Ford Motor Company Airplane Parts Manufacturing Building (Willow Run Bomber Factory), near Ypsilanti, Michigan.  1941-1943, Job No. 1888R [subseries]:  [All documents associated with this project have been declassified by the National Archives and Records Administration, 2/23/2006 Declassification Number NND41511]     (supercedes 1888) 
 
Construction Drawings by Albert Kahn Associated Architects & Engineers, Inc.
 
Architectural Drawings,  6/30/1941 (ink-on-linen drawings with pencil notations and ink and pencil drawings on vellum, 31x64-1/2 to 33-1/2x66-3/4 inches)
Tube 35  
Plot Plan (1), revised  5/23/1942
Tube 35  
Site Plan Showing Parking for 26,095 Cars (2),  undated (32x53-3/4 inches)
Tube 35  
Foundation Plan and Details (2), revised  11/3/1941
Tube 35  
Foundation Plan and Details (2-A), revised  7/30/1941
Tube 35  
First Floor Plan (3), revised  3/10/1942
Tube 35  
First Floor Plan-Temporary Construction Lighting (3-A)
Tube 35  
First Floor Plan (3-B),  4/1/1943, revised  11/12/1943
Tube 35  
Mezzanine Floor Plan (4), revised  3/10/1942
Tube 35  
Mezzanine Floor Plan-Temporary Construction Lighting (4-A)
Tube 35  
Mezzanine Floor Plan (4-B),  9/28/1943
Tube 35  
Second Floor Plan (5), revised  11/3/1941
Tube 35  
Second Floor Plan (5-B),  11/27/1943
Tube 35  
Roof Plan (6), revised  5/4/1942
Tube 35  
Roof Plan (6-A), revised  7/2/1942
Tube 35  
Sections (7), revised  7/30/1941
Tube 35  
Sections (8), revised  7/30/1941
Tube 35  
Sections (9), revised  11/3/1941
Tube 35  
Sections (10), revised  11/3/1941
Tube 35  
East and West Elevations (11), revised  11/3/1941
Tube 35  
Elevations (12), revised  12/29/1941
Tube 35  
Elevations (13), revised  8/19/1941
Tube 35  
Elevation Details (14), revised  8/19/1941
Tube 35  
Elevation Details (15)     (date illegible due to vellum damage) 
Tube 36  
Sections (16), revised  9/10/1941
Tube 36  
"A" Sections (17), revised  9/10/1941
Tube 36  
Sections (18), revised  8/19/1941
Tube 36  
Sections and Details (19), revised  3/10/1942
Tube 36  
Construction Details "A" (20), revised  9/10/1941
Tube 36  
Construction Details (21), revised  9/10/1941
Tube 36  
Construction Details (22), revised  9/10/1941
Tube 36  
Details of Bridges and Ladders (23), revised  7/30/1941
Tube 36  
Details of Stairs and Toilets (24), revised  9/10/1941
Tube 36  
Details of Toilets (25), revised  3/10/1942
Tube 36  
Details of Toilets and Locker Rooms (26), revised  3/10/1942
Tube 36  
Details of Second Floor Locker Rooms, Partitions and Lunch Room Tables (27), revised  11/3/1941
Tube 36  
Door Details (28), revised  8/19/1941
Tube 36  
Details of Stairs # 11, 12, 53 & 54 and Toilet Rooms (29), revised  3/10/1942
Tube 36  
Details of Crane Platforms and Partition Line "B" (30), revised  9/10/1941
Tube 36  
Crane Clearance Diagrams and Platform Details (31),  2/4/1942
Tube 36  
Plans and Sections of Stair # 5 and Freight Elevator (32), revised  3/23/1942
Tube 36  
Plans and Sections of Stairs # 1-4 and Passenger Elevator (33), revised  12/10/1941
Tube 36  
Miscellaneous Details of Engineering Building (34),  10/10/1941
Tube 36  
Details of Underground Transformer Sub-Stations (35), revised  3/30/1942
Tube 37  
Details of Expansion Joints (36), revised  9/10/1941
Tube 37  
Details of Expansion Joints (37), revised  9/10/1941
Tube 37  
Details of Expansion Joints (38), revised  8/26/1941
Tube 37  
Plans and Sections of Fan Rooms at Roof (39), revised  5/26/1942
Tube 37  
Details of Fan Rooms on Col. Lines 15-17 & 28-30 (40), revised  11/3/1941
Tube 37  
Blackout Details and Details of Hangar Door and Engineering Department (41),  7/30/1941
Tube 37  
Tunnel Details (42), revised  9/9/1941
Tube 37  
Details of Fan Rooms # 68 & 69 and First Floor Pump Rooms (43),  8/19/1941, revised  2/24/1942
Tube 37  
Plans and Sections of Hospital Unit (44),  8/25/1941, revised  11/11/1942
Tube 37  
Details of First Aid Units (45),  9/3/1941, revised  3/23/1942
Tube 37  
Details of Exterior Bridges and Watch Towers (46),  9/2/1941, revised  9/30/1941
Tube 37  
Bridge Details (47),  9/2/1941, revised  9/30/1941
Tube 37  
Plans and Sections of Metallurgical, Physical and Chemistry Labs (48), 10/4/1941 revised  2/26/1942
Tube 37  
Details of Metallurgical, Physical and Chemistry Labs (49), 10/4/1941 revised  3/5/1942
Tube 37  
Laboratory Equipment Details-Metallurgical, Physical and Chemistry Labs (50),  10/4/1941, revised  2/13/1942
Tube 37  
Laboratory Equipment Details-Metallurgical, Physical and Chemistry Labs (50-A),  10/4/1941, revised  1/9/1942 (33x46 inches)
Tube 37  
Revisions to X-Ray Laboratory-Engineering Building Portion (50-B),  12/24/1941, revised  5/11/1942
Tube 37  
Details of Women's Locker Rooms, Toilet Rooms and Lunch Rooms (51), revised 10/6/1941
Tube 37  
Plans and Details of Main Kitchen and Cafeteria, Second Floor Engineering Building (52),  10/10/1941, revised  2/24/1942
Tube 37  
First and Second Floor Plans at Pay-Station and Private Dining Rooms (53),  10/10/1941, revised  2/24/1942
Tube 37  
Details of Toilet and Locker Rooms and Pay-Station, Engineering Building (54),  10/10/1941, revised  2/24/1942
Tube 37  
Details of Pay-Station, Engineering Building (55),  10/10/1941, revised  2/24/1942
Tube 37  
Details of Main Kitchen, Private Dining Rooms, Cafeteria and Toilets (56),  10/10/1941, revised  12/29/1941
Box   19 Folder   2
Details for Metal Duct Openings (100),  9/18/1941, revised  10/20/1941
Box   19 Folder   2
Details of Openings, Framing, etc., for Ducts from Fan Pits # 1-7 & 9 (104),  10/8/1941, revised  10/20/1941
Box   19 Folder   2
Details of Duct Openings at Transfer Bay (105),  9/25/1941
Box   19 Folder   2
Details of Duct Openings at Bridge (106),  9/25/1941, revised  11/15/1941
Box   19 Folder   2
Details of Revised Transformer Hatches, Sub-Stations #1-A to 8 (107),  9/25/1941 (17-3/4x33 inches)
Box   19 Folder   2
Details of Revised Transformer Hatches, Sub-Stations #9 & 10 (108),  9/26/1941 (16x24-1/2 inches)
Box   19 Folder   2
Details of Openings for Ducts from Toilets and Fan Pit #8 (109),  10/20/1941, revised  1/22/1942
Box   19 Folder   2
Details of Men's Lunch Rooms, First Floor, Mezzanine and Second Floor (112), revised 11/3/1941
Box   19 Folder   2
Details of Second Floor Sub-Stations (114), revised  12/29/1941 (19-3/4x23-1/2 inches)
Box   19 Folder   2
Details of Openings for Ducts (115),  11/26/1941, revised  1/22/1942
Box   19 Folder   2
Details of Openings for Ducts (116),  12/11/1941, revised  8/20/1942
Box   19 Folder   2
Details of Transformer Sub-Station Em-1 (117),  11/25/1941
Box   19 Folder   2
Details of Fan Platforms, Walkways and Openings for Ducts (118),  12/11/1941, revised  1/28/1942
Box   19 Folder   2
Details of Gratings and Catch Boxes at Manholes to Tunnels #1-3 (119),  12/11/1941
Box   19 Folder   2
Details of Revised Crane Operator's Platforms-Manufacturing and Receiving Areas (120),  12/19/1941, revised  2/4/1942
Box   19 Folder   2
Details of Relocation of Craneway Platforms and Ladders (121),  12/19/1941
Box   19 Folder   2
Details of Manhole for Transformer Oil Drain Tank (121),  4/7/1942, revised  6/12/1942 (16-1/2x23-1/4 inches)
Box   19 Folder   2
Details of Supports for Roof Obstruction Lights (122),  12/12/1941
Box   19 Folder   2
Details of Jib Cranes, Second Floor Col. Line Q (123),  12/18/1941
Box   19 Folder   3
Plan of Mezzanine Floor Wood Partitions (124), 12/8/1941 revised  4/18/1942 (18x47 inches)
Box   19 Folder   3
Details of Wood Partitions (125),  12/18/1941, revised  4/18/1942 (18x43-1/2 inches)
Box   19 Folder   3
Details of Mezzanine Floor Locker Rooms (130),  3/10/1942
Box   19 Folder   3
Details of Mezzanine Floor Locker Rooms (131),  3/10/1942, revised  4/9/1942
Box   19 Folder   3
Details of First and Second Floor Locker Rooms (132-133),  3/10/1942 (two drawings)
Box   19 Folder   3
Detail of Expansion Joint in Ceiling (134),  1/21/1942 (18-1/2x18-1/2 inches)
Box   19 Folder   3
Details of Mezzanine Floor Locker Rooms (135),  3/10/1942
Box   19 Folder   3
Plan of Revised Sub-Station #4 (136),  2/5/1942 (18-1/2x30 inches)
Box   19 Folder   3
Details of Truck Scale Pit and Scale House (137),  7/14/1942, revised  9/15/1942
Box   19 Folder   3
Details of Revised Crane Operator's Platforms, Manufacturing Area (138), revised  2/4/1942
Box   19 Folder   3
Plan and Sections of Metal Partitions, Second Floor, Engineering Building (139),  2/4/1942
Box   19 Folder   3
Details of Radio and Instrument Rooms (140),  3/9/1942, revised  11/23/1942
Box   19 Folder   3
Details of Women's Toilet Rooms # F-19 to F-23 and Men's Toilet Room # M-33 (141),  3/10/1942
Box   19 Folder   3
Plan of Women's Toilet Room # F-21 and Men's Toilet Room # M-31 (142),  3/10/1942
Box   19 Folder   3
Details of Women's Toilet Room # F-22 and Men's Toilet Room # M-32 (143),  3/10/1942
Box   19 Folder   3
Details of Women's Toilet Rooms # F-25 to F-27 (144),  3/10/1942
Box   19 Folder   3
Details of First and Mezzanine Floor Toilet Rooms (145),  3/10/1942
Box   19 Folder   3
Details of First Floor Toilet Rooms # F-29 to F-32 (146),  3/10/1942
Box   19 Folder   3
Details of Toilet Rooms (147),  3/10/1942
Box   19 Folder   4
Details of Revisions Involved in Change from Locker Room to Record Room (148),  3/3/1942, revised  3/12/1942
Box   19 Folder   4
Details of Unit Heater Service Walks, Receiving Bay (150),  3/4/1942, revised  3/11/1942
Box   19 Folder   4
Details of Unit Heater Service Walks, Shipping Bay (151),  3/4/1942, revised  3/11/1942
Box   19 Folder   4
Details of First Aid Units # 5 & 6 (152),  3/14/1942, revised  5/8/1942
Box   19 Folder   4
Details of New Door at Cafeteria Dining Room, Second Floor, Engineering Building (153)     (date illegible due to vellum damage)  (13x21-1/2 inches)
Box   19 Folder   4
Details of Revisions to Hospital (154), revised  4/18/1942
Box   19 Folder   4
Details of Partition on Tool Design, Locker Room # M-4 (155),  3/16/1942, revised  11/11/1942
Box   19 Folder   4
Details of Openings for Ducts (156),  3/26/1942
Box   19 Folder   4
Details of Fan Platforms and Duct Openings (157),  3/26/1942
Box   19 Folder   4
Details of Duct Openings from Radio and Instrument Rooms (158),  4/6/1942, revised  11/23/1942
Box   19 Folder   4
Plans and Sections of Pits # 1 & 2 (159),  3/26/1942 (15-1/2x26 inches)
Box   19 Folder   4
Details of Concrete Valve Pits (160),  4/2/1942, revised  4/6/1942
Box   19 Folder   4
Details of Valve Pits # C-2 & C-3 (161),  4/10/1942
Box   19 Folder   4
Details of New Fan Platform at Col. Line 40 between U & UV, First Floor (162),  5/5/1942
Box   19 Folder   4
Details of Machine Gun Range (164),  5/21/1942, revised  6/25/1942
Box   19 Folder   4
Details of Fan Rooms on Col. Line "C" (165),  4/18/1942
Box   19 Folder   4
Details of Valve Pits for Fire-Protection System (167),  5/7/1942
Box   19 Folder   4
Part Plot Plan Showing Fences and Gates (168),  5/23/1942, revised  8/10/1942
Box   19 Folder   4
Plans and Section of Spiral Stairway, Engineering Building (169),  5/26/1942
Box   19 Folder   4
Plans and Elevation of Stairs to Mezzanine over F.A. Unit #5 (171),  5/29/1942
Box   19 Folder   5
Details of Additional Doors # 8 and Change in Doors at B-3 (172),  6/6/1942
Box   19 Folder   5
Plot Plan Showing Fences and Gates (173),  6/18/1942
Box   19 Folder   5
Details of Additional Walkways and Platforms over Craneways # 2-5 (174),  10/20/1942, revised  1/8/1943
Box   19 Folder   5
Details of Turntable Pit and Machine Room for Compass Calibration of the B-24 (176-178),  8/10/1942, revised  8/20/1942 (three drawings)
Box   19 Folder   5
Details of Revision of Duct and Register Openings in Sub-Stations (179-180),  8/13/1942, revised 10/5/1942 (two drawings)
Box   19 Folder   5
Laboratory Plans, Sections and Details (181), 10/5/1942 revised  11/11/1942
Box   19 Folder   5
Details of Platforms for Blackout Sirens (182), 10/6/1942
Box   19 Folder   5
Details of Tunnel, Fan Room T-1 (183), revised  11/18/1942
Box   19 Folder   5
Details of Addition to Fan Room #35 (184), revised  11/18/1942
Box   19 Folder   5
Details of New Fan Room #54-A (185), revised  11/18/1942
Box   19 Folder   5
Details of Temporary Wood Shed over Turntable (186),  11/24/1942 (19-1/2x31-1/2 inches)
Box   19 Folder   5
Details of Radio Compass Calibrating Transmitter Housing Post (187),  11/30/1942 (20-1/2x17-1/2 inches)
Box   19 Folder   5
Details of Revision of X-Ray Room (189),  3/22/1943 (17-1/4x30-1/2 inches)
Box   19 Folder   5
Details of Revised Doors, South Elevation (190),  6/30/1943
Box   19 Folder   5
Details of Salvage Yard, Distribution Center (193),  8/28/1943
 
Architectural Drawings (cont.) (ink-on-linen drawings and pencil-on-vellum drawings, 31x55 to 32-1/2x66-1/4 inches)
Tube 38  
Foundation Plan, Engineering Building (101),  9/18/1941, revised  10/6/1941
Tube 38  
Foundation Plan, Engineering Building (102),  9/18/1941, revised  9/29/1941
Tube 38  
Foundation Plan, Engineering Building (103),  9/18/1941, revised  9/29/1941
Tube 38  
Details of Craneway Service Walks (126),  1/29/1942, revised  5/20/1943
Tube 38  
Details of Craneway Service Walks (127).  1/29/1942, revised  4/30/1942
Tube 38  
Details of Craneway Service Walks (128),  1/29/1942, revised  3/11/1942
Tube 38  
Details of Craneway Service Walks (129)     (date illegible due to vellum damage) 
Tube 38  
Details of Payroll Offices (149),  3/4/1942, revised  4/4/1942
Tube 38  
Details of Battery Room (163), revised  4/11/1942
 
Structural Drawings,  4/29/1941 (ink drawings on vellum and linen, 32-1/2x50 inches)
Box   19 Folder   6
Column Schedule and Footing Plan (1-S1), revised  9/9/1941
Box   19 Folder   6
Column Schedule and Footing Plan (1-S2),  6/28/1941, revised  8/18/1941
Box   19 Folder   6
Details of Bottom Chord Bracing, Crane Girders and Roof Framing (2-S1), revised  10/10/1941
Box   19 Folder   6
Roof Framing Plan, Second Floor Plan and Details of Bottom Chord Bracing (2-S2),  6/28/1941, revised  10/10/1941
Box   19 Folder   6
Framing Plans and Schedule, South of Expansion Line "K" from Columns 19 to 81 (3-S1),  6/28/1941, revised  11/17/1941
Box   19 Folder   6
Framing Plan and Beam Schedule, North of Expansion Line "K" from Columns 19 to 81 (3-S2),  6/28/1941, revised  6/30/1941
Box   19 Folder   6
Framing Plans, South of Expansion Line "K" & East of Column Line 81 (3-S3),  6/28/1941, revised  9/25/1941
Box   19 Folder   6
Framing Plans, North of Expansion Line "K" & East of Column Line 81 (3-S4),  6/28/1941, revised  6/30/1941
Box   19 Folder   6
Details of Wall Framing, Bracing and Crane Runways (4-S1), revised  11/17/1941
Box   19 Folder   6
Details of Wall Framing and Bracing (4-S2),  6/28/1941, revised  9/25/1941
Box   19 Folder   6
Details of Trusses and Sway Frames (5-S), revised  6/30/1941
Box   19 Folder   6
Sections and Details (6-S), revised  6/30/1941
Box   19 Folder   6
Cross-Section and Truss Details and Schedule (7-S), revised  6/30/1941
Box   19 Folder   6
Details of Framing for 150-Foot Doors (8-S),  6/28/1941, revised  10/27/1941
Box   19 Folder   6
Details of Exterior Bridges and Watch Towers (9-S),  9/2/1941, revised  9/30/1941
Box   19 Folder   6
Details of Added and Revised Trusses and Trolley Beam Conn. (SK-101-S),  6/28/1941, revised  6/30/1941
Box   19 Folder   6
Details of Vaults and Machine Foundations (SK-102-S),  6/4/1941, revised 10/4/1941
Box   19 Folder   6
Details of Men's Toilet Rooms and Mezzanine Storage Space (103-S),  2/18/1942, revised  3/14/1942 (30-1/4x39-1/4 inches)
 
Mechanical Drawings (ink and pencil drawings on vellum and sepia prints, 31x64-1/2 to 32x66 inches)
Tube 39  
Revisions of Trunk Sewers of Sheet No. 1 (1-MX),  10/25/1941 (22x20 inches)
Tube 39  
Plot Plan (1-M), revised  4/20/1942
Tube 39  
Foundation Plan (2-M), 12/8/1941
Box   Tube 39  
Aviation Field Drainage Plan (2-Ma),  undated (34x47-1/2 inches)
Box   Tube 39  
Plan of Drainage Work, South of Building (2-Mb),  1/19/1942 (24x69 inches)
Tube 39  
Details of First Aid Rooms, Scale and Spray Pits (2-Mc),  12/30/1941
Tube 39  
Foundation Plan, Showing Sprinkler and Plumbing Work Outside of Building Walls (2-Md),  12/23/1941, revised  6/26/1942
Tube 39  
First Floor Plan and Details (3-M),  undated
Tube 39  
Mezzanine Floor Plan and Details (4-M),  undated
Tube 39  
Second Floor Plan and Details (5-M),  undated
Tube 39  
Plan of First Floor Engineering Section, Between Column Lines B & M (6-M), revised  1/9/1942
Tube 39  
Plan of First Floor Engineering Section, Between Column Lines M & X (7-M), revised  12/22/1941
Tube 39  
Plan of First Floor Engineering Section, Between Column Lines X & ZQ (8-M), revised  10/13/1942
Tube 39  
Plan of Second Floor Engineering Section, Between Column Lines B & N (9-M), revised  6/5/1942
Tube 39  
Plan of Second Floor Engineering Section, Between Column Lines N & ZA (10-M), revised  6/5/1942
Tube 39  
Plan of Second Floor Engineering Section, Between Column Lines ZA & ZQ and Locker Room Details (11-M), revised  1/7/1942
Tube 39  
Toilet Room Details (12-M),  undated
Tube 39  
Toilet and Locker Room Details (13-M),  undated
Tube 39  
Toilet and Locker Room Details (13-Ma),  undated
Tube 39  
Locker Room and First Aid Unit Details (13-Mb),  3/17/1942
Tube 39  
First Floor Plan (14-M), 12/8/1941 revised  5/22/1942
Tube 39  
Mezzanine Floor Plan (15-M), 12/8/1941 revised  5/22/1942
Tube 39  
Second Floor Plan (16-M), 12/8/1941 revised  4/24/1942
Tube 39  
Heating and Ventilating Details (17-M), 12/8/1941 revised  5/22/1942
Tube 39  
Details and Plan of Trench under Engineering Section (18-M), 12/8/1941
Tube 39  
Elevation and Section of Typical Support for Heating Coil (20-XM), 11/4/1941 (18-3/4x31-1/2 inches)
Tube 40  
First Floor Plan (20-M),  8/14/1941, revised  5/4/1942
Tube 40  
Mezzanine Floor Plan (21-M),  8/14/1941, revised  5/4/1942
Tube 40  
Second Floor and Truss Space Plan (22-M),  8/14/1941, revised  5/4/1942
Tube 40  
Sections and Details (23-M),  8/14/1941, revised  2/4/1942
Tube 40  
Plan and Details of Fan Units 1-26 (24-M),  8/14/1941, revised  2/4/1942
Tube 40  
Plan of Fan Units 27-39 (25-M),  8/14/1941, revised  2/4/1942
Tube 40  
Plan of Fan Units 40-65 (26-M),  8/14/1941, revised  2/4/1942
Tube 40  
Plan of Fan Rooms 66-69 (27-M),  8/14/1941, revised  1/7/1942
Tube 40  
Plan of Fan Units 70-80 (28-M),  8/14/1941
Tube 40  
Details of Ventilation for Engineering Lab (29-M),  9/14/1941, revised  1/10/1942
Tube 40  
Plan of Toilet Rooms M-1 to M-5 and S-1 to S-5, (30-M),  10/9/1941, revised  3/3/1942
Tube 40  
Plan of Fan Units 70-80 (31-M), 11/3/1941 revised  8/8/1942
Tube 40  
Plan of Tunnel System and Details of Fan Units 140 & 141 (32-M),  11/25/1941, revised 12/2/1941
Tube 40  
Plan of Fan Units 105, 105-A, 106, 112 & 115 (33-M),  11/25/1941, revised  4/8/1942
Tube 40  
Plan of Fan Units 107-114 (34-M),  11/25/1941, revised  3/12/1942
Tube 40  
Plan of Fan Units 116-121 (35-M),  11/25/1941, revised  3/19/1942
Tube 40  
Plan of Toilet Exhaust Units 122-129 (36-M),  11/25/1941, revised  3/3/1942
Tube 40  
Plan of Fan Units 130-134 (37-M),  11/25/1941, revised  3/19/1942
Tube 40  
Plan of Smoke Exhaust Fan Units and Details (38-M),  12/17/1941
Tube 40  
Plan of Toilet Exhaust Systems (41-M),  3/12/1942, revised  4/8/1942
Tube 40  
Plan of Toilet Rooms and First Aid Room (42-M),  3/12/1942, revised  4/8/1942
Tube 40  
Plot Plan Showing Settling Basins and Oil Separators (43-M),  4/22/1942, revised  5/22/1942 (28-1/4x40-1/2 inches)
Tube 40  
Plans and Sections of Settling Basin and Oil Separator No. 1 (44-M),  4/22/1942, revised  5/22/1942 (28-3/4x39-1/4 inches)
Tube 40  
Plans and Sections of Settling Basin and Oil Separator No. 2 (45-M),  4/22/1942, revised  5/22/1942 (25x38-1/2 inches)
Box   Tube 40  
Construction Details of Settling Basins and Oil Separators (46-M),  4/22/1942. revised  5/22/1942 (25x38-1/2 inches)
Tube 40  
Details of Roof Hatch for Pump Houses-Oil Separator Nos. 1 & 2 (46-XM),  6/25/1942 (15-1/2x29-1/2 inches)
Tube 40  
Details of Air-Conditioning-Radio and Instrument Rooms (47-M), revised  8/12/1942 (31-1/4x41 inches)
Tube 40  
Plan of Transformer Room Ventilation, First Floor Battery Room and Additions and Revisions to Hospital Area (48-M),  3/19/1942, revised  5/11/1942
Drawer   19 Folder   7
Plan and Sections of Welding and Tool Room Offices (49-M), undated, revised  4/15/1942
Drawer   19 Folder   7
Plan and Section of Office for Maintenance Department (50-M), undated, revised  5/22/1942
Drawer   19 Folder   7
Plans, Section and Piping Diagram of Gauge Inspection Room (51-M), undated, revised  5/22/1942
Drawer   19 Folder   7
Plan, Elevation and Section of Chief Clerk's Office (52-M),  3/24/1942 revised  5/22/1942
Drawer   19 Folder   7
Plan and Section of Five Offices and Conference Room (53-M), undated, revised  4/15/1942
Drawer   19 Folder   7
Plan and Sections of Shipping Record Office (54-M), undated, revised  4/15/1942
Drawer   19 Folder   7
Plans, Elevation, Section and Detail of Property Receiving Office Ventilation (55-M), undated, revised  4/24/1942
Drawer   19 Folder   7
Plan and Sections of Manufacturing Superintendent Clerk and Blue-Print Release Offices (56-M), undated, revised  4/15/1942
Drawer   19 Folder   7
Plan and Sections of Engine Dress-Up and Shipping Offices (57-M), undated, revised  4/15/1942
Drawer   19 Folder   7
Plan and Sections of Outer Wing Department Office (58-M), undated, revised  4/15/1942
Drawer   19 Folder   7
Plan and Section of Industrial Relations Office (59-M), undated, revised  4/15/1942
Tube 41  
Plans and Section of Miscellaneous Small Parts Spray Room and New Dressing and Shower Rooms Ventilation (60-M),  5/13/1942 revised  6/4/1942
Tube 41  
Plans and Sections of Revised Sub-Station Ventilation (63-M),  7/20/1942 revised  8/6/1942
Tube 41  
Plans and Sections of Tunnel Ventilation (64-M),  7/30/1942 revised  9/1/1942
Tube 41  
Plans and Sections of Scale House and Scale Pit (65-M),  7/30/1942 (25-1/4x38-1/2 inches)
Tube 41  
Plan of Paint Lab Ventilation (66-M), 10/8/1942 revised 12/7/1942 (22-1/4x26-1/2 inches)
Tube 41  
Plans, Elevation and Section of Tunnel Ventilation (67-M),  10/21/1942 revised 11/6/1942
Tube 41  
First Floor Plan and Details (68-M),  10/19/1943
Tube 41  
Plan and Section of Filter Layout for Propeller Area (69-M),  2/20/1943 revised  5/20/1943 (23x42 inches)
Tube 41  
Details of Exhaust Ventilating System from Present Air Washer (70-M), undated, revised  5/24/1943 (32-1/4x36 inches)
Tube 41  
Plan of Underground Fire Protection Mains (100-M),  9/24/1941
Tube 41  
Plan of Fire Protection Sprinkler System (100-Ma),  2/21/1942 revised  8/4/1942
Tube 41  
Plans of Overhead Automatic Sprinkler System,  9/24/1941     (number illegible due to paper damage) 
Tube 41  
Plan and Sections of Underground Fire Protection Mains (102-M), 10/9/1941 (21-1/2x31-1/4 inches)
Tube 41  
Plan and Details of Equipment Layout of Main Kitchen (300-M),  9/16/1941 revised  9/29/1941 (19-1/2x41-1/4 inches)
Tube 41  
Plan of Equipment Layout of Cafeteria Dining Room (301-M),  9/4/1941 revised  9/16/1941 (19-1/2x52 inches)
Tube 41  
Plan and Details of Equipment Layout of Kitchens for Private Dining Rooms (302-M),  9/5/1941 (19-1/2x41-1/4 inches)
Tube 41  
Plan and Details of Layout of Services for Main Kitchen (303-M),  9/16/1941 revised  9/30/1941 (19-1/2x41-1/2 inches)
Tube 41  
Plan of Services for Cafeteria Dining Room (304-M),  9/16/1941 revised  9/18/1941 (19-1/2x52 inches)
Tube 41  
Plan of Services for Private Dining Room Kitchens (305-M),  9/16/1941 revised  9/18/1941 (19-1/2x41-1/2 inches)
 
Electrical Drawings (ink and pencil drawings on vellum, 32x61-1/2 to 34x68 inches)
Tube 42  
Plans of Lighting and Power Layout in Service Tunnel (30-E),  8/4/1941 revised  2/12/1942
Tube 42  
Plan of Cubicle Locations in First Floor Manufacturing Area (31-E),  8/25/1941 revised  6/22/1942
Tube 42  
Cubicle Details (32-E-1),  9/4/1941
Tube 42  
Cubicle Details (32-E),  8/18/1941 revised 10/3/1941
Tube 42  
Key Plan and Schematic Wiring Diagrams of 220 V. and 440 V. Power, 440 V. Welding and 230 V. D.C. (33-E),  8/25/1941 revised  12/12/1941
Tube 42  
Schematic One-Line Diagram (under Slab) of General Lighting in Manufacturing Area (34-E-1), 10/2/1941 revised  11/18/1941
Tube 42  
Key Plan and Schematic Conduit Diagram for Emergency Lighting and 180 ~ and 240 ~ HiCycle Panels (34-E),  8/25/1941 revised  3/24/1942
Tube 42  
Schematic Diagram of Conduit Layout for Low Tension System and 110 V. and 180 ~ HiCycle Receptacles (35-E),  8/25/1941 revised  3/30/1942
Tube 42  
Plan of Conduit Layout in Floor Slab for 440 V. Power, 440 V. Welding, 240 V. Power, 250 V. D.C. and Lighting (36-E),  8/25/1941 revised  11/26/1941
Tube 42  
Plan of Conduit Layout in Floor Slab for 440 V. Power, 440 V. Welding, 240 V. Power, 250 V. D.C. and General and Emergency Lighting (37-E),  8/25/1941 revised  11/22/1941
Tube 42  
Plan of Conduit Layout in Floor Slab for 440 V. Power, 440 V. Welding, 240 V. Power, 250 V. D.C. and Lighting (38-E),  8/25/1941 revised  11/18/1941
Tube 42  
Plan of Conduit Layout in Floor Slab for 110 V. and 180 ~ and 240 ~ HiCycle Receptacles and Low Tension (39-E),  9/3/1941 revised  1/19/1942
Tube 42  
Plan of Conduit Layout in Floor Slab for 110 V. and 180 ~ and 240 ~ HiCycle Receptacles and Low Tension (40-E),  8/25/1941 revised  1/19/1942
Tube 42  
Plan of Conduit Layout in Floor Slab for 110 V. and 180 ~ and 240 ~ HiCycle Receptacles and Low Tension (41-E),  9/3/1941 revised  1/19/1942
Tube 42  
Plan of Conduit Layout in Floor Slab for 440 V. Power, 220 V. Power, 250 V. D.C. and 120 V. General and Emergency Lighting (42-E),  9/25/1941 revised  1/22/1942
Tube 42  
Plan of Conduit Layout in Floor Slab for 440 V. Power and 120 V. General and Emergency Lighting (43-E),  9/30/1941 revised  1/22/1942
Tube 42  
Plan of Conduit Layout in Floor Slab for 440 V. Power and 120 V. General and Emergency Lighting (44-E), 10/4/1941 revised  1/22/1942
Tube 42  
Plan of Conduit Layout in Floor Slab for 440 V. Power and 120 V. General and Emergency Lighting (45-E),  11/12/1941 revised  9/19/1942
Tube 42  
Plan of Conduit Layout in Floor Slab for 440 V. Power and 120 V. General and Emergency Lighting (46-E), 12/2/1941 revised  1/22/1942
Tube 42  
Plan of Conduit Layout in Floor Slab for 440 V. Power and 120 V. General and Emergency Lighting (47-E), 12/5/1941 revised  2/12/1942
Tube 42  
Details of Emergency Switchboard (48-E),  3/10/1942
Tube 42  
Plan and Sections of Conduit and Equipment Layout of Transformer Vault EM-1 (48-E-1),  3/19/1942
Tube 42  
Plan and Sections of Conduit and Equipment Layout of Transformer Vault EM-2 (48-E-2),  3/10/1942 revised  3/20/1942
Tube 42  
Plan and Sections of Conduit and Equipment Layout of Transformer Vault EM-3 (48-E-3),  3/10/1942 revised  4/17/1942
Tube 42  
Plan and Sections of Conduit and Equipment Layout of Transformer Vault EM-4 (48-E-4),  3/20/1942
Tube 42  
Plan of Conduit Layout in Floor Slab for 110 V. and 180 ~ HiCycle Receptacles and Low Tension (49-E),  9/25/1941 revised  1/19/1942
Tube 43  
Plan of Conduit Layout in Floor Slab for 110 V. and 180 ~ HiCycle Receptacles and Low Tension (50-E),  9/30/1941 revised  1/19/1942
Tube 43  
Plan of Conduit Layout in Floor Slab for 110 V. and 180 ~ HiCycle Receptacles and Low Tension (51-E), 10/4/1941 revised  1/19/1942
Tube 43  
Plan of Conduit Layout in Floor Slab for 110 V. and 180 ~ HiCycle Receptacles and Low Tension (52-E),  11/11/1941 revised  1/19/1942
Tube 43  
Plan of Conduit Layout in Floor Slab for 110 V. and 180 ~ HiCycle Receptacles and Low Tension (53-E), 12/2/1941 revised  1/19/1942
Tube 43  
Plan of Conduit Layout in Floor Slab for 110 V. and 180 ~ HiCycle Receptacles and Low Tension (54-E), 12/5/1941 revised  3/30/1942
Tube 43  
Plan of Conduit for Monorail System (55-E),  12/17/1941 revised  11/16/1942
Tube 43  
Plan and Sections of Conduit and Equipment Layout of Transformer Vault "Y" (55-E-1),  3/21/1942
Tube 43  
Plan and Sections of Conduit and Transformer Equipment Layout for Monorail Crane (55-E-2),  11/16/1942
Tube 43  
Plan of Panel Locations on First Floor (56-E), revised  2/26/1942
Tube 43  
Plan of Panel Locations on First Floor (56-E-1), 12/5/1941 revised  4/14/1942
Tube 43  
Key Plan and Schematic Wiring Diagram of Three-Phase 480 V. Power and120/208 V. General Lighting (57-E), 10/6/1941 revised  4/9/1942
Tube 43  
Key Plan and Schematic Wiring Diagram of Three-Phase 180 ~ HiCycle (58-E), 10/9/1941 revised  3/30/1942
Tube 43  
Plan of Panel Locations on Mezzanine Floor (59-E),  1/15/1942 revised  4/27/1942
Tube 43  
Plan of Panel Locations on Mezzanine Floor (59-E-1),  1/15/1942 revised  7/8/1942
Tube 43  
Plan of Panel Locations on Second Floor (60-E),  1/15/1942 revised  4/27/1942
Tube 43  
Plan of Panel Locations on Second Floor (60-E-1),  1/15/1942 revised  7/6/1942
Tube 43  
Cubicle Details of First Floor Assembly Area (61-E),  11/27/1941 revised  4/29/1942
Tube 43  
Cubicle Details of First Floor Assembly Area (61-E-1),  1/12/1942 revised  4/29/1942
Tube 43  
Plans of Building Utility Power in Manufacturing Area (62-E),  2/9/1942 revised  4/27/1942
Tube 43  
Plan of Building Utility Power and Roof Ventilation Fans (63-E),  3/6/1942 revised  4/23/1942
Tube 43  
Plans and Sections of Conduit Layout for Fan Rooms (64-E), 12/1/1942
Tube 43  
Plans of Conduit Layout for Dark Room and Paint Mix Laboratory (65-E), 12/4/1942
Tube 44  
Details of Conduit Layout in Sub-Station "K" (70-E),  12/15/1941 revised  3/11/1942
Tube 44  
Details of Control Conduit and Grounding Plan for Sub-Station "K" (71-E),  12/15/1941 revised  4/30/1942
Tube 44  
Details of Power Conduit Layout in Sub-Station "M" (72-E), 11/5/1941 revised 3/11/942
Tube 44  
Details of Control Conduits and Grounding Plan for Sub-Station "M" (73-E),  1/2/1942
Tube 44  
Details of Conduit Layout in Sub-Station "N" (74-E),  2/26/1942
Tube 44  
Details of Capacitor Rack in Sub-Stations "A-D" (75-E),  2/9/1942 revised  2/21/1942
Tube 44  
Details of Capacitor Rack in Sub-Stations "F-J" (75-E-1),  2/9/1942 revised  2/21/1942
Tube 44  
Details of Capacitor Rack in Sub-Station "K" (75-E-2),  undated
Tube 44  
Details of Capacitor Rack in Sub-Station "M" (75-E-3),  2/21/1942
Tube 44  
Details of Conduit Layout for Capacitors (75-E-4),  3/31/1942
Tube 44  
Details of Transformer and Switchgear Assemblies (78-E),  9/15/1941
Tube 44  
Details of Control Panels for Sub-Stations (79-E),  8/29/1941 revised  2/23/1942
Tube 44  
Details of Arrangement of Electrical Equipment Bases in Sub-Stations (80-E),  2/13/1942
Tube 44  
Details of 120/13.8 Kv. Outdoor Sub-Stations No. 1-East and No. 2-West (81-E),  10/29/1941 revised  8/14/1942
Tube 44  
Key Plan for Underground Duct System (82-E), 12/1/1941 revised  5/22/1942
Tube 44  
Plans of Lighting Layout in Sub-Stations "A-J" (83-E)  1/12/1942
Tube 44  
Cable Routing Schedule (84-E),  3/31/1942 revised  3/5/1943 (ink-on-linen drawing)
Tube 44  
Control Cable Routing Schedule (84-E-1),  5/22/1942 revised  3/5/1943 (ink-on-linen drawing)
Tube 44  
Details of Underground Duct Line to Huron River Pumping Station (85-E),  1/6/1942 revised  8/30/1943
Tube 44  
Plans and Sections of Conduit Layout of Oil Separator Nos. 1 & 2 (86-E),  5/4/1942 revised  5/29/1942
Tube 44  
Diagram of Control Cable (87-E),  undated
Tube 44  
Panel and Pull-Box Schedules (88-E),  10/28/1941 revised  3/25/1942
Tube 44  
Map of Dual-Power Service from The Detroit Edison Company and Interconnections with Other Sources to Ford Bomber Plant (89-E),  undated (16-1/2x24 inches)
Tube 45  
Details of Electrical Conduit and Connections for Compass Calibrating Turntable and Machine Room (120-E),  12/21/1942 (pencil-on-linen drawing)
Tube 45  
Plans of Lighting and Receptacles between Rows B-C, Columns 19-37 (150E),  9/24/1941 revised  2/5/1942
Tube 45  
Plans of Lighting and Receptacles between Rows B-C, Columns 37-59 (151-E),  9/24/1941 revised  2/5/1942
Tube 45  
Plans of Lighting and Receptacles between Rows B-C, Columns 59-81 (152-E),  12/28/1941
Tube 45  
Plans of Lighting and Receptacles between Rows B-C, Columns 81-103 (153-E),  5/11/1942
Tube 45  
Plans of Lighting and Receptacles between Rows B-C, Columns 103-125 (154-E),  12/31/1941
Tube 45  
Plans of Lighting and Receptacles between Rows B-C, Columns 125-141 (155-E),  12/16/1941 revised  12/31/1941
Tube 45  
Plans of Lighting and Receptacles between Rows J-K, Columns 19-37 (156-E),  10/10/1941 revised  5/26/1943
Tube 45  
Plans of Lighting and Receptacles between Rows J-K, Columns 37-59 (157-E),  10/10/1941 revised  5/4/1942
Tube 45  
Plans of Lighting and Receptacles between Rows J-K, Columns 59-81 (158-E),  10/10/1941 revised  1/2/1942
Tube 45  
Plans of Lighting and Receptacles between Rows J-K, Columns 81-103 (159-E),  10/10/1941 revised  1/2/1942
Tube 45  
Plans of Lighting and Receptacles between Rows J-K, Columns 103-125 (160-E),  12/15/1941 revised  1/3/1942
Tube 45  
Plans of Lighting and Receptacles between Rows J-K, Columns 125-141 (161-E),  12/15/1941 revised  1/3/1942
Tube 45  
Plans of Lighting and Receptacles between Rows P-Q, Columns 19-37 (162-E),  undated
Tube 45  
Plans of Lighting and Receptacles between Rows P-Q, Columns 37-59 (153-E),  undated
Tube 45  
Plans of Lighting and Receptacles between Rows P-Q, Columns 59-81 (164-E), 11/7/1942
Tube 45  
Plans of Lighting and Receptacles between Rows P-Q, Columns 81-103 (165-E),  1/3/1942
Tube 45  
Plans of Lighting and Receptacles between Rows P-Q, Columns 103-125 (166-E),  1/15/1942
Tube 45  
Plans of Lighting and Receptacles between Rows P-Q, Columns 125-141 (167-E),  1/15/1942
Tube 45  
Plans of Lighting and Receptacles between Rows TU-UV, Columns 19-37 (168-E),  2/5/1942
Tube 45  
Plans of Lighting and Receptacles between Rows TU-UV, Columns 37-59 (169-E),  2/3/1942
Tube 46  
Plans of Lighting and Receptacles between Rows TU-UV, Columns 59-81 (170-E),  2/27/1942
Tube 46  
Plans of Lighting and Receptacles between Rows TU-UV, Columns 81-103 (171-E),  1/19/1942 revised  2/29/1942
Tube 46  
Plans of Lighting and Receptacles between Rows TU-UV, Columns 103-125 (172-E),  1/19/1942 revised  2/3/1942
Tube 46  
Plans of Lighting and Receptacles between Rows TU-UV, Columns 125-149-1/2 (173-E),  1/19/1942 revised  8/4/1942
Tube 46  
Plans of Lighting and Receptacles between Rows 15 & 17, Columns B-J and between Rows 17 & 19, Columns B-C, J-K, P-Q and TU-UV (174-E),  1/20/1942
Tube 46  
Plans of Lighting and Receptacles between Rows 15 & 17, Columns J-X (175E),  5/4/1942
Tube 46  
Plans of Lighting and Receptacles between Rows 15 & 17, Columns X-ZR (176-E),  1/20/1942
Tube 46  
Lighting Plans of Interior Bridges (177-E),  9/25/1941 revised  2/4/1942
Tube 46  
Plans of Lighting and Receptacles between Rows 28 & 30, Columns UV-ZR (178-E),  undated
Tube 46  
Plans of First and Second Floor, Engineering Building (179-E),  undated (ink-on-linen drawing)
Tube 46  
Plan of Revisions to Hospital (179-E-1),  undated (ink-on-linen drawing)
Tube 46  
Plans of Hospital and Laboratory, First Floor, Engineering Building (180-E),  1/9/1942 (ink-on-linen drawing)
Tube 46  
Plans of Main Kitchen and Cafeteria, Second Floor, Engineering Building (181-E),  undated (ink-on-linen drawing)
Tube 47  
Plans and Sections of Exterior Bridges and Watch Towers (182-E),  1/12/1942 (ink-on-linen drawing)
Tube 47  
Plans of Lighting between Rows A & B and Rows 2 & 30, Inclusive (183-E),  undated
Tube 47  
Plans of Lighting between Rows A & B and Rows 72 & 95, Inclusive (184-E),  undated
Tube 47  
Plans of Lighting between Rows C-J and K-P and Rows 17 & 59, Inclusive (185-E),  12/12/1941 revised  1/20/1942 (ink-on-linen drawing)
Tube 47  
Plans of Lighting between Rows C-J and K-P and Rows 59 & 103, Inclusive (186-E),  12/12/1941 (ink-on-linen drawing)
Tube 47  
Plan of Lighting between Rows X & ZR and Rows 3 & 15, Inclusive (187-E),  undated
Tube 47  
Plan of Lighting between Rows UV & ZR and Rows 17 & 28, Inclusive (188-E),  1/20/1942
Tube 47  
Plan of Lighting between Rows B & X and Rows 3 & 15, Inclusive (189-E),  undated
Tube 47  
Plans of Lighting between Rows Q & TU and Rows 17 & 103, Inclusive (190-E),  12/16/1941 revised  1/20/1942
Tube 47  
Plan of Lighting between Rows Q & TU and Rows 103 & 139, Inclusive (191-E),  12/16/1941
Tube 47  
Plans of Lighting between Rows C-J and K-P and Rows 103 & 141, Inclusive (192-E),  12/15/1941 (ink-on-linen drawing)
Tube 47  
Plans of Electrical Floor Outlets in Offices, Rows UV-TU and Lights Above (193-E),  3/24/1942 (pencil-on-linen drawing)
Tube 47  
Plan and Section of Salvage Yard Distribution Center Electrical Layout (195-E),  9/1/1943 (ink-on-linen drawing, 29-1/2x37-1/2 inches)
 
Electrical Conduit Number Schedules,  7/18/1942 (ink and pencil schedules on vellum, 31-1/4x65 to 32-3/4x65-3/4 inches)
Tube 48  
Plot Plan Showing Protective Lighting (240-E),  12/13/1941 (ink-on-linen drawing)
Tube 48  
Underground Duct-Factory Building, #1-300 (250-E),  5/22/1942 revised  3/5/1943
Tube 48  
Underground Duct-Factory Building, #304-600 (251-E),  5/22/1942 revised  3/5/1943
Tube 48  
Underground Duct-Factory Building, #601-900 (252-E),  5/22/1942 revised  3/5/1943
Tube 48  
Underground Duct-Factory Building, #901-1200 (253-E),  5/22/1942 revised  3/5/1943
Tube 48  
Underground Duct-Factory Building, #1201-1500 (254-E),  5/22/1942 revised  3/5/1943
Tube 48  
Underground Duct-Factory Building, #1501-1739-A (255-E),  5/22/1942 revised  3/5/1943
Tube 48  
Underground Feeder Service, #1739-1838 440 V. Power, 440 V. Welding and 220 V. Power (256-E)
Tube 48  
Underground Feeder Service, #1839-1959 180 ~ HiCycle and 220 V. and 440 V. Power (257-E)
Tube 48  
#1960-2200 (258-E),  5/22/1942
Tube 48  
#2201-2500 (259-E),  5/22/1942 revised  3/5/1943
Tube 48  
Underground Feeder Service, #2501-2800 440 V. Power (260-E)
Tube 48  
Underground Feeder Service, #2801-3022 440 V. Power, 250 V. D.C. and 180 ~ HiCycle Receptacles (261-E)
Tube 48  
Underground Feeder Service, #3023-3112 180 ~ HiCycle Receptacles and 110 V. Receptacles (262-E)
Tube 48  
Underground Feeder Service, #3113-3299 120 V. Receptacles, Sub-Station Lighting, and Low Tension (263-E)
Tube 48  
Underground Feeder Service, #3300-3350 440 V. Power (264-E)
Tube 48  
Underground Feeder Service, #3351-3401 440 V. Power (265-E)
Tube 48  
Underground Feeder Service, #3402-3452 440 V. Power (266-E)
Tube 48  
Underground Feeder Service, #3453-3503 440 V. Power (267-E)
Tube 48  
Underground Feeder Service, #3504-3554 440 V. Power (268-E)
Tube 48  
Underground Feeder Service, #3555-3606 440 V. Power (269-E)
Tube 48  
Underground Feeder Service, #3607-3657 440 V. Power (270-E)
Tube 48  
Underground Feeder Service, #3658-3708-E, 440 V. Power (271-E)
Tube 48  
Underground Feeder Service, #3709-3759 440 V. Power (272-E), revised  11/16/1942
Tube 49  
Underground Feeder Service, #3760-3877-B, Low Tension (273-E)
Tube 49  
Underground Feeder Service, #3878-3979 Low Tension (274-E)
Tube 49  
Underground Feeder Service, #3980-4121-A (275-E)
Tube 49  
Underground Feeder Service, #4122-4314-B, General Lighting and 180 ~ HiCycle Power (276-E)
Tube 49  
#4315-4400 (277-E),  5/22/1942 revised  3/5/1943
Tube 49  
Power Conduits-Sub-Stations A-D & M, #4401-4700 (278-E), 12/4/1941 revised  3/5/1943
Tube 49  
Power Conduits-Sub-Stations E-K, #4701-5000 (279-E), 12/4/1941 revised  3/5/1943
Tube 49  
Underground Feeder Service, #5000-5115-A, 180 ~ HiCycle and General Lighting (280-E)
Tube 49  
Underground Feeder Service, #5116-5200 440 V. Power and General Lighting (281-E)
Tube 49  
Control Conduits-Sub-Stations E-K, #5201-5500 (282-E),  1/17/1942 revised  3/5/1943
Tube 49  
Underground Feeder Service, #6000-6099 180 ~ HiCycle (285-E)
Tube 49  
Underground Feeder Service, #6100-6199 110 V. Receptacles (286-E)
Tube 49  
Underground Duct-Factory Building, #6501-6800 (288-E),  5/22/1942 revised  3/5/1943
Tube 49  
Underground Duct-Factory Building, #6801-7000 (289-E),  5/22/1942 revised  3/27/1943
Tube 49  
Feeder Service, #7001-7160 440 V. Power, 220 V. Monorail and Low Tension (290-E)
Tube 49  
Feeder Service, #7161-7300 (291-E)
Tube 49  
#7301-7500 (292-E),  5/22/1942 revised  3/5/1943
Tube 49  
Sub-Station Power, #7501-7800 (293-E),  4/8/1942 revised  3/5/1943
Tube 49  
Sub-Station Power, #7801-8100 (294-E),  4/8/1942 revised  3/5/1943
Tube 49  
Sub-Station Control, #8401-8700 (296-E),  4/8/1942 revised  3/5/1943
Tube 49  
#9301-9600 (299-E),  5/22/1942 revised  3/5/1943
Tube 49  
#9601-9900 (300-E),  5/22/1942 revised  3/5/1943
Tube 49  
#9901-10,000 (301-E),  5/22/1942 revised  3/5/1943