Ford Motor Company Engineering Laboratory, Dearborn, Michigan,  1922-1926 1929-1930, Job Nos. 1077 1077-K, 1077-L & 1077-S [subseries]:
 
Engineering Laboratory Building by Albert Kahn, Architect (1922-1924) Job No. 1077
 
Architectural Construction Drawings,  9/14/1922 (Ink-on-linen drawings with pencil and blue and orange pencil revisions, 30-1/4x56-3/4 to 30-1/4x59-1/2 inches)
Tube 8  
Plot Plan (1A), revised  6/13/1923
Tube 8  
Foundation Plan and Schedule of Columns and Footings (1), revised  6/13/1923
Tube 8  
Basement Plan (2), revised  6/6/1923
Tube 8  
First Floor and Basement Plans (3), revised  6/13/1923
Tube 8  
Second Floor and Roof Plans (4), revised  4/25/1923
Tube 8  
Details of Monitors and Columns (5), revised  4/25/1923
Tube 8  
East and West Elevations, Sections and Details (6), revised  4/25/1923
Tube 8  
North, South, East and West Elevations (7), revised  6/19/1923
Tube 8  
Details of Front-Center (8), revised 10/6/1923
Tube 8  
Details of End Features (9), undated, revised  5/2/1923
Tube 8  
Details of Pylons and East Elevation (10), revised  4/25/1923
Tube 8  
Details of Toilet and Fan Rooms (11R),  6/24/1924 revised  7/14/1924
Tube 8  
Basement Wall Details (14),  6/19/1923 (30x28 inches)
 
Structural Construction Drawings (Ink-on-linen drawngs with red and blue pencil revisions, 30x56-1/2 to 30x57-1/2 inches)
Tube 9  
First Floor Framing Plan (11-S), undated, revised  7/27/1923
Tube 9  
Details of First Floor Beams (12-S),  5/29/1923 revised  8/16/1923
Tube 9  
Details of Concrete Columns (13-S), undated, revised  6/13/1923
Tube 9  
Second Floor and Roof Framing Plans and Truss Details (14-S),  5/21/1923
Tube 9  
Roof Framing Plan, Cross-Section and Beam Schedule (15-S),  undated
Tube 9  
Details of Roof Girders (16-S), undated, revised  7/31/1923
Tube 9  
Details of Roof Beams (17-S),  2/19/1923 revised  8/9/1923
Tube 9  
Details of Beams     (not numbered or dated due to linen damage) 
Tube 9  
Foundation and Floor Plans of Printing Press and Paper Storage Rooms (18),  8/2/1923
Tube 9  
Basement Floor Plan, Plans and Details of Office Building and Fan Rooms (19-S),  8/1/1923
Tube 9  
Details of Transformer Rooms (21-S),  12/19/1923 (Pencil-on-vellum drawing, 19-1/2x36 inches)
 
Mechanical Construction Drawings (Black and red ink-on-linen drawings with pencil and blue pencil revisions, 30-1/4x57-1/2 inches)
Tube 9  
Plans of Basement and Fan Rooms (2M), revised  6/13/1924     (undated due to linen damage) 
Tube 9  
First and Second Floor Plans and Details (3M),  5/16/1923 revised  6/18/1924
Tube 9  
Ventilating Details (4M),  6/27/1923 revised  9/24/1923
Tube 9  
Second Floor, Attic Space and Exhaust Fan Plans (5M),  10/10/1922 revised  7/3/1924
Tube 9  
Basement Electrical Plan (7M),  6/19/1923 revised  3/20/1924
Tube 9  
First Floor, Second Floor and Attic Space Electrical Plans (8M), revised  4/18/1924     (undated due to linen damage)  (31x56 inches)
Tube 9  
First and Second Floor Heating and Ventilating Plans (10M),  2/6/1924 revised  7/8/1924 (30-3/4x46 inches)
Tube 9  
Revised First and Second Floor Lighting Layout in Office Portion of Laboraory (11M), undated, revised  4/18/1924 (25-1/2x49-1/4 inches)
Tube 9  
Revised First Floor Lighting Layout in Office Portion of Laboratory (100M), undated, revised  2/20/1924 (22x54-1/2 inches)
Tube 9  
Plan and Longitudinal Elevation (117M)     (undated due to linen damage)  (24-3/4x55 inches)
 
Extension to Engineering Laboratory Building (1925) Job No. 1077-L
 
Architectural Construction Drawings by Albert Kahn, Inc., Architects,  4/29/1925 revised  9/11/1925 (Ink-on-linen drawings, 29-1/2x48 inches)
Drawer   9 Folder   10
Plot Plan (1) (29-1/4x45-1/2 inches)
Drawer   9 Folder   10
Present Floor Plan (1-A),  7/1/1925 (Pencil-on-vellum drawing, 28-1/4x46-1/4 inches)
Drawer   9 Folder   10
Present Building Foundation Plan (2), revised  8/7/1925
Drawer   9 Folder   10
First Floor Plan (3)
Drawer   9 Folder   10
Roof Plan (4)
Drawer   9 Folder   10
Elevations and Sections (5)
Drawer   9 Folder   10
Door Details (6)
Drawer   9 Folder   10
Roof Details (7)
Drawer   9 Folder   10
Elevations of Connecting Passage and Details (8)
 
Structural Construction Drawings by Albert Kahn, Inc., Architects (Ink-on-linen drawings)
Tube 9  
Typical Cross Section and Details (1-S), undated, revised  July 1925 (26-1/4x47-1/2 inches)
Tube 9  
Roof Framing Plan (2-S)     (undated due to linen damage)  (27-1/2x54-1/4 inches)
Tube 9  
Cross-Section Showing Alternate Design for Roof (3-S), undated, revised  7/3/1925 (27-1/4x56 inches)
 
Mechanical Construction Drawings by Albert Kahn, Inc., Architects (Ink-on-linen drawings with blue pencil revisions)
Drawer   10 Folder   1
First Floor Plan, Section "AA" and Details (2-M),  5/20/1925 revised  10/28/1925 (30x48 inches)
Drawer   10 Folder   1
Heating Details, etc. (3-M),  5/20/1925 revised  9/24/1925 (30-1/4x47-1/2 inches)
Drawer   10 Folder   1
First Floor Plan (4-M), undated, revised 11/9/1925 (29-1/2x48 inches)
Drawer   10 Folder   1
Plan of Ventilating Equipment (6-M), undated, revised  12/19/1925 (29x35-1/4 inches)
Drawer   10 Folder   1
Plan, Sections and Riser Detail of Cleaning Plant (7-M),  12/12/1925 (24-3/4x36-1/2 inches)
Drawer   10 Folder   1
Proposed Arrangement of Cafeteria (9-M),  12/28/1925 (29-3/4x35-1/2 inches)
Drawer   10 Folder   1
Part of Mezzanine and First Floor Plans (10-M), undated, revised  3/1/1926 (26-3/4x33-3/4 inches)
Drawer   10 Folder   1
Connection Plan of Cafeteria (101-M), 12/4/1925 (25-1/4x30-1/2 inches)
 
Addition to Power House, Engineering Laboratory Building (1923-1926) Job No. 1077-K
 
Architectural Construction Drawings by Albert Kahn, Architect,  8/22/1923 revised  7/1/1925 (Ink-on-linen drawings, 27x37-1/2 inches)
Drawer   10 Folder   2
Plot Plan (1)
Drawer   10 Folder   2
Basement Plan (2)
Drawer   10 Folder   2
First Floor Plan (3)
Drawer   10 Folder   2
Roof Plan (4)
Drawer   10 Folder   2
Elevations (5)
Drawer   10 Folder   2
Sections (6)
Drawer   10 Folder   2
Section "C" and Details of Monitor, etc. (7)
 
Structural Construction Drawings by Albert Kahn, Inc., Architect,  8/28/1923 revised  7/1/1925 (Ink-on-linen drawings, 26-3/4x37 inches)
Drawer   10 Folder   2
Foundation Plan and Sections (1-S)
Drawer   10 Folder   2
Boiler Room Framing Plan and Sections (2-S)
Drawer   10 Folder   2
Roof Framing Plan and Details (3-S)
Drawer   10 Folder   2
Details of New Platforms around Boilers (4-S),  1/6/1926 revised  3/13/1926 (Pencil-on-vellum drawing, 25-x34-1/2 inches)
Drawer   10 Folder   2
Layout of Walkways over Boilers (5-S),  1/6/1926 revised  3/16/1926 (26x40 inches)
Drawer   10 Folder   2
Details of First Floor Hand Rails (6-S),  3/16/1926 (26x45 inches)
 
Mechanical Construction Drawings by Albert Kahn, Inc., Architects and Engineers (Ink-on-linen drawings with pencil and blue pencil revisions, 26-1/4x45-1/2 inches)
Drawer   10 Folder   3
First Floor Plan (1-M),  6/16/1925
Drawer   10 Folder   3
Basement Floor Plan and Section "A-A" (2-M),  6/17/1925
Drawer   10 Folder   3
Sections thru' Power House (3-M),  6/16/1925
Drawer   10 Folder   3
Details of Feed Water Heater, Water Softener and Misc. Piping (4-M),  6/17/1925 revised  12/23/1925
Drawer   10 Folder   3
Details of Tunnel Piping Layout and Sump (5-M),  6/17/1925
Drawer   10 Folder   3
Details of Platform for Feed Water Heater and Breeching for Badenhauser Boilers (6-M),  6/19/1925
Drawer   10 Folder   3
Details of Setting for Badenhausen Boiler (7-M),  6/19/1925
Drawer   10 Folder   3
Drainage Plan (8-M),  6/18/1925
Drawer   10 Folder   3
Details of Jackets for Stacks and Breeching (9-M),  4/23/1926 (25-1/2x44-3/4 inches)
 
Addition to the Power House, Engineering Laboratory Building (1929-1930) Job No. 1077-S
 
Architectural Construction Drawings by Albert Kahn , Inc., Architects,  10/14/1929 (Ink-on-linen drawings with pencil and blue pencil revisions, 27x38 inches)
Drawer   10 Folder   4
Plot Plan and Details (1), revised  12/19/1929
Drawer   10 Folder   4
Foundation Plan and Details (2), revised  3/17/1930
Drawer   10 Folder   4
First Floor Plan and Details (3), revised  12/12/1929
Drawer   10 Folder   4
Roof Plan and Stack Details (4), revised  3/11/1930
Drawer   10 Folder   4
Sections (5), revised  12/12/1929
Drawer   10 Folder   4
Elevations (6), revised  11/12/1929
Drawer   10 Folder   4
Elevation at Northeast Corner of Building and Details (7), revised  12/12/1929
Drawer   10 Folder   4
Plot Plan and Tunnel Details (8), revised  12/19/1929
Drawer   10 Folder   4
North Elevation of Power House Showing Arrangement of Floodlights (10),  February 1930 (Pencil-on-vellum drawing, 29-3/4x24-3/4 inches)
Drawer   10 Folder   4
Details of Addition to Present Tunnel (13),  4/28/1930 (Pencil-on-vellum drawing, 27-3/4x36 inches)
Drawer   10 Folder   4
Plot Plan of Proposed Addition (100),  7/26/1929 (19x28-1/2 inches)
Drawer   10 Folder   4
[Plot Plan of] Proposed Addition (100-B),  7/25/1929 (18-3/4x33 inches)
Drawer   10 Folder   4
[Plot Plan of] Proposed Addition (100-C),  7/25/1929 (18-1/2x33-1/4 inches)
 
Structural Construction Drawings by Albert Kahn, Inc., Architects,  10/14/1929 (Ink-on-linen drawings with pencil and blue pencil revisions, 26-1/2x38 inches)
Drawer   10 Folder   5
Roof Framing Plan, Sections and Details (1-S), revised  11/21/1929
Drawer   10 Folder   5
Elevations and Sections (2-S), revised  4/7/1930
Drawer   10 Folder   5
Foundation Plan and Sections (3-S), revised  12/19/1929
Drawer   10 Folder   5
Underpinning and Footing Details (4-S), revised  11/21/1929
Drawer   10 Folder   5
Details of Walkways (7-S),  1/28/1930 revised  5/9/1930
Drawer   10 Folder   5
Stack Details (8-S),  3/7/1930 revised  7/8/1930 (Pencil-on-vellum drawing, 26x37-1/4 inches)
 
Mechanical Construction Drawings by Albert Kahn, Inc., Architects and Engineers (Ink-on-linen drawings with pencil revisions, 30-1/2x42-1/2 inches)
Drawer   10 Folder   6
Details of Tunnel Piping (2-M),  10/14/1929 revised 11/6/1929
Drawer   10 Folder   6
Details of Tunnel Piping (3-M),  10/16/1929 revised  1/10/1930
Drawer   10 Folder   6
Plan of Underground Lines (4-M),  11/12/1929 revised  1/9/1930
Drawer   10 Folder   6
First Floor Plan of Boiler Room (5-M), 12/9/1929 revised  5/22/1930
Drawer   10 Folder   6
Cross-Section and Elevation of Main Steam Header (6-M),  12/24/1929
Drawer   10 Folder   6
Details of Boiler Feed Heater and Auxiliaries (7-M),  12/18/1929 revised  8/25/1930
Drawer   10 Folder   6
Elevation and Sections of Boiler Setting (8-M),  6/9/1930
Drawer   10 Folder   6
Sections of Oil Storage Tanks (9-M),  2/4/1930
Drawer   10 Folder   6
Plan and Sections of Oil Burner Piping (10-M),  1/18/1930
Drawer   10 Folder   6
Breeching Details (11-M),  undated
Drawer   10 Folder   6
Plan and Section of Equalizing Pipe Line between East and West Pond (13-M),  2/26/1930 revised  3/15/1930
Drawer   10 Folder   6
Details of Tunnel Lighting and Power Conduit (1-E),  11/23/1929 revised  11/29/1929 (27x40 inches)
 
Mechanical Construction Drawings by Albert Kahn, Inc., Architects and Engineers (Pencil-on-vellum drawings, 29-1/2x41-1/2 inches)
Drawer   10 Folder   7
Details of Rearrangement of Piping in Tunnel #3 (15-M),  3/27/1930
Drawer   10 Folder   7
Details of Transite Boiler (17-M)     (undated due to paper damage) 
Drawer   10 Folder   7
Details of Transite Casing (18-M),  5/1/1930
Drawer   10 Folder   7
Details of Power House Gage Board (19-M),  undated
Drawer   10 Folder   7
[Piping Details], untitled due to paper damage     (undated due to damage) 
Drawer   10 Folder   7
Details of Foundation for Fan     (undated due to damage) 
Drawer   10 Folder   7
Details of Instrument Piping (22-M),  undated
Drawer   10 Folder   7
Details of Arrangement of Water Softener (119-M),  undated (27x33-3/4 inches)
Drawer   10 Folder   7
Plan and Sections of Oil Storage Tanks (121-M),  11/24/1930 (21-3/4x34 inches)
Drawer   10 Folder   7
Details of Oil Ret'n to Tanks, Scheme No. 1 (100-X),  10/29/1930
Drawer   10 Folder   7
[Details of Oil Ret'n to Tanks], untitled (100-X-M),  undated (29-1/2x35-1/2 inches)