Albert Kahn papers   1896-2011
full text File Size: 2311 K bytes | Add this to my bookbag

 
   Container / Location    Title
 
Glenn L. Martin Company Plant Additions, Middle River, Baltimore County, Maryland,  1937-1942, Job Nos. 1752 and 1752-C [subseries]:
 
Glenn L. Martin Company Plant Addition,  1937 (Job No. 1752)
 
Architectural Construction Drawings by Albert Kahn, Inc., Architects,  4/14/1937 (Ink-on-linen drawings with pencil notations, 30-1/4x44 inches)
Drawer   16 Folder   6
Plot Plan (1), revised  6/24/1937
Drawer   16 Folder   6
Underground Plan (2), revised  5/24/1937
Drawer   16 Folder   6
Details of Heater Rooms (3),  4/5/1937
Drawer   16 Folder   6
Details of Underground Work (4)
Drawer   16 Folder   6
First Mezzanine and Second Floor Plans (5), revised  9/10/1937
Drawer   16 Folder   6
Roof Plan (6), revised  5/24/1937
Drawer   16 Folder   6
Elevations (7), revised  10/12/1937 (Mylar print)
Drawer   16 Folder   6
West Elevation, Section "E-E" and Partition Details (8)
Drawer   16 Folder   6
Section "A-A" (9) (Mylar print)
Drawer   16 Folder   6
Section "B-B" (10)
Drawer   16 Folder   6
Section "C-C" (11)
Drawer   16 Folder   6
Section "D-D" (12), revised  6/24/1937
Drawer   16 Folder   7
Construction Details (13)
Drawer   16 Folder   7
Sections thru' East Wall of Existing Building at Monitors (14)
Drawer   16 Folder   7
Construction Details (15)
Drawer   16 Folder   7
Details of First Aid Group and Stair #4 (16),  4/5/1937 revised  6/24/1937
Drawer   16 Folder   7
Details of Executive Dining Room, Stairs #1 & 3 and Toilet Room #3 (17), revised  9/10/1937
Drawer   16 Folder   7
Miscellaneous Details (18), revised  10/12/1937
Drawer   16 Folder   7
Miscellaneous Details (19)
Drawer   16 Folder   7
Revised Cafeteria Layout (20)     (undated due to vellum damage)  (Pencil and ink drawing on vellum, 28x39 inches)
Drawer   16 Folder   7
Revised Cafeteria Layout (21)     (undated due to vellum damage)  (Pencil and ink drawing on vellum, 27x39 inches)
 
Structural Construction Drawings by Albert Kahn, Inc., Architects & Engineers (Ink-on-linen drawings, 29-1/2x41-1/4 to 30-3/4x46-1/4 inches)
Drawer   16 Folder   8
Details of Footings and Grillage and Footing Schedule (1-S),  3/24/1937 revised  4/27/1937
Drawer   16 Folder   8
Roof and Second Floor Framing Plans and Material Schedule (2-S),  3/6/1937 revised  4/27/1937
Drawer   16 Folder   8
Truss Details (3-S),  3/6/1937
Drawer   16 Folder   8
Cross-Section of Cafeteria Wing and Truss and Column Details (4-S),  3/6/1937
Drawer   16 Folder   8
East and West Elevations and Typical Elevation of Monitor E-6 (5-S),  3/6/1937
Drawer   16 Folder   8
Mezzanine Floor Framing Plan, North and South Elevations and Miscellaneous Details (6-S),  3/6/1937
Drawer   16 Folder   8
Details of Hanger Brackets, Trusses T-1, T-2 and T-3 and Bases for Columns (7-S),  3/6/1937
Drawer   16 Folder   8
Framing Plan of Bottom Chord of Main Trusses-End Bays and Miscellaneous Sections (9-S),  3/17/1937
Drawer   16 Folder   8
Details of Counterweight Boxes at Columns (10-S),  4/3/1937
Drawer   16 Folder   8
Section through Supply Ducts (11-S), revised  4/27/1937
Drawer   16 Folder   8
Plan of Floor over Heater Room #1 and Transformer Room and Details of Typical Columns and Footing for Transformer Room (12-S),  undated
Drawer   16 Folder   8
Plan of Floor over Heater Room #2 and Tunnels and Plan of Floor over Fan Room and Tunnels (13-S),  undated
Drawer   16 Folder   8
Floor Plan of Heater Rooms #1 and #2 and Sections (14-S),  undated
 
Mechanical Construction Drawings by Albert Kahn, Inc., Architects & Engineers,  5/12/1937 (Black and blue ink drawings on linen with pencil notations, 28x40 to 29x44-1/2 inches)
Drawer   16 Folder   9
Foundation Plan (1-M), revised  7/7/1937
Drawer   16 Folder   9
First, Mezzanine and Second Floor Plans (2-M), revised  7/7/1937
Drawer   16 Folder   9
First Floor Plan Showing Hot Air Outlets, Return Air Outlets and Location of Heater Rooms (3-M)
Drawer   16 Folder   9
Part Plans of First and Second Floors (4-M), revised  4/21/1937
Drawer   16 Folder   9
Plans and Sections of Hot Air Outlets at East Wall and at West Columns (5-M)
Drawer   16 Folder   9
Plan of Cafeteria on Second Floor (6-M),  9/7/1937 (16x44-1/2 inches)
Drawer   16 Folder   9
Plan of Cafeteria (7-M), revised  10/22/1937 (Pencil-on-vellum drawing)
Drawer   16 Folder   9
Plans of Mezzanine and First and Second Floors and Section "A-A" Showing Ducts along Wall and Beams (8-M), 11/3/1937 (Pencil drawing on tracing paper, 28x29 inches)
 
Fuel Oil Piping Drawings, revised  7/10/1937 (Pencil-on-vellum drawings)
Drawer   16 Folder   9
Plot Plan (10-M)
Drawer   16 Folder   9
Plans and Sections (11-M)
Drawer   16 Folder   9
Plans and Sections (12-M)
Drawer   16 Folder   9
Plans and Sections (13-M)
Drawer   16 Folder   9
Plans and Sections (13-MA),  10/10/1937
Drawer   16 Folder   9
Plans, Sections and Elevation (14-M)
Drawer   16 Folder   9
Foundation Plan of Compressed Air Piping (15-M),  6/7/1937
Drawer   16 Folder   9
Plot Plan and Foundation and Basement Plan (16-M),  undated
Drawer   16 Folder   9
Plans and Sections of Ventilating System under Loading Dock (17-M)     (undated due to vellum damage)  (Pencil-on-vellum drawing)
Drawer   16 Folder   9
Plan of Revised Dining Room Ventilation System (18-M),  3/3/1942 revised  3/7/1942 (Pencil-on-vellum drawing)
Drawer   16 Folder   9
Plot Plan (100-M),  5/13/1937
Drawer   16 Folder   9
Layout of Storm Sewer (101-M),  5/13/1937
 
Electrical Construction Drawings by Albert Kahn, Inc., Architects & Engineers,  5/20/1937 (Black and blue ink drawings on linen with pencil notations, 28-3/4x42-1/2 inches)
Drawer   16 Folder   10
Plot Plan and Plan of Tunnel between Factory and Engineering Buildings (1-E)
Drawer   16 Folder   10
Plan of Heater Rooms, Air Tunnels and Service Trenches in First Floor Slab (2-E)
Drawer   16 Folder   10
First Floor Plan (3-E)
Drawer   16 Folder   10
Plans of Mezzanine, Second Floor and Roof Showing Sash Operator Motors (4-E), revised  10/22/1937
Drawer   16 Folder   10
Section "A-A" (5-E)
Drawer   16 Folder   10
Power and Lighting Riser Diagrams and Panel Schedules (6-E)
Drawer   16 Folder   10
Plan of Transformer Bank, Primary and Secondary Switchboards, and Details (7-E),  5/18/1937 (Ink and pencil drawing on vellum, 27-1/4x39-1/2 inches)
Drawer   16 Folder   10
Plans of Present Switch House and Welder Transformer Bank in Present Building and Details (8-E),  5/25/1937 (Pencil drawing on vellum, 27-1/4x39-1/2 inches)
Drawer   16 Folder   10
Revised Cafeteria Layout, Second Floor (9-E),  10/22/1937 (27-3/4x40 inches)
 
Glenn L. Martin Company Plant Addition,  1939 (Job No. 1752-C)
 
Architectural Construction Drawings by Albert Kahn, Inc., Architects,  2/21/1939 (Black and blue ink drawings on linen, 30-1/2x53-1/2 inches)
Tube 31  
Foundation Plan (1), revised  3/9/1939
Tube 31  
Basement Floor Plan (2), revised  6/30/1939
Tube 31  
Plot Plan, Elevations of Basement Walls to First Floor Line and Detail of Hold-Down Anchor (2-A), revised  3/2/1939
Tube 31  
First Floor Plan (3), revised  6/30/1939
Tube 31  
Plans of Second Floor, Roof and Walkway (4), revised  3/9/1939
Tube 31  
Elevations (5), revised  6/30/1939
Tube 31  
Sections (6), revised  3/2/1939
Tube 31  
Details of Expansion Joints (7), revised  6/30/1939
Tube 31  
Sections and Details (8), revised  3/2/1939
Tube 31  
Sections and Details (9), revised  6/30/1939
Tube 31  
Sections and Details (10), revised  3/2/1939
Tube 31  
Details at Two-Story Portion (11), revised  3/2/1939
Tube 31  
Details at Two-Story Portion (12), revised  6/30/1939
Tube 31  
Elevator Details (13), revised  3/9/1939
Tube 31  
Details of Stairs, Toilets and Sewage Pump Pit and Miscellaneous Details (14), revised  3/30/1939
Tube 31  
Details of Stairs, Ladders and Catwalks (15), revised  3/9/1939
Tube 31  
Details of Heater Rooms (16),  3/2/1939 revised  6/30/1939
Tube 31  
Details of First Aid Room, Assistant Superintendant's Office Above and Fan Platform (16A & 17), revised  6/30/1939
Tube 31  
Details of Transformer and Switchboard Rooms, Alterations to Present Assembly Building Tunnel and New Hydraulic Hoist (18), revised  6/30/1939
Tube 31  
Details of Alterations to Fresh Air Intakes, Exhaust Ducts, Etc. (19 & 20),  3/9/1939 revised  6/30/1939
Tube 31  
Details of Metal Louvres and Exhaust Duct at Roof North of Elevator and of Hot Air Heating Outlets (21 & 22),  3/9/39
Tube 31  
Details of Dining Room Unit (23),  3/15/1939 revised  4/27/1939
Tube 31  
Miscellaneous Details (24, 26 & 26),  3/20/1939
 
Structural Construction Drawings by Albert Kahn, Inc., Architects & Engineers,  2/9/1939 revised  2/21/1939 (Ink-on-linen drawings with pencil notations, 30x52-3/4 to 30-1/2x55 inches)
Tube 32  
Footing Plan and Details (1-S)
Tube 32  
Column and Flat Slab Schedules and Details (2-S)
Tube 32  
First Floor Flat Slab Plan (3-S), revised  3/17/1939
Tube 32  
Second Floor Framing Plan and Material Schedule (4-S)
Tube 32  
Longitudinal Section and Truss Details (5-S)
Tube 32  
Elevations and Truss Details (6-S)
Tube 32  
Sections and Truss Details (7-S)
Tube 32  
Sections and Truss Details (8-S)
Tube 32  
Elevations "A-A" through "J-J" and Details of Steel Plate Floor in Service Tunnel (9-S),  undated
 
Mechanical Construction Drawings by Albert Kahn, Inc., Architects & Engineers (Black and blue ink drawings on linen with pencil notations and pencil and ink drawings on vellum, 28x51-3/4 to 30x53 inches)
Tube 33  
Basement Plan (1-M),  2/21/1939 revised 6/30/  1939
Tube 33  
First Floor Plan (2-M),  2/20/1939 revised  6/30/1939
Tube 33  
Section "A-A" Looking East, Section "B-B" Looking South and Details of Toilet Rooms, Kitchen and Cafeteria (3-M),  2/21/1939 revised  4/25/1939
Tube 33  
Basement Floor Plan, Heating and Air Conditioning (5-M), revised  6/30/1939
Tube 33  
First and Second Floor Plans (6-M), revised  6/30/1939
Tube 33  
Ventilation Plan of Cafeteria, First Aid Room and Superintendant's Office (7-M),  3/1/1939 revised  6/30/1939
Tube 33  
Plot Plan (20-M),  3/20/1939
Tube 33  
Basement Floor Plan (21-M),  3/20/1939 revised  6/30/1939
Tube 33  
Transverse Section and Detail of Oil Burners (22-M),  3/20/1939
Tube 33  
Details of Fuel Oil Tanks and Fuel Oil Pump Room (23-M),  3/20/1939
Tube 33  
Structural Details of Oil Storage Tanks (24-M),  3/20/1939
Tube 33  
Plot Plan and Detail of New Storm Sewer (100-M),  2/9/1939 revised  2/11/1939 (28-1/4x43-3/4 inches)
Tube 33  
Plot Plan, Second Floor Plan and Sections for Sprinkler Work (101-M),  2/17/1939
Tube 33  
Plan and Section of Typical 25x25-Foot Bay in Basement Showing Typical Sprinkler, Lighting and Heating Ducts (101-MX),  2/23/1939 (Pencil drawing on tracing paper, 20-1/2x22 inches)
Tube 33  
Basement Floor Plan for Sprinkler Work     (not numbered or dated due to vellum damage) 
Tube 33  
Plan of Auto Sprinklers at Roof (103-M),  2/17/1939
Tube 33  
Basement Floor Plan Showing Duct and Piping Cross-Overs at Ceiling     (not numbered or dated due to vellum damage) 
Tube 33  
Plan of Cafeteria Showing Duct and Piping Cross-Overs above Suspended Ceiling (112-M),  3/31/1939 (28-1/4x33-1/4 inches)
Tube 33  
Electrical Construction Drawings by Albert Kahn, Inc., Architects & Engineers,  2/22/1939 (Black and blue ink drawings on linen with pencil notations, 29-3/4 x52-3/4 inches)
Tube 33  
Plot Plan, Plan of Tunnel and Manhole Details (1-E),  2/13/1939 revised  6/30/1939
Tube 33  
Basement Floor Plan, Lighting (2-E), revised  4/8/1939
Tube 33  
Basement Floor Plan Showing First Floor Serivce Receptacle Wiring (3-E), revised  3/14/1939
Tube 33  
First Floor Plan, Lighting (4-E), revised  3/14/1939
Tube 33  
Second Floor Plan, Sections and Riser Diagrams (5-E), revised  4/8/1939
Tube 33  
Basement Feeder Plan (6-E), revised  4/8/1939
Tube 33  
First Floor Feeder Plan (7-E), revised  3/14/1939
Tube 33  
Plan and Sections of Primary and Secondary Switchboard Rooms, revised  2/24/1939 (Pencil-on-vellum drawing, 28x52 inches)
Tube 33  
Plan, Wiring Diagram and Details of Parking Area Lighting (9-E),  3/14/1939