, CK, CL, CN, CO, CP & CS [subseries]:
Box   10  
Construction of Pumping Station and Oil Tanks (Job No. 450-BE) by unknown photographer,  undated (six 3-1/2x4-1/2-inch, black-and-white prints)
Box   10  
Construction of Plant Addition (Job No. 450-BP) by unknown photographer,  5/2/1925 (four 8x10-inch, black-and-white prints)
Box   10  
Unfinished Body Storage Building (Job No. 450-CK) by Manning Bros.,  12/19/1927-1/23/1928 (six 7-1/4x9-1/4-inch, black-and-white prints)
Box   10  
Construction of Addition to Sheet Metal Shop (Job No. 450-CL) by Kalec & Forster, 1/6/1928-3/16/1928 (nineteen 7-3/4x9-1/2-inch, black-and-white prints)
Box   10  
Construction of Plant Addition (Job No. 450-CN) by Kalec & Forster,  10/25/1928-1/8/1929 (eleven 7-3/4x9-1/2-inch, black-and-white prints)
Box   10  
Construction of Hospital (Job No. 450-CO) by Spencer & Wyckoff, 1/12/1929-5/7/1929 (seven 7-1/2x9-1/2-inch, black-and-white prints)
Box   10  
Construction of Garage and Showroom (Job No. 450-CP) by Manning Bros., 1/12/1929-5/6/1929 (nineteen 7-1/2x9-1/2-inch, black-and-white prints)
Box   10  
Construction of Addition to Building 101 (Job No. 450-CS) by O. R. Forster Co., Commercial Photographers,  5/16/1929-6/14/1929 (six 7-3/4x9-1/2-inch, black-and-white prints )
 
Industrial Works Building (Industrial Brownhoist), Bay City, Michigan (1907) Job No. 362 [subseries]:
Box   10  
Renovated Building in  2005 by John Lore,  5/2005 (seven 4x6-inch, color prints)
 
William L. Clements Residence, Stable Building, Bay City, Michigan (1908) Job No. 362 [subseries]:
Box   10  
Stable Building in  2005 by John Lore,  5/2005 (four 4x6-inch, color prints)
 
First National Bank, Bay City, Michigan (1919) Job No. 610 [subseries]:
Box   10  
Building in  2005 by John Lore,  5/2005 (four 4x6-inch, color prints)
 
Bay City Library, Bay City, Michigan (1920-1922) Job No. 920 [subseries]:
Box   10  
Building in  2005 by John Lore,  5/2005 (five 4x6-inch, color prints)
 
Ford Motor Company Glass Manufacturing Plant, River Rouge, MI (1922-1923) Job No. 1071 [subseries]:
Box   10  
Construction Photographs of Glass Plant by Manning Bros., Commercial Photographers, Detroit,  12/11/1922-6/7/1923 (forty-one 7-1/2x9-1/2-inch, black-and-white prints)
Box   10  
Construction Photographs of Stone Crusher and Slag Crusher Buildings by Manning Bros., Commercial Photographer, Detroit,  12/11/1922-3/9/1923 (eight 7-1/2x9-1/2-inch, black-and-white prints)
 
Packard Motor Car Company Plant and Buildings, Detroit, Philadelphia, Long Island, Chicago, New York and Boston (1911-1917) [subseries]:
Box   12  
Photographs of Buildings under Construction and Completed by Manning Bros., Commercial Photographer (Detroit), W. D. Benham Co., Photographers (Detroit), Underwood & Underwood (New York), Edwin Levick (New York), N. Lazarnick (New York), F. E. Parshley Photo (Brooklyn), Howe & Arthur, Photographers (Chicago), and unknown photographers,  1911-1917 (seventy-eight 3-1/4x7-1/2 to 7-1/2x16-inch, black-and-white prints, most undated)
 
Shaarey Zedek Synagogue, Detroit (1930) Job No. 1385 [subseries]:
Box   12  
Construction Photographs by O. R. Forster Co., Commercial Photographers, Detroit,  4/17/1930-9/18/1930 (twenty-four 7-1/2x9-3/4-inch, black-and-white prints)
 
Ford Motor Company Iron Mountain Distillation and Carbonization Plant, Kingsford, Upper Peninsula, Michigan (1923-1925) Job Nos. 988 & 988-A, B, C, D & AA [subseries]:
Box   12  
Construction Photographs of Distillation Building (Job No. 988-A) by Quades Picture Shop, Iron Mountain, and unknown photographer,  6/11/1923-5/19/1924 (thirty-one 7-1/2x10-inch, black-and-white prints)
Box   12  
Construction Photographs of Carbonization Plant (Job No. 988-B) by Quades Picture Shop, Iron Mountain, and unknown photographer,  8/22/1923-5/28/1924 (twenty-seven 7-1/2x10-inch, black-and-white prints)
Box   12  
Construction Photographs of Power Building (Job No. 988-C) by Quades Picture Shop, Iron Mountain, and unknown photographer, 8/22/1923-2/3/1924 (forty-five 7-1/2x10-inch, black-and-white prints)
Box   12  
Construction Photographs of Power House and Storage Bins by unknown photographer,  11/18/1924-4/17/1925 (five 7-1/2x9-1/2-inch, black-and-white prints)
Box   12  
Construction Photographs of Saw Mill Extension (Job No. 988-D) by Quades Picture Shop, Iron Mountain, and unknown photographer,  6/25/1923-5/19/1924 (twenty-two 7-1/2x9-1/2-inch, black-and-white prints)
Box   12  
Construction Photographs of Green Parts Saw Mill and Shipping Building by Quades Picture Shop, Iron Mountain, and unknown photographer,  3/31/1924-8/16/1924 (seven 7-1/2x9-1/2-inch, black-and-white prints)
Box   12  
Construction Photographs of Charcoal Storage Plant (Job No. 988-AA & W) by Quades Picture Shop, Iron Mountain, and unknown photographer, 2/11/1925-7/1/1925 (twenty-six 7-1/2x9-1/2-inch, black-and-white prints)
 
Albums Containing Furniture, Fabric, Ironwork and Terra Cotta Samples [series]:

Albums Containing Furniture, Fabrics, Ironwork and Terra Cotta Samples comprise the second series which was accessioned in 2009. These 19 scrapbooks contain photographs and drawings of decorative arts pieces used by Kahn in the designs of both the interiors and exteriors of a number of his projects, built between 1913 and 1926. Researchers interested in Kahn's selection of furniture, fabrics and decorative architectural elements for such buildings as the Detroit Athletic Club, the University of Michigan Natural Science Building and Hill Auditorium, the Standard Club of Chicago, the Evening News Building, King's Theatre and Detroit Trust Company, among others, will find these albums of great interest. Many of them were prepared by W. & J. Sloane, the renowned interior design firm and furniture and rug store in New York, which serviced prominent clients across the country during its 94-year history (1891-1985).

 
Country Club of Detroit, Grosse Pointe, MI (1923) Job No.  1049
 
Furniture and Fabrics by W. & J. Sloane, New York     [vol. 16]  (catalogue photographs, prints of furniture drawings and floor plan layouts, fabric swatches, and copies of furniture estimate and order, 4/25/1923 & 5/7/1923)
 
Detroit Athletic Club (1914) Job No. 593
 
Furniture and Fabrics by W. & J. Sloane, New York (Book I)     [vol. 2]  (prints of furniture drawings, fabric swatches, and letter from Sloane to Kahn, 11/19/1914)
 
Furniture and Fabrics by W. & J. Sloane, New York (Book II)     [vol. 1]  (catalogue photographs, prints of furniture drawings, and fabric swatches)
 
Furniture and Fabrics by W. & J. Sloane, New York (Book III)     [vol. 3]  (prints of furniture drawings and fabric swatches)
 
Samples of Miscellaneous Chairs and Tables by W. & J. Sloane, New York     [vol. 4]  (three original renderings and six catalogue photographs)
 
Detroit Golf Club (1917) Job No. 740
 
Furniture (Books I & II)     [vols. 12 & 13]  (catalogue photographs and prints of furniture drawings )
 
Detroit Trust Company (1914-1915) Job No. 637
 
Furniture and Draperies by W. & J. Sloane, New York (Books I & II)     [vols. 10 & 11]  (catalogue photographs, blueprints of furniture drawings, and fabric swatches)
 
"Greater Detroit" and "Greater Buffalo" Steamships, Detroit & Cleveland Navigation Co. (1925)
 
Memorandum of Furniture for Two Steamers by W. & J. Sloane, New York     [vol. 17]  (blueprints of furniture drawings by Schmieg, Reichman, Thonet and Palmer & Embury and fabric swatches)
 
Evening News (Detroit News) Building (1915-1916) Job No. 641
 
Furniture and Leather     [vol. 14]  (catalogue photographs, blueprints of furniture drawings, and leather swatches)
 
Franklin Hills Country Club, Franklin, MI (1926) Job No.  1374
 
Furniture by W. & J. Sloane, New York     [vol. 19]  (catalogue photographs and blueprints of furniture drawings)
 
Miscellaneous Buildings     [vol. 8]   (Includes Terra Cotta Samples by Atlanta Terra-Cotta Co. and Ornamental Iron Samples, indexed for Detroit Athletic Club, Horace Dodge Residence, King's (National) Theatre, Trussed Concrete Co. Building, Kahn Stores, Hill Auditorium, University of Michigan Library, University of Michigan Natural Science Building, Kresge Building, etc.)  (catalogue photographs with pencil and ink notations)
 
National Bank of Commerce, Detroit (1916) Job No. 725
 
Furniture and Draperies by W. & J. Sloane, New York     [vol. 15]  (prints of furniture and fabric swatches)
 
Packard Motor Car Company, Detroit
 
Furniture for Directors' Room     [vol. 9]  (catalogue photographs of antique pieces, five original drawings and blueprints of furniture, and two original renderings by W. & J. Sloane, New York)
 
Psi Upsilon House, University of Michigan, Ann Arbor (1924-1925) Job No.  1200
 
Furniture and Fabric Samples by Kathleen Calkins, Decorator, J. L. Hudson Co.     (vol. 18)  (original plans of furniture layouts, catalogue photographs, fabric swatches, and two original pencil drawings of furniture details)
 
Standard Club, Chicago (1923) Job No.  1174
 
Furniture and Fabrics by W. & J. Sloane, New York (Book I)     [vol.5]  (catalogue photographs, blueprints of furniture drawings and drapery treatments, and fabric swatches)
 
Furniture and Fabrics (Book II) by W. & J. Sloane, New York (Book II)     [vol. 6]  (catalogue photographs, blueprints of furniture drawings, and fabric swatches)
 
Furniture by Mandel Brothers, Chicago     [vol. 7]  (twenty prints of renderings of furniture)
 
Audio-Visual Materials [series]:
 
Videotape [subseries]:
Box   10  
Architects We Knew: Kahn, Saarinen and Yamasaki, produced by Detroit Historical Museum,  2004     (includes introductory remarks by Sally Bund and lecture by Kahn scholar, Grant Hildebrand) 
 
Books Owned by Albert Kahn [series]:

The Books Owned by Albert Kahn series (added to the collecton in 2009) is a library of 73 books, most of which were autographed and dated by the architect when Kahn purchased them between 1901 and 1938. These volumes, published between 1881 and 1937, cover a number of subjects of interest to Kahn, including European and American art, architecture and gardens, as well as library, school, greenhouse, ironwork and hospital design. The large-format books about architecture and gardens contain hundreds of plates of images, which may have been of inspiration to Kahn in the design of his residential, commercial and institutional buildings.

 
A Monograph of the Work of McKim Mead & White, 1879-1915 Vol. 1. New York: The Architectural Book Publishing Co., Paul Wenzel & Maurice Krakow, 1915     [vol. 1] 
 
A Monograph of the Work of McKim Mead & White, 1879-1915 Vol. 2. New York: The Architectural Book Publishing Co., Paul Wenzel & Maurice Krakow, 1915     [vol. 2] 
 
A Monograph of the Work of McKim Mead & White, 1879-1915 Vol. 3. New York: The Architectural Book Publishing Co., Paul Wenzel & Maurice Krakow, undated     (autographed by Albert Kahn)   [vol. 3] 
 
A Monograph of the Work of McKim Mead & White, 1879-1915 Vol. 4. New York: The Architectural Book Publishing Co., Paul Wenzel & Maurice Krakow, undated     (autographed by Albert Kahn)   [vol. 4] 
 
American Greenhouses. Chicago: American Greenhouse Manufacturing Co., undated     (title page missing)   [vol. 36]   [vol. 36] 
 
American Greenhouses. Chicago: American Greenhouse Manufacturing Co., 1928     [vol. 37] 
 
Architectural Association Sketch Book: France, Belgium, Spain, etc.1909-1912     (autographed by Albert Kahn)   [vol. 5] 
 
Arnott, James A. & Wilson, John. The Petit Trianon Versailles. New York: Charles Scribner's Sons, 1908     (autographed by Albert Kahn)   [vol. 12] 
 
Aumonier, W., ed. Modern Architectural Sculpture. London: The Architectural Press and New York: Charles Scribner's Sons, 1930     (autographed by Albert Kahn, 7/16/1930)   [vol. 26] 
 
Aus der Kunst-Schmiede -- Eisen Sammlung des Architekten Friedr. Halselmann in Munchen. Munich: Verlag von Joseph Albert, 1881     (autographed by Albert Kahn, 9/1929)   [vol. 40] 
 
Azema, Leon. Documents d'Architecture Contemporaine, 1st Serie. Paris: A. Vincent et Cie, 1927     (autographed by Albert Kahn, 2/18/1929)   [vol. 46] 
 
Beauclair, R. & Gradl, M. I.Documents Architecture-Moderne, 3rd Annee. Paris: H. Laurens Editeur, undated     (autographed by Albert Kahn)   [vol. 49] 
 
Book Stack and Shelving for Libraries by Bernard R. Green, C. E. Jersey City, N. J.: The Snead and Company Iron Works, 1908     [vol. 53] 
 
Byne, Arthur & Stapley, Mildred. Rejeria of the Spanish Renaissance. New York: The Hispanic Society of America, 1914     (autographed by Albert Kahn, 5/15/1915)   [vol. 24] 
 
Calavas, A., ed., Le Petit Trianon: Architecture, Decoration -- Ameublement. Paris: Librairie des Arts Decoratifs, undated     (autographed by Albert Kahn, July 12)   [vol. 10] 
 
Cantacuzene, G. M., compiler.Petits Edifices: Roumanie, 7th Serie. Paris: Vincent, Freal et Cie, Editeurs, 1931     (autographed by Albert Kahn, 12/30/1936)   [vol. 58] 
 
Cary, A. Cent Portes Cocheres. Paris: A. Cary, 1904     (autographed by Albert Kahn)   [vol. 50] 
 
Colasanti, Arduino. L'Arte Bisantina in Italia. Milan: Bestetti & Tumminelli, Editori d'Arte, 1912     (autographed by Albert Kahn)   [vol. 8] 
 
Conklin, Edward F. The Lincoln Memorial, Washington. Washington, D.C.: United States Government Printing Office, 1927     (autographed by Albert Kahn)   [vol. 64] 
 
Cunningham, Harry Francis, and Younger, Joseph Arthur. Measured Drawings of Georgian Architecture in the District of Columbia, 1750-1820. New York: Architectural Book Publishing Co., Paul Wenzel and Maurice Krakow, 1914     (autographed by Albert Kahn, 2/27/1925)   [vol. 20] 
 
Cyclopedia of Architecture, Carpentry and Building: Carpentry, Stair Building, Estimating, Steel Square, Vol. 2. Chicago: American Technical Society, 1908     [vol. 68] 
 
Cyclopedia of Architecture, Carpentry and Building: Plastering, Painting, Sheet Metal, Vol. 9. Chicago: American Technical Society, 1908     [vol. 69] 
 
Donovan, John J. et al. School Architecture: Principles and Practices. New York: The MacMillan Company, 1921     (inscribed by John J. Donovan: "It's a real joy to find you so human. St. Patrick's Day, 1924")   [vol. 57] 
 
Dufrene, Maurice. Ensembles Mobiliers: Exposition Internationale de 1937 Vol. 2. Paris: Editions d'Art Charles Moreau, 1937     (autographed by Albert Kahn, 9/25/1937)   [vol. 51] 
 
Franke-Berlin, Diedrich. Schmiedeeiserne Gitter. Stuttgart: Julius Hoffman Verlag, undated     (autographed by Albert Kahn, 4/15/1926)   [vol. 44] 
 
French Exteriors     (title page missing, autographed by Albert Kahn)   [vol. 60] 
 
Gardens Old & New: The Country House & Its Garden Environment. London: The Offices of "Country Life Illustrated" and George Newnes, Limited, undated     (autographed by Albert Kahn, 5/25/1901)   [vol. 30] 
 
Gardens Old & New: The Country House & Its Garden Environment, Vol. 2. John Leyland, ed. London: Offices of Country Life and George Newnes, Limited, and New York: Charles Scribner's Sons, undated     (autographed by Albert Kahn, 4/9/1923)   [vol. 31] 
 
Gardens Old & New: The Country House & Its Garden Environment, Vol. 3. H. Avray Tipping, ed. London: Offices of Country Life and George Newnes, Limited, and New York: Charles Scribner's Sons, undated     (autographed by Albert Kahn, 2/25/1923)   [vol. 32] 
 
Godard, Octave. Jardins de la Cote d'Azur. Paris: Ch. Massin et Cie, Editeurs, 1927     (autographed by Albert Kahn, 8/10/1927)   [vol. 11] 
 
Gromort, Georges. Jardins d'Espagne, Vol I. Paris: A. Vincent et Cie, 1926     (autographed by Albert Kahn)   [vol. 16] 
 
Gromort, Georges. Jardins d'Espagne, Vol. II. Paris: A. Vincent et Cie, 1926     (autographed by Albert Kahn)   [vol. 17] 
 
Gromort, Georges. Jardins d'Italie. Paris: A. Vincent, Editeur, 1922     [vol. 18] 
 
Gromort, Georges. Jardins d'Italie, Vol. III. Paris: Vincent, Freal et Cie, 1931     (autographed by Albert Kahn, 10/19/1931)   [vol. 19] 
 
Hadley, Chalmers. Library Buildings: Notes and Plans. Chicago: American Library Association, 1924     (autographed by Albert Kahn, 8/25/1924)   [vol. 66] 
 
Hamlin, A. D. F. & Snyder, C. B. J., et al. Modern School Houses. New York: The Swetland Publishing Co., 1910     (autographed by Albert Kahn, 1911)   [vol. 54] 
 
Hautecoeur, Louis. Sculpture Decorative: Exposition Internationale de 1937. Paris: Editions d'Art Charles Moreau, 1937     (autographed by Albert Kahn, 11/24/1937)   [vol. 42] 
 
Harrison, W. K. & Dobbin, C. E. School Buildings of Today and Tomorrow. New York: Architectural Book Publishing Company, Inc., 1931     (autographed by Albert Kahn, 2/19/1931)   [vol. 52] 
 
Hegemann, Werner. Amerikanische Architektur & Stadtbaukunst. Berlin: Ernst Wasmuth, A.-G., 1927     (autographed by Albert Kahn, 11/15/1929)   [vol. 38] 
 
Hegemann, Werner. City Planning, Housing, Vol. 3: A Graphic Review of Civic Art, 1922-1937. New York: Architectural Book Publishing Company, Inc., 1938     (autographed by Albert Kahn, 6/15/1938)   [vol. 34] 
 
Holme, Charles, compiler. Les Jardins d'Angleterre dans les Comtes du Nord. Paris: Bureau du "Studio" a Paris, 1911     (autographed by Albert Kahn, 2/3/1922)   [vol. 65] 
 
Junghandel, Max and Gurlitt, Cornelius. Die Baukunst Spaniens, Vol. I. Dresden: Gilbers'sche Konigl. Hof-Verlagsbuchhandlung, undated     (autographed by Albert Kahn, 7/19/1928)   [vol. 6] 
 
Junghandel, Max and Gurlitt, Cornelius. Die Baukunst Spaniens, Vol. II. Dresden: Gilbers'sche Konigl. Hof-Verlagsbuchhandlung, undated     (autographed by Albert Kahn, 7/19/1928)   [vol. 7] 
 
Klauder, Charles Z. & Wise, Herbert C. College Architecture in America and Its Part in the Development of the Campus. New York: Charles Scribner's Sons, 1929     (autographed by Albert Kahn, 6/10/1929)   [vol. 73] 
 
L'Architecte: Revue Mensuelle de L'Art Architectural Ancien et Moderne, 6th Annee. Paris: Librairie Centrale des Beaux-Arts, 1911     (autographed by Albert Kahn)   [vol. 28] 
 
Lloyd, Nathaniel. Building Craftsmanship in Brick and Tile and in Stone Slates. Cambridge: The University Press, 1929     (autographed by Albert Kahn, 7/22/1929)   [vol. 61] 
 
Magonigle, H. Van Buren. The Nature, Practice and History of Art. New York: Charles Scribner's Sons, 1924     (autographed by Albert Kahn, 1924)   [vol. 70] 
 
Martinie, A. H. La Ferronnerie, 2nd Serie. Paris: Editions Albert Levy -- Librarie Centrale des Beaux-Arts, undated     [vol. 45] 
 
Mawson, Thomas H. Civic Art: Studies in Town Planning, Parks, Boulevards and Open Spaces. London: B. T. Batsford and New York: Chas. Scribner's Sons, 1911     (autographed by Albert Kahn, 10/1911)   [vol. 27] 
 
Meheut, Mathurin. La Plante Exotique. Paris: Ch. Massin et Cie, 1931     (inscribed by Mathurin Meheut: "A Monsieur et Madame Albert Kahn de Detroit, Hommage reconnaissant. Paris, Mai 31")   [vol. 33] 
 
Millar, Donald. Measured Drawings of Some Colonial and Georgian Houses, Vol. 3. New York: Architectural Book Publishing Co., Inc., 1930     (autographed by Albert Kahn, 9/29/30)   [vol. 21] 
 
Modern School Houses, Part II. New York: The American Architect, 1915     (autographed by Albert Kahn)   [vol. 55] 
 
Moretti, Bruno. Ospedali. Milan: Ulrico Hoepli Editore, 1935     (autographed by Albert Kahn, 12/1/1936)   [vol. 63] 
 
Mujica, Francisco. History of the Skyscraper. Paris: Archaeology & Architecture Press, 1929     (autographed by Albert Kahn, 5/25/1931)   [vol. 9] 
 
The Passports: Printed by Benjamin Franklin at His Passy Press. Ann Arbor: The William L. Clements Library, 1925     (inscribed by William L. Clements: "To my much esteemed friend Mr. Albert Kahn, who was an inspiration in the building of the William L. Clements Library, 3/23/1926")   [vol. 56] 
 
Pean, P. Jardins de France, Vol. I. Paris: A. Vincent, Editeur, 1925     [vol. 13] 
 
Pean, P. Jardins de France, Vol. II. Paris: A. Vincent, Editeur, 1925     (autographed by Albert Kahn, 1/25/1926)   [vol. 14] 
 
Phillipps, E. March. The Gardens of Italy. Bolton, Arthur T., ed., London: Offices of Country Life, Ltd., and George Newnes, Ltd., and New York: Charles Scribner's Sons, 1919     (autographed by Albert Kahn, 10/1920)   [vol. 39] 
 
Poulin, Roger, compiler. Hospitaux, Sanatoria. Paris: Vincent Freal et Cie, undated     (autographed by Albert Kahn, 9/29/1930)   [vol. 62] 
 
Poulin, Roger, compiler. Villas Modernes. Paris: Vincent Freal et Cie, undated     (autographed by Albert Kahn, 12/4/1930)   [vol. 59] 
 
Prentice, Andrew N. Renaissance Architecture and Ornament in Spain: A Series of Examples Selected from the Purest Works Executed between the Years 1500-1560. London: B. T. Batsford, 1893     (autographed by Albert Kahn)   [vol. 15] 
 
Roeper. Adalbert. Geschmiedete Gitter des XVI-XVIII Jahrhunderts aus Suddeutschland. Leipzig: A. Schumann's Verlag, undated     (autographed by Albert Kahn, 9/25/1924)   [vol. 23] 
 
Roussel, J. Palais de Fontainebleau. Paris: Armand Guerinet, Libraire-Editeur des Musees Nationaux, undated     (autographed by Albert Kahn)   [vol. 22] 
 
Ruggles, E. A. Small Stone Houses of the Cotswold District. Cleveland: J. H. Jansen, 1931     (autographed by Albert Kahn, 8/28/1931)   [vol. 35] 
 
Sloan, Raymond P. Hospital Color and Decoration. Chicago: Physicians' Record Company, 1944     [vol. 72] 
 
Small, Tunstall & Woodbridge, Christopher. English Wrought Ironwork of the Late 17th & Early 18th Centuries: A Portfolio of Full-Sized Details. London: The Architectural Press and New York: William Helburn, Inc., undated     (autographed by Albert Kahn, 3/2/1931)   [vol. 48] 
 
Soule, Charles C. How to Plan a Library Building for Library Work. Boston: The Boston Book Company, 1912     [vol. 71] 
 
Stevens, Edward F. The American Hospital of the Twentieth Century. New York: Architectural Record Publishing Company, 1918     (autographed by Albert Kahn)   [vol. 67] 
 
Tipping, H. Avray. English Gardens. London: Country Life, Ltd., and New York: Charles Scribner's Sons, 1925     (autographed by Albert Kahn)   [vol. 29] 
 
Totten, George Oakley. Maya Architecture. Washington, D. C.: The Maya Press, 1926     (autographed by Albert Kahn, 10/15/1927)   [vol. 25] 
 
Virette, Jean. La Cite Jardin. Paris: Editions S. de Bonadona, Librairie Nouvelle de l'Architecture et des Beaux-Arts, undated     (autographed by Albert Kahn, 10/4/1931)   [vol. 47] 
 
Weaver, Lawrence.Houses and Gardens by E. L. Lutyens. London: Offices of "Country Life" and George Newnes, Ltd., 1913     (autographed by Albert Kahn, 1914)   [vol. 41] 
 
Zoubaloff, Jacques. Clos Joli I -- Les Fleurs and Clos Joli II -- Les Fruits. Paris: Editions d'Art Charles Moreau, 1929     (two volumes autographed by Albert Kahn, 8/15/1929)   [vol. 43] 
 
Project Records [series]:

The heart of the Albert Kahn Papers is located in the Project Records series. A total of 7,417 original, architectural drawings by Kahn's firm are located in 32 flat-file storage drawers and 69 oversized tubes and are accessible to researchers for study. The meticulously detailed, ink-on-linen drawings are associated with 145 of Kahn's projects, and are organized for the most part in construction sets, with a few design development drawings available for some of the projects. The Bentley Library reference archivists will explain certain reproduction restrictions to researchers who wish to order duplications of drawings in hard copy or on CD. The drawings of a number of the 145 projects have been scanned.

The buildings represented in this collection of drawings range from Job #1, A. Dupont Residence (1896) to Job. No. 1888, Ford Motor Company Willow Run Bomber Plant (1941-1943). They include such industrial landmarks as Packard Motor Company Building No. 10, Ford Motor Company Highland Park Plant, Ford Motor Company River Rouge Eagle Shipbuilding Plant, Ford Motor Company River Rouge Glass Manufacturing Plant and the Amtorg Trading Company Stalingrad Tractor Plant. The drawings representing sections of these innovative factory buildings are especially illustrative of the pioneering structural design which revolutionized American industrial architecture. Elevations of the George G. Booth, Edsel and Eleanor Ford and James C. Couzens residences show the rich, historic, exterior detailing of Kahn's domestic architecture. His versatility with Italian Renaissance and Art Deco design styles in his institutional and commercial work is also beautifully illuminated in the construction drawings of, among others, the William L. Clements Library and at the University of Michigan and the Fisher Building in Detroit.

The original, ink-on-linen drawings in this series are arranged chronologically by building and often include the structural, mechanical and electrical drawings, as well as the architectural. Please note that the date, medium/support and dimensions of the documents within each of these sub-groups of drawings are described in their headings in the finding aid. Exceptions to these descriptive data are indicated next to each drawing in the list which follows the headings. A number of the larger projects include more than one building, as in the case of the Edsel and Eleanor Ford Residence (1926-1932), for which the drawings of the Gate Lodge, Heating Plant, Boat House, Dog Kennel and later Activities Building (1990-1991) are also available.

 
A. Dupont Residence, Detroit, Michigan,  1896, Job No. 1 [subseries]:
 
Construction Drawings,  undated (Black and red ink-on-linen drawings, 18-3/4x28 inches and 13-3/4x28 inches)
 
Architectural Drawings
Drawer   1 Folder   1
Foundation Plan (1)
Drawer   1 Folder   1
First Floor Plan (2)
Drawer   1 Folder   1
Second Floor Plan (3)
Drawer   1 Folder   1
Roof Plan (4)
Drawer   1 Folder   1
West Elevation (5)
Drawer   1 Folder   1
South Elevation (6)
Drawer   1 Folder   1
East Elevation (7)
Drawer   1 Folder   1
North Elevation (8)
Drawer   1 Folder   1
Elevations in Living Room and Cross Section thro' Main Part (9)
Drawer   1 Folder   1
Longitudinal Section (10)
 
Professor Edward DeMille Campbell Residence, Ann Arbor, Michigan,  1899, Job No. 12 [subseries]:
 
Construction Drawings by Nettleton and Kahn, Architects,  7/22/1899 (Ink-on-linen drawings, 18x26 inches)
 
Architectural Drawings
Drawer   8 Folder   1
Foundation Plan
Drawer   8 Folder   1
First Floor Plan
Drawer   8 Folder   1
Second Floor Plan
Drawer   8 Folder   1
Third Floor and Roof Plan
Drawer   8 Folder   1
West Elevation
Drawer   8 Folder   1
South Elevation
Drawer   8 Folder   1
North Elevation
Drawer   8 Folder   1
East Elevation
Drawer   8 Folder   1
Finish [Details] in Main Hall
Drawer   8 Folder   1
Inside Finish Details-Study, Living Room and Dining Room
Drawer   8 Folder   1
[Interior Elevations]-Pantry and China Closet Fittings
 
Sigma Phi House, University of Michigan, Ann Arbor,  undated, Job No. 66 [subseries]:
 
Construction Drawings,  undated (Black and orange ink-on-linen drawings, 22x34-3/4 to 22-1/2x35-1/2 inches except as noted)
 
Architectural Drawings
Drawer   8 Folder   3
Sub-Basement Plan (2)
Drawer   8 Folder   3
Basement Plan (3)
Drawer   8 Folder   3
First Floor Plan (4)
Drawer   8 Folder   3
Second Floor Plan (5)
Drawer   8 Folder   3
Third Floor Plan (6)
Drawer   8 Folder   3
Details of Inside Finish (7)
Drawer   8 Folder   3
Details of Inside Finish (8)
Drawer   8 Folder   3
West Elevation and Transverse Section through East Wing (9)
Drawer   8 Folder   3
East Elevation and Transverse Section (10)
Drawer   8 Folder   3
North Elevation (11)
Drawer   8 Folder   3
South Elevation (12)
Drawer   8 Folder   3
Detail of Front Elevation and Section thro' Front Wall (23-1/4x12 inches)
 
Temple Beth El, Detroit, Michigan,  1902, Jobs No. 89 and 136-A [subseries]:
 
Design Development Drawings (Set of Bonds) by George D. Mason and Albert Kahn, Architects,  undated (Ink-on-linen drawings)
Drawer   1 Folder   2
Elevation of Large Window on South Side of Temple Beth El (27x14 inches)
Drawer   1 Folder   2
Plan of Locker and Shower Rooms (12x14 inches)
Drawer   1 Folder   2
[Foundation Plan], untitled (13x16 inches)
Drawer   1 Folder   2
Heating Plan (Two drawings, 26x14 inches)
Drawer   1 Folder   2
Heating Plan for Temple Beth El Showing Mechanical Hot Air System of The Bryce Heating & Ventilating Co., Toledo Ohio (13x26 inches)
 
Design Development Drawings (Set of Bonds),  undated (Ink-on-linen drawings)
Drawer   1 Folder   2
Foundation and Basement Plan (1) (30x18 inches)
Drawer   1 Folder   2
First Floor Plan (2) (28x17 inches)
Drawer   1 Folder   2
Second Floor Plan (3) (26x17 inches)
Drawer   1 Folder   2
Roof Plan (4) (27x17 inches)
Drawer   1 Folder   2
Front and Rear Elevations (5) (16x28 inches)
Drawer   1 Folder   2
North Side Elevation (6) (17x26 inches)
Drawer   1 Folder   2
South Side Elevation (7) (16x27 inches)
Drawer   1 Folder   2
Detail of Front Entrance (8) (30x18 inches)
Drawer   1 Folder   2
Longitudinal Section on Line J-J Looking North (9) (17x30 inches)
Drawer   1 Folder   2
Sections thro' Lines E-E, G-G and H-H Looking East (10) (32x16 inches)
Drawer   1 Folder   2
Detail of Platform, Tabernacle Choir Gallery, etc., Detail of Skylight in Main Ceiling, and Section on Line A-A (11) (18x32 inches)
Drawer   1 Folder   2
Interior Details (12) (18x27 inches)
Drawer   1 Folder   2
Half-Elevation of Dome Trusses and Section of Side Walls of Dome, Detail Showing Support of Purlins at Top Joints, and Section thro' Corner of Dome (13) (27x18 inches)
Drawer   1 Folder   2
Plan of Dome (14) (27x18 inches)
 
Construction Drawings (Ink-on-linen drawings)
 
Architectural Drawings
Drawer   1 Folder   3
Detail of Rear Stairs, Rear Entrance Doors, Frames, Sash, Glass, Partitions and Cupboards (13) by Albert Kahn, Architect     (date not visible due to linen damage)  (29x48-3/4 inches)
Drawer   1 Folder   3
Plaster Details of Auditorium (20) by Mason & Kahn, Architects (20),  10/24/1902 (37x33-3/4 inches)
Drawer   1 Folder   3
Diagram Showing Plan and Profiles of Dome Ceiling (20),  undated (28x35-1/2 inches)
Drawer   1 Folder   3
[Plan] (23), untitled, by Albert Kahn, Architect,  undated (28x18 inches)
Drawer   1 Folder   3
Plaster Details of Auditorium (89) by Mason & Kahn, Architects,  10/17/1902 (40x29 inches)
Drawer   1 Folder   3
Plan of Auditorium and Sections on Lines A, B, C, D and E (Job No. 136-A)     (date not visible due to linen damage)  (23x47 inches)
Drawer   1 Folder   3
Alterations to Temple Beth El (2) by Albert Kahn, Architect (Job 136-A),  9/22/1902 (Pencil-on-vellum drawing, 23-1/2x30 inches)
 
Engineering Building, University of Michigan, Ann Arbor, Michigan,  1902-03 and  1908-1910, Job No. 145, 145A & 145B [subseries]:
 
Engineering Building (Job No. 145)
 
Design Development Drawings (Block Plans) by Mason & Kahn Architects,  undated (Ink-on-linen drawings, 27-1/2x39 to 27-1/2/x42 inches)
Drawer   3 Folder   10
Ground Floor Plan
Drawer   3 Folder   10
Second Floor Plan (Two drawings)
Drawer   3 Folder   10
Third Floor Plan
Drawer   3 Folder   10
Roof Plan
 
Construction Drawings by Mason & Kahn Architects,  undated (Ink and colored pencil drawings on linen, some with pencil notations, 27-3/4x440 to 29-3/4x43 inches)
 
Architectural Drawings
Drawer   3 Folder   10
Foundation Plan (1)
Drawer   3 Folder   10
Ground Floor Plan (2)
Drawer   3 Folder   10
Second Floor Plan (3), revised  4/1/1903
Drawer   3 Folder   10
Third Floor Plan (4), revised  4/1/1903
Drawer   3 Folder   10
Fourth Floor Plan (5), revisd  4/1/1903
Drawer   3 Folder   10
Roof Plan (6), revised  4/1/1903
Drawer   3 Folder   10
Elevations of South Wing and Center Pavilion (7)
Drawer   3 Folder   10
Elevations and Cross-Sections (8)
Drawer   3 Folder   10
Elevations and Cross-Section (9)
Drawer   3 Folder   10
Fourth Floor Plan by Albert Kahn, architect (10),  3/24/1903
Drawer   3 Folder   10
Details of Interior Finish (10)
Drawer   3 Folder   10
Detail of Main Stairs and Brick and Wood Details (11)
Drawer   3 Folder   10
Details of Steel Work (12)
Drawer   3 Folder   10
Roof Framing Plan (13)
Drawer   3 Folder   10
Detail of Stone and Brick Work in Archway (23)
Drawer   3 Folder   10
Details of Cupola, Interiors, Dormers and Boiler House Clere Story (28), discarded  2/26/1903
Drawer   3 Folder   10
Plan Showing Method of Determining Present Position of Wall (35) (14x22-1/2 inches)
Drawer   3 Folder   11
Elevations and Plan of Stacks, South Extension (37) (24-1/2x29-1/4 inches)
Drawer   3 Folder   11
Elevation and Plan of Stacks, South Extension, by Albert Kahn, Architect (37 Revised),  3/24/1903 revised  4/4/1903 (28-3/4x29 inches)
Drawer   3 Folder   11
Elevations and Plans of Stacks (38),  2/26/1903 completed  4/4/1903 (25x34-1/2 inches)
Drawer   3 Folder   11
Revised Brick and Wood Details (39),  9/16/1902
Drawer   3 Folder   11
Brick and Wood Details of Tower and Detail of Windows and Door at East Wing Stairs (44),  9/16/1902 revised  11/25/1902 (23x29 inches)
Drawer   3 Folder   11
Revised Plan of Center Pavilion, Ground Floor (46) (19x18-1/2 inches)
Drawer   3 Folder   11
Revised Plan of Center Pavilion, Fourth Floor (49) (19x18 inches)
Drawer   3 Folder   11
Ground Floor Plan (53),  11/17/1902 revised  12/30/1902
Drawer   3 Folder   11
Second Floor Plan (54),  11/17/1902 revised  12/30/1902
Drawer   3 Folder   11
Third Floor Plan (55),  11/17/1902 revised  12/30/1902
Drawer   3 Folder   11
Fourth Floor Plan (56),  11/17/1902 revised  12/30/1902
Drawer   3 Folder   11
Detail of Main Stairs (60),  11/18/1902 (27-1/4x23-1/4 inches)
Drawer   3 Folder   11
Revised Second Floor Plan of North Wing (91),  1/22/1903 (20x17-1/2 inches)
Drawer   3 Folder   11
Plans, Elevations and Sections of Boiler Room (96),  12/1902 (25x36 inches)
Drawer   3 Folder   11
Typical Interior Trim Details (99),  2/28/1903     ("Albert Kahn Architect in Charge" notation) 
Drawer   3 Folder   11
Plans, Elevations and Sections of Tower (102),  3/17/1903
Drawer   3 Folder   11
Details of Dormers (114),  4/14/1903 (28x53 inches)
Drawer   3 Folder   11
Detail of Entrance Doors and Lobby (119),  4/13/1903 (11x27-1/4 inches)
Drawer   3 Folder   11
Revised Plan of General Toilet, Locker Room, etc. (131),  9/1/1903 (19-1/4x29 inches)
Drawer   3 Folder   11
Interior Finish in Faculty and Secretary's Room and Studies (134),  9/17/1903 (25-1/2x26-1/4 inches)
Drawer   3 Folder   11
Ammended Plan of Library (139) (25x33-3/4 inches)
Drawer   3 Folder   11
Ammended Detail of Finish in Library (139) (25x33-3/4 inches)
Drawer   3 Folder   11
Archway in Centre Pavilion (10-1/2x38-1/2 inches)
 
Addition to Engineering Building (1908-1910) Job No. 145-A
 
Construction Drawings by Albert Kahn Architect, Ernest Wilby Associate
 
Architectural Drawings,  undated (Ink-on-linen drawings, 27x34 inches, except as noted)
Drawer   3 Folder   12
Foundation Plan (1),  9/9/1908 revised  8/11/1909
Drawer   3 Folder   12
Plot Plan (1-A)
Drawer   3 Folder   12
First Floor Plan (2), revised  4/20/1910
Drawer   3 Folder   12
Second Floor Plan (3), revised  9/20/1909
Drawer   3 Folder   12
Third Floor Plan (4), revised  4/20/1910
Drawer   3 Folder   12
Fourth Floor Plan (5), revised  4/20/1910
Drawer   3 Folder   12
Roof Plan and Details (6), revised  5/4/1909
Drawer   3 Folder   12
Longitudal Sections (7)
Drawer   3 Folder   12
Transverse Section and Details of Dormers and Doors (8)
Drawer   3 Folder   12
North and East Elevations (9), revised  5/4/1909
Drawer   3 Folder   12
South and West Elevations (10), revised  5/4/1909
Drawer   3 Folder   12
Section thro' Stairs and Details of Stairs(11)
Drawer   3 Folder   12
Interior Details (12)
Drawer   3 Folder   12
Details of Columns and Stairs in North Wing (13)
Drawer   3 Folder   12
Typical Detail of East Elevation (14)
Drawer   3 Folder   12
Typical Details of West and North Elevations (15)
Drawer   3 Folder   12
Typical Detail of Window Frames (16)
Drawer   3 Folder   12
Roof Framing Plan (17), revised  5/4/1909
Drawer   3 Folder   12
Riser Diagrams, West, North and East Walls (18)
Drawer   3 Folder   12
Riser Diagram, West and South Walls, and Detail of Typical Vent Air Register (19)
Drawer   3 Folder   12
Sections "D-D" and "E-E" thro' Fan Room (20)
Drawer   3 Folder   12
Revised Second Floor Plan (29),  4/21/1909 (11-1/4x15-1/4 inches)
 
Heating and Ventilating Plans by H. C. Anderson, Engineer,  undated (Ink-on-linen drawings with pencil notations, 24x34 inches)
Drawer   3 Folder   13
First Floor Plan (1),  6/29/1909
Drawer   3 Folder   13
Second Floor Plan (2)
Drawer   3 Folder   13
Third Floor Plan (3)
Drawer   3 Folder   13
Fourth Floor Plan (4)
Drawer   3 Folder   13
Riser Diagrams, North and East Walls (5)
Drawer   3 Folder   13
Riser Diagram, South and West Walls (6)
Drawer   3 Folder   13
Sections "R-R" and "B-B" (7)
 
Alterations to Library, Engineering Building (1910) Job No. 145-B
 
Architectural Construction Drawing by Albert Kahn, Architect, Ernest Wilby, Associate,  8/9/1910 (Ink-on-linen drawing, 17x21 inches)
Drawer   3 Folder   13
Alterations to Library, Second Floor (1)
 
Delta Upsilon House, University of Michigan, Ann Arbor (1902-1903) Job No. 173 [subseries]:
 
Construction Drawings by Albert Kahn, Architect,  10/18/1902 (Black and red ink, pencil and red pencil drawings on linen, 22x28-1/2 inches)
 
Architectural Drawings
Drawer   8 Folder   2
Basement Plan (1)
Drawer   8 Folder   2
Revised Basement Plan (1),  2/3/1903
Drawer   8 Folder   2
First Floor Plan (2)
Drawer   8 Folder   2
First Floor Plan (2),  4/9/1903 (18x30-1/4 inches)
Drawer   8 Folder   2
Second Floor Plan (3)
Drawer   8 Folder   2
Second Floor Plan (3),  4/9/1903 (18x28-1/2 inches)
Drawer   8 Folder   2
Third Floor Plan (4)
Drawer   8 Folder   2
Third Floor Plan (4),  4/9/1903 (18x28-1/2 inches)
Drawer   8 Folder   2
Front Elevation (5)
Drawer   8 Folder   2
West Elevation (6)
Drawer   8 Folder   2
East Elevation (7)
Drawer   8 Folder   2
Rear Elevation (8)
Drawer   8 Folder   2
Transverse Section and Detail of Interior Finish in General (9)
Drawer   8 Folder   2
Details of Interior Finish (10)
Drawer   8 Folder   2
Basement Plan (Revised 11),  11/26/1902 (15x25 inches)
Drawer   8 Folder   2
First and Second Floor Plans (Revised 12),  2/3/1903 (15x25 inches)
Drawer   8 Folder   2
Third Floor Plan (Revised 13),  11/26/1902 (15x25 inches)
Drawer   8 Folder   2
Rear and East Elevations (Revised 14),  2/3/1903 (15x25 inches)
Drawer   8 Folder   2
Exterior Details
Drawer   8 Folder   2
Exterior Details (18),  4/17/1903 (23x36 inches)
Drawer   8 Folder   2
Basement, First Floor, Second Floor and Attic Plans (19),  1/14/1903 (21-3/4x38 inches)
 
Packard Motor Company Factory Addition, Building Number 10, Detroit, Michigan,  1905-1909, Job No. 277 [subseries]:
 
Construction Drawings by Albert Kahn, Architect, Ernest Wilby, Associate,  10/25/1905 (Ink-on-linen drawings with pencil notations, 20-1/4x26 inches)
 
Architectural Drawings
Drawer   1 Folder   4
Foundation Plan (1), revised  12/16/1909
Drawer   1 Folder   4
First Floor Plan (2), revised  2/16/1909
Drawer   1 Folder   4
Second Floor Plan (3), revised  12/16/1909
Drawer   1 Folder   4
North and South Elevations (4)
Drawer   1 Folder   4
East and Court Elevations and Transverse and Typical Detail Sections (5)
Drawer   1 Folder   4
Revised Drawing of Fan Room and Air Flues (10),  11/22/1905 (15x23 inches)
Drawer   1 Folder   4
Revised Drawing of Floor Construction for Fan Room (12),  12/12/1905 (15-1/4x20 inches)
 
Packard Motor Company Factory Addition, Building Number 11, Detroit, Michigan,  1906, Job No. 289 [subseries]:
 
Construction Drawings by Albert Kahn, Architect, Ernest Wilby, Associate,  undated (Ink-on-linen drawings with pencil notations, 16-3/4x45-1/2 inches)
 
Architectural Drawings
Drawer   1 Folder   5
Foundation Plan of Section A (1),  4/10/1906
Drawer   1 Folder   5
Foundation and First Floor Plans of Section B (2)
Drawer   1 Folder   5
Plot Plan of Buildings 10, 11 and 12 Showing Columns and Conductors and Third Floor Plan of Section B, Building No. 11 (2) (17x47 inches)
Drawer   1 Folder   5
Foundation Plan of Section C (3)
Drawer   1 Folder   5
First Floor Plan of Section A (4)
Drawer   1 Folder   5
First Floor Plan of Section C (5)
Drawer   1 Folder   5
Secdong Floor Plan of Section A (6)
Drawer   1 Folder   5
Second Floor Plan of Section C (7)
Drawer   1 Folder   5
Second Floor Plan of Section B and East Elevation of Section A and B (8)
Drawer   1 Folder   5
Roof Plan, End Elevation of Section C, Section thro' Elevator Shaft Passage and Toilet Room, and Details (9)
Drawer   1 Folder   5
North and South Elevations of Section B, Transverse Section of Section B and Details (10)
Drawer   1 Folder   5
East and West Elevations of Section C (11) (17-3/4x45-1/2 inches)
Drawer   1 Folder   5
Block Plan (12)
Drawer   1 Folder   5
Block Plan (12) (17-1/2x33-1/4 inches)
Drawer   1 Folder   5
Typical Details of Coil and Connections, Fan Room, Riser Connections and Heating Ducts (13) (17-3/4x45 inches)
Drawer   1 Folder   5
Plan, Elevations and Sections of Bridge #2 between Old Buildings (20),  6/21/1906 &  6/29/1906 (Two drawings, 16x31-3/4)
Drawer   1 Folder   5
Plan, Elevations and Sections of Bridge #3 (21),  6/28/1906 (13-1/2x35 inches)
 
Packard Motor Car Company Forge Building, Detroit, Michigan,  1910, Job No. 201-A-N [subseries]:
 
Construction Drawings by Albert Kahn, Architect, Ernest Wilby, Associate,  1/15/1910 (Ink-on-linen drawings, 30x40 inches)
 
Architectural Drawings
Drawer   1 Folder   6
Foundation Plans, Sections A and B (1)
Drawer   1 Folder   6
First Floor Plans, Sections A and B (2)
Drawer   1 Folder   6
Roof Plans, Sections A and B (3)
Drawer   1 Folder   6
Second Floor Plan, East Elevation-Section B, South Elevation and Transverse Section (4)
Drawer   1 Folder   6
East Elevation-Section A and West Elevations-Section B (5)
Drawer   1 Folder   6
North Elevations and Transverse and Longitudinal Sections (6)
Drawer   1 Folder   6
Plot Plan, Detail of Interior Steel Columns in Stamping Room and Sections thru' Hammer Foundations (8),  1/26/1910
 
Albert Kahn Residence, Detroit, Michigan,  1906 and  1921-1928, Job No. 293 and 293-E, F & G [subseries]:
 
Albert Kahn Residence (Job No. 293)
 
Architectural Construction Drawings,  undated (Ink-on-linen drawings with pencil revisions, 17-1/2x25 to 23x31 inches)
Drawer   1 Folder   7
Basement Plan (1), Heating revised  9/11/1906
Drawer   1 Folder   7
First Floor Plan (2), Heating revised  9/11/1906
Drawer   1 Folder   7
Second Floor Plan (3)
Drawer   1 Folder   7
Attic and Roof Plan (4)
Drawer   1 Folder   7
Front Elevation (5)
Drawer   1 Folder   7
Rear Elevation (6)
Drawer   1 Folder   7
West Elevation (7)
Drawer   1 Folder   7
East Elevation (8)
Drawer   1 Folder   7
Transverse Section (9)
Drawer   1 Folder   7
Plan and Elevations of Terrace and Garden Enclosure (10)
Drawer   1 Folder   7
Plan and Elevations of Living Room Porch (41)
Drawer   1 Folder   7
Details of Vestibule and Main Hall (43)
Drawer   1 Folder   7
Details of Butler's Pantry and New Porch Addition (44)
Drawer   1 Folder   7
Dining Room, Den and Living Room Mantel Elevations (45)
Drawer   1 Folder   7
Details of Closets and Pantry Fittings (47), 10/9/1906
 
Gallery and Garage Addition to Residence for Mr. Albert Kahn by Albert Kahn, Inc., Architects (Job No. 293-F)
 
Architectural Construction Drawings,  6/8/1928 (Black and green ink and pencil drawings on vellum and tracing paper, 13x17 to 24-1/2x35-1/2 inches)
Drawer   1 Folder   8
First Floor Plan (2), revised  8/21/1928
Drawer   1 Folder   8
Second Floor and Roof Plan (3), revised  8/20/1928
Drawer   1 Folder   8
John R. Street Elevation (4), revised  9/14/1928
Drawer   1 Folder   8
East Elevation and Sections (5), revised  8/8/1928
Drawer   1 Folder   8
Sections "AA" and "BB" (6), revised  9/4/1928
Drawer   1 Folder   8
Garage Elevations and Details, revised  8/8/1928     (not numbered due to paper damage) 
Drawer   1 Folder   8
Detail of Paneling and Mantel and Section thru' Fireplace (9),  7/10/1928 revised  8/27/1928
Drawer   1 Folder   8
Ceiling Plan (10),  7/14/1928 revised  8/22/1928
Drawer   1 Folder   8
Revised Detail of Dining Room Bay (11),  8/15/1928 revised  8/16/1928
Drawer   1 Folder   8
Plan of Hearth in Gallery (12),  8/27/1928
Drawer   1 Folder   8
Detail of Paneling in Dining Room and Bay (13),  8/28/1928 revised  8/31/1928
Drawer   1 Folder   8
Elevations of Gallery Interiors Showing Revised Wood Cornice (14)     (undated due to paper damage) 
Drawer   1 Folder   8
Gallery Floor Pattern (50)     (undated due to paper damage) 
Drawer   1 Folder   8
Elevations of Gallery Interiors     (not numbered or dated due to paper damage) 
 
Mechanical Construction Drawings (Green and black ink drawing on vellum, 24-1/2x32-3/4 inches)
Drawer   1 Folder   8
Foundation Plan (1ME)     (undated due to paper damage) 
 
Alterations to Residence of Mr. Albert Kahn (Job No. 293-E)
 
Architectural Construction Drawing,  9/2/1921 (Pencil-on-vellum drawings)
Drawer   1 Folder   9
Details of Cupboards and Cabinets (48) (21-1/2x27 inches)
Drawer   1 Folder   9
Plan, Elevations and Sections of Second Floor Addition     (not numbered or dated due to paper damage)  (17-1/4x27 inches)
 
Alterations to Residence of Mr. Albert Kahn (Job No. 293-G)
 
Architectural Construction Drawing,  6/28/1928 (Pencil drawing on tracing paper, 19-3/4x28-1/4 inches)
Drawer   1 Folder   9
Detail of Wood Bookcase in Third Floor Bedroom (1)
 
George G. Booth Residence at Cranbrook, Birmingham, Michigan,  1907-1908 &  1913-1923, Jobs No. 333 & 333-A, B, D-K [subseries]:
 
George G. Booth Residence by Albert Kahn, Architect, Ernest Wilby, Associate (Job No. 333)
 
Survey Document by Mason L. Brown & Co., Civil Engineers, Detroit,  undated (Red, yellow and black ink drawing on linen, 31x37-1/2 inches)
Drawer   1 Folder   10
Contour Map of Proposed Residence Site for G. G. Booth, Esq., at Cranbrook
 
Architectural Construction Drawings,  undated (Ink-on-linen drawings, 23x46)
Drawer   1 Folder   10
Basement Plan (1),  4/1/1907 revised  6/28/1907
Drawer   1 Folder   10
Basement Piping Plan (1A), revised  7/23/1907
Drawer   1 Folder   10
First Floor Plan (2), revised  1/6/1908
Drawer   1 Folder   10
Second Floor Plan (3), revised  4/11/1908
Drawer   1 Folder   10
Third Floor and Roof Plan (4), revised  1/28/1908
Drawer   1 Folder   10
Sections on Lines A-B and C-D (5), revised  6/5/1907
Drawer   1 Folder   10
South Elevation (6), revised  1/6/1908
Drawer   1 Folder   10
North Elevation (7)
Drawer   1 Folder   10
East and West Elevations and Section thro' Rear Stairs (8), revised  6/5/1907
Drawer   1 Folder   10
Plan of Retaining Walls and Out-Buildings (9), revised  3/2/1908 (30x33-1/2 inches)
Drawer   1 Folder   10
Elevations and Sections of Garage and Out-Buildings (10), revised 10/8/1907 (26x33-1/2 inches)
Drawer   1 Folder   10
Details of Wardrobes, Linen Closet, Laundry Cupboard, Butler's and Kitchen Pantries, and Window and Door Trim, etc. (11) (22-3/4x27-1/2 inches)
Drawer   1 Folder   10
Plans of Revised Portion of Second and Third Floors and Roof (15), revised  6/7/1907 (22-1/2x33 inches)
Drawer   1 Folder   10
Front Elevation and Window Elevations Showing Stonework (19),  6/11/1907 revised  6/20/1907 (18-1/2x27-1/2 inches)
Drawer   1 Folder   10
Layout of Terrace (134) (26x26 inches)
Drawer   1 Folder   10
Plan and Details of Junk Garden and Terrace (135) (21-1/2x14 inches)
 
Cottage for Gardener for George Booth Residence by Albert Kahn, Architect, Ernest Wilby, Associate (Job No. 333-A)
 
Architectural Construction Drawings,  undated (Ink-on-linen drawings, 12x25-1/4 inches)
Drawer   1 Folder   11
Foundation and First Floor Plans (1),  3/28/1908
Drawer   1 Folder   11
Attic and Roof Plan and Section (2)
Drawer   1 Folder   11
South and East Elevations (3)
Drawer   1 Folder   11
North and West Elevations (4)
 
Water Tower for George Booth Residence by Albert Kahn, Architect, Ernest Wilby, Associate (Job No. 333-B)
 
Architectural Construction Drawing,  8/3/1908 (Ink-on-linen drawing, 33-1/2x22-1/2 inches)
Drawer   1 Folder   11
Plans and Details of Water Tower (1)
 
Addition to Water Tower for George Booth Residence by Albert Kahn, Architect, Ernest Wilby, Associate (Job No. 333-D)
 
Architectural Construction Drawing,  7/17/1913 (Ink-on-linen drawing, 24-1/4x23 inches)
Drawer   1 Folder   11
Plans and Elevations (1)
 
Addition to Residence for George Booth by Albert Kahn, Architect (Job No. 333-E)
 
Architectural Construction Drawings,  2/25/1918 (Ink-on-linen drawings with blue pencil revisions, 25-3/4x42-1/4 to 24-3/4x46 inches)
Drawer   1 Folder   11
Basement Plan (1), revised  7/11/1918
Drawer   1 Folder   11
First Floor Plan (2), revised  8/27/1918
Drawer   1 Folder   11
Roof Plan (3), revised  3/4/1918
Drawer   1 Folder   11
East Elevation (4), revised  6/20/1918
Drawer   1 Folder   11
West and South Elevations (5), revised  4/2/1918
Drawer   1 Folder   11
Sections (6), revised  4/2/1918
Drawer   1 Folder   11
Details of Library (7), revised  3/4/1918
Drawer   1 Folder   11
Details of Sun Room, Office and Work Room, and Hall and Work Room (8), revised  4/2/1918
Drawer   1 Folder   11
Detail of Tile Radiator Enclosure in Sun Room (27),  10/15/1918 (18-1/4x18-1/2 inches)
 
Mechanical Construction Drawings (Ink-on-linen drawings)
Drawer   1 Folder   11
Basement Plan (1M),  2/26/1918 revised  7/11/1918 (25-3/4x45-1/2 inches)
Drawer   1 Folder   11
Sun Room Plan and Sections -- Heating System (2M),  12/31/1918 (17x30 inches)
 
Addition to Residence for George Booth by Albert Kahn, Architect (Job No. 333-F)
 
Architectural Construction Drawings,  6/19/1918 (Ink-on-linen drawings with blue pencil revisions, 18-1/4x30-1/4 inches)
Drawer   1 Folder   12
Basement Plan (1), revised  7/11/1918
Drawer   1 Folder   12
First Floor Plan (2), revised  8/8/1918
Drawer   1 Folder   12
Second Floor Plan (3), revised  7/11/1918
Drawer   1 Folder   12
Third Floor Plan (4), revised  6/29/1918
Drawer   1 Folder   12
West and North Elevations (5), revised  8/8/1918
Drawer   1 Folder   12
South Elevation and Section thro' Porch on Line A-A (6), revised  8/8/1918
Drawer   1 Folder   12
East Elevation of Dormer for Alcove, Section thro' Porch on Line B-B and Detail of Overhang at Bay (7), revised  8/8/1918
Drawer   1 Folder   12
Details of Hall #37 and Main Stairs to Third Floor (8),  undated
Drawer   1 Folder   12
Interior Details of Chamber #30 (9), undated, revised  9/14/1918
Drawer   1 Folder   12
Interior Details of Dressing Rooms #32 & 35 (10), undated, revised  2/28/1919
Drawer   1 Folder   12
Interior Details of Chamber #33 (11), undated, revised  9/14/1918
Drawer   1 Folder   12
Details of Chamber #33 (12),  undated
Drawer   1 Folder   12
Details of Chamber #33 (12R),  9/13/1918 revised  9/26/1918
Drawer   1 Folder   12
Details of Baths #31 & 36 (13R), undated, revised  9/13/1918
Drawer   1 Folder   12
Interior Details of Porch (14),  undated
Drawer   1 Folder   12
Interior Details of Hall #37 (15),  undated
Drawer   1 Folder   12
South and East Elevations (16),  9/11/1918 revised  11/21/1918
Drawer   1 Folder   12
Details of Fountain Basin (17),  10/24/1918 revised  11/30/1918
 
Additions to Residence for George Booth by Albert Kahn, Architect, Ernest Wilby, Associate (Job No. 333-G)
 
Architectural Construction Drawing,  August 1918 (Ink-on-linen drawing, 26-1/4x45-3/4 inches)
Drawer   1 Folder   13
Basement Plan and Terrace Wall Details (1), revised  1/10/1919
 
Alterations and Additions to Service Wing of Residence for George Booth by Albert Kahn, Architect and Ernest Wilby, Associate (Job No. 333-H)
 
Architectural Construction Drawings, undated, revised  1/4/1922 (Ink-on-linen drawings, 28-1/2x35 inches)
Drawer   1 Folder   13
Basement Plan (1)     (not revised) 
Drawer   1 Folder   13
First Floor Plan (2)
Drawer   1 Folder   13
Second Floor Plan (3)
Drawer   1 Folder   13
Third Floor and Roof Plan and Section thro' Common Room Wing (4)
Drawer   1 Folder   13
South Elevation (5)
Drawer   1 Folder   13
West and South Elevations of Common Room Wing (6)
Drawer   1 Folder   13
East Elevation (7)
Drawer   1 Folder   13
North Elevation (8)     (not revised) 
Drawer   1 Folder   13
Interior Elevations and Sections (9)
Drawer   1 Folder   13
Interior Elevations (10)
Drawer   1 Folder   13
Common Room Details (125),  9/5/1919
 
Mechanical Construction Drawing,  4/28/1919 (Ink-on-linen drawing, 27-3/4x34-1/2 inches)
Drawer   1 Folder   13
Basement Plan (2M)
 
Alterations to Residence for George Booth by Albert Kahn, Architect (Job No. 333-J)
 
Architectural Construction Drawings (Pencil-on-vellum drawings)
Drawer   1 Folder   13
Detail of Bookcases (1), 11/7/1923 (21-3/4x18-1/2 inches)
Drawer   1 Folder   13
Detail of Balustrade for North Terrace (2),  11/15/1923 (26-3/4x21 inches)
 
Alterations to Bath Rooms for Residence of George Booth by Albert Kahn, Architect (Job No. 333-K)
 
Architectural Construction Drawing, 12/6/1923 (Pencil and red pencil drawing on vellum, 23-1/2x33-3/4 inches)
Drawer   1 Folder   13
Plans and Elevations of Guest Room Bath and Bath Rooms #37 & 41 (1), revised  1/9/1924
 
Additions to Residence for George Booth by Albert Kahn, Architect (Job No. 333-I)
 
Mechanical Construction Drawings,  12/12/1922 (Ink-on-linen drawings, 30x49 inches)
Drawer   1 Folder   14
Basement Plan (1M)
Drawer   1 Folder   14
First Floor Plan (2)
Drawer   1 Folder   14
Second Floor Plan (3)
Drawer   1 Folder   14
Third Floor Plan (4)
 
Ford Motor Company, Highland Park Plant, Michigan,  1908-1909, Job No. 375 [subseries]:
 
Construction Drawings by Albert Kahn, Architect, Ernest Wilby, Associate,  undated (Ink-on-linen drawings, 33x63 inches)
 
Architectural Drawings
Tube 1  
Plot Plan (Two drawings, 33x47 inches and 33x39 inches)
Tube 1  
Foundation Plan, North and South Halves (1), revised  9/8/1908 Heating revised  9/29/1909
Tube 1  
First Floor Plan, North and South Halves (2), revised  9/8/1908 Heating revised  9/29/1909
Tube 1  
Second Floor Plan, North and South Halves (3), revised  9/8/1908 Heating revised  9/29/1909 (One drawing and one electrostatic print)
Tube 1  
Third Floor Plan, North and South Halves (4), Heating revised  9/29/1909
Tube 1  
Fourth Floor Plan, North and South Halves (5), Heating revised  9/29/1909
Tube 1  
Roof Plan, North and South Halves (6)
Tube 1  
Front Elevation, North and South Halves (7) (One drawing and one electrostatic print)
Tube 1  
Transverse Section, Part Longitudinal Section, Section thru' Platform and Reservoir, Section A-A, and North and South Elevations (8), revised  9/14/1908 (One drawing and one electrostatic print)
Tube 1  
Rear Elevation, North and South Halves (9)
Tube 1  
Exterior Details of North and West Elevations (10) (One drawing and one electrostatic print)
Tube 1  
Details of Rear Wall and Doors, Plans of Stairs and Section thru' Stairs (11)
Tube 1  
Typical Detail for Windows with Plank Frames, Typical Double-Hung Windows in 8" HB Walls, Section thru' Elevator Shafts #1, #2 and #5 and Typical Interior Columns (12)
Tube 1  
First Floor Plan Showing Steel Frame, Front Elevation Showing Steel Frame of West Elevation and Typical Details of Steel Frame (13), revised  7/15/1908
Tube 1  
Elevation, Section and Details of Ford Motor Company Sign (27),  5/22/1909 (34x24 inches)
 
Ford Motor Company Power Building, Highland Park, Michigan,  1909, Job No. 375-A [subseries]:
 
Construction Drawings by Albert Kahn, Architect, Ernest Wilby, Associate (Ink-on-linen drawings, 23x29 inches)
 
Architectural Drawings
Drawer   2 Folder   1
Plans of Foundation and Drainage, First Floor and Roof, and Transverse Section (1),  4/15/1909 revised  8/25/1909
Drawer   2 Folder   1
North, South and West Elevations, Detail of Iron Stairs and Detail of Steel Girders, Brackets and Columns (2),  4/15/1909
Drawer   2 Folder   1
Plans and Elevations of North and South Doors, Sections A-A, B-B & C-C and Plan and Elevation of Corner Pier (3),  4/15/1909
Drawer   2 Folder   1
Revised Elevations and Section-This Sheet to Supersede Parts of Sheets No. 1 & No. 2 (12),  7/13/1909
Drawer   2 Folder   1
Revised Exterior Detail-This Sheet to Supersede Sheet No. 3 (13),  7/10/1909
Drawer   2 Folder   1
Plan, Elevations and Section A-A of Engine Foundations (14),  6/18/1909 revised  7/8/1909 (28 x 39 inches)
 
Ford Motor Company Administration Building, Highland Park, Michigan,  1909-1910, Job No. 375-D [subseries]:
 
Construction Drawings by Albert Kahn, Architect, Ernest Wilby, Associate (Ink-on-linen drawings, 28x44 inches)
 
Architectural Drawings
Drawer   2 Folder   2
Plot Plan (1),  2/12/1910 revised  6/24/1910
Drawer   2 Folder   2
Interior Finish, Basement Plan (1-A), 18x44 inches,  8/2/1910
Drawer   2 Folder   2
Plans and Sections of Tunnel between Power and Main Building and of Hose and Hydrant House (1-B),  7/26/1909 (17x21 inches)
Drawer   2 Folder   2
Foundation and Basement Plans (2),  2/12/1910 revised  7/12/1910
Drawer   2 Folder   2
First Floor Plan (2-A),  8/12/1910 (18x44 inches)
Drawer   2 Folder   2
First and Second Floor Plans (3)     (date not visible due to linen damage) 
Drawer   2 Folder   2
Second Floor Plan (3-A),  8/12/1910 (18x44 inches)
Drawer   2 Folder   2
Roof Plan, North and South Elevations and Sections (4),  2/12/1910
Drawer   2 Folder   2
Details of Room #105, Vestibule and North and South Stairs (5-A),  8/12/1910 (18x44 inches)
Drawer   2 Folder   2
Detail of End Bay-West Elevation, Detail of Main Entrance, and Typical Riser Diagram and Radiator Connections (6),  2/12/1910
Drawer   2 Folder   2
North Elevation of Lobby and Section thru' Stair Landing (6-A),  8/12/1910 (18x44 inches)
Drawer   2 Folder   2
Typical Details for Windows on North and South Elevations and Typical Details of North and South Elevation-Corner Bay (7),  2/12/1910
Drawer   2 Folder   2
Typical Detail of First and Second Story Partitions and Detail of Blind Windows, Door and Cast Iron Stairs (7-A),  8/12/1910 (18x44 inches)
Drawer   2 Folder   2
Detail of Entrance-East Elevation, and Elevation and Detail of Rear End Bay (8),  2/12/1910
Drawer   2 Folder   2
Typical Section thru' Column above Second Floor Line, Sections of Hot Air Ducts and Plan of Hot Air Duct at Corners (8-A),  8/12/1910 (18x44 inches)
Drawer   2 Folder   2
Plans of Main Staircase and Ceiling over Lobby (9-A),  8/12/1910 (18x44 inches)
Drawer   2 Folder   2
Pipe Connections at Gas House (27),  5/17/1910 (Red and black ink drawing on vellum, 16x28 inches)
Drawer   2 Folder   2
Plan, Elevation and Sections thru' Bridge at Factory and Office Buildings and Full-Size Detail of Fenestra Sash and Chanel [sic] [of] Iron Door Frame (31),  9/28/1910 (25x46 inches)
Drawer   2 Folder   2
Detail of Bridge Connecting Office and Factory Building (31), 11/2/1910 (25x37 inches)
Drawer   2 Folder   2
Plan and Sections of Desk in Room #223 (48),  undated (23x18 inches)
 
Horace Elgin Dodge Residence, Grosse Pointe, Michigan,  1910-1911, Job No. 423 [subseries]:
 
Construction Drawings by Albert Kahn, Architect, Ernest Wilby, Associate,  3/30/1910 (Ink-on-linen drawings, 27x39 inches)
 
Architectural Drawings
Drawer   2 Folder   3
Basement Plan (1), revised 12/5/1910
Drawer   2 Folder   3
Design for Retaining Wall in Front of Property (1-A), revised  6/18/1910 (16x19 inches)
Drawer   2 Folder   3
Basement Plan (1-B), revised  9/27/1910
Drawer   2 Folder   3
Excavation Plan (1-B)
Drawer   2 Folder   3
Plot Plan (1-C)
Drawer   2 Folder   3
First Floor Plan (2), revised 12/5/1910
Drawer   2 Folder   3
Second Floor Plan (3), revised 12/5/1910
Drawer   2 Folder   3
Third Floor and Roof Plan (4), revised 12/5/1910
Drawer   2 Folder   3
Section on Line A-A, Details for Vestibule, Door Frame with Side Lights, Typical Eaves and Box Windows and Section thro' Living Room Bay (5)
Drawer   2 Folder   3
Front Elevation (6)
Drawer   2 Folder   3
East Elevation and Details for Main Entrance Porch (7)
Drawer   2 Folder   3
West Elevation, Section on Line B-B, Details for Bath Room No 206, and Typical Door, Transom, Window Stool, Chair Rail and Door and Window Trim (8)
Drawer   2 Folder   3
South Elevation, Detail for Porch Ceiling and Removable Enclosure for South Porch (9)
Drawer   2 Folder   3
Main Hall Details (10), revised  9/21/1910 (Two drawings)
Drawer   2 Folder   3
Main Hall Details (10-A),  9/22/1910 revised  12/28/1910
Drawer   2 Folder   3
Dining Room and Living Room Details (11), revised  12/10/1910
Drawer   2 Folder   3
Details for Den, Main Stair, Reception Room, Sewing Room Cabinet, Nook in Chamber No. 209 and Mantel in Chamber No. 202 and Dining Room Ceiling Plan (12)
Drawer   2 Folder   3
Fittings for Butler's Pantry, Pantry, Closets, Cabinets, Wine Rack and Wardrobes (13)
Drawer   2 Folder   3
Revised Detail for South Porch (14) (16x21 inches)
Drawer   2 Folder   3
Details for Sinks in Butler's Pantry (40), 12/1/1910 (16x26 inches)
Drawer   2 Folder   3
Details for Main Entrance (105),  6/11/1910
Drawer   2 Folder   3
Boat House Plan and Roof Plan (129),  4/29/1911 (20x30 inches)
Drawer   2 Folder   3
Boat House South, North and West Elevations and Section (130),  4/29/1911 (20x28 inches)
 
The Detroit Free Press Office Building, Detroit, Michigan,  1911-1912, Job No. 487 [subseries]:
 
Design Development Architectural Drawings (Block Plans),  undated (Ink-on-linen drawings, 27-1/2x22-1/2 to 28x23-1/4 inches)
Drawer   10 Folder   10
Basement Plan (1)
Drawer   10 Folder   10
First Floor Plan (2)
Drawer   10 Folder   10
Second Floor Plan (3)
Drawer   10 Folder   10
Third and Fifth Floor Plans (4)
Drawer   10 Folder   10
Fourth Floor Plan (5)
Drawer   10 Folder   10
Sixth, Eighth and Ninth Floor Plans (6)
Drawer   10 Folder   10
Tenth Floor Plan (7)
Drawer   10 Folder   10
Seventh Floor Plan (8)
 
Construction Drawings by Albert Kahn, Architect, Ernest Wilby, Associate (Ink-on-linen drawings with pencil notations)
 
Architectural Drawings,  4/10/1911 (27-3/4x33-3/4 inches)
Drawer   10 Folder   10
Plot Plan (1) (27x31-1/2 inches)
Drawer   10 Folder   10
Foundation and Basement Plan and Section "AA" of Present Building (1-A),  undated
Drawer   10 Folder   10
Foundation and Basement Plans (2), revised  4/24/1912
Drawer   10 Folder   10
First and Second Floor Plans of Present Building (2-A),  undated
Drawer   10 Folder   10
First, Second and Mezzanine Floor Plans (3), revised  11/17/1911
Drawer   10 Folder   10
Third and Fourth Floor Plans (4)
Drawer   10 Folder   10
Ninth and Tenth Floor Plans (5), revised  2/8/1912
Drawer   10 Folder   10
Roof Plans and Sections (6)
Drawer   10 Folder   10
Front and Rear Elevations (7), revised  5/30/1911 (Two drawings, only one revised)
Drawer   10 Folder   10
East Side Elevation and Details of Typical Window Frames (8), revised  5/30/1911
Drawer   10 Folder   10
West Elevation and Detail of Iron Stairs to Mailing Room (9), revised  5/30/1911
Drawer   10 Folder   10
Longitudinal Section and Detail of Men's Toilet Rooms (10),  2/9/1912
Drawer   10 Folder   10
Transverse Section and Detail of Dumb Waiter (11)
Drawer   10 Folder   10
Detail of Front Elevation Showing Lower Portion of East Bay (12)
Drawer   10 Folder   10
Detail of Front Elevation Showing Lower Portion of East Bay-Alternate Design (12-A),  undated
Drawer   10 Folder   11
Typical Detail of Upper Story of North Part of East and West Elevations (13 & 13-A) (Two drawings, one undated)
Drawer   10 Folder   11
Detail of East Half of First Story Rear Elevation (14), revised  3/16/1912
Drawer   10 Folder   11
Typical Details of Stairs and Elevators from Third to Ninth Floor (15)
Drawer   10 Folder   11
Elevations and Details of Corridor Partitions (16)
Drawer   10 Folder   11
Typical Press Foundations and Typical Details of Fire Escape (17)
Drawer   10 Folder   11
Elevations of Main Entrance and Plan of Top of Marquise (18)
Drawer   10 Folder   11
Detail of Passenger Elevators (19),  undated (7x10 inches)
Drawer   10 Folder   11
Plan, Elevation and Section of Press Room (31),  9/5/1911 (21x26-3/4 inches)
Drawer   10 Folder   11
Interior Finish for First Floor (34),10/12/1911 revised  2/8/1912
Drawer   10 Folder   11
Details for General Office and Lobby (35),  10/12/1911
Drawer   10 Folder   11
Details for General Office and Lobby (35-A),  11/11/1911
Drawer   10 Folder   11
Details for General Office (36),  10/12/1911
Drawer   10 Folder   11
Details for General Office (36-A),  11/11/1911 revised  2/8/1912
Drawer   10 Folder   11
Ceiling Plan (37),  10/12/1911
Drawer   10 Folder   11
Detail of Main Entrance, Case in Lobby and Cashier's Cage (38),  10/12/1911
Drawer   10 Folder   11
Details of Main Stairs, Desks in General Office, Office Walls, Lobby Finish and Cast Iron Frames (39),  10/12/1911
Drawer   10 Folder   11
Plan of Tenth Floor (40), revised  8/10/1912 (28-1/2x35 inches)
Drawer   10 Folder   11
Plan of Editorial Room and Mezzanine, Tenth Floor (55),  4/3/1912 (16-1/4x22-3/4 inches)
Drawer   10 Folder   11
Lighting Plan for Mezzanine Floor in Editorial Room (67),  undated (14x27-3/4 inches)
Drawer   10 Folder   11
Details of Proof Room, Composing Room and Copy Room Partitions (70),  7/20/1912 revised  8/10/1912 (19-1/4x22 inches)
Drawer   10 Folder   11
Floor Plan of Rooms 701-702 (71),  7/25/1912 (8-3/4x11 inches)
Drawer   10 Folder   11
Ninth Floor Plan (73), revised  9/6/1912 (20-1/2x17-1/4 inches)
Drawer   10 Folder   11
Layout of Offices, Sixth Floor (76), revised  9/23/1912 (15-1/4x14-3/4 inches)
Drawer   10 Folder   11
Plan of Offices, Eighth Floor (80),  undated (18-1/4x18-3/4 inches)
Drawer   10 Folder   11
Plan at Sixth Floor (88),  10/23/1912 (12-3/4x9 inches)
Drawer   10 Folder   11
Plan of Offices-Southwest Corner of Sixth Floor (89),  10/31/1912 revised 11/5/1912 (11x12 inches)
Drawer   10 Folder   11
Plan of Offices on Ninth Floor, Northeast Corner (94),  12/13/1912 (12x13-1/4 inches)
Drawer   10 Folder   11
Layout of Offices, Southwest Corner on Eighth Floor (95),  undated (9-1/4x10-1/2 inches)
Drawer   10 Folder   11
Plan Showing Second Floor Office Lighting (97),  3/12/1913 revised  3/17/1913 (18-1/2x9-1/2 inches)
 
Structural Drawings (27-3/4x33-1/2 inches)
Drawer   10 Folder   12
First and Second Floor Framing Plans (1S),  4/7/1911 revised  2/18/1912
Drawer   10 Folder   12
Typical Floor Framing Plan and Tenth Floor Framing Plan (2S),  4/6/1911 revised  5/12/1911
Drawer   10 Folder   12
Roof Plan, Column Schedule and Details of Cast Iron Column Bases (3S),  4/7/1911 revised  2/8/1912
Drawer   10 Folder   12
Piling and Footing Plan (4S),  6/30/1911 revised  7/17/1911 (16-3/4x21-1/4 inches)
 
Mechanical and Electrical Drawings,  4/8/1911 (27-3/4x33-1/2 inches)
Drawer   10 Folder   12
Basement Plan and Drainage Plan (1E), revised  3/16/1912
Drawer   10 Folder   12
First and Second Floor Plans (2E), revised  10/28/1911
Drawer   10 Folder   12
Tenth Floor Plan and Typical Floor Plan (3E), revised  2/9/1912
Drawer   10 Folder   12
Detail of Ventilating Fan and Piping in Linotype Room and Elevation of Toilet Vents (4E),  4/12/1911
Drawer   10 Folder   12
Steam Riser Diagram (5E),  4/12/1911
Drawer   10 Folder   12
Plan of Machine Room (6E),  5/20/1911
Drawer   10 Folder   12
Revised Plan of Machine Room (7E),  3/6/1912 redrawn  6/11/1912 (24-1/4x33-3/4 inches)
 
King's Theatre (National Theatre), Detroit, Michigan,  1911,  1920 &  1924, Jobs No. 478 and 478-A, C & D [subseries]:
 
Theatre Building by Albert Kahn, Architect, Ernest Wilby, Associate (Job No. 478)
 
Architectural Construction Drawings,  2/14/1911 (Ink-on-linen drawings with pencil notations, 24x29-1/4 inches)
Drawer   8 Folder   4
Foundation and Parquet Floor Plans (1), revised  4/18/1911 (Two drawings, only one revised)
Drawer   8 Folder   4
Balcony and Mezzanine Floor Plan and Roof Plan (2), revised  4/18/1911
Drawer   8 Folder   4
North Elevation and Sections (3), revised  4/19/1911
Drawer   8 Folder   4
Half-Front Elevation, Half Cross-Section thro' Front and Details (4), revised  4/19/1911
Drawer   8 Folder   4
Ceiling Plan and Longitudinal Section (5), revised  4/19/1911
Drawer   8 Folder   4
First Floor and Balcony Plans and Cross-Section and Direct Elevation of Boxes (6), revised  4/21/1911
Drawer   8 Folder   4
Typical Side Elevation of Tower and Details of Vestibule and Lobby (7), revised  4/18/1911
Drawer   8 Folder   4
Plans of Stairs and Sections through Stairs (8), revised  4/22/1911
Drawer   8 Folder   4
Details of Dressing Rooms and Stairs to Boxes (9), revised  4/25/1911
Drawer   8 Folder   4
Detail for Marquise and Entrance Door Frame (10)
Drawer   8 Folder   4
Foundation and Parquet Floor Plans, Heating and Lighting (11), revised  4/8/1911 and  7/31/1911 (Two drawings)
Drawer   8 Folder   4
Half-Balcony and Mezzanine Plan and Roof Plan, Heating and Lighting (12), revised  6/20/1911
Drawer   8 Folder   4
Longitudinal Section and Sections thro' Front and Rear, Heating and Lighting (13)
Drawer   8 Folder   4
Terra-Cotta Detail of Half of Front Elevation (15),  3/20/1911 revised  4/20/1911 (29-3/4x39-3/4 inches)
Drawer   8 Folder   4
Sprinkler System Underground Plan (17),  3/23/1911 (19x11 inches)
Drawer   8 Folder   4
Sprinkler System Plans under Stage Floor and over Procenium Arch (18),  3/23/1911 (19x24-3/4 inches)
Drawer   8 Folder   4
Sprinkler System Plans for Gridiron Floor and Roof (19),  3/23/1911 (18x23 inches)
Drawer   8 Folder   4
Sprinkler System Plan for Dressing Rooms (20),  3/23/1911 (10-1/4x13-3/4 inches)
Drawer   8 Folder   4
Revised Plans Showing Dressing Rooms in Basement (36),  6/19/1911 (11x29-1/4 inches)
Drawer   8 Folder   4
Revised Basement Plan, Heating and Lighting (37),  6/20/1911 (11-3/4x19 inches)
Drawer   8 Folder   4
Elevations of Steel Frame for Electric Sign (40), revised  9/30/1911 (20x32-1/2 inches)
 
Structural Construction Drawings,  2/17/1911 (Ink-on-linen drawings with pencil notations, 24x29 inches)
Drawer   8 Folder   5
Half-Plans of Mezzanine and Balcony and Roof Plan (1S)
Drawer   8 Folder   5
Half-Front Elevation and Half-Cross-Section on "D-D" (2S)
Drawer   8 Folder   5
Gridiron and Stage Floor Plans and Details (3S),  4/10/1911 revised  4/11/1911
 
Alterations to King's (National) Theatre by Albert Kahn, Architect (Jobs No. 478-A, C & D)
 
Architectural and Mechanical Construction Drawings (Ink-on-linen drawings)
Drawer   8 Folder   5
Revised Plan, Elevation and Section, Mezzanine Floor Lobby, Job No. 478-A (1),  9/17/1920 (24x29-1/2 inches)
Drawer   8 Folder   5
Details of Alterations to Marquise, Job No. 478-C (1),  10/21/1920 revised  11/18/1920 (Pencil-on-vellum drawing, 19-1/4x28 inches)
Drawer   8 Folder   5
Basement and Roof Plans, Air-Conditioning System, Job No. 478-D (1M),  2/8/1924 (18x23-3/4 inches)
 
Professor George Washington Patterson Residence, Ann Arbor, Michigan,  1913, Job No. 544 [subseries]:
 
Construction Drawings
 
Architectural Drawings,  3/5/1913 revised  6/9/1913 (Ink-on-linen drawings, 19-1/2x27-1/4, inches, excpet as noted)
Drawer   3 Folder   9
Proposed Plot Plan,  undated (Pencil drawing on tracing paper, 19-3/4x26-1/4 inches)
Drawer   3 Folder   9
Plan of Basement (2),  undated     ("Void" notation) 
Drawer   3 Folder   9
Plan of Basement (2)
Drawer   3 Folder   9
Basement Plan (2)
Drawer   3 Folder   9
First Floor Plan (3)
Drawer   3 Folder   9
Second Floor Plan (4)
Drawer   3 Folder   9
Third Floor Plan (5)     (not revised) 
Drawer   3 Folder   9
Transverse Sections on Lines "A-A" and "B-B" (6)
Drawer   3 Folder   9
South Elevation (7)
Drawer   3 Folder   9
East Elevation and Section Showing Support for Brickwork in Large Gable at West End (8)
Drawer   3 Folder   9
West Elevation and Details for Interior Finish (9)
Drawer   3 Folder   9
North Elevation (10)
Drawer   3 Folder   9
Main Hall Details (11)     (not revised) 
Drawer   3 Folder   9
Living Room, Music Room and Study Details (12)     (not revised) 
Drawer   3 Folder   9
Dining Room Details and Elevations of Chamber Mantels (13)     (not revised) 
Drawer   3 Folder   9
Details of Butler's Pantry and Kitchen Cabinet, etc. (14)     (not revised) 
Drawer   3 Folder   9
Plan Showing Concrete Reinforcement and Structural Details (19),  7/16/1913
 
Mechanical Drawings,  2/22/1913 revised  6/9/1913 (Ink-on-linen drawing, 20x29 inches)
Drawer   3 Folder   9
Basement Plan (2M)
 
Detroit Athletic Club, Detroit, Michigan,  1913-1914 and  1918-1935, Jobs No. 593 and 593-A, H, I, N, O, P, Q & R [subseries]:
 
Detroit Athletic Club by Albert Kahn, Architect, Ernest Wilby, Associate (Job No. 593)
 
Architectural Construction Drawings,  11/29/1913 (Ink-on-linen drawings with pencil revisions, 29-1/4x34-1/2 inches)
Drawer   2 Folder   4
Plot Plan,  undated
Drawer   2 Folder   4
Excavation Plan (1A)
Drawer   2 Folder   4
Foundation Plan (2), undated, revised  1/7/1914
Drawer   2 Folder   4
Basement Plan and Details (3),  undated
Drawer   2 Folder   4
First Floor Plan and Details (4)
Drawer   2 Folder   4
First Floor Plan and Details (4), revised  1/30/1914
Drawer   2 Folder   4
First Floor Mezzanine and Ceiling Plans (5),  undated
Drawer   2 Folder   4
First Floor Mezzanine and Ceiling Plans (5), revised  1/30/1914
Drawer   2 Folder   4
Second Floor Plan and Details (6), revised  1/30/1914
Drawer   2 Folder   4
Second Floor Mezzanine [Plan] (7)
Drawer   2 Folder   4
Second Floor Mezzanine [Plan] (7), revised  2/11/1914
Drawer   2 Folder   4
Third Floor Plan and Details (8)
Drawer   2 Folder   4
Third Floor Plan and Details (8), revised  1/30/1914
Drawer   2 Folder   4
Fourth Floor Plan and Squash and Hand Ball Courts Elevations (9)
Drawer   2 Folder   4
Fourth Floor Plan and Squash and Hand Ball Courts Elevations (9), revised  1/30/1914
Drawer   2 Folder   4
Fourth Floor Plan, First Mezzanine (10)
Drawer   2 Folder   4
Fourth Floor Plan, Second Mezzanine (11)
Drawer   2 Folder   4
Fifth Floor Plan and Details (12)
Drawer   2 Folder   4
Fifth Floor Plan and Details (12), revised  1/30/1914
Drawer   2 Folder   4
Sixth Floor Plan and Details (13)
Drawer   2 Folder   4
Sixth Floor Plan and Details (13), revised  1/30/1914
Drawer   2 Folder   5
Bowling Alley Details and Plan of Pipe Space over Sixth Floor (14)
Drawer   2 Folder   5
Roof Plan (15)
Drawer   2 Folder   5
Longitudinal Section and Elevations of Light Court #1 (16),  undated
Drawer   2 Folder   5
Madison Avenue Elevation (18), revised  1/30/1914
Drawer   2 Folder   5
John R. Street Elevation (19), revised  1/30/1914
Drawer   2 Folder   5
Randolph Street Elevation (20), revised  1/30/1914
Drawer   2 Folder   5
Cross Street Elevation (21), revised  1/30/1914
Drawer   2 Folder   5
Detail of Front Elevation, First and Second Stories (22)
Drawer   2 Folder   5
Detail of Front Elevation at Third and Fourth Stories (23),  undated
Drawer   2 Folder   5
Detail of Front Elevation at Fifth and Sixth Stories (24)
Drawer   2 Folder   5
Detail of Ladies Entrance and Adjoining Wall (25)
Drawer   2 Folder   5
Detail of Rear Elevation below Fifth Story (26),  undated
Drawer   2 Folder   5
Details of Lobby, Lounging Room and Entrance to Grill Room, Billiard Room and Vestibules #116-B & 117 (27)
Drawer   2 Folder   5
Detail of Main Staircase (28)
Drawer   2 Folder   5
Details of Grill Room and Billiard Room (29)
Drawer   2 Folder   5
Interior Details of Vestibule #117, Lobby #134a, Lobby #212 and Stairs of Halls #113, 132a, 206 & 236a (30)
Drawer   2 Folder   5
Details for Main Dining Room and Ladies Dining Room (31)
Drawer   2 Folder   5
Details for Basement Corridor, Palm Room, Lobby #211 and Private Dining Rooms #208, 209 & 210 (32)
Drawer   2 Folder   5
Details for Third Floor Private Dining Rooms, Corridor #307, Library #135-A and Ladies Room #114 (33)
 
Structural Construction Drawings,  11/29/1913 (Ink-on-linen drawings with pencil revisions, 29-1/4x35 to 30-1/4x38 inches)
Drawer   2 Folder   6
Column Schedule (1-S)
Drawer   2 Folder   6
First Floor Framing Plan (2-S)
Drawer   2 Folder   6
First Floor Framing [Plan] (2-SR),  1/24/1914 revised  2/11/1914
Drawer   2 Folder   6
First and Second Floor Mezzanines Framing [Plans] (3-S)
Drawer   2 Folder   6
First and Second Floor Mezzanines Framing [Plans] (3-SR),  1/24/1914 revised  1/29/1914
Drawer   2 Folder   6
Second Floor Framing [Plan] (4-S)
Drawer   2 Folder   6
Second Floor Framing [Plan] (4-SR),  1/24/1914 revised  1/29/1914
Drawer   2 Folder   6
Third Floor Framing [Plan] (5-S)
Drawer   2 Folder   6
Third Floor Framing [Plan] (5-SR),  2/21/1914 revised  3/4/1914
Drawer   2 Folder   6
Fourth Floor Framing [Plan] (6-S)
Drawer   2 Folder   6
Fourth Floor Framing [Plan] (6-SR), undated, revised  3/4/1914
Drawer   2 Folder   6
Fourth Floor First and Second Mezzanines Framing [Plans] (7-S)
Drawer   2 Folder   6
Fourth Floor First and Second Mezzanines Framing [Plans] (7-SR),  undated
Drawer   2 Folder   6
Fifth Floor Framing Plan (8-S)
Drawer   2 Folder   6
Fifth Floor Framing [Plan] (8-SR),  undated
Drawer   2 Folder   6
Sixth Floor Framing Plan (9-S)
Drawer   2 Folder   6
Roof Framing and Half Attic Framing Plans (10-S)
Drawer   2 Folder   6
Attic Framing Plan (10-SR),  3/19/1914
Drawer   2 Folder   6
Revised Column Schedule (11-S),  1/17/1914 revised  3/5/1914
Drawer   2 Folder   6
Typical Connections on Flanges, Webs, Concrete Joists and Special Plate Girders (12-S),  1/24/1914
Drawer   2 Folder   6
Cornice Framing [Plan] and Details (25-S),  4/6/1914
 
Mechanical and Electrical Construction Drawings,  2/8/1913 (Ink-on-linen drawings with pencil revisions, 28-1/2x33-1/2 to 33x43-1/2 inches)
Drawer   2 Folder   7
Basement Plan (3M), revised  3/12/1914
Drawer   2 Folder   7
[First Floor Plan], untitled (4M),  12/18/1913 revised  4/10/1914
Drawer   2 Folder   7
First Floor Mezzanine Plan (5M), revised  3/30/1914
Drawer   2 Folder   7
Second Floor Plan (6M), revised  7/28/1914
Drawer   2 Folder   7
Plan of Second Floor Mezzanine (7M), revised  4/8/1914
Drawer   2 Folder   7
Third Floor Plan (8M),  4/17/1914
Drawer   2 Folder   7
Fourth Floor Plan (9M),  4/14/1914
Drawer   2 Folder   7
Fourth Floor Plan -- First Mezzanine (10M), revised  4/14/1914
Drawer   2 Folder   7
Fourth Floor Plan -- Second Mezzanine (11M)
Drawer   2 Folder   7
Fourth Floor Plan -- Second Mezzanine (11M), revised  4/16/1914
Drawer   2 Folder   7
Fifth Floor Plan (12M)
Drawer   2 Folder   7
Sixth Floor Plan (13M)
Drawer   2 Folder   7
Attic Plan (14M), revised  4/20/1914
Drawer   2 Folder   7
John R. Street Elevation (15M)
Drawer   2 Folder   7
Cross Street Elevation (16M)
Drawer   2 Folder   7
Randolph Street Elevation (17M)
Drawer   2 Folder   7
Madison Avenue Elevation (18M), revised  4/17/1914
Drawer   2 Folder   8
Machine Room Details (19M), revised  3/9/1914
Drawer   2 Folder   8
Diagram of Piping to Pumps, Heaters, etc., and Detail of Riser Connections (20M), revised  4/20/1914
Drawer   2 Folder   8
Roof Plan and Arrangement of Elevator Machinery in Pent House (21M)
Drawer   2 Folder   8
Electric Feeder Diagram (22M),  12/10/1913 revised  4/17/1914
Drawer   2 Folder   8
Details of Drain Box for Plunge (24M),  4/14/1914
Drawer   2 Folder   8
Details of Gutter Drain and Water Inlet (25M),  4/20/1914
Drawer   2 Folder   8
Refrigerating Layout (27M),  5/18/1914
Drawer   2 Folder   8
Plan of Kitchen -- Second Floor (33M),  6/17/1914 revised  7/1/1914
Drawer   2 Folder   8
Plan of Foundations in Machine Room (36M),  6/5/1914 revised  6/18/1914
Drawer   2 Folder   8
Diagram of Cooled Drinking Water Piping (39M),  7/20/1914
Drawer   2 Folder   8
Plan of Piping in Furred Space under Kitchen Floor and on First Floor Mezzanine Ceiling (38M),  7/11/1914
Drawer   2 Folder   8
Arrangement of Kitchen Apparatus (40M)     (Undated due to linen damage) 
Drawer   2 Folder   8
Plan and Elevation of Service Bar -- First Mezzanine (45M),  10/19/1914 (25-1/2x26-1/2 inches)
 
Seventh Floor Addition to Detroit Athletic Club by Albert Kahn, Architect, Ernest Wilby, Associate (Job No. 593-A)
 
Architectural Construction Drawings,  undated (Ink-on-linen drawings, 24x34 inches)
Drawer   2 Folder  
Plan of Seventh Floor on Roof of Present D.A.C Building (1),  2/19/1918
Drawer   2 Folder  
Plan of Roof over Seventh Floor (2)
Drawer   2 Folder  
Details of Skylights over Corridors and Typical Toilets (3)
Drawer   2 Folder  
Plan of Present Building (4)
Drawer   2 Folder  
Sections (5)
Drawer   2 Folder  
Full-Size Details of Galvanized Iron Work (6) (Pencil-on-vellum drawing, 22x32 inches)
Drawer   2 Folder  
Full-Size Details of D. H. Windows (7) (Pencil-on-vellum drawing, 23x38 inches)
Drawer   2 Folder  
Details of Entrance Doors to Corridors (8) (Pencil-on-vellum drawing, 23-1/2x37-1/2 inches)
Drawer   2 Folder  
Details of Doors in Corridor (9) (Pencil-on-vellum drawing, 25x38 inches)
 
Mechanical Construction Drawings by Albert Kahn, Architect,  2/19/1918 revised  3/13/1918 (Ink-on-linen drawings, 20x28-1/2 inches)
Drawer   2 Folder  
Floor Plan (1M)
Drawer   2 Folder  
Attic Plan (2M)
 
Alterations to Rooms #100, 113, 117, 150, 151 & 152 of Detroit Athletic Club by Albert Kahn, Architect. (Job No. 593-H)
 
Architectural Construction Drawings (Pencil and ink drawings on vellum)
Drawer   2 Folder   9
Details of Alterations (1),  2/29/1920 (16-1/4x41 inches)
Drawer   2 Folder   9
Plans of Mezzanine and First Floor (2),  2/27/1920 (16-1/4x41 inches)
Drawer   2 Folder   9
Revised Plan and Elevations of Reception Room, Showing Revision in Floor and Width of Soffit (3),  8/21/1920 revised  9/28/1920 (13x27 inches)
 
Squash Courts for Detroit Athletic Club by Albert Kahn, Inc., Architect (Job No. 593-I)
 
Architectural Construction Drawings, 12/4/1924 (Pencil and ink drawings on vellum, 22x24-1/2 inches)
Drawer   2 Folder   9
Plan (1), revised  2/24/1925
Drawer   2 Folder   9
Balcony and Roof Plans and Details (2), revised  2/24/1925
Drawer   2 Folder   9
Elevations (3), revised  1/8/1925
Drawer   2 Folder   9
Section (4), revised  1/8/1925
 
Structural Construction Drawings, 12/8/1924 (Pencil-on-vellum drawings, 23-1/2x26 inches)
Drawer   2 Folder   9
Details of Framing at Present Roof (2-S)
Drawer   2 Folder   9
Roof and Wall Framing Plan, Elevations and Sections (3-S), revised  1/8/1925
 
Mechanical Construction Drawing,  9/25/1924 (Ink-on-linen drawings, 23-1/4x27 inches)
Drawer   2 Folder   9
Plans and Details (1M)
 
Alteration to Ladies Reception Room of Detroit Athletic Club by Albert Kahn, Architect (Job No. 593-N)
 
Architectural Construction Drawings (Ink, pencil and colored pencil drawings on vellum, 13-1/2x27-1/2 to 15-1/2x29-1/4 inches)
Drawer   2 Folder   9
Details (1),  4/16/1930
Drawer   2 Folder   9
Plan and Elevations (2 & 3),  2/4/1930 (Two drawings)
 
Fourth Floor Lounge of Detroit Athletic Club by Albert Kahn, Inc., Architects & Engineers (Job No. 593-O)
 
Mechanical Construction Drawing,  12/18/1930 (Pencil and blue pencil drawing on velum, 24x30 inches)
Drawer   2 Folder   9
Ventilation Layout (1-M)
 
Air Conditioning for Detroit Athletic Club by Albert Kahn, Inc., Architects & Engineers (Job No. 593-P)
 
Mechanical Construction Drawings,  5/31/1935 (Pencil-on-vellum drawings)
Drawer   2 Folder   9
Plans of Basement and Platform for Coils and Filter on Third Floor (1M) (25x32 inches)
Drawer   2 Folder   9
Part Plans of Second Floor Mezzanine and Third Floor and Sections (2-M) (30-1/4x32 inches)
 
Alterations to Abbey Room, Lounge and Bowling Alley of Detroit Athletic Club by Albert Kahn, Inc., Architects (Job. No. 593-Q)
 
Architectural Construction Drawings,  6/14/1935 (Pencil and blue ink drawings on vellum, 20-3/4x34 inches)
Drawer   2 Folder   9
Basement Floor Plan (1)
Drawer   2 Folder   9
Passage and Hall Details (2)
Drawer   2 Folder   9
East and West Elevations of Abbey Room (3)
Drawer   2 Folder   9
North and South Elevations of Abbey Room (4)
Drawer   2 Folder   9
Lounge, Shower and Phone Booth Details (5)
 
Alterations to Cocktail Room, Grill Room and Billiard Room of Detroit Athletic Club by Albert Kahn, Inc., Architects & Engineers (Job. No. 593-R)
 
Architectural Construction Drawings,  12/18/1935 (Pencil-on-vellum drawings, 16x34 inches)
Drawer   2 Folder   9
Elevations and Ceiling Plan of Cocktail Room (1)
Drawer   2 Folder   9
Elevations and Sections of Grill Room, Billiard Room and Bar Front (2)
 
Newberry Residence Hall, University of Michigan, Ann Arbor,  1914 and  1920, Jobs No. 606 & 606-A [subseries]:
 
Design Development Drawings (Block Plans),  undated (Ink-on-linen drawings, 17-1/2x28 inches)
Drawer   8 Folder   6
First Floor Plan (1)
Drawer   8 Folder   6
Typical Floor Plan (2)
 
Construction Drawings by Albert Kahn, Architect, Ernest Wilby, Associate
 
Architectural Drawings,  4/17/1914 revised  6/18/1914 (Ink-on-linen drawings with pencil notations, 25-1/2x27-1/2 inches)
Drawer   8 Folder   6
Plot Plan and Details of Elevator, Mantels and Interior Doors (1)
Drawer   8 Folder   6
Foundation and Basement Plans (2), revised  7/17/1914
Drawer   8 Folder   6
First, Second and Third Floor Plans (3), revised  7/17/1914
Drawer   8 Folder   6
Attic Plan, East and West Elevations and Cross-Section (4), revised  7/17/1914
Drawer   8 Folder   6
North and South Elevations (5)
Drawer   8 Folder   6
One-Half-Inch Details of Exterior (6)     (Not revised) 
Drawer   8 Folder   6
Details of Stairs, Dumb Waiter and Cupboards in Kitchen, Serving Room and Kitchenette (7)
Drawer   8 Folder   6
Details of Porches, Windows and Toilets (8)
 
Mechanical Drawings, undated, revised  6/22/1914 (Ink-on-linen drawings with pencil notations, 25-1/26x27-1/2 inches)
Drawer   8 Folder   6
Basement and First Floor Plans (1M)
Drawer   8 Folder   6
Basement Plan (1MR),  9/30/1914
Drawer   8 Folder   6
Second and Third Floor Plans (2M)
Drawer   8 Folder   6
Fourth Floor Plan and Riser Diagram (3M)
Drawer   8 Folder   6
Revised Drainage Plan (4M),  8/18/1914
 
Supplementary Construction Drawing     (undated due to paper damage)  (Pencil-on-vellum drawing, 24x29 inches)
Drawer   8 Folder   6
Details of Elevator
 
Changes in Connection with Kitchen and Bakery (Job No. 606-A),  1/20/1920 (Pencil-on-vellum drawings, 13x26 inches)
Drawer   8 Folder   6
Basement Floor Plan (1)
Drawer   8 Folder   6
Details of Door Lintel, Tilting Flour Bin, Drawer and Shelf (2)
 
Detroit Trust Company, Detroit, Michigan,  1914-1915 and  1926, Job No. 637 & 637-F [subseries]:
 
Detroit Trust Company by Albert Kahn, Architect, Ernest Wilby, Associate (Job No. 637)
 
Design Development (Block Plans) Drawings,  undated (Ink-on-linen drawings, 16x30 inches)
Drawer   3 Folder   1
First Floor Plan
Drawer   3 Folder   1
Second Floor Plan
 
Architectural Construction Drawings,  12/15/1914 (Ink-on-linen drawings, 29x47 inches)
Drawer   3 Folder   1
Excavation and Plot Plan (1)
Drawer   3 Folder   1
Foundation Plan (2), revised  1/27/1915
Drawer   3 Folder   1
Basement Plan (3)
Drawer   3 Folder   1
First Floor Plan (4)
Drawer   3 Folder   1
Mezzanine Floor [Plan] (5)
Drawer   3 Folder   1
Second Floor Plan (6)
Drawer   3 Folder   1
Third Floor Plan (7)
Drawer   3 Folder   1
Roof Plan (8)
Drawer   3 Folder   1
Elevations (9)
Drawer   3 Folder   1
Cross-Section and Misc. Details (10)
Drawer   3 Folder   1
Longitudinal Section (11)
Drawer   3 Folder   1
Details of Fort Street Elevation (12)
Drawer   3 Folder   1
Revised Details, Fort Street Elevation (12-R),  2/8/1915
Drawer   3 Folder   1
Details of Shelby Street Elevation (13)
Drawer   3 Folder   1
Interiors (14)
Drawer   3 Folder   1
Interior Finish (15),  1/4/1915 revised  1/13/1915
Drawer   3 Folder   1
Interior Finish (16),  1/4/1915 revised  1/13/1915
Drawer   3 Folder   1
Details of Furniture in Cages on Second Floor (21),  2/5/1915 (23x39 inches)
 
Structural Construction Drawings,  11/20/1914 revised  1/15/1915 (Ink-on-linen drawings, 23x47 inches)
Drawer   3 Folder   2
Framing of First Floor (1S)
Drawer   3 Folder   2
Framing of Mezzanine (2S)
Drawer   3 Folder   2
Framing of Second Floor (3S)
Drawer   3 Folder   2
Framing of Third Floor (4S), revised  1/7/1915
Drawer   3 Folder   2
Framing of Roof (5S)
 
Mechanical Construction Drawings,  12/15/1914 (Ink-on-linen drawings, 29x47 inches)
Drawer   3 Folder   2
Basement Plan for Heating and Ventilation (1M), revised  2/19/1915
Drawer   3 Folder   2
Exhaust Piping (2M)
Drawer   3 Folder   2
Riser Diagram (3M)
Drawer   3 Folder   2
Future Fourth Floor Plan and Attic Plan Showing Future Piping (MM),  2/10/1915
 
Detroit Trust Company Addition by Albert Kahn, Inc., Architects (Job No. 637F)
 
Design Development (Block Plans) Drawings,  undated (Ink-on linen drawings, 27x30 inches)
Drawer   3 Folder   3
Basement Plan (1)
Drawer   3 Folder   3
Main Floor Plan (2)
Drawer   3 Folder   3
Mezzanine Floor Plan (3)
Drawer   3 Folder   3
Second Floor Plan (4)
Drawer   3 Folder   3
Third Floor Plan (5)
 
Architectural Construction Drawings,  2/9/1926 (Ink-on-linen drawings, 29x40 inches)
Drawer   3 Folder   3
Plot Plan (1)
Drawer   3 Folder   3
Foundation Plan (2)
Drawer   3 Folder   3
Basement Plan (3), revised  3/26/1926
Drawer   3 Folder   3
First Floor Plan (4), revised  5/17/1926
Drawer   3 Folder   3
Mezzanine Floor Plan (5), revised  3/26/1926
Drawer   3 Folder   3
Second Floor Plan (6), revised  3/26/1926
Drawer   3 Folder   3
Third Floor Plan (7), revised  3/26/1926
Drawer   3 Folder   3
Plan at Fan Room and Roof (8), revised  3/26/1926
Drawer   3 Folder   3
Elevations (9), revised  3/26/1926
Drawer   3 Folder   3
Elevations and Details (10), revised  3/26/1926
Drawer   3 Folder   4
Sections (11), revised  3/26/1926
Drawer   3 Folder   4
Exterior Details (12), revised  3/26/1926
Drawer   3 Folder   4
Plans: Elevators and Stairs #2 & 3 (13)
Drawer   3 Folder   4
Sections of Elevators and Stairs #2, 3 & 4 (14), revised  3/26/1926
Drawer   3 Folder   4
Plans and Sections of Stairs #1 & 6 (15), revised  3/26/1926
Drawer   3 Folder   4
Banking Room Interiors (16)
Drawer   3 Folder   4
Banking Room Interiors (17), revised  3/26/1926
Drawer   3 Folder   4
Banking Room and Safe Deposit Dept. Interiors (18), revised  3/26/1926
Drawer   3 Folder   4
Interior Scale Details (19)
Drawer   3 Folder   4
Interior Scale Details (20), revised  3/26/1926
Drawer   3 Folder   5
Structural Construction Drawings,  2/8/1926 (Ink-on-linen drawings, 29x40 inches)
Drawer   3 Folder   5
First Floor Framing (1S)
Drawer   3 Folder   5
Mezzanine Floor Framing (2S)
Drawer   3 Folder   5
Second Floor Framing (3S)
Drawer   3 Folder   5
Third Floor Framing (4S)
Drawer   3 Folder   5
Roofing and Attic Framing (5S), revised  2/16/1926
Drawer   3 Folder   5
Column Schedule; Footing Details (6S)
Drawer   3 Folder   5
Alterations in Present Building (7S)
Drawer   3 Folder   5
Second Floor Trusses and Girders (8S)
 
Mechanical Construction Drawings,  3/15/1926 revised  5/8/1926 (Ink-on-linen drawings, 29x40 inches)
Drawer   3 Folder   6
Foundation Plan (1M), revised  8/17/1926
Drawer   3 Folder   6
Basement Floor Plan (2M), revised  9/11/1926
Drawer   3 Folder   6
First Floor Plan (3M)
Drawer   3 Folder   6
Mezzanine Floor Plan (4M)
Drawer   3 Folder   6
Second Floor Plan (5M)
Drawer   3 Folder   6
Third Floor Plan (6M)
Drawer   3 Folder   6
Pipe Space Plan (7M)
Drawer   3 Folder   6
Heating Riser Diagram and Details (8M)
 
Electrical Construction Drawings,  4/12/1926 (Ink-on-linen drawings, 29x40 inches)
Drawer   3 Folder   6
Basement Plan and Riser Diagrams (9M), revised  9/11/1926
Drawer   3 Folder   6
First Floor Plan (10M), revised  9/30/1926
Drawer   3 Folder   6
Mezzanine Floor Plan (11M), revised  3/5/1926
Drawer   3 Folder   6
Second Floor Plan (12M), revised  9/11/1926
Drawer   3 Folder   6
Third Floor Plan (13M), revised  9/11/1926
Drawer   3 Folder   6
Fan Room and Roof Plan (14M)
 
Library Building, University of Michigan, Ann Arbor,  1916-1917,  1949,  1969,  1972 and  1977, Jobs No. 663 & 663-A-E [subseries]:
 
Library Building by Albert Kahn, Architect, Ernest Wilby, Associate (Job No. 663)
 
Design Development Drawings (Block Plans),  undated (Ink-on-linen drawings, 19-3/4x25 inches)
Drawer   8 Folder   7
First Floor Plan
Drawer   8 Folder   7
Second Floor Plan
Drawer   8 Folder   7
Third Floor Plan
 
Architectural Construction Drawings,  5/20/1916 revised  5/8/1917 (Ink-on-linen drawings with pencil, blue pencil and red ink notations, 35x38 to 35-1/2x43-1/2 inches)
Drawer   8 Folder   7
Plot Plan (1), revised  9/16/1916
Drawer   8 Folder   7
Footing and Foundation Plan (2)
Drawer   8 Folder   7
Basement Plan (3)
Drawer   8 Folder   7
First Floor Plan (4)
Drawer   8 Folder   7
Second Floor Plan (5)
Drawer   8 Folder   7
Third Floor Plan (6), revised  12/27/1917
Drawer   8 Folder   7
Fourth Floor Plan (7)
Drawer   8 Folder   7
Attic Plan (8)
Drawer   8 Folder   7
Roof Plan (9), revised  9/16/1916
Drawer   8 Folder   7
North and South Elevations (10), revised  9/16/1916
Drawer   8 Folder   7
East and West Elevations (11), revised  9/16/1916
Drawer   8 Folder   7
Sections on Lines "B-B" and "C-C" (12), revised  9/16/1916
Drawer   8 Folder   7
Sections through East and West Courts and on Line "J-J" (13)
Drawer   8 Folder   7
Sections through Outside Walls and on Line "A-A" (14)
Drawer   8 Folder   7
Sections on Lines "D-D" and "E-E" (15), revised  9/16/1916
Drawer   8 Folder   8
Sections on Line "B-B" and "G-G" (16)
Drawer   8 Folder   8
Section on Line "F-F" and Details of Main Stair (17), revised  9/16/1916
Drawer   8 Folder   8
Plan and Section Showing Run of Book Carrier and Details of Toilets (18), revised  9/16/1916
Drawer   8 Folder   8
Basement Plan (19), revised  12/26/1917
Drawer   8 Folder   8
Second, Third and Fourth Floor Plans (20)
Drawer   8 Folder   8
Typical Floor Plan of East Stack and Sections thru' Outside Walls of East and West Stacks (21)
Drawer   8 Folder   8
Exterior Detail of Front (22)
Drawer   8 Folder   8
Details of Main Entrance and of Windows, East End of Front Pavilion (23)
Drawer   8 Folder   8
Typical Details of Center Bay, East Elevation, and of Bay, South Wall of East Stack (24)
Drawer   8 Folder   8
Details of Entrances, West Elevation, of Rec. Entrance, East Elevation, and of Dormers on Stacks (25), revised  11/26/1917
Drawer   8 Folder   8
Plan and Elevations of Vestibule and Main and Rear Corridors (26), revised  7/6/1917
Drawer   8 Folder   8
Details of Delivery Corridor, Second Floor (27), revised  9/16/1916
Drawer   8 Folder   8
Details of Main Reading Room, Second Floor (28), revised  9/16/1916
Drawer   8 Folder   8
Details of Main Reading Room, Second Floor (29)
Drawer   8 Folder   8
Elevations of Periodical Room and Study Room, First Floor (30), revised  9/16/1916
Drawer   8 Folder   8
Alternate North Elevation, Alternate East Elevation of North Pavilion and Detail of Terra Cotta Ornament and Brick Pattern (31), revised  9/16/1916
 
Structural Construction Drawings,  undated (Ink-on-linen drawings, 35x41 inches)
Drawer   8 Folder   9
First Floor Framing Plan (1-S)
Drawer   8 Folder   9
Second Floor Framing Plan (2-S)
Drawer   8 Folder   9
Third Floor Framing Plan (3-S)
Drawer   8 Folder   9
Fourth Floor Framing Plan (4-S)
Drawer   8 Folder   9
Attic and Part Roof Framing Plan (5-S)
Drawer   8 Folder   9
Column and Footing Schedules (6-S)
 
Mechanical Construction Drawings,  6/5/1916 (Ink-on-linen drawings, 35x41 inches)
Drawer   8 Folder   9
Foundation Plan (1M), revised 10/1/1917
Drawer   8 Folder   9
Basement Plan (2M), revised  9/27/1917
Drawer   8 Folder   9
First Floor Plan (3M), revised  10/26/1917
Drawer   8 Folder   9
Second Floor Plan (4M), revised  8/24/1916
Drawer   8 Folder   9
Third Floor Plan (5M), revised  11/21/1917
Drawer   8 Folder   9
Fourth Floor Plan (6M), revised  11/21/1917
Drawer   8 Folder   9
Attic Plan (7M), revised  11/21/1917
Drawer   8 Folder   9
Steam Riser Diagram (8M), revised 10/1/1917
Drawer   8 Folder   9
Supply and Exhaust Air Riser Diagrams (9M), revised  7/7/1916
Drawer   8 Folder   9
Details (10M), revised  8/24/1916
Drawer   8 Folder   9
Typical Floor Plan of East Stack and First Floor Plans of West Stack and First and Eighth Tiers (11M),  8/5/1916
 
Stack Buildings for the Library , University of Michigan, by Albert Kahn, Architect, Ernest Wilby, Associate (Job No. 663-A)
 
Architectural Construction Drawings,  5/25/1916 (Ink-on-linen drawings, 28-1/2x41 inches)
Drawer   8 Folder   10
Plot Plan and Foundation and Basement Plans (1),  undated
Drawer   8 Folder   10
First and Second Floor Plans (2)
Drawer   8 Folder   10
Third Floor Plan and Attic and Roof Plan (3)
Drawer   8 Folder   10
South Elevation and Section on Line "C-C" (4)
Drawer   8 Folder   10
West Elevation, Sections thru' East and West Stacks and Details of Entrance (5)
 
Alterations and Addition to Library Building, University of Michigan, by Albert Kahn Associated Architects & Engineers, Inc. (Job No. 663-B).
 
Structural Construction Drawings,  1/31/1949 (Ink-on-linen drawings with yellow and red pencil revisions, 30-1/4x45-3/4 inches)
Drawer   9 Folder   1
Foundation Plan and Details (1-S)
Drawer   9 Folder   1
Column and Footing Schedules (2-S)
Drawer   9 Folder   1
First Floor Framing and Details (3-S)
Drawer   9 Folder   1
Second Floor Framing Plan (4-S)
Drawer   9 Folder   1
Third Floor Framing Plan (5-S)
Drawer   9 Folder   1
Framing Plan at Bottom Chord of Trusses and Details of Trusses (6-S)
Drawer   9 Folder   1
Roof Framing Plan (7-S)
Drawer   9 Folder   1
Ceiling Framing Plan and Details (8-S)
 
Mechanical Construction Drawings,  1/19/1949 (Ink and blue pencil drawings on linen, 29-1/2x44-01/4 to 30x45-1/2 inches)
Drawer   9 Folder   2
Plot Plan and Details (1-M)
Drawer   9 Folder   2
Foundation Plan (2-M)
Drawer   9 Folder   2
Basement Floor Plan, First Stack Floor (3-M)
Drawer   9 Folder   2
Basement Floor Mezzanine Plan, Second Stack Floor (4-M)
Drawer   9 Folder   2
First Floor Ventilation Plan, Third Stack Floor (5-M)
Drawer   9 Folder   2
First Floor Mezzanine Plan, Fourth Stack Floor (6-M)
Drawer   9 Folder   2
Second Floor Plan, Fifth Stack Floor (7-M)
Drawer   9 Folder   2
Second Floor Mezzanine Plan, Sixth Stack Floor (8-M)
Drawer   9 Folder   2
Third Floor Plan, Seventh Stack Floor (9-M)
Drawer   9 Folder   2
Third Floor Mezzanine Plan, Eighth Stack Floor, and Details (10-M)
Drawer   9 Folder   3
Pipe Space Plan and Details (11-M)
Drawer   9 Folder   3
Toilet Details (12-M)
Drawer   9 Folder   3
Plans and Sections of Fan Rooms # 4 & 5 (13-M) (Two drawings, one pencil-on-vellum)
Drawer   9 Folder   3
Plan and Sections of Fan Room # 2 (14-M) (Two drawings, one pencil and ink-on-vellum)
Drawer   9 Folder   3
Plan of Fan Room # 1 and Equipment Schedule (15-M) (Two drawings, one pencil-on-vellum)
Drawer   9 Folder   3
Section thru' Building (16-M)
Drawer   9 Folder   3
Heating Details (17-M)
Drawer   9 Folder   3
Heating Riser Diagram and Details (18-M)
 
Electrical Construction Drawings,  8/12/1949 (Ink, pencil and blue pencil drawings on linen, 29-1/2x44-1/4 inches)
Drawer   9 Folder   4
Plot Plan, Riser Diagram and Symbols (1-E)
Drawer   9 Folder   4
Basement Wiring Plan (2-E)
Drawer   9 Folder   4
First Floor Wiring Plan (3-E)
Drawer   9 Folder   4
Second Floor Wiring Plan (4-E)
Drawer   9 Folder   4
Third Floor Wiring Plan (5-E)
Drawer   9 Folder   4
Pipe Space Wiring Plan (6-E)
Drawer   9 Folder   4
Basement Floor Plan, Present Building (7-E)
Drawer   9 Folder   4
First Floor Plan, Present Building (8-E)
 
Alterations to General Library, University of Michigan (Job No. 663-C)
 
Mechanical Design Development Drawings by Albert Kahn Associated Architects & Engineers, Inc.,  3/3/1969 (Pencil drawings on sepia prints, 21x32inches)
Drawer   9 Folder   5
Basement Floor Plan with New Supply Air Units (1-MD)
Drawer   9 Folder   5
First Floor Plan with New Main Supply Air Duct (2-MD)
Drawer   9 Folder   5
Second Floor Plan (3-MD)
Drawer   9 Folder   5
Third Floor Plan with New Fan Room (4-MD)
Drawer   9 Folder   5
Fourth Floor Plan with New Fan Room (5-MD)
Drawer   9 Folder   5
Fifth Floor Plan (6-MD)
Drawer   9 Folder   5
Typical Cross-Section (7-MD) (Pencil-on-vellum drawing)
 
General Library Renovation, University of Michigan (Job No. 663-D)
 
Architectural Construction Drawings by Albert Kahn Associates, Inc., Architects & Engineers,  11/30/1972 (Pencil drawings on electrostatic prints on mylar, 23x37 inches)
Drawer   9 Folder   6
Site Plan (1)
Drawer   9 Folder   6
Basement Plan (2)
Drawer   9 Folder   6
First Floor Plan (3-A),  undated (Pencil drawing on sepia print)
Drawer   9 Folder   6
Second and Fourth Stack Floor Plans (4)
Drawer   9 Folder   6
Sixth and Ninth Stack Floor Plans (6)
Drawer   9 Folder   6
Third Floor Plan (7)
Drawer   9 Folder   6
Fourth Floor Plan (8)
Drawer   9 Folder   6
Attic and Tenth Stack Floor Plans (9)
Drawer   9 Folder   6
Roof Plan (10)
Drawer   9 Folder   6
West Elevation (12)
Drawer   9 Folder   6
South Elevation (13)
 
Graduate Library, University of Michigan, Revisions to Ventilation in Photo Duplication Area (Job No. 663-E)
 
Mechanical Construction Drawing by Albert Kahn Associates, Inc., Architects & Engineers,  7/29/1977 (Pencil-on-vellum drawing, 24x33-3/4 inches)
Drawer   9 Folder   6
Part Plan of Basement Photo Duplication Area -- Air-Conditioning and Ventilating (1-M)
 
Burroughs Adding Machine Company, Detroit, Michigan,  1916-1917, Job No. 300K [subseries]:
 
Construction Drawings by Albert Kahn, Architect, Ernest Wilby, Associate (Ink-on-linen drawings, 16-1/2x38-1/2 inches)
 
Architectural Drawings,  10/12/1916
Drawer   3 Folder   7
Plot Plan (1), revised 11/8/1916
Drawer   3 Folder   7
Excavation Plan (1-A),  9/26/1916 revised 11/8/1916
Drawer   3 Folder   7
Basement and Foundation Plan (2), revised 11/8/1916
Drawer   3 Folder   7
First Floor Plan (3), revised 11/8/1916
Drawer   3 Folder   7
Typical Floor Plan (4), revised 11/8/1916
Drawer   3 Folder   7
Roof Plan (5), revised  11/13/1916
Drawer   3 Folder   7
North and South Elevations (6), revised 11/8/1916
Drawer   3 Folder   7
Typical Section on Line B-B, East and West Elevations and Toilet Elevations (7), revised  11/13/1916
Drawer   3 Folder   7
First Floor Plan of Elevators-Wings #1 & 2, and Section thru' Elevator and Toilet Room on Line A-A (8), revised 11/8/1916
Drawer   3 Folder   7
Details of Doors, Stairs, Toilets and Cesspool (9), revised 11/816
Drawer   3 Folder   7
Details of Employees' Entrance to Basement (10), revised 11/7/1916
Drawer   3 Folder   7
[Details of Employees' Entrance to Basement] to Supersede Entrance Details on Sheet #10 (10A),  12/19/1916 (17x28 inches)
Drawer   3 Folder   7
Details of Steel Bridge and Column Caps and Floor Slabs (11), revised 11/8/1916
Drawer   3 Folder   7
[Details of Steel Bridge] to Supersede Bridge Details Shown on Old Sheet #11 (11A),  12/19/1916 revised  1/25/1917 (20x31-3/4 inches)
Drawer   3 Folder   7
Plan of Shipping Platform, Section thru' Shipping Platform, South Elevation, Typical Detail of Sash in Outside Walls and Sections A-A to H-H (12), revised 11/8/1916
 
Structural Drawing,  3/12/1917
Drawer   3 Folder   7
Roof over Kitchen (1-S) (19-3/4x22-1/4 inches)
 
Mechanical Drawings,  10/17/1916 revised 11/7/1916
Drawer   3 Folder   7
Foundation and Basement Plan (1M)
Drawer   3 Folder   7
First Floor Plan (2M)
Drawer   3 Folder   7
Second, Third and Fourth Floor Plan (3M)
Drawer   3 Folder   7
Fifth Floor Plan (4M)
Drawer   3 Folder   7
Layout of Plumbing Fixtures as Per Bulletin No. 53 (5M),  2/10/1917 revised  2/26/1917
 
Betsy Barbour Residence Hall, University of Michigan, Ann Arbor,  1917, Job No. 829 [subseries]:
 
Construction Drawings by Albert Kahn, Architect, Ernest Wilby, Associate
 
Architectural Drawings,  11/20/1917 (Ink-on-linen drawings with pencil and blue pencil revisions, 25x27 to 25-3/4x28 inches)
Drawer   9 Folder   7
Plot Plan (1)
Drawer   9 Folder   7
Basement and First Floor Plans (2)
Drawer   9 Folder   7
Second, Third and Fourth Floor Plans (3)
Drawer   9 Folder   7
North and South Elevations (4)
Drawer   9 Folder   7
Maynard and State Street Elevations, Section "A-A" and Interior Details (5)
Drawer   9 Folder   7
Details of Maynard Street Entrance (6)
Drawer   9 Folder   7
Details of Windows and Fireplace in Sewing and Games Room #19 (7)
Drawer   9 Folder   7
Interior Details (8)
Drawer   9 Folder   7
Sections and Details of Stairs (9)
Drawer   9 Folder   7
Interior Details (10)
 
Structural Drawings,  undated (Ink-on-linen drawing with blue pencil revisions, 25-3/4x28 inches)
Drawer   9 Folder   7
First, Second, Third and Fourth Floor Plans (1-S)
 
Mechanical Drawings,  12/20/1917 (Ink-on-linen drawings, 264x28 inches)
Drawer   9 Folder   7
Heating Riser Diagram and Foundation and Drainage Plan (1)
Drawer   9 Folder   7
Basement Plan (2)
Drawer   9 Folder   7
Second, Third and Fourth Floor Plans (3)
Drawer   9 Folder   7
Plumbing Riser Diagram and Details (4)
 
Ford Motor Company Eagle Shipbuilding Plant, River Rouge, Michigan,  1918, Job No. 847 [subseries]:
 
Construction Drawings by Albert Kahn, Architect
 
Architectural Drawings,  2/12/1918 revised  2/15/1918 (Ink-on-linen drawings)
Drawer   9 Folder   8
Plot Plan,  undated (14-1/2x32 inches)
Drawer   9 Folder   8
Plot Plan (1A) (30-1/2x41 inches)
Drawer   9 Folder   8
Building "A" Foundation Plan and Details (1), revised  3/1/1918 (30-3'4x 41-3/4 inches)
Drawer   9 Folder   8
Building "A" Floor Plan (2), revised  3/1/1918 (31-3/4x42 inches)
Drawer   9 Folder   8
Building "A" Roof Plan (3), revised  3/1/1918 (30-3/4x42 inches)
Drawer   9 Folder   8
Building "A" Elevations and Cross-Section (4), revised  2/26/1918 (32x42 inches)
Drawer   9 Folder   8
Elevation of Monitor and Typical Details (5), revised  2/26/1918 (31-1/2x42 inches)
Drawer   9 Folder   8
Building "B" Foundation Plan and Details (6)     (undated due to linen damage)  (33-3/4x49 inches)
Drawer   9 Folder   8
Building "B" Floor Plan and Details (7), revised  4/4/1918 (34-1/4x49 inches)
Drawer   9 Folder   8
Building "B" Roof Plan (8) (33-3/4x49 inches)
Drawer   9 Folder   8
Elevations and Sections thru' High Point and Monitor (9), revised  2/23/1918 (34-3/4x4 inches)
Drawer   9 Folder   8
Building "B" Sections (10), revised  2/23/1918 (34-3/4x49 inches)
 
Structural Drawings,  2/11/1918 revised  2/15/1918 (Ink-on-linen drawings with pencil and blue pencil revisions)
Drawer   9 Folder   9
Details of Girders in Monitor Walls and under Main Roof (1-S),  2/12/1918 (31-3/4x42-1/2 inches)
Drawer   9 Folder   9
Building "B" Half-Plan Showing Framing and Details (2-S) (34x49 inches)
Drawer   9 Folder   9
Elevations, Sections and Sway Frame Details (3-S) (34x49 inches)
Drawer   9 Folder   9
Details of Roof Trusses, Monitor Framing and Bottom Chord Bracing (4-S) (34x49 inches)
Drawer   9 Folder   9
Building "B" Cross-Sections thru' High and Low Portions (5-S) (34-3/4x48-3/4 inches)
 
Mechanical Drawings (Ink-on-linen drawings with pencil and blue pencil notations)
Tube 2  
[Plan and Section of] Service Tracks (1-MR)     (undated due to linen damage)  (28-1/4x54-1/2 inches)
Tube 2  
Plot Plan and Details of Septic Tank, Sludge Beds and Toilet, etc. (1M),  3/5/1918 (31-3/4x42 inches)
Tube 2  
Drinking Water Layout (2M),  5/10/1918 (21-1/4x35 inches)
Tube 2  
Layout of Steam Plant and Detail of Unit Heater and Connections     (not numbered or dated due to linen damage)  (23x55 inches)
Tube 2  
Building "B" Layout of Heating System and Details (4M),  8/1/1918 revised  8/10/1918 (23x56 inches)
Tube 2  
Plan of Existing Underground Pipe Lines (5M),  8/16/1918 (24x43-1/2 inches)
Tube 2  
Building "A" Heating Plan (6M),  undated (23x46-1/2 inches)
Tube 2  
Layout of Steam Piping (8M)     (undated due to linen damage)  (23-1/2x54-1/2 inches)
 
First and Old Detroit National Bank, Detroit, Michigan,  1919-1922, Job No. 803 [subseries]:
 
Construction Drawings by Albert Kahn, Architect
 
Architectural Drawings,  12/20/1919 revised  9/22/1920 (Ink-on-linen drawings with red ink, pencil and blue pencil revisions, 30-3/4x47 to 31-3/4x52-3/4 inches)
Tube 16  
Plot Plan (1)
Tube 16  
Sub-Basement and Mezzanine Floor Plans (2)     (revision date illegible) 
Tube 16  
Basement, Basement Mezzanine and First Floor Mezzanine Floor Plans (3), revised  2/15/1922
Tube 16  
First and Second Floor Plans (4), revised  2/14/1922
Tube 16  
Third, Fourth and Truss Space Floor Plans (5), revised  2/14/1922
Tube 16  
Sixth and Seventh Floor Plans (6), revised  5/29/1920
Tube 16  
Fifth and Eighth Floor Plans (7), revised  2/15/1922
Tube 16  
Ninth and Typical Floor Plans (8)
Tube 16  
Twenty-Second, Twenty-Third and Twenty-Fourth Floor Plans (9)
Tube 16  
Roof and Pipe Space Floor Plans (10),  undated
Tube 16  
Woodward Avenue Elevation (11)
Tube 16  
Cadillac Square Elevation (12)
Tube 16  
East Elevation (13)
Tube 16  
West Half of South Elevation and West Elevation of Court and Section on Line "F-F" (14)
Tube 16  
East Half of South Elevation, Section "G-G" and Cross-Section "B-B" (15)
Tube 16  
Transverse Section on Line "D-D" (16)
Tube 16  
Sections "A-A," "C-C" and "E-E" (17)
Tube 16  
Elevation of West Bay, Cadillac Square, and Details of Lower Stories (18)
Tube 16  
Detail of Upper Portion of Cadillac Square and Woodward Ave. Elevations (19)
Tube 16  
First Floor Exterior Details (20)
Tube 16  
Details of Rear Elevation (21)
Tube 16  
Details of Passenger Elevators, Pent House and Stairs #3 (22)
Tube 16  
Sections thru' Elevator Lobby and Freight Elevator (23), revised  January 1921
Tube 16  
Sections thru' Elevators and Details of Passenger Elevator Doors, etc. (24), revised  1/4/1921
Tube 17  
Details of Elevators (25)     (undated due to linen damage) 
Tube 17  
Sections and Details of Stairs (26)
Tube 17  
Sub-Basement Mezzanine, Basement Mezzanine and First Floor Plans (27)
Tube 17  
First Floor Mezzanine and Third and Fourth Floor Plans (28)
Tube 17  
Miscellaneous Floor Plan Details (29)
Tube 17  
Detail of Stack and Typical Wall Sections (30)
Tube 17  
Details of Typical Toilet Rooms and Corridor Office Partitions (31)
Tube 17  
Details of Typical Doors, Toilets and Barber Shop (32),  undated,   revised 9/22/1920
Tube 17  
Details of Girders, Metal Louvres, Skylights, Columns and Walls, etc. (33)
Tube 17  
Details of Window Frames in Main Banking Room, Shop Fronts and Savings Bank (34)
Tube 17  
Plan and Interior Elevations of Directors' Room and Appurtenances on Sixth Floor (35)
Tube 17  
Basement Plan, Elevations and Details (36)
Tube 17  
Interior Designs for Entrance Lobby (37),  9/20/1919 revised  9/22/1920
Tube 17  
Interior Designs for Main Banking Room (38),  9/20/1920 revised  9/22/1920
Tube 17  
Interior Designs for Savings Bank (39)     (date illegible due to linen damage) 
Tube 17  
Typical Floor Plan Showing Revised Widths of Elevator Doors (41),  5/24/1920 revised  9/22/1920 (31-1/2x36-1/2 inches)
Tube 17  
First Floor Plan (47)     (undated due to linen damage)  (39-1/4x53-3/4 inches)
Tube 17  
[Floor Plan], untitled due to linen damage (48),  undated (39-1/4x53 inches)
Tube 17  
Details of Vaults in Sub-Basement Mezzanine, in Basement and at Eighth Floor (50),  11/22/1920 revised  12/21/1920 (32-3/4x37-3/4 inches)
Tube 17  
Details of Vault Furniture and Safe-Deposit Vault Floor Framing (52),  11/22/1920 revised  12/21/1920 (32-3/4x38 inches)
Tube 17  
Details of Furniture in Bank Vault (52A), undated, revised  12/21/1920 (33x38 inches)
Tube 17  
Typical Floor Plan (65)     (undated due to linen damage)  (36-1/2x49 inches)
Tube 17  
Part Plan of Public Elevator Lobby at Twenty-First through Twenty-Fouth Floors (65A),  undated (18x10-3/4 inches)
Tube 17  
Details of Ceiling of Second Floor (Low Part) (82),  3/10/1921 revised  9/7/1921 (27x44-1/2 inches)
 
Structural Drawings,  12/20/1919     (some not numbered or dated due to linen damage)  (Ink-on-linen drawings with pencil notations, 30x50-1/2 to 31-1/2x52-1/2 inches)
Tube 18  
Column Schedule (1-S)
Tube 18  
Column Schedule (2-S)
Tube 18  
Column Schedule (cont.)
Tube 18  
Foundation Plan and Details of Caissons
Tube 18  
[Details of] Foundation Girders and Grillage for Columns 86, 87, 88 and 90
Tube 18  
Sub-Basement Mezzanine and Basement Floor Framing Plans
Tube 18  
Basement Mezzanine and First Floor Framing Plans (7-S)
Tube 18  
First Floor Mezzanine and Second Floor Framing Plans (8-S)
Tube 18  
Third and Fourth Floor Framing Plans (9-S)
Tube 18  
Fifth Floor Framing Plan, revised  10/15/1920
Tube 18  
Sixth Floor and Truss Space Framing Plans
Tube 18  
Seventh and Eighth Floor Framing Plans (12-S)
Tube 18  
Ninth Floor Framing Plan, revised  8/24/1920
Tube 18  
Typical Floor Framing Plan
Tube 18  
Twenty-First, Twenty-Second and Twenty-Third Floor Framing Plans (15-S)
Tube 18  
Twenty-Fourth Floor and Pipe Space Floor Framing Plans (16-S), revised  9/10/1920
Tube 18  
Pent House Floor and Main Roof Framing Plan (17-S), revised  9/1/1920
Tube 18  
Fifth Floor Truss and Girder Details (18-S)
Tube 19  
Wind Bracing Systems A-A and M-M (19-S)
Tube 19  
Wind Bracing Systems D-D, J-J and K-K (22-S)
Tube 19  
Wind System F-F, Woodward Avenue Elevation (24-S)
Tube 19  
Wind System G-H, Rear Elevation (25-S)
Tube 19  
Longitudinal Wind Bracing System M-M.
Tube 19  
Wind System N-N, Cadillac Square Elevation (27-S)
Tube 19  
Wind Bracing Connections, Special Vault and D-Type (28-S),  3/15/1920
Tube 19  
Wind Bracing Systems, B-E and F-Type (29-S),  3/15/1920
Tube 19  
Wind Bracing Systems, C-Type (30-S),  3/15/1920
Tube 19  
Wind Bracing Systems, A, B, C and X-Type (31-S),  3/15/1920
Tube 19  
Wind Bracing Connections, 20, 26 and 30-Inch Spandrel Connections (32-S),  3/15/1920
Tube 19  
Wind Bracing Connections, 18 and 24-Inch Spandrel Connections (33-S),  3/15/1920
Tube 19  
Wind Bracing Connections, 15-Inch Spandrel Connections (34-S),  3/15/1920
Tube 19  
Wind Bracing Connections, 12 and 18-Inch Spandrel Connections
Tube 19  
Untitled drawing (36-S),  undated
Tube 19  
Elevation and Detail of Additional Girder at Caisson for Column #8 (38-S),  9/29/1920 (28-1/2x26 inches)
Tube 19  
Piling Plan (1000-S),  4/12/1920 (26-3/4x34-1/4 inches)
Tube 19  
Cornice Channels, Pipe Space (1016-S),  2/2/1921 (17-1/4x30-1/2 inches)
Tube 19  
Main Cornice Details (1026-S),  6/24/1921 revised  8/5/1921 (16-1/2x39 inches)
Tube 20  
Mechanical Drawings by Albert Kahn, Architects and Engineers,  1/5/1920 (Ink-on-linen drawings with pencil Tube notations, 31-1/4x50-1/4 to 31-1/2x52 inches)
Tube 20  
Section Details and Symbols (1-M), revised 12/3/1920
Tube 20  
Sub-Basement Mezzanine and Sub-Basement Floor Plans (2-M), revised  10/17/1921
Tube 20  
Basement Mezzanine and Basement Floor Plans (3-M), undated, revised  11/11/1921
Tube 20  
First Floor Mezzanine and First Floor Plans (4-M), revised  11/29/1921
Tube 20  
Second Floor Plan and Details of Typical Toilet Room (5-M), revised  5/6/1921
Tube 20  
Third and Fourth Floor Plans (6-M), revised  9/13/1921
Tube 20  
Fifth Floor and Truss Space Plans (7-M), revised  9/13/1921
Tube 20  
Sixth and Seventh Floor Plans (8-M), revised  5/18/1921
Tube 20  
Eighth and Ninth Floor Plans (9-M), revised  3/21/1922
Tube 20  
Typical Floor Plan for Electrical Work Only, Fifth to Twenty-Fourth Floors, and Typical Floor Plan, Tenth to Nineteenth Floors (10-M), revised  5/18/1921
Tube 20  
Twentieth through Twenty-Third Floors Plan and Twenty-Fourth Floor Plan (11-M), revised  5/18/1921
Tube 20  
Pipe Space Plan (12-M), revised 10/6/1921
Tube 20  
Riser Diagrams (13-M), revised5/6/1921
Tube 20  
[Riser Diagram], untitled (14-M), revised  5/6/1921
Tube 20  
[Riser Diagrams], untitled (15-M), revised  5/6/1921
Tube 20  
Sub-Basement Mezzanine and Basement [Electrical] Plans (16-M),  undated
Tube 20  
Riser Diagram-Lighting Feeders and Diagram of Telephone Risers (17-M),  undated
Tube 20  
Riser Diagram-Power Feeders (18-M),  undated (31-1/2x44 inches)
Tube 20  
Layouts of Fan Room in Basement and of Exhaust and Recirculating Duct in Truss Space and Details (19-M), 12/3/1920 revised  10/18/1921
Tube 20  
Typical [Pipe] Installation Plan and Front and Rear Sectional Elevations (20-M),  3/17/1921 revised  5/6/1921
Tube 21  
Sub-Basement Mezzanine [Electrical] Plan (21M),  5/9/1921 revised  8/23/1921
Tube 21  
Basement [Electrical] Plan (22-M),  3/2/1921 revised  8/2/1921
Tube 21  
First Floor [Electrical] Plan (23-M),  5/19/1921 revised  11/29/1921
Tube 21  
First Floor Mezzanine [Electrical] Plan (24-M),  4/27/1921 revised  8/2/1921 (30-1/4x50-3/4 inches)
Tube 21  
Second Floor [Electrical] Plan (25-M),  4/18/1920 revised  8/2/1921
Tube 21  
Third Floor [Electrical] Plan (26-M), revised  8/2/1921
Tube 21  
    (undated due to linen damage) 
Tube 21  
Fourth Floor [Electrical] Plan (27-M),  3/31/1921 revised  8/2/1921
Tube 21  
Fifth Floor [Electrical] Plan (28-M), revised  8/2/1921     (date illegible) 
Tube 21  
Sixth Floor [Electrical] Plan (29-M),  4/13/1921
Tube 21  
Seventh Floor [Electrical] Plan (31-M),  4/12/1921 revised  8/2/1921
Tube 21  
Eighth Floor [Electrical] Plan (32-M), undated, revised  8/2/1921
Tube 21  
Typical Floor [Electrical] Plan (33-M), revised  9/6/1921     (undated due to linen damage) 
Tube 21  
Riser Diagram (34-M),  4/7/1921 revised  6/8/1921
Tube 21  
Truss Space [Electrical] Plan (35-M),  5/19/1921 revised 10/6/1921
Tube 21  
Conduit Schedule and [Electrical] Plans and Sections (36-M),  10/24/1921 (30-3/4x47 inches)
Tube 21  
Wiring Diagram-Electric Sub-Station (37-M), 11/3/1921 (29-3/4x46-1/2 inches)
Tube 21  
[Electrical] Sections (38-M),  11/17/1921 revised  9/20/1922 (31-1/4x46-1/2 inches)
Tube 21  
Pipe Space Plan (39-M)     (undated due to linen damage) 
Tube 21  
Power Risers (40-M),  undated (36x38-3/4 inches)
Tube 21  
Main Distribution of A.C. and D.C. Current (42-M),  8/24/1921 (30-3/4x42-1/4 inches)
Tube 21  
Main Control Switchboard (44-M)     (undated due to linen damage)  (32x41-1/2 inches)
 
University Hospital, University of Michigan, Ann Arbor,  1919-1921, Job No. 850 [subseries]:
 
Construction Drawings by Albert Kahn, Architect (Ink-on-linen drawings)
 
Architectural Drawings,  10/4/1919 (35-1/2x60-1/2to37x64 inches)
Tube 3  
Plot Plan (1)
Tube 3  
Foundation Plan (2), revised  11/17/1919
Tube 3  
Sub-Basement Plan (3), revised  11/17/1919
Tube 3  
Basement Plan (4), revised  11/17/1919
Tube 3  
Ground Floor Plan (5)
Tube 3  
First Floor Plan (6), revised  11/17/1919
Tube 3  
Second Floor Plan (7), revised  11/17/1919
Tube 3  
Third Floor Plan (8)
Tube 3  
Fourth through Tenth Floors Plan (9)
Tube 3  
Roof Plan (10), revised  1/24/1921
Tube 4  
North and South Elevations of Ward Wings and Main Building (11), revised  11/17/1919
Tube 4  
East and West Elevations of Ward Wings and End Elevations of East and West Wings (12)
Tube 4  
East and West Elevations of Demonstration Wing and Sections D-D through GG (13)
Tube 4  
Elevations of Surgical Wing (14)
Tube 4  
Section on Line A-A Looking West and Elevations of Pent House (15), revised  11/17/1919
Tube 4  
Sections through Typical Ward and Demonstration Wings and Details of Fire Escapes (16), revised  11/17/1919
Tube 4  
Details of Ward Wings (17)
Tube 4  
North Elevation of Ward Wing and Main Building and Miscellaneous Details (18)
Tube 4  
Details of Surgical Building (19)
Tube 4  
Details of Amphitheater (20)
Tube 4  
Rear Elevation of Main Ward Building, East Elevation of Demonstration Wing and Miscellaneous Floor Plans (21),  10/30/1919 (17x28 inches)
Tube 4  
Plans, Elevations and Section of Diet Kitchen, Main Ward Building (22),  10/30/1919 revised  6/28/1920 (18x15 inches)
Tube 4  
Revised Plan of Wing between Administration Building and Main Building (27),  9/15/1920 revised 11/2/1920 (20x33 inches)
 
Structural Drawings, 10/4/1919 (36x56 to 37x57 inches)
Tube 5  
Sub-Basement and Basement Framing Plans (1-S), revised  5/7/1920
Tube 5  
Ground Floor Framing (2-S), revised  5/10/1920
Tube 5  
First Floor Framing (3-S), revised  5/10/1920
Tube 5  
Second Floor Framing Plan (4-S), revised  5/11/1920
Tube 5  
Typical Floor Framing Plan, Third through Tenth Floors (5-S), revised  5/12/1920
Tube 5  
Roof Framing (6-S)
Tube 5  
Column Schedule (7-S), revised  4/16/1920
Tube 5  
Plan of Revised Framing , Sub-Basement Floor at Teaching Lab (8-S),  4/15/1920 (19-1/2x23-1/4 inches)
Tube 5  
Change in Framing Adjacent to Administration Building (11-S),  9/15/1920 revised 11/1/1920 (12-1/2x32 inches)
Tube 5  
Detail of Columns Supporting Area Walls (13-S), 12/2/1920 (12-1/2x32 inches)
 
Tables of Electrical Outlets,  undated (16-3/4x36 inches)
Drawer   3 Folder   8
Sub-Basement, Basement and Foundation Floor Plans (101M)
Drawer   3 Folder   8
Basement, Ground and First Floor Plans (102M)
Drawer   3 Folder   8
First Floor Plan (103M)
Drawer   3 Folder   8
Second and Third Floor Plans (104M)
Drawer   3 Folder   8
Third and Fourth Floor Plans (105M)
Drawer   3 Folder   8
Fourth and Fifth Floor Plans (106M)
 
Block Plans,  12/30/1921 revised  4/20/1925 (23x33 inches)
Drawer   3 Folder   8
Sub-Basement Floor Plan (1)
Drawer   3 Folder   8
Basement Floor Plan (2)
Drawer   3 Folder   8
Ground Floor Plan (3)
Drawer   3 Folder   8
First Floor Plan (4)
Drawer   3 Folder   8
Second Floor Plan (5)
Drawer   3 Folder   8
Third Floor Plan (6)
Drawer   3 Folder   8
Fourth Floor Plan (7)
Drawer   3 Folder   8
Fifth Floor Plan (8)
Drawer   3 Folder   8
Sixth Floor Plan (9)
Drawer   3 Folder   8
Roof Plan (10)
 
General Motors (Durant) Building, Detroit, Michigan,  1919-1920, Job No. 902 [subseries]:
 
Project Records  8/2/1919
Box   2  
Specification for Office and Laboratory Building, Durant Building Corporation by Albert Kahn, Incorporated,  8/2/1919
 
Construction Drawings by Albert Kahn, Architect
 
Architectural Drawings,  8/2/1919 (Ink-on-linen drawings with pencil notations, 28-3/4x34 to 29x44 inches)
Drawer   12 Folder   6
Plot Plan Showing Present Buildings (A-1),  undated
Drawer   12 Folder   6
Plot Plan (1)
Drawer   12 Folder   6
Excavation Plan (A-2),  6/6/1919
Drawer   12 Folder   6
Details of Swimming Pools (2), revised  9/2/1919
Drawer   12 Folder   6
Grading Plan (A-3), revised  5/28/1921
Drawer   12 Folder   6
Details of Laboratory Foundations and Tunnel (3)     (undated due to linen damage) 
Drawer   12 Folder   6
Plan of Foundation and Sub-Basement (4), revised  1/3/1922
Drawer   12 Folder   6
Basement Plan (5-R), revised  1/3/1922
Drawer   12 Folder   6
First Floor Plan (6), revised  1/3/1922
Drawer   12 Folder   6
Plan of Mezzanine Floor and First Floor of Laboratory (7), revised  1/3/1922
Drawer   12 Folder   6
Second Floor Plan (8), revised  5/16/1921
Drawer   12 Folder   6
Third Floor Plan (9), revised  5/16/1921
Drawer   12 Folder   6
Fourth Floor Plan (10), revised  9/27/1920
Drawer   12 Folder   6
Fifth Floor Plan (11), revised  9/27/1920
Drawer   12 Folder   6
Typical Floor Plan (12), revised 11/1/1920
Drawer   12 Folder   6
Fourteenth Floor Plan (13), revised  6/23/1920
Drawer   12 Folder   6
Fifteenth Floor Plan (14), revised  6/23/1920
Drawer   12 Folder   6
Plan of Pipe Space and Sixteenth Floor (15), revised  7/20/1920
Drawer   12 Folder   6
Roof Plan (16), revised  6/10/1920
Drawer   12 Folder   7
North Elevation, Grand Boulevard     (not numbered or dated due to print damage)  (sepia print)
Drawer   12 Folder   7
South Elevation, Milwaukee Avenue (18), revised  9/2/1919
Drawer   12 Folder   7
West Elevation, Second Avenue (19), revised  9/2/1919
Drawer   12 Folder   7
Section "A-A" (20), revised  9/2/1919
Drawer   12 Folder   7
Section "B-B" (21), revised  1/3/1922
Drawer   12 Folder   7
Section "C-C" thru' Courts #1, 2 & 4, Looking towards Laboratory (22), revised  7/9/1920
Drawer   12 Folder   7
Section "D-D" thru' Courts # 1, 2 & 4, Looking North (23-R), revised  1/3/1922
Drawer   12 Folder   7
Sections "E-E" and "J-J" (24), revised  1/3/1922
Drawer   12 Folder   7
Elevations of Courts # 2 & 4 and Sections "G-G" and "H-H" (25), revised  5/5/1920
Drawer   12 Folder   7
Section "F-F" thru' Courts # 3 & 7, Looking East (26), revised  5/18/1920
Drawer   12 Folder   7
Section "I-I" thru' Courts # 1 & 8, Looking West (27), revised  1/3/1922
Drawer   12 Folder   7
Details of Driveway (28)     (undated due to linen damage) 
Drawer   12 Folder   7
Details of Main Entrance, West Grand Boulevard (29), revised  9/2/1919 (sepia print)
Drawer   12 Folder   7
Details of Main Entrance (30), revised  9/2/1919
Drawer   12 Folder   7
Details of First Story Windows (31), revised  2/24/1920
Drawer   12 Folder   7
Details of Entrances to Shops on Grand Boulevard and Second and Cass Avenues (32), revised  6/10/1920
Drawer   12 Folder   8
Details of Typical Window Frames and Typical Walls and Spandrels (33), revised  1/3/1922
Drawer   12 Folder   8
Basement Plan, East Half, Future Arrangement (34)     (undated due to linen damage) 
Drawer   12 Folder   8
Wall Sections (34-R), revised  1/3/1922
Drawer   12 Folder   8
Details of Fourteenth and Fifteenth Stories (35), revised  1/3/1922
Drawer   12 Folder   8
Details of Laboratory Entrance Portico, Milwaukee Street Elevation (36), revised  1/3/1922
Drawer   12 Folder   8
Details of Laboratory, Milwaukee Street Elevation (37), revised  7/9/1920
Drawer   12 Folder   8
Details of Laboratory Entrance Steps, Milwaukee Street Elevation (38), revised  7/9/1920
Drawer   12 Folder   8
Detail of Typical Bay for Laboratory (39)     (undated due to linen damage) 
Drawer   12 Folder   8
Details of Connection between Laboratory and Office Building (40), revised  1/3/1922
Drawer   12 Folder   8
Foundation Plan of Stairs, Elevators, etc. of Laboratory Building, Footing Plan of Exterior Columns and Area Walls, and Sections thru' Columns at Basement Floor (41), revised  5/10/1920
Drawer   12 Folder   8
Basement and First Floor Plans of Laboratory Building (42), revised  1/3/1922
Drawer   12 Folder   8
Mezzanine and Second Floor Plans of Laboratory Building (43), revised  1/3/1922
Drawer   12 Folder   8
Plans of Third Floor, Pent Houses at Fifth Floor and North Wall at Fourth Floor of Laboratory Building (44), revised  1/3/1922
Drawer   12 Folder   8
Detail Sections of Elevators L-1 to L-4 and Stairs # 9 (45), revised  1/3/1922
Drawer   12 Folder   8
Cross-Section thru' Laboratory at Fourth Floor, Typical Elevation of Half-Bay and Sections "T-T" and "U-U" thru' Fresh Air Intake and Shaft (46), revised  1/3/1922
Drawer   12 Folder   8
Plans of Stairs # 1 at Basement through Fourth Floors and at East Entrance (47), revised  6/10/1920
Drawer   12 Folder   8
Plans of Stairs # 1 at Eleventh through Fifteenth Floors (48-R),  1/2/1920 revised  9/3/1920
Drawer   12 Folder   9
Details of Elevators "A" to "M" & "Z" and Stairs # 7 & 8 (49), revised  6/10/1920
Drawer   12 Folder   9
Basement Plan of Elevators and Lobby and Details of Freight Elevators (50), revised  7/1920
Drawer   12 Folder   9
Detail Plans of Stairs # 8 & 12 and Elevators "A" to "M" & "W" to "Z" (51), revised  9/1/1920
Drawer   12 Folder   9
Details of Elevators "A" to "M" and Stairs # 2 (52), revised  9/1/1920
Drawer   12 Folder   9
Details of Elevators and Stairs (53), revised  1/3/1922
Drawer   12 Folder   9
Detail Plans of Stairs # 2, 5 & 15 and Elevators "A" to "M" & "Z" (54), revised  6/23/1920
Drawer   12 Folder   9
Plan of Pent House, Plan at Pipe Space and Details of Stairs (55), revised  1/3/1922
Drawer   12 Folder   9
Sections thru' Stairs # 1 & 6, 7 & 8 and 2 & 5 (56), revised  6/10/1920
Drawer   12 Folder   9
Typical Floor Plan Showing Men's Toilet and Stairs # 1 and Elevations and Details of Toilets (57), revised  1/3/1922
Drawer   12 Folder   9
Elevations of Corridors (58), revised  9/1/1920
Drawer   12 Folder   9
Detail Sections of Hollow Metal Doors, Frames and Trim and Section thru' Stair # 15 (59), revised  1/3/1922
Drawer   12 Folder   9
Details of Main Entrance Lobby #104 (60), revised  3/24/1920
Drawer   12 Folder   9
Reflected Ceiling Plans and Elevations of Elevator Lobby and Stairway # 3 (61), revised  9/2/1919
Drawer   12 Folder   9
Elevations and Ceiling Plan of East and West Corridors (62), revised  9/1/1920
Drawer   12 Folder   9
Details of Entrance Lobby # 105 to Laboratory (63), revised  1/3/1922
Drawer   12 Folder   9
Detail Sections thru' Stairs # 10 and Lobby # 210 (64)     (undated due to linen damage) 
Drawer   12 Folder   9
Plan of Sub-Basement and Machine Room (65),  9/9/1919 revised  1/3/1922
Drawer   12 Folder   10
Details of Laboratory Flues (66),  11/12/1919 revised  5/10/1920
Drawer   12 Folder   10
Sections "C-C" and "D-D" thru' Stair # 1 and Elevations and Details for Toilets (67),  1/2/1920 revised  1/3/1922
Drawer   12 Folder   10
Revised Marble and Plaster Work in Stairs # 3 & 4 and Lobbies # 104 & 105 (68),  1/2/1920 revised  2/17/1920
Drawer   12 Folder   10
Detail Sections thru' Stairs # 10 and Lobby # 210, Showing Revised Finish of Plaster and Marble Wainscot (70),  1/3/1920 revised  1/3/1922
Drawer   12 Folder   10
Details of Air Shaft and Revised Details Showing New Location of Two-Part Sliding Doors to Office Building from Driveway (71),  1/6/1920
Drawer   12 Folder   10
Details of West End of Driveway (72), revised  12/11/1920
Drawer   12 Folder   10
Details of Driveway at East End of Building (73),  1/20/1920 revised  12/11/1920
Drawer   12 Folder   10
Details of Doors in Basement (74),  5/11/1920 revised  7/26/1920
Drawer   12 Folder   10
Details of Mailing Room, Monorail and Men Janitors' Locker Room # 5-C (75),  5/11/1920 revised  1/3/1922
Drawer   12 Folder   10
Details of Women's Toilet Room # 21, Toilets # M-8, M-9 & M-13, and Utility Space (76), revised  1/3/1922
Drawer   12 Folder   10
Plan of Mezzanine Floor Utilities Space and Miscellaneous Details (77), revised  1/3/1922
Drawer   12 Folder   10
Basement Plan for Telephone Conduit Layout (78),  undated
Drawer   12 Folder   10
Revisions to Stairs # 8 between Sub-Basement and First Floor and Details of Stairs # 5 (270 & 274),  3/30/1920 revised  7/23/1920
 
Structural Drawings (Ink-on-linen drawings with pencil notations, 37-1/2x47 to 36-1/4x48 inches)
Drawer   12 Folder   11
Column Schedule (1-S), revised  9/2/1919
Drawer   12 Folder   11
Column Schedule (2-S), revised  9/2/1919
Drawer   12 Folder   11
Details of Columns (3-S),  8/11/1919
Drawer   12 Folder   11
Half Framing Plan of First Floor (4-S),  9/22/1919
Drawer   12 Folder   11
Half Framing Plan of Mezzanine Floor, revised  9/22/1919     (not numbered due to linen damage) 
Drawer   12 Folder   11
Half Framing Plan of Second Floor (6-S), revised  9/9/1919
Drawer   12 Folder   11
Third Floor Framing Plan (7-S), revised  9/2/1919
Drawer   12 Folder   11
Typical Floor Half Framing Plan of Fourth to Eleventh Floors (8-S),  6/28/1919 revised  9/10/1919
Drawer   12 Folder   11
Plan of Framing Adjoining Laboratory at First Floor of Laboratory (9-S),  6/28/1919 revised  9/13/1919
Drawer   12 Folder   11
Half Framing Plan of Twelfth and Thirteenth Floors (10-S),  7/1/1919 revised  8/2/1919
Drawer   12 Folder   11
Half Framing Plan of Fourteenth Floor (11-S),  8/1/1919
Drawer   12 Folder   11
Half Framing Plan of Fifteenth Floor (12-S), revised  9/2/1919
Drawer   12 Folder   11
Half Framing Plan of Pipe Gallery     (not numbered or dated due to linen damage) 
Drawer   12 Folder   11
Half Framing Plan of Roof (14-S), revised  9/15/1919
Drawer   12 Folder   11
Wind Bracing Details (15-S), revised  9/6/1919
Drawer   13 Folder   1
Girder Details (16-S),revised  8/6/1919
Drawer   13 Folder   1
Details of Girders and Trusses (17-S), revised  9/23/1919
Drawer   13 Folder   1
Penthouse Roof Plan and Truss Details (18-S), revised  9/16/1919
Drawer   13 Folder   1
Framing Plan of Ground, First, Second and Forty-Third Floors of Laboratory (19-S), revised  9/24/1919
Drawer   13 Folder   1
Framing Plan of Fourth Floor and Penthouses (20-S),  8/2/1919 revised  10/16/1919
Drawer   13 Folder   1
Beam Schedule for Laboratory Building,  10/17/1919     (not numbered due to linen damage) 
Drawer   13 Folder   1
Details of Trusses for Laboratoy (22-S),  8/1/1919 revised  8/15/1919
Drawer   13 Folder   1
Footing Schedule,  8/8/1919 revised 10/8/1919     (not numbered due to linen damage) 
Drawer   13 Folder   1
Details of Retaining Walls of Main Building (24-S),  undated
Drawer   13 Folder   1
Details of Retaining Walls around Sub-Basement (25-S), revised  10/15/1919
Drawer   13 Folder   1
Details of Men's and Women's Swimming Pools (26-S),  undated
Drawer   13 Folder   1
Details of Trusses (27-S)     (undated due to linen damage) 
Drawer   13 Folder   1
Column Schedule (28-S)     (undated due to linen damage) 
Drawer   13 Folder   1
Details of Roof and Pipe Gallery Framing     (not numbered or dated due to linen damage) 
 
Structural "Sketches" (Ink-on-linen drawings with pencil notations)
Drawer   13 Folder   2
Section thru' Vacuum Room of Laboratory Building (112-S),  9/9/1919 revised  9/15/1919 (12-1/2x22-3/4 inches)
Drawer   13 Folder   2
Plan and Revised Layout of Retaining Wall between Columns # 263 & 176A (113-S),  9/12/1919 (10-1/4x34 inches)
Drawer   13 Folder   2
Elevation of Retaining Walls at Driveways (114-S),  9/17/1919 revised  9/18/1919 (17x22 inches)
Drawer   13 Folder   2
Elevation Showing Location of Bolts for Beam Seats for Beams Connecting Laboratory with Durant Building (115-S),  9/29/1919 revised  10/13/1919 (15-1/4x37 inches)
Drawer   13 Folder   2
Elevation Showing Location of Bolts for Beam Seats for Beams Connecting Laboratory with Durant Building (117-S),  10/10/1919 (15-1/2x38-3/4 inches)
Drawer   13 Folder   2
Plan and Section of Proposed Walkway around Testing Machine Opening at Ground Floor Level-Laboratory Building (119-S),  1/10/1920 (14x22 inches)
Drawer   13 Folder   2
Elevation Showing Location of Bolts for Beam Seats for Beams Connecting Laboratory with Durant Building at Second Floor of Laboratory (120-S),  10/13/1919 (14-3/4x38-1/4 inches)
Drawer   13 Folder   2
Elevation Showing Location of Bolts for Beam Seats for Beams Connecting Laboratory with Durant Building at Third Floor of Laboratory (121-S),  10/15/1919 (15x38-1/2 inches)
Drawer   13 Folder   2
Details of Concrete Columns Supporting Steel Girders, Showing Base Plates and Anchor Bolts for Same-Laboratory Building (122-S),  10/21/1919 (13x26-1/4 inches)
Drawer   13 Folder   2
Details of Pipe Sleeves in Laboratory (124-S), 11/4/1919 revised  11/26/1919 (24-1/2x33-1/2 inches)
Drawer   13 Folder   2
Details of Instrument Tower-Laboratory Building (125-S),  11/12/1919 (26x32 inches)
Drawer   13 Folder   2
Plan and Section of Openings in Floors for Steam Risers (128-S), 12/3/1919 (15-1/2x20 inches)
 
Structural Drawings (cont.) (Black and red ink drawings on linen with pencil notations, 24-1/4x30 to 28x43-1/2 inches)
Drawer   13 Folder   3
Changes in Framing at Vents B and F (132-S),  1/19/1920 revised  4/22/1920 (Pencil-on-vellum drawing)
Drawer   13 Folder   3
Plans and Sections of Beams and Girders-Field Work, First and Second Floors (133-S),  1/19/1920 revised  2/20/1920
Drawer   13 Folder   3
Details of Brackets on Columns Supporting Girders and Trusses in Laboratory (136-S),  1/28/1920
Drawer   13 Folder   3
Details of Brackets Supporting Beams, Ground to Fourth Floors (139-S),  2/2/1920 revised  3/12/1920
Drawer   13 Folder   3
Details of Framing for Locker Rooms in Courts # 2 & 4 (140-S),  4/1/1920 revised  4/21/1920
Drawer   13 Folder   3
Details of Concrete Spandrels in Courts # 1 & 5 at Second Floor (141-S),  2/19/1920 revised  3/25/1920
Drawer   13 Folder   3
Details of Bracing for Girder G-36 (143-S),  3/22/1920
Drawer   13 Folder   3
Revised Details of Columns 77, 78 & 96-A at Fourteenth Floor, Elevator "A" (144-S),  4/21/1920
Drawer   13 Folder   3
Plan and Sections of Pit for Elevator "A" and Details of Pipe Chase in Sub-Basement (151-S),  4/20/1920
Drawer   13 Folder   3
Part Plans and Sections of Laboratory Floors over Openings for Tower and Machine Room (154-S),  4/15/1920
Drawer   13 Folder   3
Plans of Stairways # 17-20 (157-S),  4/26/1920 revised 10/6/1920
Drawer   13 Folder   3
Details of New Brackets on Columns 332 & X91-A (160-S),  4/29/1920 revised  5/7/1920
Drawer   13 Folder   3
Plans and Sections of Framing and Footings in Basement Truckway (161-S & 162-S),  5/11/1920 revised  5/22/1920
Drawer   13 Folder   3
Details of Floor over Vacuum Room Opening in Laboratory (165-S),  5/17/1920
Drawer   13 Folder   3
Record of Test Borings (188-S),  9/23/1920
 
Mechanical Drawings,  8/12/1919 (Ink-on-linen drawings with pencil notations, 36x44-1/4 to 36-1/4x48 inches)
Drawer   13 Folder   4
Plot Plan, revised  2/4/1920     (not numbered due to linen damage) 
Drawer   13 Folder   4
Sub-Basement Plan, East Half (2-M), revised 12/6/1920
Drawer   13 Folder   4
Sub-Basement Plan, West Half (3-M), revised  12/27/1922
Drawer   13 Folder   4
Basement Plan, East Half (4-M), revised  5/23/1921
Drawer   13 Folder   4
Basement Plan, West Half (5-M), revised  8/17/1922
Drawer   13 Folder   4
First Floor Plan, East Half (6-M), revised  10/26/1921
Drawer   13 Folder   4
First Floor Plan, West Half (7-M), revised  8/17/1922
Drawer   13 Folder   4
Mezzanine Floor Plan, East Half (8-M), revised  5/23/1921
Drawer   13 Folder   4
Mezzanine Floor Plan, West Half (9-M), revised  2/24/1922
Drawer   13 Folder   4
Second Floor Plan, East Half (10-M), revised  6/16/1920
Drawer   13 Folder   4
Second Floor Plan, West Half (11-M), revised  8/6/1920
Drawer   13 Folder   4
Typical Floor Plan of Floors # 3 to 12, East Half (12-M), revised  6/16/1920
Drawer   13 Folder   4
Typical Floor Plan of Floors # 3 to 13, West Half (13-M), revised  6/18/1920
Drawer   13 Folder   5
Fourteenth Floor Plan, East Half (14-M), revised  5/2/1922
Drawer   13 Folder   5
Fourteenth Floor Plan, West Half (15-M), revised  9/8/1920
Drawer   13 Folder   5
Fifteenth Floor Plan, East Half (16-M), revised  5/2/1922
Drawer   13 Folder   5
Fifteenth Floor Plan, West Half (17-M), revised  6/11/1920
Drawer   13 Folder   5
Pipe Space Plan, East Half (18-M), revised  9/8/1920
Drawer   13 Folder   5
Pipe Space Plan, West Half (19-M), revised  8/5/1920
Drawer   13 Folder   5
Pent House Plan and Vent Riser Details (20-M), revised  8/5/1920
Drawer   13 Folder   5
Drainage Plan, Laboratory (21-M), revised  4/20/1920
Drawer   13 Folder   5
Basement Plan, Laboratory (22-M), revised  8/24/1921
Drawer   13 Folder   5
Ground Floor Plan, Laboratory (23-M), revised  10/21/1921
Drawer   13 Folder   5
First Floor Plan, Laboratory (24-M), revised  10/21/1921
Drawer   13 Folder   5
Second Floor Plan, Laboratory (25-M), revised  8/24/1921
Drawer   13 Folder   5
Third Floor Plan, Laboratory (26-M), revised  8/24/1921
Drawer   13 Folder   6
Fourth Floor Plan, Laboratory (27-M)     (undated due to linen damage) 
Drawer   13 Folder   6
Machine Room Plan (28-M), revised  7/20/1920
Drawer   13 Folder   6
Swimming Pool Details (29-M), revised  1/28/1920
Drawer   13 Folder   6
Piping Diagrams (30-M)     (undated due to linen damage) 
Drawer   13 Folder   6
Piping Details (31-M), revised  5/18/1920
Drawer   13 Folder   6
Tunnel Piping Details (32-M),  9/13/1919 revised  7/6/1920
Drawer   13 Folder   6
Heating Riser Diagram (33-M), revised  6/11/1920
Drawer   13 Folder   6
Heating Riser Diagram (34-M), revised  6/11/1920
Drawer   13 Folder   6
Heating Riser Diagram (35-M), revised  1/31/1920
Drawer   13 Folder   6
Heating Riser Diagram (36-M), revised  10/19/1920
Drawer   13 Folder   6
Heating Riser Diagram (37-M), revised  1/31/1920
Drawer   13 Folder   6
Details of Pipe Shafts (38-M), revised  1/22/1920
 
Electrical Drawings (Ink-on-linen drawings with pencil notations, 36x48 to 36x51 inches)
Drawer   13 Folder   7
Sub-Basement Plan (39-M),  10/10/1919 revised  6/17/1920
Drawer   13 Folder   7
Basement Wiring Plan, East Half (40-M),  1/8/1920 revised  6/17/1920
Drawer   13 Folder   7
Basement Wiring Plan, West Half (41-M),  8/12/1919 revised 11/1/1920
Drawer   13 Folder   7
First Floor Plan (42-M),  10/10/1919 revised  11/26/1920
Drawer   13 Folder   7
Mezzanine Floor Plan (43-M),  10/10/1920 revised  6/1/1920
Drawer   13 Folder  
Second Floor Plan (44-M),  10/10/1920 revised  5/29/1920
Drawer   13 Folder   7
Typical Floor Plan, East Half, Third to Twelfth Floors (45-M),  6/21/1920 revised  6/25/1920
Drawer   13 Folder   7
Plan of Center Connection between Main Building and Laboratory (46-M),  10/10/1919 revised  6/20/1920
Drawer   13 Folder   7
Fourteenth Floor Lighting Plan, East Half (47-M), revised  1/9/1922
Drawer   13 Folder   7
Fifteenth Floor Lighting Plan, East Half (48-M),  7/17/1920 revised  1/9/1922
Drawer   13 Folder   7
Fifteenth Floor Lighting Plan, West Half (49-M),  7/17/1920 revised  1/9/1922
Drawer   13 Folder   7
Fifteenth Floor and Pipe Space Plan, East Half-Kitchen Wiring (50-M),  1/8/1920 revised  1/9/1922
Drawer   13 Folder   7
Sixteenth Floor and Pipe Space Wiring Plan, West Half-Wiring (51-M),  1/8/1920 revised  1/9/1922     (letter from F. Gossman attached, 1/29/1965) 
Drawer   13 Folder   7
Pent House Plan (52-M),  10/10/1919 revised  3/26/1920
Drawer   13 Folder   8
Basement Plan, Laboratory (53-M),  9/21/1919 revised  1/9/1922
Drawer   13 Folder   8
Ground Floor Plan, Laboratory (54-M),  10/10/1919 revised  1/9/1922
Drawer   13 Folder   8
First Floor Plan, Laboratory (55-M),  10/10/1919 revised  1/9/1922
Drawer   13 Folder   8
Second Floor Plan, Laboratory (56-M),  10/10/1919 revised  1/9/1922
Drawer   13 Folder   8
Third Floor Plan, Laboratory (57-M),  10/10/1919 revised  10/17/1920
Drawer   13 Folder   8
Fourth Floor Plan, Laboratory (58-M),  8/12/1919 revised  1/9/1922
Drawer   13 Folder   8
Light and Power Riser Diagram (59-M),  10/10/1919 revised  1/9/1922
Drawer   13 Folder   8
Plan of Electrical Conduit Lines and Sections of Duct Lines (60-MR), revised  5/21/1920
Drawer   13 Folder   8
Site Plan of Additions to Sewers by Albert Kahn, Architect, Ernest Wilby, Associate (61-M), revised  12/16/1919 (17-1/2x30 inches)
Drawer   13 Folder   8
First Floor Plan, Laboratory by Albert Kahn, Architect, Ernest Wilby, Associate (62-M),  10/22/1919 (17-1/2x31-1/2 inches)
Drawer   13 Folder   8
Layout of Electrical Lab, East End of First Floor (63-M), revised  11/20/1919 (27-1/2x60 inches)
Drawer   13 Folder   8
Plan of Register Openings (64-M),  undated (17-1/2x31-1/2 inches)
Drawer   13 Folder   8
Layout of Electric Sub-Station in Laboratory Basement (64-M), ?/17/1920 revised  7/7/1921 (Pencil-on-paper drawing, 27x38-1/4 inches)
Drawer   13 Folder   8
Details of Power House Tunnel, revised  1/20/1920     (not numbered due to linen damage)  (30-1/4x54 inches)
Drawer   13 Folder   8
Plan Showing Location of Light Outlets in Typical Bays by Albert Kahn, Architect, Ernest Wilby, Associate (66-M),  12/16/1919 (17x30-3/4 inches)
Drawer   13 Folder   8
Riser Diagrams for Low Tension Conduit, Clock and Telephone Systems, Main Building and Laboratory (67-M),  2/3/1920 revised  1/9/1922
 
Mechanical and Electrical Drawings (Ink-on-linen drawings, 36x48 to 36x51 inches)
Drawer   13 Folder   9
Plan of Revised Machine Room Piping (68-M), revised  5/23/1921
Drawer   13 Folder   9
Layout of Sprinkler, Basement (69-M),  undated
Drawer   13 Folder   9
Thirteenth Floor Radiator Plan (70-M),  6/11/1920 revised  1/9/1922
Drawer   13 Folder   9
Thirteenth Floor Lighting Plan, revised  1/9/1922     (not numbered due to linen damage) 
Drawer   13 Folder   9
Detail of Special Manhole Cover (75-M),  6/23/1920 (17-1/2x30-3/4 inches)
Drawer   13 Folder   9
Details of Refrigerator Piping (76-M),  1/9/1922
Drawer   13 Folder   9
Elevations and Details of Laboratory Power Cabinets (77-M), revised  10/17/1920
Drawer   13 Folder   9
Fire Alarm Riser Diagram (80-M),  8/24/1920 (25-1/2x26 inches)
Drawer   13 Folder   9
Thirteenth and Fourteenth Floor Plans (83),  10/18/1920 revised  1/9/1922 (21-1/4x39-3/4 inches)
Drawer   13 Folder   9
Details of Supply and Return Connections to Vento Heaters for Fan Units (85-M),  11/18/1920 (17-1/2x31 inches)
Drawer   13 Folder   9
First Floor Electrical Plan by Albert Kahn Architect and Engineers (88-M), 12/9/1921 revised  1/9/1922
Drawer   13 Folder   9
Electrical Plan of Mezzanine over Sales Rooms # 106-B & 106-C by Albert Kahn Architects and Engineers (89-M),  1/12/1922 revised  1/9/1922
Drawer   13 Folder   9
Mezzanine Floor Electrical Plan by Albert Kahn Architects and Engineers (90-M),  1921 revised  1/9/1922
Drawer   13 Folder   9
First Floor Electrical Plan, West End     (not numbered or dated due to paper damage)  (Pencil-on-paper drawing, 19-3/4x28-1/2 inches)
Drawer   13 Folder   9
Details of Transformer Room No. 1     (not numbered or dated due to linen damage)  (29-1/2x41 inches)
Drawer   13 Folder   9
Details of Transformer Room No. 1,  5/26/1920     (not numbered due to linen damage)  (29-1/2x42 inches)
Drawer   13 Folder   9
Details of Transformer Room No. 2     (not numbered or dated due to linen damage)  (29-1/2x40-1/4 inches)
Drawer   13 Folder   9
Details of Transformer Room No. 2 (48-M),  5/20/1920 (30x41 inches)
 
The New Temple Beth El, Detroit, Michigan,  1920-1922, Job No. 821 [subseries]:
 
Construction Drawings by Albert Kahn, Architect,  undated (Ink-on-linen drawings, 26x33 inches)
 
Architectural Drawings
Drawer   4 Folder   1
Plot Plan (1),  4/18/1921 revised  5/17/1921
Drawer   4 Folder   1
Foundation Plan (2),  5/3/1921 revised  5/17/1921
Drawer   4 Folder   1
Basement Plan (3), revised  5/4/1922
Drawer   4 Folder   1
First Floor Plan (4), revised  2/14/1922
Drawer   4 Folder   1
Second Floor Plan (5), revised  2/14/1922
Drawer   4 Folder   1
Third Floor Plan (6), revised  2/14/1922
Drawer   4 Folder   1
Fourth Floor Plan (7), revised  2/14/1922
Drawer   4 Folder   1
Roof Plan (8),  11/11/1920 revised  5/17/1921
Drawer   4 Folder   1
Woodward Avenue and Gladstone Avenue Elevations (9), revised  5/17/1921
Drawer   4 Folder   1
Rear and North Elevations (10), revised 2/14/922
Drawer   4 Folder   1
Cross-Section, Main Auditorium, and Longitudinal Section (11), revised  5/17/1921
Drawer   4 Folder   1
Elevations of Basement Lobby and Sections C-C, D-D and E-E (12), revised  2/14/1922
Drawer   4 Folder   1
Exterior Details (13), revised  5/17/1921
Drawer   4 Folder   2
Plan of Columns, Door Elevations and Window Details (14), revised  5/17/1921
Drawer   4 Folder   2
Half-Plan of Ceiling under Balcony and Views Looking East and West (15), revised  2/14/1922
Drawer   4 Folder   2
South Elevation of Main Auditorium Line A-A and Elevations of Lobby #101 (16), revised  2/14/1922
Drawer   4 Folder   2
Corridor Elevations and Details of Men's Room #110 and Ladies Room #105 (18), revised  5/17/1921
Drawer   4 Folder   2
Interior Details of Assembly Room (19), revised  2/14/1922
Drawer   4 Folder   2
Details of Windows and Wardrobes in Class Rooms (20),  11/11/1920 revised  5/17/1921
Drawer   4 Folder   2
Details of Stair #3 (21), revised  5/17/1921
Drawer   4 Folder   2
Details of Main Stairs #2 (22),  11/11/1920 revised  5/17/1921
Drawer   4 Folder   2
Details of Passenger and Freight Elevators, Library Bookshelves and Dumbwaiter (23), revised  2/14/1922
Drawer   4 Folder   2
Details of Dining Room #1 and Women's and Men's Showers (24), revised  2/14/1922
Drawer   4 Folder   2
Revised Layout of Organ Space and Choir Gallery (30),  2/8/1922 (18x29 inches)
Drawer   4 Folder   2
West and South Elevations (38),  9/28/1922 revised  10/18/1922 (13x33 inches)
 
Structural Drawings
Drawer   4 Folder   3
Roof Framing Plan (1-S), revised  8/13/1921
Drawer   4 Folder   3
Fourth Floor Plan (2-S), revised  5/17/1921
Drawer   4 Folder   3
Third Floor Framing (3-S), revised  9/28/1921
Drawer   4 Folder   3
Second Floor Plan (4-S), revised  2/24/1922
Drawer   4 Folder   3
First Floor Framing (5-S), revised  8/20/1921
Drawer   4 Folder   3
Columns and Footings (6-S), revised  8/17/1921
Drawer   4 Folder   3
Truss Details (7-S), revised  8/13/1921
Drawer   4 Folder   3
Steel and Concrete Girders (8-S), revised  5/17/1921
Drawer   4 Folder   3
Main Dome Rib, Balcony Framing, Truss T2 and Details of Column Bases (9-S), revised  5/17/1921
 
Mechanical Drawings,  12/22/1920
Drawer   4 Folder   3
Foundation Plan (1M), revised  8/17/1921
Drawer   4 Folder   3
Basement Plan (2M), revised  2/8/1922
Drawer   4 Folder   3
First Floor Plan (3M), revised  6/2/1921
Drawer   4 Folder   3
Second Floor Plan (4M), revised  6/2/1921
Drawer   4 Folder   3
Third Floor Plan (5M), revised  6/2/1921
Drawer   4 Folder   3
Fourth Floor Plan (6M), revised  3/7/1922
Drawer   4 Folder   3
Detail of Ventilating Equipment in Basement (7M), revised  8/17/1921
Drawer   4 Folder   3
Heating Riser Diagram and Details (8M), revised  6/2/1921
Drawer   4 Folder   3
Boiler Room (9M), revised  8/17/1921
 
William L. Clements Library, University of Michigan, Ann Arbor,  1921-1922, Job No. 1001 & 1001-B [subseries]:
 
Program Document
Drawer   4 Folder   4
Campus of the University of Michigan at Ann Arbor [Site Plan] by Rippey and Newton,  8/27/1897 (Ink-on-linen drawing, 35x29 inches)
 
Design Development (Block Plans) Drawings by Albert Kahn, Architect,  undated (Ink-on-linen drawings, 20x20 inches)
Drawer   4 Folder   4
Basement Plan
Drawer   4 Folder   4
First Floor Plan
Drawer   4 Folder   4
Second Floor Plan
 
Construction Drawings by Albert Kahn, Architect (Ink-on-linen drawings, 27x42 inches)
 
Architectural Drawings,  12/14/1921
Drawer   4 Folder   4
Plot Plan (1), revised  5/23/1922
Drawer   4 Folder   4
Basement Plan and First Floor Plan (2)
Drawer   4 Folder   4
Attic Plan and Second Floor Plan (3)
Drawer   4 Folder   4
North, South and East Elevations and Section A-A (4), revised  12/24/1921
Drawer   4 Folder   4
Section thru' Window at Each Side of Entrance, Section on Line A-A, Elevation of Loggia and Section thru' Loggia (5)
Drawer   4 Folder   4
Detail Plans of Loggia, Details of Terrace Steps and Railing and Details of Fan Room (6)
Drawer   4 Folder   4
Plans and Sections of Windows in Main Reading Room, in Alcove and on North Elevation (7), revised  12/24/1921
Drawer   4 Folder   4
Details of Main Reading Room and Custodian's Room (8)
Drawer   4 Folder   4
Details of Main Reading Room, Rare Book Room, Men's and Women's Toilet, Balcony, Main Entrance-Vestibule, Doors and Windows (9)
Drawer   4 Folder   4
Details of Stairs and Dumb Waiter Door (10)
Drawer   4 Folder   4
Alternate Scheme for Approach (11), revised  12/24/1921
Drawer   4 Folder   4
Plan for New Pavement (3),  9/11/1925 (Pencil-on-vellum drawing, 18x23 inches)
 
Structural Drawings,  12/14/1921
Drawer   4 Folder   5
Roof and Ceiling Framing Plans and Truss Details (1S)
Drawer   4 Folder   5
First and Second Floor Framing Plan (2S)
 
Mechanical Drawings,  8/23/1921
Drawer   4 Folder   5
Basement and Foundation Plans (1M), revised 12/6/1921
Drawer   4 Folder   5
First and Second Floor Plans (2M), revised 12/6/1921
Drawer   4 Folder   5
Attic Plan (3M), revised 11/9/1921
Drawer   4 Folder   5
Ventilating Equipment by Albert Kahn, Inc., Architects & Engineers (1M), Job No. 1001-B,  10/11/1928
 
Ford Motor Company Glass Manufacturing Plant, River Rouge, Michigan,  1922-1923, Job No.  1071 [subseries]:
 
Construction Drawings by Albert Kahn, Architect (Ink-on-linen drawings, 28x63 inches)
 
Architectural Drawings,  10/9/1922
Tube 6  
[Site Plan], untitled (1)
Tube 6  
Foundation Plan (2), revised  5/23/1923
Tube 6  
First Floor Plan (3), revised  6/27/1923
Tube 6  
Roof Plan (4),  11/23/1922
Tube 6  
Elevations (5), revised  11/23/1922
Tube 6  
Sections thru' Main Building (6), revised  5/2/1923
Tube 6  
Plans of Storage Bins, Cross-Section thru' Furnace Room and Details (7), revised  5/23/1923 (One drawing and one electrostatic print on mylar)
Tube 6  
Details of Conveyor Bin, Rolling Curtain, Railroad Tracks and Exterior (8), revised  5/23/1923
Tube 6  
Details of Storage Bins and Conveyor Pits (9), revised  11/23/1922
Tube 6  
Details of Balcony, Sand Tanks, Toilets, Stairs and Loading Platform (10), revised  8/1/1923
Tube 6  
Details of Roof and Wall Sections (11), revised  11/23/1922
Tube 6  
Plans and Elevations of Sub-Station No. 9 (19-A), undated, revised  11/23/1923 (28-1/4x32-1/4 inches)
Tube 6  
Sections and Stair Details of Sub-Station No.9 (19-B), undated, revised  2/12/1923 (28-1/2x33-1/4 inches)
Tube 6  
General Plan of Grinder Foundations (20),  2/5/1923 revised  11/19/1923 (22-1/2x40-3/4 inches)
 
Structural Drawings,  undated
Tube 7  
Roof Plan and Column and Footing Schedules (1-S), revised  11/11/1922
Tube 7  
Sections (2-S), revised  11/23/1922
Tube 7  
Sections (3-S), revised  11/11/1922
Tube 7  
Plans of Balcony, Charging Floor and Toilets (4-S), revised  11/27/1922
Tube 7  
Elevations (5-S), revised  11/11/1922
Tube 7  
Plans and Sections of Concrete Storage Bins (6-S), revised  11/11/1922
Tube 7  
Details of Connections to Concrete Bins (7-S), revised  11/11/1922
 
Mechanical Drawings
Tube 7  
Foundation Plan (1M),  12/22/1922 revised  3/27/1923
Tube 7  
First Floor Plan and Section "AA" (2M), 11/3/1922 revised  3/27/1923
Tube 7  
First Floor Plan and Sections "AA" & "BB" (3M), undated, revised  7/6/1923
Tube 7  
Heating Plan (4M),  12/29/1922 revised  5/2/1923
 
Ford Motor Company Engineering Laboratory, Dearborn, Michigan,  1922-1926 1929-1930, Job Nos. 1077 1077-K, 1077-L & 1077-S [subseries]:
 
Engineering Laboratory Building by Albert Kahn, Architect (1922-1924) Job No. 1077
 
Architectural Construction Drawings,  9/14/1922 (Ink-on-linen drawings with pencil and blue and orange pencil revisions, 30-1/4x56-3/4 to 30-1/4x59-1/2 inches)
Tube 8  
Plot Plan (1A), revised  6/13/1923
Tube 8  
Foundation Plan and Schedule of Columns and Footings (1), revised  6/13/1923
Tube 8  
Basement Plan (2), revised  6/6/1923
Tube 8  
First Floor and Basement Plans (3), revised  6/13/1923
Tube 8  
Second Floor and Roof Plans (4), revised  4/25/1923
Tube 8  
Details of Monitors and Columns (5), revised  4/25/1923
Tube 8  
East and West Elevations, Sections and Details (6), revised  4/25/1923
Tube 8  
North, South, East and West Elevations (7), revised  6/19/1923
Tube 8  
Details of Front-Center (8), revised 10/6/1923
Tube 8  
Details of End Features (9), undated, revised  5/2/1923
Tube 8  
Details of Pylons and East Elevation (10), revised  4/25/1923
Tube 8  
Details of Toilet and Fan Rooms (11R),  6/24/1924 revised  7/14/1924
Tube 8  
Basement Wall Details (14),  6/19/1923 (30x28 inches)
 
Structural Construction Drawings (Ink-on-linen drawngs with red and blue pencil revisions, 30x56-1/2 to 30x57-1/2 inches)
Tube 9  
First Floor Framing Plan (11-S), undated, revised  7/27/1923
Tube 9  
Details of First Floor Beams (12-S),  5/29/1923 revised  8/16/1923
Tube 9  
Details of Concrete Columns (13-S), undated, revised  6/13/1923
Tube 9  
Second Floor and Roof Framing Plans and Truss Details (14-S),  5/21/1923
Tube 9  
Roof Framing Plan, Cross-Section and Beam Schedule (15-S),  undated
Tube 9  
Details of Roof Girders (16-S), undated, revised  7/31/1923
Tube 9  
Details of Roof Beams (17-S),  2/19/1923 revised  8/9/1923
Tube 9  
Details of Beams     (not numbered or dated due to linen damage) 
Tube 9  
Foundation and Floor Plans of Printing Press and Paper Storage Rooms (18),  8/2/1923
Tube 9  
Basement Floor Plan, Plans and Details of Office Building and Fan Rooms (19-S),  8/1/1923
Tube 9  
Details of Transformer Rooms (21-S),  12/19/1923 (Pencil-on-vellum drawing, 19-1/2x36 inches)
 
Mechanical Construction Drawings (Black and red ink-on-linen drawings with pencil and blue pencil revisions, 30-1/4x57-1/2 inches)
Tube 9  
Plans of Basement and Fan Rooms (2M), revised  6/13/1924     (undated due to linen damage) 
Tube 9  
First and Second Floor Plans and Details (3M),  5/16/1923 revised  6/18/1924
Tube 9  
Ventilating Details (4M),  6/27/1923 revised  9/24/1923
Tube 9  
Second Floor, Attic Space and Exhaust Fan Plans (5M),  10/10/1922 revised  7/3/1924
Tube 9  
Basement Electrical Plan (7M),  6/19/1923 revised  3/20/1924
Tube 9  
First Floor, Second Floor and Attic Space Electrical Plans (8M), revised  4/18/1924     (undated due to linen damage)  (31x56 inches)
Tube 9  
First and Second Floor Heating and Ventilating Plans (10M),  2/6/1924 revised  7/8/1924 (30-3/4x46 inches)
Tube 9  
Revised First and Second Floor Lighting Layout in Office Portion of Laboraory (11M), undated, revised  4/18/1924 (25-1/2x49-1/4 inches)
Tube 9  
Revised First Floor Lighting Layout in Office Portion of Laboratory (100M), undated, revised  2/20/1924 (22x54-1/2 inches)
Tube 9  
Plan and Longitudinal Elevation (117M)     (undated due to linen damage)  (24-3/4x55 inches)
 
Extension to Engineering Laboratory Building (1925) Job No. 1077-L
 
Architectural Construction Drawings by Albert Kahn, Inc., Architects,  4/29/1925 revised  9/11/1925 (Ink-on-linen drawings, 29x45-1/2 inches)
Drawer   9 Folder   10
Plot Plan (1)
Drawer   9 Folder   10
Present Floor Plan (1-A),  7/1/1925 (Pencil-on-vellum drawing, 28x44 inches)
Drawer   9 Folder   10
Present Building Foundation Plan (2), revised  8/7/1925
Drawer   9 Folder   10
First Floor Plan (3)
Drawer   9 Folder   10
Roof Plan (4)
Drawer   9 Folder   10
Elevations and Sections (5)
Drawer   9 Folder   10
Door Details (6)
Drawer   9 Folder   10
Roof Details (7)
Drawer   9 Folder   10
Elevations of Connecting Passage and Details (8)
 
Structural Construction Drawings by Albert Kahn, Inc., Architects (Ink-on-linen drawings)
Tube 9  
Typical Cross Section and Details (1-S), undated, revised  July 1925 (26-1/4x47-1/2 inches)
Tube 9  
Roof Framing Plan (2-S)     (undated due to linen damage)  (27-1/2x54-1/4 inches)
Tube 9  
Cross-Section Showing Alternate Design for Roof (3-S), undated, revised  7/3/1925 (27-1/4x56 inches)
 
Mechanical Construction Drawings by Albert Kahn, Inc., Architects (Ink-on-linen drawings with blue pencil revisions)
Drawer   10 Folder   1
First Floor Plan, Section "AA" and Details (2-M),  5/20/1925 revised  10/28/1925 (30x48 inches)
Drawer   10 Folder   1
Heating Details, etc. (3-M),  5/20/1925 revised  9/24/1925 (30-1/4x47-1/2 inches)
Drawer   10 Folder   1
First Floor Plan (4-M), undated, revised 11/9/1925 (29-1/2x48 inches)
Drawer   10 Folder   1
Plan of Ventilating Equipment (6-M), undated, revised  12/19/1925 (29x35-1/4 inches)
Drawer   10 Folder   1
Plan, Sections and Riser Detail of Cleaning Plant (7-M),  12/12/1925 (24-3/4x36-1/2 inches)
Drawer   10 Folder   1
Proposed Arrangement of Cafeteria (9-M),  12/28/1925 (29-3/4x35-1/2 inches)
Drawer   10 Folder   1
Part of Mezzanine and First Floor Plans (10-M), undated, revised  3/1/1926 (26-3/4x33-3/4 inches)
Drawer   10 Folder   1
Connection Plan of Cafeteria (101-M), 12/4/1925 (25-1/4x30-1/2 inches)
 
Addition to Power House, Engineering Laboratory Building (1923-1926) Job No. 1077-K
 
Architectural Construction Drawings by Albert Kahn, Architect,  8/22/1923 revised  7/1/1925 (Ink-on-linen drawings, 27x37-1/2 inches)
Drawer   10 Folder   2
Plot Plan (1)
Drawer   10 Folder   2
Basement Plan (2)
Drawer   10 Folder   2
First Floor Plan (3)
Drawer   10 Folder   2
Roof Plan (4)
Drawer   10 Folder   2
Elevations (5)
Drawer   10 Folder   2
Sections (6)
Drawer   10 Folder   2
Section "C" and Details of Monitor, etc. (7)
 
Structural Construction Drawings by Albert Kahn, Inc., Architect,  8/28/1923 revised  7/1/1925 (Ink-on-linen drawings, 26-3/4x37 inches)
Drawer   10 Folder   2
Foundation Plan and Sections (1-S)
Drawer   10 Folder   2
Boiler Room Framing Plan and Sections (2-S)
Drawer   10 Folder   2
Roof Framing Plan and Details (3-S)
Drawer   10 Folder   2
Details of New Platforms around Boilers (4-S),  1/6/1926 revised  3/13/1926 (Pencil-on-vellum drawing, 25-x34-1/2 inches)
Drawer   10 Folder   2
Layout of Walkways over Boilers (5-S),  1/6/1926 revised  3/16/1926 (26x40 inches)
Drawer   10 Folder   2
Details of First Floor Hand Rails (6-S),  3/16/1926 (26x45 inches)
 
Mechanical Construction Drawings by Albert Kahn, Inc., Architects and Engineers (Ink-on-linen drawings with pencil and blue pencil revisions, 26-1/4x45-1/2 inches)
Drawer   10 Folder   3
First Floor Plan (1-M),  6/16/1925
Drawer   10 Folder   3
Basement Floor Plan and Section "A-A" (2-M),  6/17/1925
Drawer   10 Folder   3
Sections thru' Power House (3-M),  6/16/1925
Drawer   10 Folder   3
Details of Feed Water Heater, Water Softener and Misc. Piping (4-M),  6/17/1925 revised  12/23/1925
Drawer   10 Folder   3
Details of Tunnel Piping Layout and Sump (5-M),  6/17/1925
Drawer   10 Folder   3
Details of Platform for Feed Water Heater and Breeching for Badenhauser Boilers (6-M),  6/19/1925
Drawer   10 Folder   3
Details of Setting for Badenhausen Boiler (7-M),  6/19/1925
Drawer   10 Folder   3
Drainage Plan (8-M),  6/18/1925
Drawer   10 Folder   3
Details of Jackets for Stacks and Breeching (9-M),  4/23/1926 (25-1/2x44-3/4 inches)
 
Addition to the Power House, Engineering Laboratory Building (1929-1930) Job No. 1077-S
 
Architectural Construction Drawings by Albert Kahn , Inc., Architects,  10/14/1929 (Ink-on-linen drawings with pencil and blue pencil revisions, 27x38 inches)
Drawer   10 Folder   4
Plot Plan and Details (1), revised  12/19/1929
Drawer   10 Folder   4
Foundation Plan and Details (2), revised  3/17/1930
Drawer   10 Folder   4
First Floor Plan and Details (3), revised  12/12/1929
Drawer   10 Folder   4
Roof Plan and Stack Details (4), revised  3/11/1930
Drawer   10 Folder   4
Sections (5), revised  12/12/1929
Drawer   10 Folder   4
Elevations (6), revised  11/12/1929
Drawer   10 Folder   4
Elevation at Northeast Corner of Building and Details (7), revised  12/12/1929
Drawer   10 Folder   4
Plot Plan and Tunnel Details (8), revised  12/19/1929
Drawer   10 Folder   4
North Elevation of Power House Showing Arrangement of Floodlights (10),  February 1930 (Pencil-on-vellum drawing, 29-3/4x24-3/4 inches)
Drawer   10 Folder   4
Details of Addition to Present Tunnel (13),  4/28/1930 (Pencil-on-vellum drawing, 27-3/4x36 inches)
Drawer   10 Folder   4
Plot Plan of Proposed Addition (100),  7/26/1929 (19x28-1/2 inches)
Drawer   10 Folder   4
[Plot Plan of] Proposed Addition (100-B),  7/25/1929 (18-3/4x33 inches)
Drawer   10 Folder   4
[Plot Plan of] Proposed Addition (100-C),  7/25/1929 (18-1/2x33-1/4 inches)
 
Structural Construction Drawings by Albert Kahn, Inc., Architects,  10/14/1929 (Ink-on-linen drawings with pencil and blue pencil revisions, 26-1/2x38 inches)
Drawer   10 Folder   5
Roof Framing Plan, Sections and Details (1-S), revised  11/21/1929
Drawer   10 Folder   5
Elevations and Sections (2-S), revised  4/7/1930
Drawer   10 Folder   5
Foundation Plan and Sections (3-S), revised  12/19/1929
Drawer   10 Folder   5
Underpinning and Footing Details (4-S), revised  11/21/1929
Drawer   10 Folder   5
Details of Walkways (7-S),  1/28/1930 revised  5/9/1930
Drawer   10 Folder   5
Stack Details (8-S),  3/7/1930 revised  7/8/1930 (Pencil-on-vellum drawing, 26x37-1/4 inches)
 
Mechanical Construction Drawings by Albert Kahn, Inc., Architects and Engineers (Ink-on-linen drawings with pencil revisions, 30-1/2x42-1/2 inches)
Drawer   10 Folder   6
Details of Tunnel Piping (2-M),  10/14/1929 revised 11/6/1929
Drawer   10 Folder   6
Details of Tunnel Piping (3-M),  10/16/1929 revised  1/10/1930
Drawer   10 Folder   6
Plan of Underground Lines (4-M),  11/12/1929 revised  1/9/1930
Drawer   10 Folder   6
First Floor Plan of Boiler Room (5-M), 12/9/1929 revised  5/22/1930
Drawer   10 Folder   6
Cross-Section and Elevation of Main Steam Header (6-M),  12/24/1929
Drawer   10 Folder   6
Details of Boiler Feed Heater and Auxiliaries (7-M),  12/18/1929 revised  8/25/1930
Drawer   10 Folder   6
Elevation and Sections of Boiler Setting (8-M),  6/9/1930
Drawer   10 Folder   6
Sections of Oil Storage Tanks (9-M),  2/4/1930
Drawer   10 Folder   6
Plan and Sections of Oil Burner Piping (10-M),  1/18/1930
Drawer   10 Folder   6
Breeching Details (11-M),  undated
Drawer   10 Folder   6
Plan and Section of Equalizing Pipe Line between East and West Pond (13-M),  2/26/1930 revised  3/15/1930
Drawer   10 Folder   6
Details of Tunnel Lighting and Power Conduit (1-E),  11/23/1929 revised  11/29/1929 (27x40 inches)
 
Mechanical Construction Drawings by Albert Kahn, Inc., Architects and Engineers (Pencil-on-vellum drawings, 29-1/2x41-1/2 inches)
Drawer   10 Folder   7
Details of Rearrangement of Piping in Tunnel #3 (15-M),  3/27/1930
Drawer   10 Folder   7
Details of Transite Boiler (17-M)     (undated due to paper damage) 
Drawer   10 Folder   7
Details of Transite Casing (18-M),  5/1/1930
Drawer   10 Folder   7
Details of Power House Gage Board (19-M),  undated
Drawer   10 Folder   7
[Piping Details], untitled due to paper damage     (undated due to damage) 
Drawer   10 Folder   7
Details of Foundation for Fan     (undated due to damage) 
Drawer   10 Folder   7
Details of Instrument Piping (22-M),  undated
Drawer   10 Folder   7
Details of Arrangement of Water Softener (119-M),  undated (27x33-3/4 inches)
Drawer   10 Folder   7
Plan and Sections of Oil Storage Tanks (121-M),  11/24/1930 (21-3/4x34 inches)
Drawer   10 Folder   7
Details of Oil Ret'n to Tanks, Scheme No. 1 (100-X),  10/29/1930
Drawer   10 Folder   7
[Details of Oil Ret'n to Tanks], untitled (100-X-M),  undated (29-1/2x35-1/2 inches)
 
Psi Upsilon Fraternity House, University of Michigan, Ann Arbor,  1924-1925, Job No. 1200-A [subseries]:
 
Construction Drawings by Albert Kahn, Inc., Architect
 
Architectural Drawings, undated, revised  2/21/1925 (Ink-on-linen drawings with pencil and blue pencil revisions, 25x34 inches)
Drawer   10 Folder   8
Plot Plan (1), revised  4/21/1925
Drawer   10 Folder   8
Basement Plan (2), revised  1/5/1925
Drawer   10 Folder   8
First Floor Plan (3
Drawer   10 Folder   8
Second Floor Plan (4
Drawer   10 Folder   8
Third Floor Plan (5)
Drawer   10 Folder   8
Roof Plan (6)
Drawer   10 Folder   8
North Elevation (7)
Drawer   10 Folder   8
South Elevation and Details (8)
Drawer   10 Folder   8
East and West Elevations (9), revised  1/5/1925
Drawer   10 Folder   8
Sections and Miscellaneous Details (10), revised  1/5/1925
Drawer   10 Folder   8
Interior Details(11), revised  1/5/1925
Drawer   10 Folder   8
Interior Details (12), revised  1/5/1925
Drawer   10 Folder   8
Details for Living Room (14),  2/5/1925 (Pencil-on-vellum drawing, 20-3/4x35 inches)
Drawer   10 Folder   8
Details for Solarium and Lobby (17),  3/19/1925 (Pencil-on-vellum drawing, 19-1/2x42 inches)
Drawer   10 Folder   8
Details for Library on Second Floor (19),  4/4/1925 (Pencil-on-vellum drawing, 20x26 inches)
Drawer   10 Folder   8
Details for Main Stairway (20-A),  4/27/1925 revised  6/24/1925 (Pencil-on-vellum drawing, 26-1/2x28-1/2 inches)
Drawer   10 Folder   8
Details for Main Stairway (20-B),  4/27/1925 (Pencil-on-vellum drawing, 21x17 inches)
 
Structural Drawings,  10/17/1924 revised  2/27/1924 (Pencil-on-vellum drawings, 24x33 inches)
Drawer   10 Folder   9
Basement and Foundation Plan (1-S)
Drawer   10 Folder   9
First Floor Framing Plan (2-S)
Drawer   10 Folder   9
Second Floor Framing Plan (3-S)
Drawer   10 Folder   9
Third Floor Framing Plan (4-S), revised  3/19/1925
Drawer   10 Folder   9
Roof Framing Plan (5-S), revised  3/19/1925
 
Mechanical Drawings, 12/3/1924 revised  4/4/1925 (Ink-on-linen drawings, 25x34 inches)
Drawer   10 Folder   9
Basement Plan (1-M)
Drawer   10 Folder   9
First Floor Plan (2-M)
 
The Thomas Henry Simpson Memorial Institute for Medical Research, Ann Arbor, Michigan,  1925-1926, Job. No. 1239 [subseries]:
 
Construction Drawings by Albert Kahn, Inc., Architects (Ink-on-linen drawings, 24x34 inches)
 
Architectural Drawings,  4/22/1925 revised  5/26/1925
Drawer   4 Folder   6
Plot Plan (1)
Drawer   4 Folder   6
Foundation Plan (2)
Drawer   4 Folder   6
Sub-Basement Plan (3), revised 10/1/1925
Drawer   4 Folder   6
Basement Plan (4)
Drawer   4 Folder   6
First Floor Plan (5), revised  9/25/1925
Drawer   4 Folder   6
Second Floor Plan (6)
Drawer   4 Folder   6
Third Floor Plan (7)
Drawer   4 Folder   6
Fourth Floor Plan (8)
Drawer   4 Folder   6
Roof Plan (9)
Drawer   4 Folder   6
Elevations (10)
Drawer   4 Folder   6
Detail of Center Bays (11)
Drawer   4 Folder   6
Scale Details of Exterior (12)
Drawer   4 Folder   6
Sections (13)
Drawer   4 Folder   6
Details (14)
Drawer   4 Folder   6
West Elevation of Corridors (15)
Drawer   4 Folder   6
East Elevation of Corridors (16)
Drawer   4 Folder   6
Interior Details (17)
 
Structural Drawings,  4/22/1925 revised  5/14/1925
Drawer   4 Folder   7
Basement Framing Plan; Column and Footing Schedule (1-S)
Drawer   4 Folder   7
First Floor Framing Plan (2-S)
Drawer   4 Folder   7
Second Floor Framing Plan (3-S)
Drawer   4 Folder   7
Third Floor Framing Plan (4-S)
Drawer   4 Folder   7
Fourth Floor Framing Plan (5-S), revised  6/12/1925
 
Mechanical Drawings,  5/13/1925
Drawer   4 Folder   7
Plot Plan (1M)
Drawer   4 Folder   7
Foundation Plan (2M), revised  1/15/1926
Drawer   4 Folder   7
Sub-Basement Plan (3M), revised  1/15/1926
Drawer   4 Folder   7
Basement Plan (4M), revised  1/15/1926
Drawer   4 Folder   7
First Floor Plan (5M), revised  1/15/1926
Drawer   4 Folder   7
Second Floor Plan (6M), revised  1/15/1926
Drawer   4 Folder   7
Third Floor Plan (7M), revised  10/10/1925
Drawer   4 Folder   7
Fourth Floor Plan (8M)
Drawer   4 Folder   7
Heating Riser Diagram (9M)
Drawer   4 Folder   7
Electric Feeder Layout (10M),  9/1/1925
 
University Museums, Ann Arbor, Michigan, Michigan,  1926-1927, Job No. 1319 [subseries]:
 
Construction Drawings by Albert Kahn, Inc. Architects (Ink-on-linen drawings, some with blue pencil revisions, 35x51-1/2 inches)
 
Architectural Drawings,  12/20/1926
Tube 10  
Plot Plan (1), revised  5/9/1927
Tube 10  
Foundation Plan (2), revised  2/25/1927
Tube 10  
Basement Floor Plan (3), revised  5/9/1927
Tube 10  
First Floor Plan (4), revised  5/3/1927
Tube 10  
Second Floor Plan (5), revised  8/17/1927
Tube 10  
Third Floor Plan (6), revised  8/17/1927
Tube 10  
Fourth Floor and Roof Plans (7), revised  8/17/1927
Tube 10  
Elevations # 1, 2 & 3 (8), revised  5/9/1927
Tube 10  
Elevations # 4,5,6,7 & 8 (9), revised  1/6/1927
Tube 10  
Detail of Exterior Elevation # 2 (10), revised  1/6/1927
Tube 10  
Details of Exterior Elevations # 1 & 3 (11), revised  1/6/1927
Tube 10  
Details of Exterior Elevations # 5, 6 & 7 (12), revised  1/6/1927
Tube 10  
Plan of Stair # 1 and Main Lobby (13), revised  5/3/1927
Tube 10  
Interior Elevations (14), revised  1/6/1927
Tube 10  
Miscellaneous Details (15), revised  3/31/1927
 
Structural Drawings,  12/20/1926 revised  1/6/1927
Tube 10  
Column Schedule and Details (1-S)
Tube 10  
First Floor Framing Plan (2-S)
Tube 10  
Second Floor Framing Plan (3-S)
Tube 10  
Third Floor Framing Plan (4-S)
Tube 10  
Fourth Floor Framing Plan (5-S)
Tube 10  
Roof Framing Plan (6-S), revised  6/1/1927
 
Mechanical Drawings,  12/27/1926
Tube 11  
Foundation Plan (1-M), revised  2/11/1927
Tube 11  
Basement Plan (2-M), revised  3/23/1927
Tube 11  
First Floor Plan (3-M)
Tube 11  
Second Floor Plan (4-M), revised  1/26/1927
Tube 11  
Third Floor Plan (5-M), revised  1/26/1927
Tube 11  
Fourth Floor Plan (6-M)
Tube 11  
Pipe Space Plan (7-M), revised  3/24/1927
Tube 11  
Heating Riser Plan (8-M)
 
Electrical Drawings,  2/22/1927
Tube 11  
Basement Plan (9-MR), revised  3/24/1927
Tube 11  
First Floor Plan (10-MR), revised  3/24/1927
Tube 11  
Second Floor Plan (11-MR), revised  8/17/1927
Tube 11  
Third Floor Plan (12-MR), revised  8/17/1927
Tube 11  
Fourth Floor Plan (13-MR), revised  8/17/1927
 
Edsel B. Ford Residence, Gaukler Pointe, Michigan,  1926-1932 and  1977-1991, Jobs No. 1334 & 1334-A, B, C, D, E, F, H, L, V, W, AA, AB & AD [subseries]:
 
Edsel B. Ford Residence (Job No. 1334)
 
Design Development Drawings (Block Plans) (Ink-on-linen drawings, 25-1/2x34 inches)
Drawer   4 Folder   8
First Floor Plan,  undated
Drawer   4 Folder   8
Second Floor Plan,  1/23/1931
 
Architectural Construction Drawings by Albert Kahn, Inc., Architects, 11/4/1926     (Prints of originals in Drawer 4, Folder 9)  (Ink-on-linen drawings with pencil revisions, 29x39-1/2 inches)
Drawer   4 Folder   8
Part Plan of the Estate of Edsel B. Ford, Esq.,  1/18/1927     (in Oversized Tube 12)  (31-3/4x59 inches)
Drawer   4 Folder   8
Plot Plan (1), revised  4/12/1927
Drawer   4 Folder   8
Excavation Plan (1-A), undated, revised  4/12/1927
Drawer   4 Folder   8
Wall Footing Plan (2), revised  8/8/1927
Drawer   4 Folder   8
Basement Plan (3), revised  7/19/1927
Drawer   4 Folder   8
First Floor Plan (4), revised  1/30/1928
Drawer   4 Folder   8
Second Floor Plan (5), revised  1/30/1928
Drawer   4 Folder   8
Attic Floor Plan (6), revised  3/3/1928
Drawer   4 Folder   8
Roof Plan (7), revised  4/12/1927
Drawer   4 Folder   8
First Floor Plan-Portion "A" (8), revised  3/1/1928
Drawer   4 Folder   8
Second Floor Plan-Portion "A" (9), revised  3/15/1928
Drawer   4 Folder   8
First Floor Plan-Portions "B" & "C" (10), revised  2/8/1928
Drawer   4 Folder   8
Second Floor Plan-Portion "B" and Basement Plan (11), revised  3/1/1928
 
Architectural Construction Prints, 11/4/1926 (Electrostatic prints of originals on mylar, 29-1/2x42 inches)
Drawer   4 Folder   9
Basement Plan (3), revised  7/19/1927
Drawer   4 Folder   9
First Floor Plan (4), revised  1/30/1928
Drawer   4 Folder   9
Second Floor Plan (5), revised  1/30/1928
Drawer   4 Folder   9
Attic Floor Plan (6), revised  3/3/1928
Drawer   4 Folder   9
Elevations # 1-7 Inclusive (12), revised  8/1/1927 (Sepia print, 29-1/2x39-1/2 inches)
Drawer   4 Folder   9
Elevations # 8-17 Inclusive (13), revised  6/6/1927 (Sepia print, 29-1/4x40-1/4 inches)
 
Architectural Construction Drawings by Albert Kahn, Inc., Architects, 11/4/1926 (Ink-on-linen drawings with pencil revisions, 29x39-1/2 inches)
Drawer   4 Folder   10
Elevations # 1-7 Inclusive (12), revised  8/1/1927
Drawer   4 Folder   10
Elevations # 8-17 Inclusive (13), revised  6/6/1927
Drawer   4 Folder   10
Sections (14), revised  4/12/1927
Drawer   4 Folder   10
Sections (15), revised  12/31/1927
Drawer   4 Folder   10
Details of Main Entrance and Drawing Room (16), revised  4/12/1927
Drawer   4 Folder   10
Exterior Details of Gallery Portion "C" (17), revised  4/12/1927
Drawer   4 Folder   10
Exterior Details of Loggia, Porch and Dining Room Bay (18), revised  8/1/1927
Drawer   4 Folder   10
Exterior Details of Southeast Corner of Library Wing (19), revised  4/12/1927
Drawer   4 Folder   10
Exterior Details at North Side of Drawing Room, Son's Room Dormers and Chimney, and Balcony and Bay in Study (20), revised  6/6/1927
Drawer   4 Folder   10
Floor Plan, Elevations and Sections of Store Room, Kitchen and Butler's Pantry (21), revised  1/21/1928     (undated due to damage)  (Pencil-on-vellum drawing)
Drawer   5 Folder   1
Elevations, Sections and Details of Butler's Pantry and Store Room (22)
Drawer   5 Folder   1
Details of Son's Room #216 and Kitchens #105, 109 & 307 (23), undated, revised  2/2/1928
Drawer   5 Folder   1
Details of Wardrobes (24), revised  12/23/1927
Drawer   5 Folder   1
Details of Owner's Wardrobe #227 (25), undated, revised 12/1/1927
Drawer   5 Folder   1
Detail of Cedar Closets (26)
Drawer   5 Folder   1
Details of Cupboards and Interior Finish at Windows in Bathrooms #235 & 236 (27), revised  1/16/1928
Drawer   5 Folder   1
Miscellaneous Wardrobe and Toilet Details (28)
Drawer   5 Folder   1
Details of Bath Room #225 to Owner's Room (29), revised  1/10/1928
Drawer   5 Folder   1
Detail of Daughter's and Governess's Bath Rooms #217 & 219 (30),  undated
Drawer   5 Folder   1
Details of Sons' Bath Rooms #211 & 215 (31), undated, revised  12/14/1927
Drawer   5 Folder   1
Details of Guests' Bath Rooms #235 & 236 (32)
Drawer   5 Folder   1
Details of Maids' and Housekeeper's Bath Rooms #203 & 209 (33),  undated
Drawer   5 Folder   1
Details of Toilets #120, 124 & 129 and Wardrobes in Closet to Owner's Room (34),  undated
Drawer   5 Folder   1
Details of Typical Interior Trim (35)
Drawer   5 Folder   1
Detail of Owner's Bed Room (36)
Drawer   5 Folder   2
Details of Son's Room #216, Rooms #213, 218, 221, 224 & 233 and Halls #223 & 230 (37)
Drawer   5 Folder   2
Details of Son's Room #213 and Study #214 (38), revised  1/26/1928
Drawer   5 Folder   2
Details of Daughter's Room #221 and Governess's Room #218 (39), revised 12/4/1927
Drawer   5 Folder   2
Details of Guest Rooms #233 & 238 (40),  undated
Drawer   5 Folder   2
Details of Finish in Help's Dining Room #104 and Maid's Sitting Room #103 (41),  undated
Drawer   5 Folder   2
Details of Finish and Elevations in Halls #106, 107, 202 & 206 (42)
Drawer   5 Folder   2
Details of Ladies Room #122 and Halls #223 & 230 (43),  undated
Drawer   5 Folder   2
Details of Door Jambs, Transom and Brackets (44)
Drawer   5 Folder   2
Details of Laundry Cupboard and Clothes Chute (45)
Drawer   5 Folder   2
Revised Details of Games Room #130 and Children's Entrance (46),  undated
Drawer   5 Folder   2
Index to Rooms and Details of Electrical Heaters in Bathrooms (47)
Drawer   5 Folder   2
Floor Plan of Boudoir #222 Showing Design of Parquet Flooring (48),  undated (18x28 inches)
 
Structural Construction Drawings,  10/26/1926 (Ink-on-linen drawings with pencil revisions, 30-1/2x43 inches)
Drawer   5 Folder   3
Foundation Plan (1-S), revised  1/17/1927
Drawer   5 Folder   3
First Floor Framing Plan (2-S), revised  1/22/1927
Drawer   5 Folder   3
Second Floor Framing Plan (3-S), revised  1/19/1927
Drawer   5 Folder   3
Attic Floor Framing Plan (4-S), revised  1/17/1927
Drawer   5 Folder   3
Roof Framing Plan (5-S), revised  1/19/1927
Drawer   5 Folder   3
Column Schedule (6-S), revised  11/29/1926
Drawer   5 Folder   3
Framing Around [Vent and Register Openings] in First [Floor] (7-S)     (date illegible due to damage)  (Pencil-on-vellum drawing, 25-1/2x32-1/2 inches)
Drawer   5 Folder   3
Steel Framing to Replace Concrete Column #95 (8-S),  2/16/1927 (Pencil-on-vellum drawing, 20-1/2x31 inches)
Drawer   5 Folder   3
Anchor Bolt Setting Plan for Steel Columns in Art Gallery (10-S),  undated (Ink-on-vellum drawing, 27x34 inches)
Drawer   5 Folder   3
Cutting 7-1/2 Inches from Width of Beam #348 (11-S),  undated (Pencil-on-vellum drawing, 22-1/2x34-1/2 inches)
Drawer   5 Folder   3
Framing Due to Change in Type of Elevator (12-S),  undated (Pencil-on-vellum drawing, 21x29 inches)
 
Mechanical Construction Drawings (Ink-on-linen drawings with pencil revisions, 31x43 inches)
Drawer   5 Folder   3
Basement Plan Portion "A" (1-M),  12/17/1926 revised  3/2/1928
Drawer   5 Folder   3
Basement Plan Portion "B" (2-M), revised  2/22/1928     (date illegible due to damage) 
Drawer   5 Folder   3
Details of Manholes for Electrical Work Only (3-M), 12/8/1927
 
Structural Construction Drawings (Job No. 1334-A),  undated (Ink-on-linen drawings with pencil revisions, 24-1/4x36 inches)
Drawer   5 Folder   4
Foundation and Basement Shop Drawing (1-S), revised  9/4/1926 (30x43 inches)
Drawer   5 Folder   4
Bar List for First Floor (2-S), revised 10/8/1926
Drawer   5 Folder   4
First Floor Framing (3-S), revised 10/8/1926
Drawer   5 Folder   4
Reinforcing Bar List for First Floor Column Schedule (4-S), revised  11/27/1926
Drawer   5 Folder   4
Bar List for Balance of First Floor and Part of Second Floor (5-S), revised  11/22/1926
Drawer   5 Folder   4
Bar List for Columns and Slabs (6-S), revised  11/27/1926
Drawer   5 Folder   4
Bar List for Balance of Second Floor (7-S), revised  11/22/1926
Drawer   5 Folder   4
Second Floor Framing Plan (8-S), revised  11/22/1926
Drawer   5 Folder   4
Second Floor Joist Schedule (11-S), revised  11/13/1926
Drawer   5 Folder   4
Attic Spandrel Schedule (12-S), revised 12/8/1926
Drawer   5 Folder   4
Attic Beam Schedule (13-S), revised 12/7/1926
Drawer   5 Folder   4
Attic Beam Schedule (14-S), revised  1/5/1927
Drawer   5 Folder   4
Attic Sections (15-S), revised  1/11/1927
Drawer   5 Folder   4
Attic Floor Framing Plan (16-S), revised  1/11/1927
Drawer   5 Folder   4
Attic Beam and Spandrel Sections (17-S), revised  1/11/1927
Drawer   5 Folder   4
Attic Beam Schedule (18-S), revised  12/22/1926
Drawer   5 Folder   4
Attic Floor Slab Schedule (19-S)
Drawer   5 Folder   4
Attic Floor Slab Schedule -- Joists (20-S)
 
Gate Lodge for Edsel B. Ford Residence by Albert Kahn, Inc., Architects (Job No 1334-B)
 
Architectural Construction Drawings,  4/15/1927 revised  6/7/1927 (Pencil-on-vellum drawings, 22x30 inches)
Drawer   5 Folder   5
Plot Plan (1)
Drawer   5 Folder   5
Basement Floor Plan (2)
Drawer   5 Folder   5
First Floor Plan (3)
Drawer   5 Folder   5
Roof Plan (4)
Drawer   5 Folder   5
North and Jefferson Avenue Elevations (5), revised  6/9/1928
Drawer   5 Folder   5
West and East Elevations and Sections (6), revised  7/14/1927
Drawer   5 Folder   5
Sections (7)
Drawer   5 Folder   5
Sections and Garage Door, Window and Chimney Details (8)
 
Structural Construction Drawings,  4/13/1927 revised  6/16/1927 (Pencil-on-vellum drawings, 22x30 inches)
Drawer   5 Folder   5
Garage Roof Framing (1-S)
 
Mechanical Construction Drawings, undated, revised  8/22/1927 (Ink-on-linen drawings, 22x30 inches)
Drawer   5 Folder   5
Basement Plan (1M)
Drawer   5 Folder   5
First Floor Plan (2M)
 
Heating Plant for Edsel B. Ford Residence by Albert Kahn , Inc., Architects (Job No. 1334-C)
 
Architectural Construction Drawings,  6/17/1927 (Pencil-on-vellum drawings, 22-1/2x34 inches)
Drawer   5 Folder   6
Plot Plan (1)
Drawer   5 Folder   6
Plans, Elevations, Details (2)
Drawer   5 Folder   6
Sections and Details (3)
 
Structural Construction Drawings,  undated (Pencil-on-vellum drawings, 22-1/2x34 inches)
Drawer   5 Folder   6
Roof, First Floor and Basement Framing (1-S)
 
Mechanical Construction Drawings,  7/16/1927 (Ink-on-linen drawings with pencil revisions, 22x32 inches)
Drawer   5 Folder   6
Basement Plan (1M), revised  2/27/1928
Drawer   5 Folder   6
First Floor Plan (2M)
Drawer   5 Folder   6
Details (3M), revised  2/27/1928
Drawer   5 Folder   6
Sectional Plan and Details of Septic Tank (4M)
Drawer   5 Folder   6
Basement Plan for Electrical Work (5M),  9/1/1927 (Pencil and ink drawing on vellum, 23x32-1/2 inches)
Drawer   5 Folder   6
Schematic Connection Diagram for Electrical Work (6M), 12/1/1927 (24x37 inches)
 
Recreation Building for Edsel B. Ford Residence by Albert Kahn, Inc., Architects (Job No. 1334-D)
 
Architectural Construction Drawings,  undated (Pencil and ink drawings on vellum, 20x34 inches)
Drawer   5 Folder   7
Plot Plan (1)
Drawer   5 Folder   7
Basement, First Floor and Roof Floor Plans (2)
Drawer   5 Folder   7
Elevations (3)
Drawer   5 Folder   7
Details (4)
Drawer   5 Folder   7
Sections & Details (5)
Drawer   5 Folder   7
[Miscellaneous Details], untitled (6)
 
Structural Construction Drawings (Pencil and ink drawings on vellum, 20x34 inches)
Drawer   5 Folder   7
Roof Framing (1-S), 12/9/1927
Drawer   5 Folder   7
Foundation Plan (2-S), 12/8/1927 revised  2/14/1928
 
Mechanical Construction Drawings,  undated (Ink-on-linen drawings, 20x34 inches)
Drawer   5 Folder   7
Plot Plan (1-M)
Drawer   5 Folder   7
Basement and First Floor Plot Plans (2-M), revised  3/9/1928
Drawer   5 Folder   7
Floor Plans (3-M) (Pencil and ink drawing on vellum)
Drawer   5 Folder   7
Riser Diagram (4-M) (Ink-on-vellum drawing)
 
Swimming Pool for Edsel B. Ford Residence by Albert Kahn, Inc., Architects (Job No. 1334-E)
 
Construction Drawing,  12/28/1927 revised  1/24/1928 (Ink-on-linen drawing, 21-1/2x87-3/4 inches)
Tube 12  
Plan, Sections and Details (1-S)
Tube 12  
Woodlift for Edsel B. Ford Residence by Albert Kahn, Inc., Architects (Job No. 1334-F)
 
Construction Drawing of Framing,  5/8/1928 revised  5/10/1928 (Pencil-on-vellum drawing, 16-1/2x10-1/2 inches)
Drawer   5 Folder   8
Plan and Elevation (1-S)
 
Greenhouse Service Building for Edsel B. Ford Residence by Albert Kahn, Inc., Architects (Job No. 1334-H)
 
Architectural Construction Drawings,  8/17/1928 (Ink-on-vellum drawings with pencil revisions, 18-3/4x31 inches)
Drawer   5 Folder   8
Plot Plan (1)
Drawer   5 Folder   8
Foundation Plan (2), revised  9/28/1928
Drawer   5 Folder   8
Floor Plan (3), revised  9/12/1928
Drawer   5 Folder   8
East Elevation (4), revised  9/27/1928
Drawer   5 Folder   8
South and North Elevations (5), revised  9/27/1928
Drawer   5 Folder   8
West Elevation (6)
Drawer   5 Folder   8
Sections and Details (7), revised  9/27/1928
 
Structural Construction Drawings,  8/3/1928 (Pencil-on-vellum drawings, 18-3/4x31 inches)
Drawer   5 Folder   8
Foundation Plan (1-S), revised  8/10/1928
Drawer   5 Folder   8
Roof Framing Plan (2-S)
 
Boat House for Edsel B. Ford Residence by Albert Kahn, Inc., Architects (Job No. 1334-L)
 
Architectural Construction Drawings,  undated (Pencil-on-vellum drawings, 26x34-1/2 inches)
Drawer   5 Folder   9
Piling Plan (1), revised 12/3/1929
Drawer   5 Folder   9
Floor Plan (2), revised  3/12/1929
Drawer   5 Folder   9
Roof Plan (3), revised  3/12/1929
Drawer   5 Folder   9
North and West Elevations (4), revised  3/12/1929
Drawer   5 Folder   9
South and East Elevations (5), revised  3/12/1929
Drawer   5 Folder   9
Sections and Details (6), revised  3/12/1929
Drawer   5 Folder   9
Enlarged Details (7), revised  3/12/1929
Drawer   5 Folder   9
Structural Details (8), revised  3/1/1929
 
Cottage for Edsel B. Ford Residence by Albert Kahn, Inc., Architects (Job No. 1334-M)
 
Architectural Construction Drawings,  undated (Pencil-on-vellum drawings, 18x30-1/2 inches)
Drawer   5 Folder   10
Foundation Plan (2)
Drawer   5 Folder   10
First Floor Plan (3), revised  1/2/1930
Drawer   5 Folder   10
Second Floor Plan (4), revised  1/2/1930
Drawer   5 Folder   10
South Elevation and Details (5)
Drawer   5 Folder   10
East Elevation and Details (6)
Drawer   5 Folder   10
West Elevation and Details (7)
Drawer   5 Folder   10
North Elevation (8)
Drawer   5 Folder   10
[Section], untitled (9)
 
Mechanical Construction Drawings, 10/7/1929 (Ink-on-linen drawings, 18x30-1/2 inches)
Drawer   5 Folder   10
Foundation Plan (1M)
Drawer   5 Folder   10
First Floor Plan (2M)
Drawer   5 Folder   10
Second Floor Plan (3M)
 
Dog Kennel for Edsel B. Ford Residence by Albert Kahn, Inc., Architects (Job No. 1334-N)
 
Architectural Construction Drawing, 12/5/1929 (Pencil-on-vellum, 20x28 inches)
Drawer   5 Folder   10
Plan, Elevations and Sections (1)
 
Awning Porch for Edsel B. Ford Residence by Albert Kahn, Inc., Architects (Job No. 1334-P)
 
Architectural Construction Drawings,  6/3/1930 (Pencil-on-vellum drawings)
Drawer   5 Folder   10
Plan, Elevations and Section (18-3/4x36-1/2 inches)
Drawer   5 Folder   10
Elevations and Sections     (in Oversized Tube 12)  (51-1/2x29 inches)
 
Alterations to Cedar Closet #228 and Wardrobe #227 for Edsel B. Ford Residence by Albert Kahn, Inc., Architects (Job No. 1334-T)
 
Architectural Construction Drawing,  7/22/1931 revised  7/31/1931 (Pencil-on-vellum drawing, 21x30-3/4 inches)
Drawer   6 Folder   1
Plan, Elevation, Section and Details (1)
 
Recreation Room for Edsel B. Ford Residence by Albert Kahn, Inc., Architects and Engineers (Job 1334-V)
 
Architectural Construction Drawings,  12/21/1931 (Pencil and ink drawings on vellum, 22x35 inches)
Drawer   6 Folder   1
Plan and Elevations (1)
Drawer   6 Folder   1
Ceiling Plan, Elevations and Details (2)
 
Mechanical Construction Drawings (Pencil-on-vellum drawings, 20-1/4x26-3/4 inches)
Drawer   6 Folder   1
Plan (1M),  12/22/1931
Drawer   6 Folder   1
Plan (2M),  12/30/1931 revised  1/19/1932
Drawer   6 Folder   1
Plan and Section "AA" (3M),  3/10/1932
 
Electrical Construction Drawing,  undated (Pencil-on-vellum drawing, 22x34 inches)
Drawer   6 Folder   1
[Plan], untitled (1E)
 
Tool and Implement Shed for Edsel Ford Residence by Albert Kahn, Inc., Architects (Job No. 1334-W)
 
Architectural Construction Drawings,  3/3/1932 (Ink-on-vellum drawings, 25-1/4x35-1/2 inches)
Drawer   6 Folder   1
Plot Plan and Roof Framing Plan -- Structural Steel (1)
Drawer   6 Folder   1
Foundation and Floor Plans (2), revised  4/22/1932
Drawer   6 Folder   1
Roof Plan and Details (3)
Drawer   6 Folder   1
Elevations and Details (4)
 
Mechanical Construction Drawing,  3/3/1932 revised  5/26/1932 (Ink-on-linen drawing, 26x36 inches)
Drawer   6 Folder   1
First Floor Plan and Details (1-M)
 
Modifications of Edsel and Eleanor Ford House by Albert Kahn Associates, Inc. (Job No. 1334-AA)
 
Survey Documents
Drawer   6 Folder   2
Survey of Gaukler Pointe Tracts, E. C. Ford Estates by Mason L. Brown & Son, Civil Engineers and Surveyors, Detroit, MI,  7/7/1977 (Print on vellum, 30x42 inches)
Drawer   6 Folder   2
Survey of E. C. Ford Estates, Part of Private Claims 222, 544 & 624,  undated and 11/5/1977 (One electrostatic print on mylar, 17-3/4x23-1/2 inches, and one sepia print, 33x41-1/2 inches)
Drawer   6 Folder   2
Tree Location Index on Topographic Survey of Edsel Ford Estate by Lehner Associates, Inc., Registered Land Surveyors, Mt. Clemens, MI,  2/6/1979 and  8/15/1980 revised  9/11/1980 (Two electrostatic prints on mylar, 24x36 inches and 18x24 inches)
Drawer   6 Folder   2
Topographic Survey of Peninsula by Lehner Associates, Inc.,  10/15/1979 (Reverse sepia print, 18x24 inches)
Drawer   6 Folder   2
A Plan of the Water [Pipe System of the] Estate of Mr. Edsel B. Ford,  undated (Print on vellum, 35-1/2x58-1/2 inches)
 
Architectural Construction Drawings (Pencil drawings on mylar, 30x46-1/2 inches)
Drawer   6 Folder   3
Floor Plans, Elevations and Details of New Office (1),  12/12/1978 revised  2/5/1979
Drawer   6 Folder   3
Floor Plans and Details of New Men's and Women's Toilets, First Floor (2),  2/16/1979
Drawer   6 Folder   3
Site Plan and Layout of Residence Parking Lot (C-1),  6/5/1979 revised  7/24/1979
Drawer   6 Folder   3
Site Plans and Details of Parking Lot and Bus Entrance (C-1A),  11/10/1978 revised  9/6/1979
 
Mechanical Construction Drawings (Pencil drawings on mylar, 30x46-1/2 inches)
Drawer   6 Folder   3
Plot Plan (Plumbing) (1-M),  7/18/1979 revised  2/18/1980
Drawer   6 Folder   3
Details (2-M),  7/18/1979 revised  2/18/1980     (with "Void" in red marker) 
Drawer   6 Folder   3
Details (3-M),  10/31/1979 revised  2/18/1980     (with "Void" in red marker) 
Drawer   6 Folder   3
Profiles of Sanitary Sewer (4-M),  11/15/1979 revised  11/16/1979
 
Supplementary Construction Drawings (Pencil-on-vellum drawings, 18x24 inches)
Drawer   6 Folder   3
Floor Plans and Elevations of Ice Machine for Butler's Pantry (SK-1), 10/5/1978 (Pencil drawing on mylar)
Drawer   6 Folder   3
Elevations and Sections of Lectern (SK-1),  12/26/1978
Drawer   6 Folder   3
Door Additions to Existing Library-North Wall Elevation (LD-1),  12/27/1978
Drawer   6 Folder   3
Door Additions to Existing Library-West Wall Elevation (LD-2),  12/28/1978
Drawer   6 Folder   3
Details of Sectional Ramp (SK-R-1),  12/27/1978 (18x32 inches)
 
Activities Building, Equipment Shelter Expansion and Gatehouse Garage Renovation of Edsel and Eleanor Ford House by Albert Kahn Associates, Inc. (Job No. 1334-AB)
 
Architectural Construction Drawings (Electrostatic prints on mylar, 30x42 inches)
Drawer   6 Folder   4
Site Plan, Plan and Elevations of Activities Building and Gift Shop (GS-1), 12/4/1990 (24x36 inches)
Drawer   6 Folder   4
Proposed Activities Building Partial Site Plan -- Grading (C-1),  4/30/1987 revised  7/9/1987
Drawer   6 Folder   4
Proposed Activities Building Partial Site Plan -- Grading & Utilities (C-2),  4/30/1987 revised  7/9/1987
Drawer   6 Folder   4
Equipment Shelter Expansion and Gatehouse Garage Renovation -- Key Plan, Symbols, General Notes (1),  5/2/1990 revised  12/31/1990
Drawer   6 Folder   4
Equipment Shelter Expansion -- Plans, Sections and Elevations (A-1),  5/2/1990 revised  12/31/1990
Drawer   6 Folder   4
Equipment Shelter Expansion -- Construction Details (A-2),  5/2/1990 revised  12/31/1990
Drawer   6 Folder   4
Gatehouse Garage Renovation -- Floor Plan, Interior Elevations, General Notes (A-3),  5/2/1990 revised  12/31/1990
 
Mechanical/Electrical Construction Drawings of Equipment Shelter Expansion (Job No. 1334-AB),  5/2/1990 revised  12/31/1990 (Electrostatic prints on mylar, 30x42 inches)
Drawer   6 Folder   4
Mechanical Plan & Site Work (M-1)
Drawer   6 Folder   4
Schedules and Details (M-2)
Drawer   6 Folder   4
Details -- HVAC (M-3)
Drawer   6 Folder   4
Electrical Plan, Schedules, Details (E-1)
Drawer   6 Folder   4
Partial Site Lighting, Layout & Details (E-2)
Drawer   6 Folder   4
Gatehouse Garage Renovation, Mechanical/Electrical Services (ME-1)
 
Pool & Power House Renovations of Edsel and Eleanor Ford House by Albert Kahn Associates, Inc. (Job No. 1334-AD)
 
Architectural Construction Drawings,  2/20/1991 revised  12/18/1991 (Electrostatic prints on mylar, 30x42 inches)
Drawer   6 Folder   5
Existing Floor Plans (A-1)
Drawer   6 Folder   5
Photographs (A-2)
Drawer   6 Folder   5
Elevations and Details (A-3)
Drawer   6 Folder   5
Signage Details (A-4)
 
Mechanical/Electrical Construction Drawings,  2/20/1991 revised  12/18/1991 (Electrostatic prints on mylar, 30x42 inches)
Drawer   6 Folder   5
Mechanical Plans and Details (M-1)
Drawer   6 Folder   5
Existing Electrical Floor Plans (E-1)
 
Senator James C. Couzens Residence, Bloomfield Hills, Michigan,  1926-1927,  1938 and  1940, Job No. 1335 & 1335-B [subseries]:
 
Project Files
Box   9  
"Welcome to Wabeek Manor, the Home of Enid and Gary Goodman,"  September 2004     (Brochure documenting the restoration of the Couzens Residence, autographed by Gary Goodman) 
 
Construction Drawings by Albert Kahn Inc., Architects
 
Architectural Drawings,  8/5/1926 (Ink-on-linen drawings,some with pencil notations, 31x44-1/4 inches)
Drawer   7 Folder   9
Plot Plan (1), revised  9/14/1926
Drawer   7 Folder   9
Basement Plan (2), revised  10/11/1926
Drawer   7 Folder   9
First Floor Plan and Details (3), revised  1/4/1927
Drawer   7 Folder   9
Second Floor Plan (4), revised  5/5/1927
Drawer   7 Folder   9
Roof and Attic Plan (5), revised  2/17/1927
Drawer   7 Folder   9
Elevations (6), revised  10/11/1926
Drawer   7 Folder   9
Cross Sections (8), revised  12/21/1926
Drawer   7 Folder   9
Exterior Details (9), revised  4/20/1927
Drawer   7 Folder   9
Exterior Details (10), revised  10/11/1926
Drawer   7 Folder   9
Exterior Details (11), revised  12/21/1926
 
Structural Drawings,  8/5/1926 (Ink-on-linen drawings, 31x44 inches)
Drawer   7 Folder   9
First and Second Floor Plans (1-S), revised  11/24/1926
Drawer   7 Folder   9
Attic & Roof Framing Plans (2-S), revised  11/19/1926
 
Mechanical Construction Drawings,  9/14/1926 revised  4/22/1927 (Ink-on-linen drawings, some with blue pencil notations, 31x44 inches)
Drawer   7 Folder   9
Basement Floor Plan (1-M)
Drawer   7 Folder   9
First Floor Plan (2-M)
Drawer   7 Folder   9
Second Floor Plan (3-M)
Drawer   7 Folder   9
Attic Floor Plan (4-M)
Drawer   7 Folder   9
Plan of Tile Disposal Field #2 (5-M),  4/7/1938 (Pencil drawing on tracing paper)
Drawer   7 Folder   9
Diagram of Piping Connections for Schemes #1 & #2 (6-M),  3/11/1940 (Pencil-on-vellum drawing, 21-3/4x35 inches)
 
Interior Details for Residence of Senator James C. Couzens (1926-1927) Job No. 1335-B
 
Construction Drawings by Albert Kahn, Inc., Architects,  12/15/1926 (Ink-on-linen drawings, some with pencil notations, 30x37 inches)
 
Architectural Drawings
Drawer   7 Folder   10
Living Room Details (1)
Drawer   7 Folder   10
Library Details (2)
Drawer   7 Folder   10
Dining Room Details (3), revised  4/19/1927
Drawer   7 Folder   10
Details of Stair Halls and Landing (5), revised  5/6/1927
Drawer   7 Folder   10
Ladies' Room Details and Hall Ceiling Plans (6)
Drawer   7 Folder   10
Details of Bedroom # 201 and Bathroom #200 (7), revised  10/24/1927
Drawer   7 Folder   10
Details of Bedrooms #204 and #216 (8), revised  1/31/1927
Drawer   7 Folder   10
Details of Bedroom #205 and Bathroom #202 (9), revised  5/5/1927
Drawer   7 Folder   10
Details of Bedroom #208 and Miscellaneous Closet Details (10)
Drawer   7 Folder   10
Details of Bedrooms #211 and #302 and Vestibule (11), revised  4/26/1927
Drawer   7 Folder   10
Details of Kitchen, Pantry and Store Room (12), revised  3/1/1927
 
Fisher Building (Building for New Center Development Corporation), Detroit, Michigan,  1927-1930, Job No. 1378 [subseries]:
 
Construction Drawings by Albert Kahn, Inc., Architects
 
Architectural Drawings,  10/27/1927 (Ink-on-linen drawings with pencil notations, 30x45 to 31x45-1/2 inches)
Drawer   11 Folder   1
Plot Plan (1),  undated
Drawer   11 Folder   1
Tunnel Details (1-B),  1/12/1927 corrected to  12/17/1927
Drawer   11 Folder   1
Work Plan (2), corrected to  2/25/1928
Drawer   11 Folder   1
Sub-Basement and Foundation Plan, Section "A" (3), corrected to  2/27/1928
Drawer   11 Folder   1
Sub-Basement Foundation Plan, Section "B" (4), corrected to  2/25/1928
Drawer   11 Folder   1
Basement Plan, Section "A" (5)
Drawer   11 Folder   1
Basement Plan, Section "B" (6), corrected to  5/17/1928
Drawer   11 Folder   1
First Floor Plan, Section "A" (7), corrected to  2/25/1928
Drawer   11 Folder   1
First Floor Plan, Section "B" (8), corrected to  4/13/1928
Drawer   11 Folder   1
Second Floor Plan, Section "A" (9), corrected to  2/25/1928
Drawer   11 Folder   1
Second Floor Plan of Garage and Shops, Section "B" (10), corrected to  3/17/1928
Drawer   11 Folder   1
Third Floor Plan, Section "A" (11), corrected to  2/25/1928
Drawer   11 Folder   1
Third and Fourth Floors of Garage and Third Floor of Office Building, Section "B" (12), corrected to  2/25/1928
Drawer   11 Folder   1
Fourth Floor Plan, Section "A" (13), corrected to  3/24/1928
Drawer   11 Folder   1
Fourth and Fifth Floor Plan, Section "B" (14), corrected to  2/11/1928
Drawer   11 Folder   1
Sixth Floor Plan, Section "B," and Sixth, Eighth and Tenth Floors of Garage (15), corrected to  2/25/1928
Drawer   11 Folder   2
Typical Fifth to Tenth Floor Plan (16), corrected to  3/24/1928
Drawer   11 Folder   2
Seventh to Ninth Floor Plan of Office Building, Section "B," and Eleventh Floor of Garage (17), corrected to  3/12/1928
Drawer   11 Folder   2
Tenth Floor Plan, Section "B," and Roof Plan of Garage (18), corrected to  3/12/1928
Drawer   11 Folder   2
Eleventh Floor Plan (19), corrected to  3/30/1928
Drawer   11 Folder   2
Elevations of Pent House for Elevators 11 to 16 and Eleventh Floor Plan, Section "B" (20), corrected to  3/20/1928
Drawer   11 Folder   2
Twelfth and Thirteenth Floor Plans (21), corrected to  4/13/1928
Drawer   11 Folder   2
Plans and Sections of Pent House for Elevators 11 to 16 (22), corrected to  2/25/1928
Drawer   11 Folder   2
Fourteenth and Fifteenth Floor Plans (23), corrected to  2/25/1928
Drawer   11 Folder   2
Sixteenth to Twenty-First Floor Plans (24), corrected to  2/25/1928
Drawer   11 Folder   2
Twenty-Second to Twenty-Fifth Floor Plans (25), corrected to  4/13/1928
Drawer   11 Folder   2
Twenty-Sixth to Twenty-Eighth Floor Plans (26), corrected to  3/17/1928
Drawer   11 Folder   2
West and South Elevations (27) (Electrostatic print on mylar, 32x45-3/4 inches)
Drawer   11 Folder   2
East and North Elevations (28), corrected to  2/24/1928
Drawer   11 Folder   3
Sections "A-A," "B-B" and "C-C" (29)
Drawer   11 Folder   3
Sections "D-D" and "E-E" (30), corrrected  2/25/1928
Drawer   11 Folder   3
Sections "F-F" and "G-G" (31), corrected to  2/25/1928
Drawer   11 Folder   3
Sections "H-H" and "I-I" (32), corrected to  2/25/1928
Drawer   11 Folder   3
Details of Ramps (33), corrected to  4/25/1928
Drawer   11 Folder   3
Details of Ramps (34), undated, corrected to  2/23/1928
Drawer   11 Folder   3
Detail of Boulevard Entrance and Southeast Corner of Building (35)
Drawer   11 Folder   3
Details of Arcade Entrance on West Elevation, Theatre Entrance on Second Blvd., Office Entrance on Second Blvd. and Theatre Marquise (36)
Drawer   11 Folder   3
Details of Ornamental Iron Work (37), corrected to  3/16/1928
Drawer   11 Folder   3
Details of Lothrop Avenue Elevation (38), corrected to  2/25/1928
Drawer   11 Folder   3
Exterior Details of West Grand Blvd. Elevation (39), corrected to  2/25/1928
Drawer   11 Folder   3
Exterior Details of Second Blvd. Elevation (40)
Drawer   11 Folder   3
Exterior Details of Eleventh Floor (41)
Drawer   11 Folder   3
Exterior Details of North and South Elevations (42), corrected to  12/11/1927
Drawer   11 Folder   3
Exterior Details of East Elevation (43), corrected to  3/19/1928
Drawer   11 Folder   4
Exterior Details of Upper Part of Grand Blvd. Elevation (44), corrected to  2/25/1928
Drawer   11 Folder   4
Exterior Details of Upper Part of Second Blvd. Elevation (45), corrected to  2/25/1928
Drawer   11 Folder   4
Details of Tower Roof (46), corrected to  2/25/1928
Drawer   11 Folder   4
Details of Stair 1 (47), corrected to  3/24/1928
Drawer   11 Folder   4
Details of Elevator Shafts (48), corrected to  3/17/1928
Drawer   11 Folder   4
Plan of Elevator Lobbies in Basement and Elevations of Elevator Passages, etc. (49), corrected to  12/11/1927
Drawer   11 Folder   4
Plans of Elevator Lobbies and Toilet Rooms, Fifth to Eleventh Floor (50)     (date illegible) 
Drawer   11 Folder   4
Plans of Elevator Lobbies and Toilet Rooms, Twelfth to Twenty-First Floor (51), corrected to  2/25/1928
Drawer   11 Folder   4
Plans of Service Unit, Twenty-Second toTwenty-Eighth Floors (52), corrected to  4/10/1928
Drawer   11 Folder   4
Sections of Stairs 2 and 4 (53), corrected to  2/25/1928
Drawer   11 Folder   4
Plans of Stair 3 and Elevators, Basement to Third Floors (54), corrected to  2/25/1928
Drawer   11 Folder   4
Typical Plan of Stair 3 and Elevators, Fourth to Tenth Floors, and Details of Main Chute, Mail Box and F. A. Intake on Roof (55), corrected to  4/16/1928
Drawer   11 Folder   4
Details of Stairs 3 and 6 (56)     (date illegible) 
Drawer   11 Folder   4
Details of Garage Stairs and Elevators (57), corrected to  4/20/1928
Drawer   11 Folder   4
Door Schedule (58), corrected to  5/16/1928
Drawer   11 Folder   5
Corridor Elevations (59), corrected to  2/25/1928
Drawer   11 Folder   5
Details of Lobby and Corridor (60), corrected to  2/7/1928
Drawer   11 Folder   5
Details of Office Finish (61), corrected to  2/25/1928
Drawer   11 Folder   5
Toilet Room Elevations (62), corrected to  2/25/1928
Drawer   11 Folder   5
Plans of First Floor Arcade and Lobby (63), corrected to  3/16/1928
Drawer   11 Folder   5
Plans and Details of Second Floor Arcade (64), corrected to  2/25/1928
Drawer   11 Folder   5
Plans and Details of Third Floor Arcade (65)
Drawer   11 Folder   5
Details of Theatre Foyer and Lobby (66), corrected to  3/14/1928
Drawer   11 Folder   5
Elevations of Arcade # 115 and Galleries #205 & 304 (67), corrected to  2/25/1928
Drawer   11 Folder   5
Elevations of Arcade #100 and Galleries #200 & 300 (68), undated, corrected to  2/25/1928
Drawer   11 Folder   5
Elevations and Details of Main Entrance Lobby and Theatre Foyer (69), corrected to  3/16/1928
Drawer   11 Folder   5
Details of Arcades (70), corrected to  2/25/1928
Drawer   11 Folder   5
Details of Main Stair #2 (71), corrected to  3/16/1928
Drawer   11 Folder   5
Details of Elevator Lobbies, First, Second and Third Floors (72)
Drawer   11 Folder   5
Details of Foyer and Arcades (73), corrected to  2/4/1928
Drawer   11 Folder   5
Plan and Details of Tunnel between G. M. and Fisher Building (82), 12/2/1927 corrected to  5/21/1928
Drawer   11 Folder   5
Details of Ramps (87), undated, corrected to  2/25/1928
Drawer   11 Folder   5
Details of Additions to First Floor of Garage (115)     (undated due to linen damage)  (32-1/4x38-1/2 inches)
 
Structural Drawings,  10/27/1927 (Ink-on-linen drawings with pencil notations, 28-1/2x47-1/2 to 32-3/4x48 inches)
Drawer   11 Folder   6
Diagram of Wind-Bracing System (5-S), corrected to  11/17/1927
Drawer   11 Folder   6
First Floor Framing Plan (6-S), corrected to  8/6/1928
Drawer   11 Folder   6
Second Floor Framing Plan (7-S), corrected to  8/6/1928
Drawer   11 Folder   6
Third Floor Framing Plan (8-S), corrected to  8/6/1928
Drawer   11 Folder   6
Pipe Floor Framing Plan at Fourth Floor Elevation (9-S), corrected to  8/6/1928
Drawer   11 Folder   6
Fourth Floor Framing Plan (10-S), corrected to  8/6/1928
Drawer   11 Folder   6
Beam Schedule and Typical Floor Plan (11-S), corrected to  1/16/1928
Drawer   11 Folder   6
Pipe Floor Framing Plan at Eleventh Floor Elevation (12-S), corrected to  12/27/1927
Drawer   11 Folder   6
Eleventh Floor Framing Plan (13-S), corrected to  6/23/1928
Drawer   11 Folder   6
Twelfth Floor Framing Plan at Tower and Roof Framing Plan at Main Building (14-S), corrected to  6/23/1928
Drawer   11 Folder   6
Thirteenth to Twentieth Floors Framing Plans (15-S), corrected to  4/11/1928
Drawer   11 Folder   6
Twenty-First to Twenty-Sixth Floors Framing Plans (16-S), corrected to  2/22/1928
Drawer   11 Folder   6
Pipe Floor Framing Plan below Twenty-Second Floor and Twenty-Seventh and Twenty-Eighth Floor Framing Plans (17-S), corrected to  5/14/1928
Drawer   11 Folder   7
Tower Roof Framing (18-S), corrected to  6/20/1928
Drawer   11 Folder   7
Foundation Plan (19-S),  8/3/1927 corrected to  11/11/1927
Drawer   11 Folder   7
Caisson Details (19A-S), corrected to  11/11/1927
Drawer   11 Folder   7
Plan of Basement Walls (21-S), corrected to  12/17/1927
Drawer   11 Folder   7
Typical Pier Details (22-S), corrected to 11/2/1927
Drawer   11 Folder   7
Key Sheet for Pier Details and Stone Arches at Second Floor (23-S), corrected to  12/17/1927
Drawer   11 Folder   7
Eleventh Floor Garage Framing Plan and Ramp Sections (24-S), corrected to  4/4/1928
Drawer   11 Folder   7
Garage Roof Plan and Partial Plan, Tenth Floor Office (25-S), corrected to  5/8/1928
Drawer   11 Folder   7
Details of Apartment House Underpinning (26-S),  9/6/1927 corrected to  9/15/1927
Drawer   11 Folder   7
Basement Floor Framing Plan (27-S), corrected to  6/14/1928
Drawer   11 Folder   7
Details of Spires on Tower (28-S), corrected to  10/13/1927
Drawer   11 Folder   7
Details of Tunnel Across Grand Blvd. (30-S)
Drawer   11 Folder   7
Roof Framing Plan     (undated due to paper damage)  (Pencil-on-vellum drawing)
 
Mechanical/Electrical Drawings by Albert Kahn Architects and Engineers,  12/10/1927 (Ink-on-linen drawings with pencil notations, 32-1/4x48 to 32-1/2x49-1/2 inches)
Drawer   11 Folder   8
Foundation Plan, Section "A" (1M), revised  8/2/1928
Drawer   11 Folder   8
Foundation Plan, Section "B" (2M), revised  8/2/1928
Drawer   11 Folder   8
Basement Plan, Section "A" (3M), revised  7/18/1928
Drawer   11 Folder   8
Basement Plan, Section "B" (4M), revised  7/18/1928
Drawer   11 Folder   8
First Floor Plan, Section "A" (5M), revised  7/18/1928
Drawer   11 Folder   8
First Floor Plan, Section "B: (6M), revised  7/18/1928
Drawer   11 Folder   8
Second Floor Plan, Section "A" (7M), revised  7/18/1928
Drawer   11 Folder   8
Second Floor Plan, Section "B" (8M), revised  7/18/1928
Drawer   11 Folder   8
Third Floor Plan, Section "A" (9M), revised  7/18/1928
Drawer   11 Folder   8
Plans of Third and Fourth Floors of Garage and Third Floor of Office Building, Section "B" (10M), revised  8/20/1928
Drawer   11 Folder   8
Plan of Pipe Space above Third Floor, Section "A" (11M), revised  7/18/1928
Drawer   11 Folder   8
Plan of Pipe Space above Third Floor, Section "B," and Details (12M), revised  8/20/1928
Drawer   11 Folder   8
Fourth Floor Plan, Section "A" (13M), revised  7/18/1928
Drawer   11 Folder   8
Plan of Fifth, Seventh and Ninth Floors of Garage and Fourth and Fifth Floors of Office Building, Section "B" (14M), revised  7/18/1928
Drawer   11 Folder   9
Typical Fifth to Tenth Floor Plan (15M), revised  7/18/1928
Drawer   11 Folder   9
Plans of Sixth Floor, Section "B," and Sixth, Eighth and Tenth Floors of Garage (16M), revised  7/18/1928
Drawer   11 Folder   9
Plans of Seventh, Eighth and Ninth Floors of Office Building, Section "B," and Eleventh Floor of Garage (17M), revised  8/2/1928
Drawer   11 Folder   9
Plans of Tenth and Eleventh Floors, Section "B," and Roof of Garage (18M), revised  4/11/1928
Drawer   11 Folder   9
Plan of Pipe Space above Tenth Floor, Section "A" (19M), revised  8/27/1928
Drawer   11 Folder   9
Plan of Pipe Space above Tenth Floor, Section "B," and Details (20M), revised  8/27/1928
Drawer   11 Folder   9
Eleventh Floor Plan, Section "A" (21M), revised  3/2/1928
Drawer   11 Folder   9
Plans of Twelfth and Thirteenth Floors (22M)
Drawer   11 Folder   9
Plans of Fourteenth and Fifteenth Floors (23M)
Drawer   11 Folder   9
Plans of Sixteenth to Twenty-First Floors, including Pipe Space above Twenty-First Floor (24M)
Drawer   11 Folder   9
Plans of Twenty-Second to Twenty-Seventh Floors (25M), revised  5/5/1928
Drawer   11 Folder   9
Twenty Eighth Floor Plan and Details (26M), revised  9/19/1930
Drawer   11 Folder   9
Heating Riser Diagrams (27M-29M), revised  8/27/1928 (Three drawings, only one revised)
Drawer   11 Folder   10
Plans of Machine Room (30M), revised  8/28/1928
Drawer   11 Folder   10
Piping Details (31M & 32M), revised  8/28/1928 (Two drawings)
Drawer   11 Folder   10
Details of Arcade Ventilation (33M),  11/10/1927
Drawer   11 Folder   10
Details of Vestibule and Lobby Ventilation (34M),  11/10/1927
Drawer   11 Folder   10
Electrical Plan of Sub-Basement Machine Room and Tunnel (35M),  undated
Drawer   11 Folder   10
Basement Electrical Plan, Section A (36M), undated, revised  4/18/1928
Drawer   11 Folder   10
Basement Electrical Plan, Section B (37M), undated, revised  3/5/1928
Drawer   11 Folder   10
First Floor Electrical Plan, Section A (38M), undated, revised  2/11/1928
Drawer   11 Folder   10
First Floor Electrical Plan, Section B (39M), undated, revised  3/5/1928
Drawer   11 Folder   10
Second Floor Electrical Plan, Section A (40M), undated, revised  7/30/1930
Drawer   11 Folder   10
Second Floor Electrical Plan, Section B (41M), undated, revised  7/30/1930
Drawer   11 Folder   10
Third Floor Electrical Plan, Section A (42M), undated, revised  7/30/1930
Drawer   11 Folder   10
Electrical Plan of Third Floor, Section B, and Third and Fourth Floors of Garage (43), undated, revised  7/30/1930
Drawer   11 Folder   10
Fourth Floor Electrical Plan, Section A (44M), undated, revised  7/30/1930
 
Mechanical/Electrical Drawings (cont.), undated, revised  7/30/1930 (Ink-on-linen drawings with pencil notations, 32x48 inches)
Drawer   12 Folder   1
Electrical Plan of Fourth and Fifth Floors of Section B and Fifth, Seventh and Ninth Floors of Garage (45M)
Drawer   12 Folder   1
Electrical Plan of Fifth to Tenth Floors, Inclusive, Section A (46M)
Drawer   12 Folder   1
Electrical Plan of Sixth Floor of Section B and Sixth, Eighth and Tenth Floors of Garage (47M)
Drawer   12 Folder   1
Electrical Plan of Seventh, Eighth and Ninth Floors of Section B and Eleventh Floor of Garage (48M)
Drawer   12 Folder   1
Electrical Plans of Tenth and Eleventh Floors of Section B and Roof of Garage (49M)
Drawer   12 Folder   1
Eleventh Floor Electrical Plan, Section A (50M)
Drawer   12 Folder   1
Electrical Plans of Twelfth and Thirteenth Floors (51M)
Drawer   12 Folder   1
Electrical Plans of Twelfth, Thirteenth, Fourteenth and Fifteenth Floors (52M)
Drawer   12 Folder   1
Electrical Plans of Sixteenth to Twenty-First Floors, Inclusive (53M)
Drawer   12 Folder   1
Electrical Plans of Twenty-Second to Twenty-Seventh Floors (54M)
Drawer   12 Folder   1
Electrical Plans of Fan Room, Machine Room and Twenty-Eighth Floor, and Riser Diagrams of Flood Lighting and Watchman and Fire Alarm Systems (55M), revised  4/18/1928
Drawer   12 Folder   1
Lighting and Power Riser Diagrams (56M), revised  4/18/1928
Drawer   12 Folder   1
Plans and Sections of Transformer Banks No. 1 & 2 (63M),  3/3/1928
Drawer   12 Folder   1
Plan and Sections of Transformer Bank No. 3 (64M),  3/21/1928
 
Mechanical Drawings (cont.) (Ink-on-linen drawings with pencil notations, 32x46 to 31-1/2x50-1/2 inches)
Drawer   12 Folder   2
Fourth Floor Plan of Children's Play Room and Barber Shop (67M), revised  8/8/1928     (undated due to linen damage) 
Drawer   12 Folder   2
Basement Plan, Section A (68M),  4/7/1928 revised  9/27/1928
Drawer   12 Folder   2
Ventilation Plan of Basement, Section B (69M), undated, revised  8/13/1928
Drawer   12 Folder   2
Plan of Children's Play Room and Barber Shop (70M),  undated
Drawer   12 Folder   2
Part Plan of Tenth Floor Transformer and Fan Room and Details (75M),  7/29/1928 revised  8/27/1928
Drawer   12 Folder   2
Vent Layout of Eleventh and Twelfth Floor Kitchens (76M),  6/21/1928 revised  8/27/1928
Drawer   12 Folder   2
Eleventh Floor Plan (77M), undated, revised  7/13/1928
Drawer   12 Folder   2
Ventilation Plan of Thirteenth and Fourteenth Floors of Pent House (105M),  4/9/1928 revised  8/27/1928
Drawer   12 Folder   2
Ventilating Unit Schedule (108M),  7/15/1928 (24-1/4x31 inches)
Drawer   12 Folder   2
Proposed Method of Pipe Identification (111M),  5/21/1928 (13-1/2x20 inches)
 
Mechanical Drawings (cont.) (Ink-on-linen drawings with pencil notations, 29-1/2x40-1/4 to 30-1/4x40-1/2 inches)
Drawer   12 Folder   3
Plan at Twenty-Third Floor (Preliminary) (114M),  6/9/1928 revised  6/25/1928
Drawer   12 Folder   3
Plan at Twenty-Fourth Floor (Preliminary) (115M),  6/9/1928 revised  8/1/1928
Drawer   12 Folder   3
Plan at Twenty-Fifth Floor (Preliminary) (116M),  6/9/1928 revised  9/29/1928
Drawer   12 Folder   3
Plan at Twenty-Sixth Floor (Preliminary) (117M),  6/9/1928 revised  7/1/1928
Drawer   12 Folder   3
Plan at Twenty-Seventh Floor (Preliminary) (118M),  6/9/1928 revised  7/1/1928
Drawer   12 Folder   3
Plan at Twenty-Eighth Floor (119M),  6/9/1928 revised  8/8/1928
Drawer   12 Folder   3
Schedule of Louvres and Dampers (127M),  undated (21-1/2x31-1/2 inches)
Drawer   12 Folder   3
Layout of Main Switchroom Exhaust (128M),  8/3/1928 (33x47-3/4 inches)
Drawer   12 Folder   3
Plumbing Riser Diagram (134M & 135M),  9/19/1930 (Two drawings, 32-3/4x48-3/4 inches)
 
Mechanical Drawings (cont.) (Ink and pencil-on-vellum drawings)
Drawer   12 Folder   4
Plan, Elevations and Details of Fan Unit (59M),  undated (16-3/4x34-3/4 inches)
Drawer   12 Folder   4
Details of Cafeteria Supply Unit (62M),  2/29/1928 (32x47-1/2 inches)
Drawer   12 Folder   4
Drainage Plan for Storage Rooms in Theatre Building (66M), undated, revised  3/16/1928 (23x35 inches)
Drawer   12 Folder   4
Primary Room and Underground Layout and Manhole Details (87M),  undated (30-1/2x47-1/2inches)
Drawer   12 Folder   4
Electrical Plan and Elevations of Basement Barber Shop (78M),  undated (33-1/2x35-1/2 inches)
Drawer   12 Folder   4
Detail of Ducts thru' Telegraph Office, Schemes A & B (103M & 104M),  4/6/1928 (Two drawings, 25-3/4x29-1/2 & 25-1/2x30 inches)
Drawer   12 Folder   4
Garage Offices Lighting Layout (107M),  4/11/1928 (32x33-1/2 inches)
Drawer   12 Folder   4
Basement Cafeteria and Kitchen Layout (110M),  undated (32-1/2x48-3/4 inches)
Drawer   12 Folder   4
Ventilation Plan of Pipe Space (122M), undated, revised  7/31/1928 (32-3/4x48-1/2 inches)
Drawer   12 Folder   4
Ventilation Plan of Barber Shop, Locker Rooms and Vent Registers (126M), undated, revised  7/13/1928 (32-1/4x36-3/4 inches)
Drawer   12 Folder   4
Supply System for Receiving Room (133M), 10/2/1928 (24-3/4x34-1/2 inches)
 
Electrical Drawings,  undated (Ink-on-linen drawings with pencil notations, 31-1/4x49-1/2 to 32x50 inches)
Drawer   12 Folder   5
Electrical Layout of the Noon-Day Club (1E),  8/24/1928 (22-3/4x49-3/4 inches)
Drawer   12 Folder   5
Riser Diagram for Cove Lighting (2E)
Drawer   12 Folder   5
Riser Diagram (3E)
Drawer   12 Folder   5
Plan of Cove Lighting of First Floor Lobby 105 and Passage 104 (4E)
Drawer   12 Folder   5
Plan of Cove Lighting of First Floor Elevator Lobby 112 and Vestibule 113 (5E)
 
Stalingrad Tractor Plant, Amtorg Trading Corporation, Stalingrad, U.S.S.R.,  1929-1930, Jobs No. 1503 & 1503-A, B, C, D, E, G & H [subseries]:
 
Construction Drawing by Albert Kahn, Inc., Architects (Job No. 1503),  3/25/1930 (Ink-on-linen drawing, 29x43 inches)
Drawer   6 Folder   6
Mechanical Drawing
Drawer   6 Folder   6
Layout and Details of Drinking Water System (1-M)
 
Stalingrad Tractor Plant Assembly Building by Albert Kahn, Inc., Architects (Job No. 1503-A)
 
Architectural Construction Drawings,  6/1/1929 revised  6/23/1929 (Ink-on-linen drawings, 28x46-1/2 inches)
Drawer   6 Folder   6
Plot Plan (1)
Drawer   6 Folder   6
Foundation and Footing Plans (2), revised  7/13/1929
Drawer   6 Folder   6
First Floor Plan and Tunnel Details (3), revised  7/17/1929
Drawer   6 Folder   6
Roof Plan (4)
Drawer   6 Folder   6
Elevations (5)
Drawer   6 Folder   6
South Elevations (6)
Drawer   6 Folder   6
Sections (7)
Drawer   6 Folder   6
Toilet and Locker Room Details (8)
Drawer   6 Folder   6
Toilet and Locker Room Details (9)
Drawer   6 Folder   6
Monitor Details (10)
Drawer   6 Folder   6
Monitor Details (11)
Drawer   6 Folder   6
Expansion Joint Details (12)
Drawer   6 Folder   6
Door Details (13)
Drawer   6 Folder   6
Sump, Roof and Sash Details (14)
Drawer   6 Folder   6
Door and Monitor Details (15)
 
Structural Construction Drawings,  6/1/1929 revised  7/12/1929 (Ink-on-linen drawings, 28x47 inches)
Drawer   6 Folder   7
West Half Roof Framing Plan (1-S)
Drawer   6 Folder   7
East Half Roof Framing Plan (2-S)
Drawer   6 Folder   7
Truss Sections and Details (3-S)
Drawer   6 Folder   7
Mezzanine Locker Room Floor Plan and Truss Details (4-S)
Drawer   6 Folder   7
Column Schedule, Elevations and Sections (5-S)
Drawer   6 Folder   7
Footing Details (6-S)
Drawer   6 Folder   7
Truss Sections and Details (7-S)
Drawer   6 Folder   7
Anchor Bolt Setting Plan (8-S),  6/10/1929 revised  7/15/1929 (Ink and green ink drawing on vellum)
Drawer   6 Folder   7
Details for Tunnel Wall Reinforcing, etc. (9-S),  7/6/1929 revised  7/9/1929 (Pencil-on-vellum drawing)
Drawer   6 Folder   7
Reinforcing Steel Details, End Walls (10-S),  6/29/1929 revised  7/10/1929 (Pencil-on-vellum drawing)
Drawer   6 Folder   7
Details for Flat Slab Reinforcing, etc. (11-S),  3/6/1929 (Pencil-on-velum drawing)
 
Mechanical Construction Drawings,  6/15/1929 (Black and red ink drawings on linen, 28x47 inches)
Drawer   6 Folder   8
Plot Plan of Tractor Works (1M)
Drawer   6 Folder   8
Foundation Plan (West Half) (2M)
Drawer   6 Folder   8
Foundation Plan (East Half) (3M)
Drawer   6 Folder   8
First Floor Plan (West Half) (4M)
Drawer   6 Folder   8
First Floor Plan (East Half) (5M)
Drawer   6 Folder   8
Typical Toilet Rooms Plans and Details (6M)
Drawer   6 Folder   8
Heating Details (7M)
Drawer   6 Folder   8
First Floor (West Half) Sprinkler Plan (8M)
Drawer   6 Folder   8
First Floor Plan (East Half) Sprinkler Plan (9M)
Drawer   6 Folder   8
Sprinkler Elevations (10M)
Drawer   6 Folder   8
Hanger Details (11M)
 
Electrical Construction Drawings,  7/19/1929 (Ink-on-linen drawings, 28x47 inches)
Drawer   6 Folder   9
Power and Lighting Riser Diagrams (1E)
Drawer   6 Folder   9
First Floor Plan, Power Feeder Layout (2E)
Drawer   6 Folder   9
First Floor Plan, Switchboard #1 Section (3E)
Drawer   6 Folder   9
First Floor Plan, Switchboard #2 Section (4E)
Drawer   6 Folder   9
First Floor Plan, Switchboard #3 Section (5E)
Drawer   6 Folder   9
First Floor Plan, Switchboard #4 Section (6E)
Drawer   6 Folder   9
Motor Schedule, Sheet #1 (7E)
Drawer   6 Folder   9
Motor Schedule, Sheet #2 (8E)
Drawer   6 Folder   9
First Floor Plan, Lighting Feeders and Typical Lighting (9E)
Drawer   6 Folder   9
Lighting Layout -- East & West Units (10E)
Drawer   6 Folder   9
Lighting Layout -- Typical (11E)
Drawer   6 Folder   9
Plans and Sections of Transformer Banks #1, 2 & 4 (12E),  7/20/1929
Drawer   6 Folder   9
Plans and Sections of Transformer Bank #3 (13E)
 
Stalingrad Tractor Plant Foundry Building by Albert Kahn, Inc., Architects (Job No. 1503-B)
 
Architectural Construction Drawings,  7/15/1929 (Ink-on-linen drawings, 36x53 inches)
Tube 13  
Plot Plan (1)
Tube 13  
Foundation Plan (2), revised  7/25/1929
Tube 13  
Details of Trenches, Tunnels and Pits (3), revised  7/25/1929
Tube 13  
First Floor Plan (4), revised  7/25/1929
Tube 13  
Charging Floors and Roof Plans (5), revised  7/25/1929
Tube 13  
Roof Plan and Details of Sand and Material Storage (6)
Tube 13  
Elevations (7), revised  7/25/1929 (Reverse sepia print)
Tube 13  
Monitor Elevations (8)
Tube 13  
Sections thru' Building (9), revised  7/25/1929 (Reverse sepia print)
Tube 13  
Sections thru' Building (10), revised  7/25/1929
Tube 13  
Sections thru' Building (11)
Tube 13  
Sections thru' Building (12), revised  7/25/1929
Tube 13  
Sections thru' Building (13), revised  7/25/1929
Tube 13  
Roof and Monitor Details (14), revised  7/25/1929
Tube 13  
Roof and Monitor Details (15)
Tube 13  
Roof and Monitor Details (16)
Tube 13  
Roof and Monitor Details (17)
Tube 13  
Roof and Monitor Details (18), revised  7/25/1929
Tube 13  
Roof and Monitor Details (19)
Tube 13  
Plans of Blower and Charging Floors and Stair Sections (20)
Tube 13  
Plans and Details of Offices, Toilets, Locker Rooms, Shower Rooms, Dining Room and Kitchen (21)
Tube 13  
Details of Office Portion (22)
Tube 13  
Door Details (23)
Tube 13  
Plans and Sections of Fan Rooms (24)
Tube 13  
Details of Transformer and Fan Rooms, Monitor Roof and Typical Cement Sills (25)
Tube 13  
Details of Conveyor Trenches, Elevator Pit and Piers and Depressions (26), revised  7/25/1929
 
Structural Construction Drawings,  7/1/1929 revised  7/18/1929 (Ink-on-linen drawings, 37-1/2x53 inches)
Tube 14  
Roof Framing Plan (1-S)     (not revised) 
Tube 14  
Bottom Chord Plan and Sections (2-S)     (not revised) 
Tube 14  
Typical Cross-Section "BB" and 4-Ton Crane Section (3-S)
Tube 14  
Typical Cross-Section "BB" and Crane Details (4-S)
Tube 14  
Sections and Details (5-S)
Tube 14  
Floor Framing Plans of Cupola Building (6-S)
Tube 14  
Sections and Details (7-S)
Tube 14  
Column Footings (8-S)
Tube 14  
Footings Plans and Details (9-S)
Tube 14  
Plan of Sandbins and Wall Sections (10-S)
Tube 14  
Elevations (11-S), revised  7/28/1929
Tube 14  
Anchor Bolt Setting Plan (12-S)     (not revised)  (28-1/2x43 inches)
Tube 14  
Elevations and Sections (13-S), revised  7/26/1929
Tube 14  
Column Schedule (14-S)
Tube 14  
Plan of Monorail Supports and Truss Sections and Details (15-S)
 
Structural Construction Drawings,  7/6/1929 (Pencil drawings on vellum and tracing paper, 34x49-3/4 inches)
Drawer   6 Folder   10
Slab and Bending Schedules and Details of Slab in Bins (16-S), revised  7/22/1929
Drawer   6 Folder   10
Foundation Plan (17-S)     (undated due to paper damage) 
Drawer   6 Folder   10
Details of Footings, Wall Beams and Tunnel Pits (18-S), revised  7/17/1929
Drawer   6 Folder   10
Details of Bin Walls (19-S), revised  7/12/1929
Drawer   6 Folder   10
Details of Sandbins and Walls (20-S), revised  7/17/1929
Drawer   6 Folder   10
Reinforcing Details for Bin Walls (21-S),  7/18/1929
Drawer   6 Folder   10
Floor Framing Plans for Cupola Building (22-S),  7/23/1929
Drawer   6 Folder   10
Footings of Cupola and Mezzanine Floor (23-S), revised  7/17/1929
Drawer   6 Folder   10
Details of Lintel Beams and Beam Bending (24-S),  7/23/1929
Drawer   6 Folder   10
Plan and Details of Conveyor Trenches (25-S), revised  7/22/1929
 
Mechanical Construction Drawings,  7/18/1929 (Ink-on-linen drawings with blue and red ink revisions, 36x53 inches)
Tube 14  
Foundation Plan-Plumbing (1-M)
Tube 14  
First Floor Plan (2-M)
Tube 14  
Plumbing Details (3-M)
Tube 14  
First Floor Plan (4-M)
Tube 14  
Details of Fan and Exhaust Units (5-M),  7/20/1929
Tube 14  
Ventilating and Exhaust Equipment Schedules and Diagrams of Damper Control and Piping Connections to Vento Heaters (6-M),  7/20/1929
Tube 14  
Heating Details of Offices, Toilets, Locker Rooms, Shower Rooms, Dining Room, Kitchen and Sand Storage Bins (7-M)
Tube 14  
Heating Details (8-M)
Tube 14  
Detail of Connections to Fan Equipment (9-M),  8/17/1929
 
Electrical Construction Drawings,  7/19/1929 (Ink-on-linen drawings with red ink revisions, 36x53 inches)
Tube 14  
First Floor Plan-Lights and Power (1E)
Tube 14  
Sections, Details and Riser Diagrams (2E)
Tube 14  
Plan and Sections of Transformer Bank #7 (3E) (28x46-1/2 inches)
Tube 14  
Plan and Sections of Transformer Bank #6 (4E) (28x46-1/2 inches)
 
Stalingrad Tractor Plant Forge Shop by Albert Kahn, Inc., Architects (Job No. 1503-C)
 
Architectural Construction Drawings,  6/1/1929 (Ink-on-linen drawings, 29-1/2x42 inches)
Drawer   6 Folder   11
Roof Plan and Key Plan (1), revised  8/8/1929
Drawer   6 Folder   11
Foundation and Floor Plans of Heavy Forge Shop and of Die Machine Shop and Storage (2), revised  8/8/1929
Drawer   6 Folder   11
Foundation and Floor Plans of First Heat Treat Building (3), revised  7/3/1929
Drawer   6 Folder   11
Foundation and Floor Plans of Light Forge and Material Storage Shops (4), revised  8/8/1929
Drawer   6 Folder   11
Elevations (5), revised  8/8/1929
Drawer   6 Folder   11
Elevations and Details (6), revised  7/3/1929
Drawer   6 Folder   11
Sections (7), revised  7/3/1929
Drawer   6 Folder   11
Details (8), revised  7/3/1929
Drawer   6 Folder   11
Details (9), revised  7/3/1929
Drawer   6 Folder   11
Details of Service Buildings # 1, 2 & 3 (10), revised  8/8/1929
Drawer   6 Folder   11
Details (11), revised  7/3/1929
 
Structural Construction Drawings,  6/1/1929 revised  7/3/1929 (Ink-on-linen drawings with blue ink revisions, 36x53-1/2 inches)
Tube 15  
Elevations (1-S)
Tube 15  
Typical Sections (2-S)
Tube 15  
Truss Details (3-S)
Tube 15  
Footing Details (4-S)
 
Mechanical Architectural Drawings,  6/1/1929 (Ink-on-linen drawings, 29x42 inches)
Drawer   7 Folder   1
Foundation Plan of Forge Shop (East Half) -- Underground Plumbing (1-M)
Drawer   7 Folder   1
Foundation Plan of Forge Shop (West Half) and Material Storage Building -- Underground Plumbing (2-M)
Drawer   7 Folder   1
Floor Plan of Forge Shop (East Half) (3-M)
Drawer   7 Folder   1
Floor Plan of Forge Shop (West Half) and Service Building #1 (4-M)
Drawer   7 Folder   1
Cross-Sections, Plans of Service Buildings #2 & 3 and Details(5-M)
 
Electrical Construction Drawings,  7/19/1929 (Ink-on-linen drawings, 29x42 inches)
Drawer   7 Folder   1
Riser Diagrams and Plan of Light and Power Feeders (1-E)
Drawer   7 Folder   1
Lighting and Power Layout for First Half of Heat Treat Building (2-E)
Drawer   7 Folder   1
Lighting Layout for Light Forge and Material Storage Shops (3-E)
Drawer   7 Folder   1
Lighting Layout for Heavy Forge and Die & Machine Shops (4-E)
Drawer   7 Folder   1
Power Layout for Light and Heavy Forge Shops and Die and Machine Shop (5-E)
Drawer   7 Folder   1
Plans and Sections of Transformer Bank #5 (6-E) (29x47 inches)
 
Stalingrad Tractor Plant Forge Shop by Albert Kahn, Inc., Architects (Job No. 1503-G)
 
Mechanical Construction Drawings,  7/1/1929 revised  8/14/1929 (Ink-on-linen drawings, 30-1/2x53 inches)
Tube 15  
Plan and Details of Heavy Forge Shop -- Steam and Exhaust Piping (1M)
Tube 15  
Plan and Details of Light Forge Shop -- Steam and Exhaust Piping (2M)
Tube 15  
Details of Steam and Exhaust Headers (3M)
Tube 15  
Plans of Heavy and Light Forge Shops -- Low Pressure Air (4M)
Tube 15  
Plans of Heavy and Light Forge Shops -- Fuel Oil, High Pressure Steam and High and Low Pressure Drips (5M)
Tube 15  
Plans of Heavy and Light Forge Shops -- Lubricating Oil (6M)
Tube 15  
Plan of Heavy and Light Forge Shops and Pump Room -- Fuel Oil Pump and Tank (7M)
 
Stalingrad Tractor Plant Pump and Heater Building, Grease Extractor House and Tunnels by Albert Kahn, Inc., Architects (Job No. 503-D)
 
Architectural Construction Drawings (Pencil-on-vellum drawings, 29x41 inches)
Drawer   7 Folder   2
Plot Plan,  6/15/1929     (no number due to paper damage) 
Drawer   7 Folder   2
Tunnel Layout (4),  6/15/1929
Drawer   7 Folder   2
Plan, Elevations and Sections of Grease Extractor House and Tunnels (5),  7/18/1929 revised  9/20/1929
 
Structural Construction Drawings, undated, revised  9/23/1929 (Pencil-on-vellum drawings, 27-1/2x40-1/2 inches)
Drawer   7 Folder   2
Reinforcing Steel Details (1S)
Drawer   7 Folder   2
Reinforcing Steel Details (2S)
Drawer   7 Folder   2
Reinforcing Steel Details (3S)
 
Mechanical/Electrical Construction Drawings of Grease Extractor House and Tunnel,  8/13/1929 revised  9/21/1929 (Ink-on-linen drawings with blue pencil revisions, 29x42-1/2inches)
Drawer   7 Folder   3
Plot Plan (1AM)
Drawer   7 Folder   3
Plan "A" to "B" and Sections (2AM)
Drawer   7 Folder   3
Plans "B" to "C" and "C" to "D" and Sections (3AM)
Drawer   7 Folder   3
Plan "D" to "E" and Sections (4AM)
Drawer   7 Folder   3
Plan "E" to "F" and "G" to "H" and Sections (5M)
Drawer   7 Folder   3
Plan "K" to "L" and Sections (6AM)
Drawer   7 Folder   3
Plan "L" to "M" and Sections (7AM)
Drawer   7 Folder   3
Tunnel Sections (8AM)
Drawer   7 Folder   3
Tunnel Sections (9AM)
Drawer   7 Folder   3
Plans "R" to "Q," "N" to "P" and "T" to "S" and Sections (10AM)
Drawer   7 Folder   3
Key Plans, Sections and Details (11AM)
Drawer   7 Folder   3
Extractor House Plan, Section and Details (12AM)
Drawer   7 Folder   3
Plan of Tunnel Lighting for Pump and Heater Buildings (1E),  6/10/1929
 
Mechanical Construction Drawings of Power House (Ink-on-linen drawings with blue pencil revisions, 31-1/2x53-1/4 inches)
Tube 15  
Plan of Hot Water Equipment (13AM),  9/9/1929 revised  12/31/1929
Tube 15  
Details of Hot Water Equipment (14AM),  9/26/1929 revised  2/12/1930
 
Stalingrad Tractor Plant Underground Electrical System by Albert Kahn, Inc., Architects (Job No. 1503-E)
Drawer   7 Folder   4
Electrical Construction Drawings (Ink-on-linen drawings, 29x48 inches)
Drawer   7 Folder   4
Plot Plan (1E),  7/18/1929
Drawer   7 Folder   4
Manhole Details (2E),  7/19/1929
 
Stalingrad Tractor Plant Laboratory Building by Albert Kahn, Inc., Architects (Job No. 1503-H)
 
Mechanical Construction Drawings,  8/5/1929 (Ink-on-linen drawings, 31-3/4x44-1/4 inches)
Drawer   7 Folder   4
First Floor Plan and Details and Heating Riser Diagram (1M)
Drawer   7 Folder   4
Second Floor Plan (2M)
 
Carillon Tower for the University of Michigan [Burton Memorial Tower],  1936, Job No. 1706 [subseries]:
 
Construction Drawings by Albert Kahn, Inc., Architects
 
Architectural Drawings,  1/8/1936 (Ink-on-linen drawings with blue ink revisions, 21-1/2x36 inches)
Drawer   7 Folder   5
Plot Plan (1), revised  7/24/1936
Drawer   7 Folder   5
Basement and First Floor Plans (2), revised  4/27/1936
Drawer   7 Folder   5
Second and Third Floor Plans (3), revised  4/27/1936
Drawer   7 Folder   5
Seventh and Ninth Floor Plans and Details (4), revised  7/3/1936
Drawer   7 Folder   5
Tenth Floor and Upper Part of Bell Chamber Plans and Details (5), revised  7/24/1936
Drawer   7 Folder   5
Eleventh Floor and Roof Plans and Details (6), revised  7/3/1936
Drawer   7 Folder   5
East and North Elevations (7), revised  3/4/1936 (Original drawing and electrostatic print)
Drawer   7 Folder   5
Sections "AA" and "BB" (8), revised  3/4/1936
Drawer   7 Folder   5
Elevation of Lower Floors and Details (9), revised  3/31/1936
Drawer   7 Folder   5
Elevation of Upper Floors and Details (10), revised  3/31/1936
Drawer   7 Folder   5
Elevations, Sections and Details (11), revised  7/3/1936
Drawer   7 Folder   5
Revised Details for Steel Stair (12),  3/9/1936 revised  4/16/1936 (Pencil and ink drawing on vellum, 16-1/4x22-1/2 inches)
 
Structural Drawings,  1/8/1936 (Pencil-on-vellum drawings with colored ink and pencil revisions, 21-1/2x34-1/2 inches)
Drawer   7 Folder   6
First, Second and Typical Floor Framing Plans and Details (1-S)
Drawer   7 Folder   6
Ninth Floor Framing Plan and Stairs Sections and Details (2-S)
Drawer   7 Folder   6
Tenth Floor and Upper Level Bell Chamber Framing Plans and Details (3-S), revised  7/23/1936
Drawer   7 Folder   6
Eleventh Floor and Roof Framing Plans and Details (4-S), revised  7/23/1936
Drawer   7 Folder   6
Quarter Plan and Section "AA" (5-S),  6/24/1936 (22x33 inches)
Drawer   7 Folder   6
Detail of Enclosure over New Stairs to Tenth Floor (6-S),  7/24/1936 (1-1/4x22-1/4 inches)
Drawer   7 Folder   6
Plan at Eleventh Floor Stair Opening (7-S),  8/29/1936 (17x25-1/4 inches)
Drawer   7 Folder   6
Proposed Method of Hoisting Bells (100-S),  3/30/1936 (22-1/2x30-1/2 inches)
 
Mechanical Drawings,  1/29/1936 (Ink-on-linen drawings with pencil and blue ink revisions, 21-1/2x36 inches)
Drawer   7 Folder   7
Basement and First Floor Plans (1-M), revised  3/30/1936
Drawer   7 Folder   7
Second and Third Floor Plans and Lighting Riser Diagram (2-M), revised  3/30/1936
Drawer   7 Folder   7
Fourth and Firth Floor Plans (3-M), revised  3/30/1936
Drawer   7 Folder   7
Sixth and Seventh Floor Plans (4-M), revised  3/30/1936
Drawer   7 Folder   7
Eighth and Ninth Floor Plans (5-M), revised  7/24/1936
Drawer   7 Folder   7
Heating Riser Diagram and Details (6-M), revised  5/21/1936
Drawer   7 Folder   7
Lobby Heating System (100-M),  6/16/1936 (Pencil-on-vellum drawing, 17-3/4x24-1/2 inches)
 
Supplementary Construction Drawings of Tower (Job No. 1706-A)
 
Architectural Drawings (Pencil-on-vellum drawings, 22-1/24x33 to 24x34-1/2 inches)
Drawer   7 Folder   8
Basement and First Floor Plans and Column Reinforcing Schedule (1),  3/6/1936 revised  6/9/1936
Drawer   7 Folder   8
Elevations of Concrete Walls up to Second Floor Line (2),  3/7/1936 revised  6/9/1936
Drawer   7 Folder   8
Framing Plans for Second to Ninth Floors, Inclusive (3),  3/10/1936 revised  6/16/1936
Drawer   7 Folder   8
North Elevation, Second to Tenth Floors (4),  3/11/1936 revised  6/25/1936
Drawer   7 Folder   8
Plan of Tenth Floor and at Top of Circular Head Windows (5),  3/18/1936 revised  7/23/1936
Drawer   7 Folder   8
Elevation of Concrete Structure above Tenth Floor and Details (6),  3/16/36 revised  8/1/1936
Drawer   7 Folder   8
Eleventh Floor and Roof Framing [Plans] (7),  3/13/1936 revised  6/9/1936
Drawer   7 Folder   8
Part East Elevatiabove Tenth Floor (8),  5/5/1936 revised  8/1/1936
Drawer   7 Folder   8
 
Science Building, University of Michigan, Ann Arbor,  1914, Job No. 605 [subseries]:     (Natural Science Building) 
 
Construction Drawings by Albert Kahn, Architect, Ernest Wilby, Associate (Ink-on-linen drawings with pencil notations, 44-1/2x38 inches)
 
Architectural Drawings,  3/10/1914
Tube   22  
Plot Plan (1) (two drawings)
Tube   22  
Foundation Plan (2)
Tube   22  
Foundation Plan (2R), revised  4/30/1914
Tube   22  
First Floor Plan (3)
Tube   22  
First Floor Plan (3R), revised  4/30/1914
Tube   22  
Second Floor Plan (4)
Tube   22  
Second Floor Plan (4R), revised  4/30/1914
Tube   22  
Third Floor Plan (5)
Tube   22  
Third Floor Plan (5R), revised  4/30/1914
Tube   22  
Fourth Floor Plan (6)
Tube   22  
Fourth Floor Plan (6R), revised  4/30/1914
Tube   22  
Roof Plan (7)
Tube   22  
Roof Plan (7R),  undated
Tube   22  
South, East and North Elevations (8R), revised  4/30/1914
Tube   22  
West Elevation and Court Elevations (9R), revised  4/30/1914
Tube   22  
Transverse Section, Corridor Partition Details and Window and Door Details (11R), revised  4/30/1914
Tube   22  
Section thro' Main Stairs, Sections on Lines "AA," "BB" and "CC," and Stair Details (12R), revised  4/30/1914
Tube   22  
Miscellaneous Floor Plans and Sections (13R), revised  4/30/1914
Tube   22  
First Floor Plan of General Lecture Room (14R), revised  4/30/1914
Tube   22  
Second and Third Floor Plans [of General Lecture Room] (15R), revised  4/30/1914
Tube   22  
Transverse and Longitudinal Sections and Sections on Lines "CC" and "EE" (16R), revised  4/30/1914
Tube   22  
Miscellaneous Floor Plans and Sections (17)
Tube   22  
Miscellaneous Floor Plans and Sections (17R), revised  4/30/1914
 
Structural Drawing,  3/10/1914
Tube   23  
Structural Steel Details (1S-R), revised  4/30/1914
 
Mechanical Drawings, undated, revised  5/18/1914
Tube   23  
Foundation Plan (1M-R)
Tube   23  
First Floor Plan (2M
Tube   23  
Second Floor Plan (3M)
Tube   23  
Third Floor Plan (4M)
Tube   23  
Fourth Floor Plan (5M)
Tube   23  
Riser Diagram (6M),  3/18/1914 revised  5/6/1914
Tube   23  
Details of Supply Fans, Ducts and Exhaust (7M)
 
Ford Motor Company Extension No. 29 and 30, Highland Park, Michigan,  1915-1916, Job No. 375-W [subseries]:
 
Construction Drawings by Albert Kahn, Architect, Ernest Wilby, Assocate (Ink-on-linen drawings with pencil notations, 23x64 inches)
 
Architectural Drawings,  1/26/1915
Tube   24  
Plot Plan and Details of Bridge over John R. Street between Present and New Buildings (1), revised  3/6/1916
Tube   24  
Foundation Plan (2), revised  3/6/1916
Tube   24  
First Floor Plan (3), revised  3/11/1916
Tube   24  
Second Floor Plan (4), revised  3/11/1916
Tube   24  
Fifth Floor Plan (5), revised  3/11/1916
Tube   24  
Sixth Floor Plan (6), revised  3/11/1916
Tube   24  
Roof Plan (7), revised  7/12/1916
Tube   24  
North Elevation and Elevation of North Side of Craneway (8), revised  3/6/1916
Tube   24  
First, Third and Fourth Floor Plans, John R. Street End, and Elevation of South Side of Craneway (9), revised  3/11/1916
Tube   24  
East Elevation and Cross-Section (10), revised  3/6/1916
Tube   24  
John R. Street Elevation, Part North Elevation and Part Longitudinal Section thro' Craneway (11), revised  3/6/1916
Tube   24  
Typical Details of Elevators, Section thro' Stairs, Plan of Fan Rooms No. 2, 3 & 4, and Section "A-A" (12), revised  3/6/1916
Tube   24  
Miscellaneous Details and Sections (13)     (not dated due to linen damage) 
Tube   24  
Detail of Doors at East End of Craneway (14), revised  3/6/1916
Tube   24  
Plan of Machine Room and Revised Plan of Penthouse and Pit for Elevator No. 8 (21),  3/22/1916 revised  5/23/1916 (20-1/4x18-3/4 inches)
Tube   24  
Elevation and Revised Plan of East End of Craneway Showing Location of Door at Center of Present Railroad Track (23),  4/5/1916 (16-1/4x25-1/4 inches)
Tube   24  
Revised Detail of Rails for Balconies in Craneways (26),  3/29/1916 (16x23 inches)
Tube   24  
Revisions to Fan Room No. 8 (28),  6/22/1916 (13-3/4x28-1/4 inches)
 
Structural Drawings
Tube   24  
Column Schedule (1-S),  1/20/1916 revised3/14/1916
Tube   24  
Sixth Floor Plan, Beam Schedule and Spandrel Details (2-S),  1/22/1916 revised  3/6/1916
Tube   24  
Roof Plan (3-S),  1/20/1916 revised  2/21/1916
Tube   24  
Details of Structural Steel Framing (4-S),  1/21/1916 revised  3/6/1916
Tube   24  
Part Plan of Roof, South Wing, Part Plan of Typical Floor Showing Placing of Steel, and Detail of Typical Roof Spandrel (5-S),  1/22/1916 revised  3/6/1916
Tube   24  
Roof Framing Plan (6-S),  3/6/1916 revised  3/9/1916
Tube   24  
Typical Part Plan of Roof and Half-Section thru' Skylight over Craneway (7-S),  3/6/1916 revised  3/9/1916
Tube   24  
Plan and Elevation of Footing (8-S),  3/14/1916
 
Mechanical Drawings
Tube   24  
Plan of Fan Apparatus, Elevation at Apparatus and Section thru' Duct (1-M),  1/25/1916 revised  3/6/1916
Tube   24  
Drainage Plan (2-M),  3/14/1916
 
Literary Building (Angell Hall), University of Michigan, Ann Arbor,  1923-1924, Job No. 1025-B [subseries]:
Tube 25  
Construction Drawings by Albert Kahn, Architect (Ink-on-linen drawings with pencil notations, 28x69 except as noted)
 
Architectural Drawings,  6/6/1923 revised  10/17/1923
Tube 25  
Plot Plan (1)     (not revised) 
Tube 25  
Tunnel and Foundation Plan (2)
Tube 25  
Ground Floor Plan (3)
Tube 25  
First Floor Plan (4), revised  2/7/1924
Tube 25  
Second Floor Plan (5)
Tube 25  
Third Floor Plan (6)
Tube 25  
Fourth and Fifth Floor Plans and Pipe Space Plan (7)
Tube 25  
Roof Plan (8)
Tube 25  
Plan Showing Location of Lookouts at Fourth Floor Cornice (8-A)     (not revised)  (17-3/4x41-1/4 inches)
Tube 25  
West Elevation (9)
Tube 25  
East Elevation (10)
Tube 25  
Sections (11)
Tube 25  
Details of Stairs and Elevator (12)
Tube 25  
Details of Center Portion, West Elevation (13)
Tube 25  
Details of East Elevation (14)     (not revised) 
Tube 25  
Sections and Details (15)
Tube 25  
Plans of Main Stairs (16), revised  2/7/1924
Tube 25  
Details of Stairs # 3 & 4, Doors and Windows, etc. (17)
Tube 25  
Details of Lobby, First Floor (18), revised  2/7/1924
Tube 25  
Typical Bay and Portico Details (19)
Tube 25  
Revised Detail of Main Entrance Doors (19-A), 10/5/1923 (Pencil-on-vellum drawing, 28x26-1/2 inches)
Tube 26  
Stuctural Drawings,  undated
Tube 26  
Schedule of Columns and Footings (1-S), revised  4/27/1923
Tube 26  
Ground Floor Framing Plan (2-S), revised  2/23/1923
Tube 26  
First Floor Framing Plan (3-S), revised  3/7/1923
Tube 26  
Second and Third Floors Framing Plans (4-S), revised  5/24/1923
Tube 26  
Fourth Floor Framing Plan (5-S), revised  6/6/1923
Tube 26  
Fifth Floor and Roof Framing Plans (6-S)
Tube 26  
Mechanical Drawings,  undated
Tube 26  
Foundation Plan (1M), revised  7/23/1923
Tube 26  
Ground Floor Plan (2M), revised 311/1924
Tube 26  
First Floor Plan (3M), revised  3/11/1924
Tube 26  
Second Floor Plan (4M), revised  7/23/1923
Tube 26  
Third Floor Plan (5M),revised  7/23/1923
Tube 26  
Fourth Floor Plan (6M), revised  3/18/1924
Tube 26  
Fifth Floor Plan and Heating Riser Diagram (7M), revised  3/18/1924
 
Ford Motor Company "Century of Progress" Exposition Buildings, Chicago, Illinois,  1934, Job No. 1657 1657-A, B and C [subseries]:
 
Exposition Building (Rotunda) (Job No. 1657)
Tube 27  
Architectural Construction Drawings by Albert Kahn, Inc., Architects,  2/10/1934 (Ink-on-linen drawings with pencil notations, 23-1/2x58-3/4 to 23-3/4x60 inches)
Tube 27  
Plot Plan (1), revised  2/27/1934
Tube 27  
Foundation Plan (2), revised  2/27/1934
Tube 27  
First Floor Plan (3), revised  4/20/1934
Tube 27  
Balcony Plan (4), revised  3/1/1934
Tube 27  
Roof Plan (5), revised  2/27/1934
Tube 27  
East and West Elevations (6), revised  4/25/1934
Tube 27  
North and South Elevations, Cross-Section on Line "A-A" and Longitudinal Section on Center Line (7), revised  2/27/1934
Tube 27  
Details of Entrances (8), revised  2/27/1934
Tube 27  
Typical Cross-Section thru' Main Building and Window Details (9), revised  2/27/1934
Tube 27  
Sections and Details (10), revised  2/27/1934
Tube 27  
Details of Stairs and Escalators (11), revised  2/27/1934
Tube 27  
Plan of Lecture Hall, Wall Sections, Framing Details and Projection Room Details (12), revised  4/5/1934
Tube 27  
Interior and Exterior Elevations of Court Doors and Windows and Details for Main Entrance and Entrance to Industrial Exhibit (13), revised  4/5/1934
Tube 27  
Details of Writing Room and Women's Room and Section thru' Historical Exhibition (14), revised  4/5/1934
Tube 28  
Structural Construction Drawings by Albert Kahn, Inc., Architects (Ink-on-vellum drawings with pencil notations, 28x56-1/2 inches)
Tube 28  
Roof Framing Plan (1-S), revised  2/28/1934
Tube 28  
Balcony Framing Plan (2-S),  1/29/1934 revised  2/28/1934
Tube 28  
Footing Plan, South Portion (3-S),  2/10/1934 revised  2/26/1934
Tube 28  
Footing Plan, North Portion (4-S),  2/10/1934 revised  2/26/1934
Tube 28  
Footing Plan for Museum (5-S),  2/20/1934 revised  2/26/1934 (20-1/2x30-1/4 inches)
Tube 28  
Framing at Escalator (6-S),  3/20/1934 (Pencil-on-linen drawing, 17x23-1/2 inches)
Tube 29  
Mechanical/Electrical Construction Drawings by Albert Kahn, Inc., Architects and Engineers (Ink-on-linen drawings with pencil notations, 23-1/2x59-1/2 inches)
Tube 29  
Foundation Plan (1-M),  2/1934 revised  4/10/1934
Tube 29  
Section at Foundry Exhaust (1-MX),  6/20/1934 (Pencil-on-vellum drawing, 13-3/4x22 inches)
Tube 29  
First Floor Plan (2-M),  2/21/1934 revised  4/10/1934
Tube 29  
Balcony Floor Plan (3-M),  2/21/1934 revised  4/5/1934
Tube 29  
Detail of Conductors at Columns Z-1 to Z-22 and Y-42 to Y-101 and Piping and Coil Arrangement (4-M),  2/1934 revised  4/5/1934
Tube 29  
Roof Plan (5-M),  3/24/1934
Tube 29  
East Elevation and Plan of Transformer Room No. 1 (6-M),  3/24/1934
Tube 29  
North, South and West Elevations and Longitudinal and Cross-Sections (7-M),  3/24/1934
Tube 29  
Plan and Section of Globe Pit in Historical Exhibit, Section thru' North End of Building and Details (8-M),  3/24/1934
Tube 29  
Floor Plan of Lecture Hall, Ceiling Plan of Writing Room, Section thru' Historical Exhibit and Details (9-M),  2/21/1934 revised  3/24/1934
Tube 29  
Riser Diagram of Switchboard No. 1 and Details of Switchboard Rooms No. 2 & 3 (10-M),  3/24/1934
Tube 29  
Riser Diagram     (not numbered or dated due to linen damage) 
 
Roads of the World Exhibit at Exposition (Job No. 1657-A)
Drawer   13 Folder   10
Architectural Construction Drawi